Commissioner L v'�' / 6 -L' moved adoption
of the following Resolution:
BOARD OF COUNTY COMMISSIONERS
COUNTY OF EAGLE, STATE OF COLORADO
RESOLUTION NO. 92- ,7
SECOND PARTIAL RELEASE of COLLATERAL
"Phase I" of Filing 6 -
CORDILLERA SUBDIVISION
WHEREAS, pursuant to C.R.S. 30 -28 -137, the Board of County
Commissioners of the County of Eagle, State of Colorado ( "Board ")
intends to enter into a Subdivision Improvements Agreement dated
November 2, 1992 ( "Agreement ") with Stag Gulch Partners, a
Colorado General Partnership ( "Subdivider "), as a condition of
final plat approval for Filing 6, Cordillera Subdivision; and
WHEREAS, the Agreement requires that the Subdivider provide
collateral to guarantee the faithful completion of public
improvements described in Exhibit "A ", Pages 1 through 4; Exhibit
"A -1 "; Exhibit "B "; Exhibit "C ", Pages 1 through 3; and Exhibit
"D" of the Agreement; and
WHEREAS, Paragraphs 2.1.1 through 2.1.3 of the Agreement
provide an "Alternative Collateralization Method" whereby Sub-
divider may deposit with the County the sum of $797,425.88, prior
to the commencement of construction of "Phase I" of Filing 6, as
more particularly set forth in the Agreement; and
WHEREAS, Subdivider represented, and the County Engineering
Department corroborated Subdivider's representations, that the
collateral required for "Phase I" should be adjusted to
$462,689.92; and by its Resolution No. 92 -151, the Board accepted
a cash deposit in said amount; and
WHEREAS, at Subdivider's request, by its Resolution No. 92-
/73 of this date, the Board accepted a letter of credit in the
amount of $200,000.00, and directed the Treasurer to pay over to
the Subdivider the like sum of $200,000.00; and
WHEREAS, Subdivider has further represented that additional
work totaling the value of $163,454.64 has been completed for
"Phase I" of Filing 6 (as described in Exhibit "A" attached
hereto), and requests a second partial release of collateral in
that amount, all as provided by the Agreement.
• •
WHEREFORE, Based upon the oral and written recommendations
of the County staff, THE BOARD FINDS that a second partial
release of collateral in the amount of $163,454.64 is appropriate
for "Phase I" of Filing 6, which would result in the following
balance:
Letter of Credit No. S8698259
BHF -Bank $200,000.00
Cash deposit 99,235.28
TOTAL COLLATERAL REMAINING $299,235.28
THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO:
THAT, the collateral for "Phase I" of Filing 6, Cordillera
Subdivision, be further reduced by $163,454.64.
THAT, the Eagle County Treasurer be and is hereby requested
and directed to pay over to Subdivider the sum of $163,454.64, in
addition to the sum authorized by Resolution No. 92 - /'73
THAT, the partial release of collateral granted hereby shall
not in any way abrogate the rights of the Board in enforcing the
Subdivider's performance of its outstanding obligations under the
Agreement.
MOVED, READ AND ADOPTED by the Board of Count Commissioners
of the County of Eagle, State of Colorado, this day of
•�1`�?`x'�r. , 1992.
O
COUNTY OF EAGLE, STATE OF
4 kt
COLON =041, By and Through Its
AT •.. BO". OF COUNTY COMMISSIONERS
o
: .6 ..f , llc� ,/ B Y . a.-P.-�l Q�
/ Clerk to the Board o Richard L.(G1st fson,i hairman
County Commissioners `
r �
George4A. Gates, Commissioner
Donald H. Welch, Commissioner
-2-
• •
Commissioner a seconded adoption of the
foregoing resolution. The roll having been called, the vote was
as follows:
Commissioner Richard L. Gustafson
Commissioner George A. Gates iri ..�-
Commissioner Donald H. Welch 4 �fL
This Resolution passed by (��`jJ,`� s vote of the Board of
County Commissioners of the County of Eagle, State of Colorado.
Filing 6
#87 -84
-3-
"'J.( -it 4G ILL 1:13
P, 02
• .
MOUNT
DESCRIPTION OUANTITT UNITS UNIT COST TOTAL COST RELEASE RE THIS REMAINING
REMAINING
ROAD CONSTRUCTION
H061L12ATIOM
CLEAR AND GRUB 1.00 L.S. 5,000.00 5,000.00 2,500.00
10.20 ACRES 2,500.00 COMPLETE
TOPSOIL REMOVAL 1 .000.00 10,200.00 10,200.00 COMPLETE
10210.00 YARDS 1.50 15,315.00 15,315.00 COMPLETE
UWCLASS. EXC. 53050.00 YARDS
FINE G S. EG 3.25 172,412.50 137,930.00 34,482.50 COMPLETE
29064.00 SO.YDS, 0.35 10,172.40
ROCK EXC. 8000.00 YARDS 7,379.40 2,793,00
R BASE COURSE 4.06 32,640.00 16,320.00 16,320.00 COMPLETE
7063.00 TONS 8.50 60,035.50
TESTIWG 1.00 L.S. x,035.50 COMPLETE
S 51GNS 10,000.00 10,000.00 4,000.00 6,000.00 COMPLETE
7 .00 EACH 150.00 1,050.00
CUR& AND GUTTER 1,050.00
PLACE TOPSOIL L.F. 12.75 0.00
10210.00 YARDS 2.50 25,525.00 10,210.00 4
GRADE TOPSOIL 18498.00 SQ,YDS. .084.00 11,231.00
GRASS 0.40 7,399,20
18498.00 so.YOS, 0.21 3,884.58 7 , 3 •28
GUARD RAIL 7250,00 L.F. 3,884.58
GUARD RAIL ANCHORS 15.00 18,750,00 18,750.00 COMPLETE
6.00 EACH 600.00 3,600.00
SLOPE PROTECTION 1333.00 SO,YDS, 3.600.00 COMPLETE
O. 1,133.05 1,133.05 COMPLETE
TOTAL ROAD CONSTRUCTION
377,117.23 196,475.00 154,284.45 26,357,76
DRAINAGE
GROUTED RIP RAP 3300.00 SQ.FT
CMP PIPE 360 2.00 6,600.00 6,600.00
85.00 L.F. 60.00 3,400.00
CORRIGATED PLASTIC 3,400.00 COMPLETE
PIPE 18" 218.00 L.F.
PIPE 24 13,55 2,953.90 1,395.65
47.00 L.F. 19.25 904,75 1.508.25
904.75
CMP ENO SECTION
18" 6.00 EACH
28" 140.00 840.00 280.00
2.00 EACH 185.00 370.00 560.00
36 " 2.00 EACH 370.00
J,K PIPE 2.00 720.00 720.00 COMPLETE
CORRIGATED PLASTIC
18" 60.00 L.P. 13.55 813,00
CATTLE UNDERPASS 90.00 L.F. 813.00
CMP END SECTIONS 240.00 21,600.00 21,600.00
COMPLETE
18" 2.00 EACH
RIP RAP 140.00 280.00
10.00 C.Y. 35.00 350.00 280.00
350.00
TOTAL DRAINAGE
38,831.65 23,275,65 4,120.00 11,436.00
WATER & SEWER
8" SEWER LINE 5338.00 L.F,
SEWER MANHOLE 47 , 27.00 144,126,00 72,724.50
350.00 Y.F. 200.00 70,000.00 22,060.00 77,901.50
SEWER SERVICE 18.00 EACH 18,000.00
1 8,000.00
x.0.00
8" WATERLINE 1,000.00
1890.00 L.P. 32,00 60,480.00
6" WATERLINE 1490.00 L.F. 60,480.00
28.00 4 1,720.00
41,720.00
8" CATE VALVE 4.00 EACH
6" GATE VALVE 600.00 2,400,00
3.00 EACH 500.00 1,500.00 2,400.00
1,500.00
E Y H E A Page 1 of 2
ti u> ,.:14
P 03
•
PREVZCUS THIS AMOUNT
DESCRIPTION QUANTITY UNITS UNIT COST TOTAL COST RELEASE RELEASE REMAINING
TOTAL WATER & SEWER 338,226.00 96,784.50
243,441.50
OVERHEAD ELECTRIC LINE 18,000.00
18,000.00
TOTAL ENGINEERING
SURVEYING, TESTING 25,251.00 20,200.81 5,050.19 COMPLETE
TOTAL PUBLIC IMPROVEMENTS
PKASE I 797,425.88
TOTAL FOR THIS RELEASE 334,735.96 163,454.64 299,235.28
TOTAL COST OF IMPROVEMENTS
COMPLETE:
334,735.96 498,190.60
TOTAL AMOUNT To
BE COLLATERALIZED: 462,689.92 299,235.28
E X HE T A Page 2 of 2