HomeMy WebLinkAboutC21-252 US Customs and Border Patrol Project RequirementsProject Requirements Understanding Acknowledgement – Eagle County Regional Airport (ECRA) Project 1.I have received a copy of the U.S. Department of Homeland Security, U.S. Customs and Border Protection (“CBP”), General Aviation Facilities Design Standards, dated 2018 (Draft 100%) and understand that these are the minimum facility design requirements and are intended to be used as guidelines. Any additional facility requirements required by local, state or federal law, code, standards or statute must be incorporated into the Eagle County Regional Airport (“ECRA”). 2.I understand that the facility is provided by the Eagle County Regional Airport (“airport authority”) at no cost to the government and will be constructed as a “turn-key” project. A turn- key project includes, but is not limited to: complete construction, finishes, equipment, signage, furniture, cabling, IT infrastructure, security systems, CCTV, alarms, emergency power supply, UPS, telephone system, computer equipment, office equipment, appliances, fume hood, disposal system, non-intrusive inspectional equipment, relocation, etc. The facility shall be complete, fully operational and ready for occupancy. 3.I understand that the complete design, procurement and installation of the information technology infrastructure required for CBP operation of the facility will be performed by CBP and that all costs incurred by CBP for this equipment and work will be reimbursed to CBP by the airport authority. 4.I understand that the facility and furnishings must be adequately maintained (i.e. all monthly utilities, phone service, housekeeping, maintenance, finishes) at the Port Authority/Operator’s and/or their approved agent’s expense. 5.I understand that complete design and construction documents must be submitted, reviewed and approved by all CBP points of contact in writing prior to moving to the next stage in the design/construction process. 6.I understand that my point of contact for this project is to be the CBP Project Manager. Print Name Signature Title Date Print Name Signature Title Date 18300 E. 71st Avenue, Suite 200 Denver, CO 80249 DocuSign Envelope ID: E04583EA-F982-48D7-A429-5C1125A32224 County ManagerJeff Shroll 7/17/2021 C21-252