Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC20-396 OTAK IncFIRST AMENDMENT TO AGREEMENT BETWEEN
EAGLE COUNTY, COLORADO
AND
OTAK INC.
THIS FIRST AMENDMENT (“First Amendment”) is effective as of the _____________by and
between Otak, Incorporated, a Corporation (hereinafter “Consultant” or “Contractor”) and Eagle
County, Colorado, a body corporate and politic (hereinafter “County”).
RECITALS
WHEREAS, County and Consultant entered into an agreement dated the 23rd day of July, 2020,
for certain Services (the “Original Agreement” C20-271); and
WHEREAS, the Original Agreement contemplated that the Consultant would perform certain
Services with compensation in an amount not to exceed $55,458; and
WHEREAS, the County desires to have Consultant perform additional Services for additional
compensation as set forth below; and
WHEREAS, the term of the Original Agreement expires on the 31st day of October, 2020, and
the parties desire to extend the term for an additional year; and
WHEREAS, this Amendment sets forth the agreement to add services and revise compensation
for such additional services, and extend the term of the contract.
FIRST AMENDMENT
NOW THEREFORE, in consideration of the foregoing and the mutual rights and obligations as
set forth below, the parties agree as follows:
1.The Original Agreement shall be amended to include additional Services as described
in Exhibit A-1, which is attached hereto and incorporated herein by reference.
2. The compensation for the additional Services set forth in Exhibit A-1 shall not exceed
$18,449 or a total maximum compensation under the Original Agreement and this
First Amendment of $73,907.
3.Paragraph 3 of the Original Agreement shall be amended to extend the term to the
31st day of October, 2021.
4.Capitalized terms in this First Amendment will have the same meaning as in the
Original Agreement. To the extent that the terms and provisions of the First
Amendment conflict with, modify or supplement portions of the Original Agreement,
the terms and provisions contained in this First Amendment shall govern and control
the rights and obligations of the parties.
DocuSign Envelope ID: 7CA22FAD-6447-4EEF-9C29-13F301D54891
10/29/2020
C20-396
2
Eagle County Amend Term Scope Comp Final 5/14
5. Except as expressly altered, modified and changed in this First Amendment, all terms
and provisions of the Original Agreement shall remain in full force and effect, and are
hereby ratified and confirmed in all respects as of the date hereof.
6. This First Amendment shall be binding on the parties hereto, their heirs, executors,
successors, and assigns.
IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to the
Original Agreement the day and year first above written.
EAGLE COUNTY, COLORADO
By and through its COUNTY MANAGER
By: _______________________________________
Jeff Shroll, County Manager
CONSULTANT
By: _____________________________________
Print Name: ______________________________
Title: ___________________________________
DocuSign Envelope ID: 7CA22FAD-6447-4EEF-9C29-13F301D54891
Senior Project Manager
SCOTT BELONGER
Engineering Design Services for the Eagle-Vail Phase 2 Segment of the Eagle Valley Trail 30% Design Fee Worksheet
10/16/2020
Task #Task Name TASK DETAIL
Senior Project Manager and Trail DesignSenior Structural EngineerProject Engineer- Civil Project Engineer- StructuralEngineering Designer - CivilEngineering Designer - CivilProject AssistantOtak
Subtotal
Otak
Expense
Otak
Total Survey TEAM
TOTAL
Belonger Beltzer Wilson Graff Kallase Drafting Woods
Rates ($201) ($201) ($134) ($134) ($119) ($94) ($79)
1.01 Project Management Scoping, team coordination, invoices, tracking 2 2 ($560) ($560) ($560)
1.02 Project Start-Up Review previous design, previous geotech reports, ERWSD report
and prelimary force main design
6 ($1,206) ($1,206) ($1,206)
1.03 Site Visit Visit site 0.5 ($101) ($100) ($201) ($201)
1.04 Initial Coordination Meeting Initial call with ECO, ERWSD, HDR and Shannon & Wilson 2 ($402) ($402) ($402)
1.05 Utilty Acquire SUE information from HDR to incorporate into existing design
modeling to better define location of existing fore main throughout
2 8 ($1,474) ($1,474) ($1,474)
1.05 Conceptual Typical Sections
Consider various trail typical sections that would incorporate the
ERWSD force main, or be built independantly. These typical sections
may include variations illustrating various stages during construction
to confirm constructabilty with the existing force main in service
8 8 ($2,680) ($2,680) ($2,680)
1.06 Plan, Profile and Cross
Sections
Generate plan, profile and cross sections for two typical section
options
2 40 ($5,762) ($5,762) ($5,762)
1.07 Special Section at I70
Overpass
Explore additional solutions and constructabilty at existing I70 bridge 8 4 ($2,144) ($2,144) ($2,144)
1.08 Cost Estimate
Generate cost estimates for alternatives and collaborate with HDR to
determine potential cost savings by combining the trail construction
with the force main construction
4 8 ($1,876) ($1,876) ($1,876)
1.09 Meetings and Coordination
Up to 3 meetings with ECO, ERWSD, HDR and Shannon & Wilson 8 4 ($2,144) ($2,144) ($2,144)
Total Hours 43 0 72 0 0 0 2
Total Amount ($8,543) ($- ) ($9,648) ($- ) ($- ) ($- ) ($158) ($18,349)($100) ($18,449)($- ) ($18,449)
Exhibit A-1 DocuSign Envelope ID: 7CA22FAD-6447-4EEF-9C29-13F301D54891