Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC20-420 Colorado Department of Transportation PO # / SRM #: 491002198 / 20-HTR-ZL-03232
Routing #: 20-HTR-ZL-03232-M0002
Document Builder Generated
Rev. 12/09/2016
Page 1 of 6
STATE OF COLORADO AMENDMENT (1)
SIGNATURE AND COVER PAGE
State Agency
Department of Transportation
Grant Amendment Number / PO Number
20-HTR-ZL-03232-M0002 / 491002198
Subrecipient
EAGLE COUNTY
Original Grant Agreement Number / PO Number
20-HTR-ZL-03232 / 491002198
Current Subaward Agreement Amount Grant Agreement Performance Beginning Date
June 11, 2020
Federal Funds
Maximum Amount (100%)
Local Funds
Local Match Amount (0%)
Agreement Total
$3,576,113.00
$0.00
$3,576,113.00
Amended Agreement Expiration Date
December 31, 2021
Amended Fund Expenditure End Date
December 31, 2021
THE PARTIES HERETO HAVE EXECUTED THIS AMENDMENT
Each person signing this Amendment represents and warrants that he or she is duly authorized to execute this
Amendment and to bind the Party authorizing his or her signature.
GRANTEE
EAGLE COUNTY
____________________________________________
By: ______________________________________,
Date:_______________________________________
STATE OF COLORADO
Jared S. Polis, Governor
Department of Transportation
Shoshana M. Lew, Executive Director
By: _________________________________________
Shoshana M. Lew, CDOT Executive Director
____________________________________________
Signature*
Signatory avers to the State Controller or delegate that,
except as specified herein, Grantee has not begun
performance or that a Statutory Violation waiver has
been requested under Fiscal Rules
Date:_______________________________________
In accordance with §24-30-202 C.R.S., this Amendment is not valid until signed and dated below by the State
Controller or an authorized delegate.
STATE CONTROLLER
Robert Jaros, CPA, MBA, JD
By:___________________________________________
Department of Transportation
Effective Date:_____________________
DocuSign Envelope ID: 5E72656A-1FC3-4399-B028-A0ED061E171D
Kathy Chandler-Henry
11/18/2020
11/20/2020
Steve Harelson
11/20/2020
C20-420
PO # / SRM #: 491002198 / 20-HTR-ZL-03232
Routing #: 20-HTR-ZL-03232-M0002
Document Builder Generated
Rev. 12/09/2016
Page 2 of 6
1) PARTIES
This Amendment (the “Amendment”) to the Original Grant shown on the Signature and Cover Page for this
Amendment (the “Grant”) is entered into by and between the Grantee, and the State.
2) TERMINOLOGY
Except as specifically modified by this Amendment, all terms used in this Amendment that are defined in the
Grant shall be construed and interpreted in accordance with the Grant.
3) EFFECTIVE DATE AND ENFORCEABILITY
A. Amendment Effective Date
This Amendment shall not be valid or enforceable until the Amendment Effective Date shown on the Signature
and Cover Page for this Amendment. The State shall not be bound by any provision of this Amendment before
that Amendment Effective Date, and shall have no obligation to pay Grantee for any Work performed or
expense incurred under this Amendment either before or after of the Amendment term shown in §3.B of this
Amendment
B. Amendment Term
The Parties’ respective performances under this Amendment and the changes to the Grant contained herein shall
commence on the Amendment Effective Date shown on the Signature and Cover Page for this Amendment and
shall terminate on the termination of the Grant.
4) PURPOSE
The purpose for this Amendment is to add CARES Act Phase 2 funds, extend the agreement, and revise Exhibit
A - Statement of Work and Budget as described in Section 5.
5) MODIFICATIONS
The Subaward and all prior amendments thereto, if any, are modified as follows:
A. The Subaward Agreement Amount on the Subaward Agreement’s Cover Page is hereby deleted and replaced
with the Current Subaward Agreement Amount shown on the Signat ure and Cover Page for this Amendment.
B. The Initial Agreement Expiration Date on the Grant Agreement’s Cover Page is hereby deleted and replaced
with the Amended Agreement Expiration Date shown on the Signature and Cover Page for this Amendment.
C. The Fund Expenditure End Date on the Subaward Agreement’s Cover Page is hereby deleted and
replaced with the Amended Fund Expenditure End Date shown on the Signature and Cover Page for this
Amendment.
D. Exhibit A is hereby deleted and replaced with Exhibit A.1 .
E. All references to Exhibit A in the Subaward and any amendments are hereby deleted in its entirety and
replaced with Exhibit A.1.
6) LIMITS OF EFFECT
This Amendment is incorporated by reference into the Grant, and the Grant and all prior amendments or other
modifications to the Grant, if any, remain in full force and effect except as specifically modified in this
Amendment. Except for the Special Provisions contained in the Grant, in the event of any conflict,
inconsistency, variance, or contradiction between the provisions of this Amendment and any of the provisions
of the Grant or any prior modification to the Grant, the provisions of this Amendment shall in all respects
supersede, govern, and control. The provisions of this Amendment shall only supersede, govern, and control
over the Special Provisions contained in the Grant to the extent that this Amendment specifically modifies those
Special Provisions.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK
DocuSign Envelope ID: 5E72656A-1FC3-4399-B028-A0ED061E171D
PO # / SRM #: 491002198 / 20-HTR-ZL-03232
Routing #: 20-HTR-ZL-03232-M0002
Document Builder Generated
Rev. 12/09/2016
Page 3 of 6
EXHIBIT A.1 – STATEMENT OF WORK AND BUDGET
Project Description* 2020 CARES Act 5311 A/O Award
Federal Awarding Agency Federal Transit Administration (FTA)
Federal Regional Contact Cindy Terwilliger
Federal Award Date To Be Determined
Project End Date December 31, 2021
FAIN To Be Determined CFDA# 20.509
CFDA Title Formula Grants for Rural Areas Program
Subrecipient Eagle County DUNS # 084024447
Contact Name Jared Barnes Vendor # 2000124
Address 3289 Cooley Mesa Rd.
Gypsum, Colorado 81637-1070
Phone # (970) 328-3528
Email jared.barnes@eaglecounty.us Indirect Rate N/A
Total Project Budget $3,576,113.00
Budget WBS** ALI Federal Funds Local Funds Total
Administrative (Phase 1) 20-11-5CARE.ECOR.620 11.79.00 100% $217,360.00 0% $0.00 $217,360.00
Operating (Phase 1) 20-11-4CARE.ECOR.300 30.09.08 100% $1,956,240.00 0% $0.00 $1,956,240.00
Administrative (Phase 2) 20-11-5CARE.ECOR.620 11.79.00 100% $140,251.00 0% $0.00 $140,251.00
Operating (Phase 2) 20-11-4CARE.ECOR.300 30.09.08 100% $1,262,262.00 0% $0.00 $1,262,262.00
Total Project Amount Encumbered via this Subaward Agreement $3,576,113.00
*This is not a research and development grant.
**The WBS numbers may be replaced without changing the amount of the subaward at CDOT’s discretion.
A. Project Description
Eagle County shall maintain the existence of public transportation services through the following goals:
1. Support transit operations to prevent, prepare for, and respond to COVID -19 (see Section D for more details);
2. Enhance access to health care, education, employment, public services, recreation, social transactions, and other
basic needs;
3. Assist in the maintenance, development, improvement and use of public transportation in their Transportation
Planning Region (TPR);
4. Encourage and facilitate the most efficient use of all transportation funds used to provide passenger
transportation in their TPR through the coordination of programs and services; and
5. Encourage mobility management, employment -related transportation alternatives, joint development practices,
and transit-oriented development.
This funding is provided to support the services described above for calendar year 2020 and 2021 (January 20 –
December 31).
DocuSign Envelope ID: 5E72656A-1FC3-4399-B028-A0ED061E171D
PO # / SRM #: 491002198 / 20-HTR-ZL-03232
Routing #: 20-HTR-ZL-03232-M0002
Document Builder Generated
Rev. 12/09/2016
Page 4 of 6
B. Performance Standards
1. Project Milestones
Milestone Description Original Estimated
Completion Date
Submit Reimbursement Request in COTRAMS Monthly
Submit Final Reimbursement Request in COTRAMS 12/31/2021
IMPORTANT NOTE: All milestones in this Statement of Work (except for the final reimbursement request)
must be completed no later than the expiration date of this Subaward Agreement: December 31, 2021.
2. Performance will be reviewed throughout the duration of this Subaward Agreement. Eagle County shall report
to the CDOT Project Manager whenever one or more of the following occurs:
a. Budget or schedule changes;
b. Scheduled milestone or completion dates are not met;
c. Identification of problem areas and how the pro blems will be resolved; and/or
d. Expected impacts and the efforts to recover from delays.
C. Project Budget
1. The Total Project Budget is $3,576,113.00. CDOT will pay 100% of the eligible, actual administrative costs, up
to the maximum amount of $357,611.00, and 100% of the eligible, actual operating costs, up to the maximum
amount of $3,218,502.00. CDOT will retain any remaining balance of the federal share of CARES Act FTA-
5311 Funds. Eagle County shall be solely responsible for all costs incurred in the project in excess of the
amount paid by CDOT from Federal Funds for the federal share of eligible, actual costs. For CDOT accounting
purposes, the Federal Funds of $357,611.00 (100%) for administrative costs and $3,218,502.00 (100%) for
operating costs, will be encumbered for this Subaward Agreement.
2. No refund or reduction of the amount of Eagle County’s share to be provided will be allowed unless there is at
the same time a refund or reduction of the federal share of a proportionate amount.
3. Per the terms of this Subaward Agreement, CDOT shall have no obligation to provide state funds for use on this
project. CDOT will administer Federal Funds for this Project under the terms of this Subaward Agreement,
provided that the federal share of FTA funds to be administered by CDOT are made available and remain
available. Eagle County shall initiate and prosecute to completion all actions necessary to enable Eagle County
to provide its share of the Total Project Budget at or prior to the time that such funds are needed to meet the
Total Project Budget.
D. Allowable Costs
1. Eagle County shall agree to adhere to the provisions for allowable and unallowable costs cited in the following
regulations: 2 CFR 200.420 through 200.475; FTA C 5010.1E Chapter VI : Financial Management; Master
Agreement, Section 6 “Non-Federal Share;” and 2 CFR 200.102. Other applicable requirements for cost
allowability not cited previously, shall also be considered.
2. Eagle County’s operating expenses (net fare revenue) are eligible beginning January 20, 2020. T hose costs
include 1) paying administrative leave of operations personnel due to reductions in services or quarantine; 2)
paratransit service operating expenses; 3) Charter service in response to the COVID-19 emergency (up to 45
days without a waiver); 4) items having a useful life of less than one year, including personal protective
equipment and cleaning supplies; 5) Operating expenses related to the response to COVID -19; 6) Operating
expenses related to the pandemic preparedness; and 7) costs directly related to system operations. Eagle County
at a minimum, should consider the following items as operating expenses: fuel, oil, drivers and dispatcher
salaries and fringe benefits, and licenses.
DocuSign Envelope ID: 5E72656A-1FC3-4399-B028-A0ED061E171D
PO # / SRM #: 491002198 / 20-HTR-ZL-03232
Routing #: 20-HTR-ZL-03232-M0002
Document Builder Generated
Rev. 12/09/2016
Page 5 of 6
3. If Eagle County elects to take administrative assistance, eligible costs may include but are not limited to:
general administrative expenses (e.g., salaries of the project director, secretary, and bookkeeper); marketing
expenses; insurance premiums or payments to a self-insurance reserve; office supplies; facilities and equipment
rental; standard overhead rates; and the costs of administering drug and alcohol testing. Additionally,
administrative costs for promoting and coordinating ridesharing are eligible as project administration if the
activity is part of a coordinated public transportation program.
4. If Eagle County has already submitted invoices through its 2020 and 2021 normal 5311 grant agreement, then
these expenses are no longer eligible for CARES Act funds.
E. Reimbursement Eligibility
1. Eagle County must submit invoice(s) monthly via COTRAMS. Reimbursement will apply only to eligible
expenses that are incurred within the period of performance (January 20 – December 31) of this Subaward
Agreement.
2. Reimbursement requests must be within the limits of Section D., Allowable Costs, of this Subaward Agreement.
Eagle County will be reimbursed based on the ratio of Federal Funds share and Local Funds share set forth in
the Project Budget above.
3. Eagle County must submit the final invoice within sixty (60) calendar days of December 31, 2021, and submit a
Grant Closeout and Liquidation (GCL) Form in COTRAMS within fifteen (15) days of issuance of the final
reimbursement payment.
F. Training
In an effort to enhance transit safety, Eagle County and any subrecipients and subcontractors shall make a good faith
effort to ensure that appropriate training of agency and contracted personnel is occurring and that personnel are up to
date in appropriate certifications. In particular, Eagle County shall ensure that driving personnel are provided
professional training in defensive driving and training on the handling of mobility devices and transporting older
adults and people with disabilities.
G. Restrictions on Lobbying
Eagle County is certifying that it complies with 2 CFR 200.450 by entering into this Subaward Agreement.
H. Special Conditions
1. Eagle County will comply with all requirements imposed by CDOT on Eagle County so that the federal award
is used in accordance with federal statutes, regulations, and the terms and conditions of the federal award.
2. Eagle County agrees that if it receives federal funding from the Federal Emergency Management Agency
(FEMA) or through a pass-through entity through the Robert T. Stafford Disaster Relief and Emergency
Assistance Act, a different federal agency, or insurance proceeds for any portion of a project activity approved
for FTA funding under this Grant Agreement, it will provide written notification to CDOT, and reimburse
CDOT for any federal share that duplicates funding provided by FEMA, another federal agency, or an insurance
company.
3. Eagle County must permit CDOT and their auditors to have access to Eagle County’s records and financial
statements as necessary, with reasonable advance notice.
4. Record retention shall adhere to the requirements outlined in 2 CFR 200.333 and FTA C 5010.1E.
5. Eagle County cannot request reimbursement for costs on this project from more than one Federal Awarding
Agency or other federal awards (i.e., no duplicate billing).
DocuSign Envelope ID: 5E72656A-1FC3-4399-B028-A0ED061E171D
PO # / SRM #: 491002198 / 20-HTR-ZL-03232
Routing #: 20-HTR-ZL-03232-M0002
Document Builder Generated
Rev. 12/09/2016
Page 6 of 6
6. Eagle County must obtain prior CDOT approval, in writing, if FTA funds are intended to be used for payment
of a lease or for third-party contracts.
7. If receiving FTA 5311 funding, Eagle County shall advertise its fixed route and/or rural based service as
available to the general public and service will not be explicitly limited by trip purpose or client type.
8. If receiving FTA 5311 funding, Eagle County shall maintain and report annually all information required by
NTD and any other financial, fleet, or service data.
9. If receiving FTA 5311 or 5339 funding, Eagle County will ensure subcontractors and subrecipients comply with
FTA Drug and Alcohol Regulations.
10. Eagle County will comply with the Federal Transit Administration (FTA) Drug and Alcohol Regulations, to
include on time submission to FTA’s Drug and Alcohol Management Information System (DAMIS).
11. Eagle County shall ensure that it does not exclude from participation in, deny the benefits of, or subject to
discrimination any person in the United States on the ground of race, color, national origin, sex, age or disability
in accordance with Title VI of the Civil Rights Act of 1964.
12. Eagle County shall seek to ensure non-discrimination in its programs and activities by developing and
maintaining a Title VI Program in accordance with the “Requirements for FTA Subrecipients” in CDOT’s Title
VI Program Plan and Federal Transit Administration Circular 4702.1B, “Title VI Requirements and Guidelines
for FTA Recipients.” The Party shall also facilitate FTA’s compliance with Executive Order 12898 and DOT
Order 5610.2(a) by incorporating the principles of environmental justice in planning, project development and
public outreach in accordance with FTA Circular 4703.1 “Environmental Justice Policy Guidance for Federal
Transit Administration Recipients.”
13. Eagle County will provide transportation services to persons with disabilities in accordance with the Americans
with Disabilities Act of 1990, as amended, 42 U.S.C. § 12101 et seq.
14. Eagle County shall develop and maintain an ADA Program in accordance with 2 8 CFR Part 35,
Nondiscrimination on the Basis of Disability in State and Local Government Services, FTA Circular 4710.1,
and any additional requirements established by CDOT for FTA Subrecipients.
15. Eagle County shall ensure that it will comply with the Ameri cans with Disabilities Act, Section 504 of the
Rehabilitation Act, FTA guidance, and any other federal, state, and/or local laws, rules and/or regulations. In
any contract utilizing federal funds, land, or other federal aid, Eagle County shall require its subrecipients
and/or contractors to provide a statement of written assurance that they will comply with Section 504 and not
discriminate on the basis of disability.
16. Eagle County shall agree to produce and maintain documentation that supports compliance wit h the Americans
with Disabilities Act to CDOT upon request.
17. Eagle County shall update its Agency Profile in COTRAMS with any alterations to existing construction or any
new construction in accordance with FTA Circular 4710.1.
18. If applicable, Eagle County will adopt a Transit Asset Management Plan that complies with regulations
implementing 49 U.S.C. § 5326(d).
19. Eagle County shall include nondiscrimination language and the Disadvantaged Business Enterprise (DBE)
assurance in all contracts and solicitations in accordance with DBE regulations, 49 CFR part 26 and CDOT’s
DBE program.
DocuSign Envelope ID: 5E72656A-1FC3-4399-B028-A0ED061E171D