Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR18-047 Amended Public Health Agency On-Site Wastewater Treatment System Regulations Commissioner 11)-f ha-, moved adoption
of the following Resolution:
BOARD OF COUNTY COMMISSIONERS
COUNTY OF EAGLE, STATE OF COLORADO,
SITTING AS THE EAGLE COUNTY
BOARD OF HEALTH
RESOLUTION ADOPTING THE AMENDED EAGLE COUNTY PUBLIC HEALTH
AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS
RESOLUTION NO. 2018- 01-1
WHEREAS, the Colorado Water Quality Control Commission("WQCC") amended the
On-Site Wastewater Treatment System Regulation, Regulation 43 (5 CCR 1002-43)
("Regulation 43"), on May 8, 2017 pursuant to the authority provided by the Colorado On-site
Wastewater Treatment System Act, § 25-10-101, et seq. C.R.S. (the "OWTS Act"), effective
June 30, 2017; and
WHEREAS, Regulation 43 establishes minimum standards for the location, design,
construction, performance, installation, alteration and use of on-site wastewater treatment
systems ("OWTS")within the state of Colorado and the minimum requirements for regulations
adopted by local boards of health including, but not limited to, permit application requirements,
requirements for issuing permits, inspections, testing and supervision of installed systems,
maintenance and cleaning of systems, the disposal of waste material and issuance of cease and
desist orders; and
WHEREAS,Regulation 43 contains several "local decision points"that govern the
technical requirements for OWTS which are at the discretion of the local boards of health to
incorporate into their OWTS Regulations; and
WHEREAS,Regulation 43 requires local public health agencies to have their boards of
health promulgate local OWTS regulations within one year of adoption by the WQCC which are
at least as stringent as Regulation 43; and
WHEREAS, local boards of health may utilize a red line version of Regulation 43 for
promulgation of local OWTS regulations that identify their discretionary"local decision points";
and
WHEREAS, an OWTS with a design capacity less than 2,000 gallons per day must
comply with regulations adopted by local board of health pursuant to Regulation 43 and the
OWTS Act; and
Eagle County, CO 201811814
Regina O'Brien 07/10/2018
Pgs: 98 04:36:33 PM
REC: $0.00
DOC: $0.00
WHEREAS, within the jurisdiction of the local public health agency, the regulations
promulgated by the local boards of health govern all aspects of OWTS permits, performance,
location, construction, alteration, installation and use.
WHEREAS,the Board of County Commissioners established the Eagle County Public
Health Agency on June 30, 2009 (Eagle County Resolution No. 2009-063); and
WHEREAS, the Eagle County Public Health Agency organized the agency through the
appointment of the Eagle County Board of Health, whose members are the members of the
Board of County Commissioners; and
WHEREAS, the Eagle County Board of Health submitted the proposed Eagle County
Public Health Agency OWTS Regulations to the WQCD for review as required by Regulation 43
and received verification that the proposed regulations are compliant with the OWTS Act and
Regulation 43; and
WHEREAS, the Eagle County Board of Health has followed the procedures outlined in
Regulation 43 for the promulgation of local OWTS regulations for Eagle County, and proper
publication and public notice was provided for the hearings before the Eagle County Board of
Health; and
WHEREAS,the Eagle County Board of Health held a public hearing on July 10, 2018 to
consider the Eagle County OWTS Regulations, attached hereto as Exhibit A, for adoption by the
Eagle County Board of Health.
NOW, THEREFORE,BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF THE COUNTY OF EAGLE, STATE OF COLORADO, SITTING
AS THE EAGLE COUNTY BOARD OF HEALTH:
THAT,the Eagle County Board of Health hereby adopts the Eagle County Public Health
Agency OWTS Regulations attached hereto as Exhibit A; and
THAT, the requirements of Regulation 43 and future revisions thereto, are made a part
of the Eagle County Public Health Agency OWTS Regulations and shall apply except where
identified as an option of the Eagle County Public Health Agency or where the Eagle County
OWTS Regulations are more stringent than Regulation 43; and
THAT, all aspects of an OWTS including, but not limited to,permits, design,
performance, location, construction, alteration, inspection, maintenance and use shall be as
provided in the Eagle County Public Health Agency OWTS Regulations; and
THAT,these Regulations apply to all OWTS in the unincorporated areas of Eagle
County and within all municipal corporations and special districts within the territorial limits of
Eagle County; and
2
THAT, the Eagle County Board of Health hereby designates the Eagle County Public
Health Agency,which further designated the Eagle County Department of Environmental Health
to implement the Eagle County OWTS Regulations on behalf of the Board of Health; and
THAT,the amended Eagle County Public Health Agency OWTS Regulations will
become effective 45 days after final adoption unless the WQCD notifies the Eagle County Board
of Health before the forty-fifth day that the Eagle County OWTS Regulations or any portion
therein have been determined to be less stringent than the OWTS Act or Regulation 43; and
THAT, the amended Eagle County Public Health Agency OWTS Regulations shall
supersede the Eagle County Public Health Agency OWTS Regulations previously adopted by the
Eagle County Board of Health on May 13, 2014 as of the effective date of the amended Eagle
County Public Health Agency OWTS Regulations; and
THAT,the Eagle County Board of Health hereby finds, determines and declares that this
Resolution is necessary for the health, safety and welfare of the citizens of Eagle County.
MOVED,READ AND ADOPTED by the Board of County Commissioners of the
County of Eagle, State of Colorado, sitting as the Eagle County Board of Health at its regular
meeting held the 1014 day of j •-1 , 2018.
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
BOARD OF COUNTY COMMISSIONERS
OGLe SITTING AS THE EAGLE COUNTY BOARD OF
00%
1- HEALTH
k
ATTEST: *
,• ( i
114-0...t.c.--0A cbtoRsg- By t A 4 1 - A
Clerk to the Board of Kathy f andler-Henry
County Commissioners Char
Sitting as the Eagle County
Board.Of 4
. • DilvT 7 H. Ryan
Commissioner
gime McQueenT
mmissioner
3
Commissioner e.,4444.,. - seconded adoption of the foregoing resolution. The roll
having been called,the vote was as follows:
Commissioner Chandler-Henry
Commissioner Ryan
Commissioner McQueeney 14-4/7 S
/This resolution passed by 0 vote of the Board of County Commissioners of
the County of Eagle, State of Colorado.
4
EXHIBIT A
EAGLE COUNTY
Public Health
&Environment
EAGLE COUNTY PUBLIC HEALTH AGENCY
ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS
Pursuant to Title 25-10-101, et seq. Colorado Revised Statutes and the Colorado Department of Public
Health and Environment Water Quality Control Commission On-Site Wastewater Treatment System
REGULATION NO.43-ON-SITE WASTEWATER TREATMENT SYSTEM REGULATION
5 CCR 1002-43
ADOPTED: July 10, 2018
EFFECTIVE: August 24, 2018
Table of Contents
43.1 Authority 1
43.2 Scope and Purpose 1
43.3 Definitions 2
43.4 Applicability 14
43.5 Site and Soil Evaluation 25
43.6 Wastewater Flow and Strength 34
43.7 Minimum Distances Between Components of an On-site Wastewater Treatment System and
Physical Features 41
43.8 Design Criteria—General 46
43.9 Design Criteria—Components 49
43.10 Design Criteria—Soil Treatment Area 56
43.11 Design Criteria—Higher Level Treatment Systems 69
43.12 Design Criteria—Other Facilities 76
43.13 Technology Review and Acceptance 83
43.14 Operation and Maintenance 88
43.15 Severability 90
43.16 Materials Incorporated by Reference 92
EAGLE COUNTY PUBLIC HEALTH AGENCY ONSITE WASTEWATER TREATMENT SYSTEM
(OVVTS) REGULATIONS
Pursuant to Title 25-10-101, et seq. Colorado Revised Statutes and the Colorado Department of Public
Health and Environment Water Quality Control Commission On-Site Wastewater Treatment System
REGULATION NO.43-ON-SITE WASTEWATER TREATMENT SYSTEM REGULATION
5 CCR 1002-43
43.1 Authority
1. This regulation is promulgated pursuant to the On-site Wastewater Treatment System Act, 25-10-
101, atoeg. C.R.S.
2. These requirements will be known as the"Eagle County Public Health Agency On-site
Wastewater Treatment Systems Regulations."
3. These requirements have been adopted by the Eagle County Board of County Commissioners,
acting as the Eagle County Board of Health, pursuant to and under authority contained in the On-
oihmVVmstewmterTnsatment8ynb»mAot' 25-1O-1D1. etuaq. C.R.S. ondhaadeoignatndtbeEag|e
County Public Health Agency(ECPHA)to implement these Regulations on behalf of the Eagle
County Board of Health(Board of Health).
43.2 Scope and Purpose
A. Declaration
1. In order to preserve the environment and protect the public health and water quality; to
eliminate and control causes of disease, infection, and aerosol contamination; and to
reduce and control the pollution of the air, land and water, it is declared to be in the public
interest to establish minimum standards and regulations for On-site Wastewater
Treatment Systems(OWlS) in Eagle County and to provide the authority for the
administration and enforcement of such minimum standards and regulations.
2. This regulation will apply to all On-site Wastewater Treatment Systems in Eagle County
as defined in section 25-10-103(12), C.R.S.
B. Purpose
1. The purpose of this regulation as authorized by the OWTS Act is to establish minimum
standards for the location, design, construction, performance, installation, alteration and
use of OWTS with a capacity less than or equal to 2,000 gallons per day within Eagle
County, and establish the minimum requirements for regulations adopted by Board of
Health including but not limited to permit application requirements; requirements for
issuing permits; the inspection, testing, and supervision of installed systems; the
maintenance and cleaning of systems; the disposal of waste material and the issuance of
cease and desist orders.
C. Effluent Discharged to Surface Waters
1. Any system that will discharge into surface waters must be designed by a professional
engineer.The discharge permit application must be submitted for preliminary approval to
1
43.3 Definitions
the Board of Health. Once approved by the Board of Health,the application must be
submitted to the Water Quality Control Division for review in accordance with the Water
Quality Control Act, 25-8-101, et seq .C.R.S, and all applicable regulations of the Water
Quality Control Commission. Compliance with such a permit will be deemed full
compliance with this regulation.
D. Jurisdiction of Local Health Agencies
1. The jurisdiction of ECPHA extends over all unincorporated areas and over all municipal
corporations within Eagle County, Colorado, but not over the territory of any municipal
corporation that maintains its own public health agency.
43.3 Definitions
1. "Absorption system"means a leaching field and adjacent soils or other system for the treatment
of sewage in an On-site Wastewater Treatment System by means of absorption into the ground.
See Soil treatment area.
2. "Accessible" means easily reached, attained or entered by the necessary equipment or
maintenance provider.
3. "Applicant" means a person who submits an application for a permit for an On-site Wastewater
Treatment System.
4. "Basal Area" means the effective surface area available to transmit the treated effluent from the
filter media in a mound system into the in-situ receiving soils. The perimeter is measured at the
interface of the imported fill material and in-situ soil. On sloping sites, only the area down-gradient
from the up-slope edge of the distribution media may be included in this calculation.
5. "Bed"means a below-grade soil treatment area with a level sub-base, consisting of a shallow
excavation greater than three feet wide containing distribution media and more than one lateral.
6. "Bedrock"means continuous rock that underlies the soil or is exposed at the surface. Bedrock is
generally considered impervious, but if fractured or deteriorated, it may allow effluent to pass
through without adequate treatment.
7. "Bedroom"means a room with an egress window, a closet, and/or is intended for sleeping
purposes; or as defined by the local board of health, as stated in the local OWTS regulation.
8. "Biochemical Oxygen Demand, Five-Day"(BOD 5 )means quantitative measure of the amount of
oxygen consumed by bacteria while stabilizing, digesting, or treating biodegradable organic
matter under aerobic conditions over a five-day incubation period; expressed in milligrams per
liter(mg/L).
9. "Biochemical Oxygen Demand, Carbonaceous Five Day"(CBOD 5)means quantitative measure
of the amount of oxygen consumed by bacteria while stabilizing, digesting, or treating the organic
matter under aerobic conditions over a five-day incubation period while in the presence of a
chemical inhibitor to block nitrification; expressed in milligrams per liter(mg/L).
10. "Building sewer"means piping that conveys wastewater to the first system component or the
sewer main.
11. "Carbonaceous Biochemical Oxygen Demand"See Biochemical Oxygen Demand,
Carbonaceous.
2
43.3 Definitions
12. "Cesspool"means an unlined or partially lined underground pit or underground perforated
receptacle into which raw household wastewater is discharged and from which the liquid seeps
into the surrounding soil. Cesspool does not include a septic tank.
13. "Chamber" means an open, arch-shaped structure providing an open-bottom soil interface with
permeable sidewalls used for distribution of effluent in a soil absorption system.
14. "Cistern" means an underground, enclosed unpressurized reservoir or tank for storing water as
part of a potable water supply system.
15. "Cleaning" means the act of removing septage or other wastes from a wastewater treatment
system component or grease/waste from a grease interceptor.
16. "Colorado Plumbing Code" means Rules and Regulations of the Colorado State Plumbing Board
(3 CCR 720-1).
17. "Commission"means the Water Quality Control Commission created by section 25-8-201, C.R.S.
18. "Competent technician" means a person who has the appropriate expertise and is able to conduct
and interpret the results of soil profile test pit excavations, percolation tests, and site evaluations.
This individual has also met the required competencies for a"Competent Technician" as defined
in section 43.5.1.
19. "Component"means a subsection of an On-site Wastewater Treatment System;a component
may include multiple devices.
20. ^CompoybnOtoi|et^meannaue|f-uontoinedwatedeootoUetdenignodhodeoompooenon-wmbap
ooniadhumanwaotosthnouQhmionobia| octionandhonbnnothannoubingmatterfordiupouai
21. "Consistence" means the degree and kind of cohesion and adhesion that soil exhibits and/or the
resistance of soil to deformation or rupture under an applied stress to an extent that the soil
density would restrict permeability. Aspects of consistence are used to determine if the horizon
will have permeability lower than that of the defined soil type. Additional insight to consistence
can be found in the UDSA-NRCS Field book for Describing and Sampling Soils; Version 3.0,
Sept. 2012.
22. "Crest" means the highest point on the side of a dry gulch or cut bank.
23. "Cut-bank" means a nearly vertical slope caused by erosion or construction that has exposed
historic soil strata.
24. "Deep gravel system"means a soil treatment area for repairs only where the trenches utilize a
depth of gravel greater than 6 inches below the distribution pipe and sidewall area is allowed
according to a formula specified in this regulation.
25. "Deficiency"See Malfunction.
26. "Department"means the Department of Public Health and Environment created by section 25-1-
102, C.R.S.
27. "Design"means 1. the process of selecting, sizing, locating, specifying, and configuring treatment
train components that match site characteristics and facility use as well as creating the
associated written documentation; and 2. written documentation of size, location, specification
and configuration of a system.
– —
43.3 Definitions
28. "Design capacity"See Flow, Design.
29. "Design flow' See Flow, Design.
30. "Designer, on-site wastewater treatment system" means a practitioner who utilizes site evaluation
and investigation infomiation to select an appropriate OWTS and prepares a design document in
conformance with this regulation.
31. "Distribution" means the process of conveying wastewater or effluent to one or more components,
devices, or throughout a soil treatment area.
32. "Distribution box"means a watertight component that receives effluent from a septic tank or other
treatment unit and distributes effluent via gravity in approximately equal portions to two or more
distribution laterals in the soil treatment area.
33. "Division"means the division of administration of the department of which the Water Quality
Control Division is a part.
34. "Domestic wastewater" See Wastewater, domestic.
35. "Domestic Wastewater Treatment Works"means a system or facility for treating, neutralizing,
stabilizing, or disposing of domestic wastewater which system or facility has a designed capacity
to receive more than 2,000 gallons of domestic wastewater per day.The term "domestic
wastewater treatment works"also includes appurtenances to such system or facility such as
outfall sewers and pumping stations and to equipment related to such appurtenances.The term
"domestic wastewater treatment works" does not include industrial wastewater treatment plants
or complexes whose primary function is the treatment of industrial wastes, notwithstanding the
fact that human wastes generated incidentally to the industrial process are treated therein. 25-8-
103 (5), C.R.S.
5-O'103 (5). C.R3.
36. "Dosing" means a high rate periodic discharge into a soil treatment area.
37. "Dosing, demand"means configuration in which a specific volume of effluent is delivered to a
component based upon patterns of wastewater generation from the source.
38. "Dosing, pressure"means a uniform application of wastewater throughout the intended portion of
the soil treatment area through small diameter pipes and orifices, under pressure. For this
definition, the term pressure indicates that the system is capable of creating upward movement of
effluent out of the distribution system piping.
39. "Dosing, timed" means a configuration in which a specific volume of effluent is delivered to a
component based upon a prescribed interval, regardless of facility water use.
40. "Dosing siphon"means a device used for demand dosing effluent; which stores a predetermined
volume of water and discharges it at a rapid rate, from a tank at a given elevation to a component
at a lower elevation, accomplished by means of atmospheric pressure and the suction created by
the weight of the liquid in the conveying pipe.
41. "Dosing tank"means a tank, compartment or basin that provides for storage of effluent from a
septic tank or other treatment unit intended to be delivered to a soil treatment area at a high rate
periodic discharge.
42. "Drainfield" See Soil treatment area.
4
43.3 Definitions
43. "Drop box"means adevice used for serial orsequential distribution ofeffluentbygravityflmwtno
lateral of a soil treatment area.
44. "Dry gulch" See Gulch, dry.
45. "Drywell"means an unlined or partially lined underground pit(regardless of geometry) into which
drainage from roofs, basement floors, water softeners or other non-wastewater sources is
discharged and from which the liquid seeps into the surrounding soil.
46. "Effective Size"means the size of granular media such that 10 percent by weight of the media is
finer than the size specified.
47. "Effluent" means the liquid flowing out of a component or device of an On-site Wastewater
Treatment System.
48. "Effluent filter" See Effluent screen.
49. "Effluent pipe"means non-perforated pipe that conveys effluent from one On-site Wastewater
Treatment System component to the next.
50. "Effluent screen"means a removable, cleanable (or disposable)device installed on the outlet
piping of a septic tank for the purpose of retaining solids larger than a specific size and/or
modulating effluent flow rate.An effluent screen may be a component of a pump installation. An
effluent screen may also be installed following the septic tank but before higher level treatment
components or a soil treatment area.
51. "Environmental health specialist"means a person trained in physical, biological, or sanitary
science to carry out educational and inspectional duties in the field of environmental health.
52. "Evapotranspiration/absorption system"means an unlined On-site Wastewater Treatment
component that uses evaporation, transpiration, and absorption for dispersal of effluent.
53. "Evapotranspiration system" means an On-site Wastewater Treatment component with a
continuous, impermeable liner that uses evapotranspiration and transpiration for dispersal of
effluent.
54. "Experimental system"means a design or type of system based upon improvements or
development in the technology of sewage treatment that has not been fully tested.
55. "Failure"means a condition existing within any component of an OWTS which prevents the
system from functioning as inbended, and which results in the discharge of untreated or partially
treated wastewater onto the ground surface, into surface water or ground water, or which results
in the back-up of sewage into the building sewer. Other conditions within an OWTS component
that are deemed by a local public health agency to be a threat to public health and/or safety may
also be deemed a failure.
56. "Field performance testing"means data gathering on a system in actual use that is being
proposed for Division acceptance.
57. "Floodplain (100-year)"means an area adjacent to a stream which is subject to flooding as the
result of the occurrence of a one hundred (100)year flood, and is so adverse to past, current or
foreseeable construction or land use as to constitute a significant hazard to public or
environmental health and safety or to property or is designated by the Federal Emergency
Management Agency(FEMA)or National Flood Insurance Program (NFIP). In the absence of
FEMA/NFIP maps, a professional engineer must certify the flood plain elevations.
5
43.3 Definitions
58. "Floodway"means the channel of a river or other watercourse and the adjacent land areas that
must be reserved in order to discharge the base flood without cumulatively increasing the water
surface elevation more than one foot or as designated by the Federal Emergency Management
Agency or National Flood Insurance Program. In the absence of FEMA/NFIP maps, a
professional engineer must certify the floodway elevation and location.
59. "Flow, daily"means the measured volume of wastewater generated from a facility in a 24-hour
period expressed as gallons per day.
60. "Flow, design"means the estimated volume of wastewater per unit of time for which a component
or system is designed. Design flow may be given in the estimated volume per unit such as person
per unit time that must be multiplied by the maximum number of units that a facility can
accommodate over that time.
61. "Flow equalization" means a system configuration that includes sufficient effluent storage
capacity to allow for regulated flow on a daily or multi-day basis to a subsequent component
despite variable flow from the source.
62. "Flow equalizer" means an adjustment device to evenly distribute flow between outlets in a
distribution box or other device that may be out of level.
63. "Grease interceptor tank"means a watertight device located outside a facility designed to
intercept, congeal, and retain or remove fats, oils, and grease from sources such as commercial
food-service that will generate high levels of fats, oils and greases.
64. "Ground water" means that part of the subsurface water that is at or below the saturated zone.
65. "Ground water surface"means the uppermost limit of an unconfined aquifer at atmospheric
pressure.
68. "Guidelines"means State Board of Health Guidelines on Individual Sewage Disposal Systems, 5
CCR 1003-6—predecessor of Regulation 43, On-site Wastewater Treatment System Regulation,
5 CCR 1002-43.
67. "Gulch, dry" means a deep, narrow ravine marking the course of an intermittent or ephemeral
stream.
68. "Health officer"means the chief administrative and executive officer of a local public health
agency, or the appointed health officer of the local board of health. Health officer includes a
director of a local public health agency.
09. "Higher level treatment" means designated treatment levels other than treatment level 1. (See
Table 6-3)
70. "Holding tank" See Vault.
71. "Individual Sewage Disposal System"means a term used for On-site Wastewater Treatment
System in Colorado regulations from 1973 until 2013.
72. "Infiltrative surface"means designated interface where effluent moves from distribution media or
a distribution product into treatment media or original soil. In standard trench or bed systems this
will bethe interface ofthe distribution media orproduct and in-situ soil. Two separate infi|tnative
surfaces will exist in a mound system and an unlined sand filter, one at the interface of the
distribution media and fill sand, the other at the interface of the fill sand and in-situ soil.
6
43.3 Definitions
73. "Inspection port" means an access point in a system component that enables inspection,
operation and/or maintenance.
74. "Invert"means elevation of the bottom of the inside pipe wall or fitting.
75. "Lateral" means a pipe, chamber or other conveyance used to carry and distribute effluent.
76. 'Leach field"See Soil treatment area.
77. "Limiting layer"means a horizon or condition in the soil profile or underlying strata that limits the
treatment capability of the soil or severely restricts the movement of fluids. This may include soils
with low or high parmeabi|ih/, impervious or fractured bednouk, or a seasonal or current ground
water surface.
78. "Liner" means an impermeable synthetic or natural material used to prevent or restrict infiltration
and/or exfiltration. For the purposes of this regulation, the minimum thickness of a liner must be
30 ml.
79. "Linear loading rate" means the amount of effluent applied per linear foot along the contour
(gpd/linear ft.).
80. "Local board of health"means any local, county, or district board of health.
81. "Local health department" See local public health agency.
82. "Local public health agency"means any county, district, or municipal public health agency and
may include a county, district, or municipal board of health to oversee On-site Wastewater
Treatment System permitting and inspection or an on-site wastewater treatment system program.
A local public health agency may designate another agency to administer the OWTS program.
83. "Long-term acceptance rate"(LTAR) means design parameter expressing the rate that effluent
enters the infiltrative surface of the soil treatment area at equilibrium, measured in volume per
area per time, e.g. gallons per square foot per day(gal/ft 2/day).
84. "Malfunction" means the condition in which a component is not performing as designed or
installed and is in need of repair in order to function as originally intended.
85. "Manufactured media"See Media, other manufactured.
86. "Media" means solid material that can be described by shape, dimensions, surface area, void
space, and application.
87. "Media, enhanced manufactured" means an accepted proprietary manufactured distribution
product, wrapped in a specified fabric, and placed on a specified sandbase or media that does
not mask the infiltrative surface of the in-situ soil.
88. ''K4edio, other manufactured"means an accepted proprietary manufactured distribution product
made of synthetic media for distribution of effluent that is placed directly on the in-situ soil.
89. ^K4odio, treatment"means non-or slowly-degradable media used for physical, uhomina|, and/or
biological treatment in an On-site Wastewater Treatment System component.
90. "Mound"means a soil treatment area whereby the infiltrative surface is at or above original grade
at any point.
7
.
43.3 Definitions
91. "Nitrogen reduction"means a minimum 50 percent reduction of influent nitrogen strength which is
the minimum objective of NSF/ANSI Standard 245-Wastewater Treatment Systems -Nitrogen
Reduction (2013 version).
92. "On-Site Wastewater Treatment System"nr^OVVTS"and,where the context so indinates,the
term "system"means an absorption system of any size or flow or a system or facility for treating,
nautno|iaing, otabi|izing, or dispersing sewage generated in the vicinity, which system is not a part
of or connected to a sewage treatment works.
93. "OWTS Act"means the On-site Wastewater Treatment System Act, 25-10-101, etoeq. C.R.S.
94. "Percolation test"means a subsurface soil test at the depth of a proposed absorption system or
similar component of an OWTS to determine the water absorption capability of the soil, the
results of which are normally expressed as the rate at which one inch of water is absorbed. The
rate is expressed in minutes per inch.
95. "Performance standard"means minimum performance criteria for water quality and operation and
maintenance established by the regulatory authority to ensure compliance with the public health
and environmental goals of the state or public health agency.
96. "Permeability" means the property of a material which permits movement of water through the
material.
97. "Permit"means a permit for the construction or alteration, installation, and use or for the repair of
an On-site Wastewater Treatment System.
98. "Person"means an individual, partnership,firm, corporation, association, or other legal entity and
also the obyte, any political subdivision thoreof, or other governmental entity.
99. "Pressure distribution" See Dosing, pressure.
100. "Privy"means an above grade structure allowing for the disposal of excreta not transported by a
sewer and which provides privacy and shelter and prevents access to the excreta by flies,
nodento, or other vectors.
a. Pit privy—privy over an unlined excavation.
b. Vault privy—privy over a vault.
101. "Professional engineer" means an engineer licensed in accordance with section 12-25-1, C.R.S.
102. "Professional geologist" means a person who is a graduate of an institution of higher education
which is accredited by a regional or national accrediting agency, with a minimum of thirty
semester(forty-five quarter)hours of undergraduate or graduate work in a field of geology and
whose post-baccalaureate training has been in the field of geology with a specific record of an
additional five years of geological experience to include no more than two years of graduate work.
23-41-208. C.R.S. and 34-1-201, C.R.S.
103. "Proprietary product"means a manufactured component or other product that is produced by a
private person. It may be protected by patent, trademark or copyright.
104. "Public domain technology" means a system that is assembled on location from readily available
components and is based on well-established design criteria and is not protected by patent,
trademark or copyright.
8
43.3 Definitions
105. "Record drawing" means construction drawings provided to illustrate the progress or completion
of the installation of an OWlS, or components of the OWTS; typically based on field inspections
by the designer or local public health agency.
106. "Redoximorphic"means a soil property that results from the reduction and oxidation of iron and
manganese compounds in the soil after saturation with water and subsequent desaturation.
107. "Remediation system" means a treatment system, chemical/biological additive or physical
process that is proposed to restore the soil treatment area of an OWTS to intended performance.
108. "Repair" means restoration of functionality and/or treatment by reconstruction, relocation, or
replacement of an on-site wastewater treatment system or any component thereof in order to
allow the system to function as intended.
109. "Replacement system" See Repair.
110. "Riser"means a watertight vertical cylinder and lid allowing access to an OWTS component for
inspection, cleaning, maintenance, or sampling.
111. "Rock-plant filter"means a designed system which utilizes treatment media and various wetland
plants to provide treatment of wastewater through bio}ogino|, phyoina|, and chemical processes.
Also called a constructed wetland.
112. "Sand filter" means an engineer designed OWTS that utilizes a layer of specified sand as filter
and treatment media and incorporates pressure distribution.
113. "Sand filter, lined"means an engineer designed OWTS that has an impervious liner and under-
drain below the specified sand media. Lined sand filters may be intermittent/single pass where
the effluent is distributed over the sand bed a single time before distribution to a soil treatment
area, or re-circulating where part of the effluent is returned to an earlier component for additional
treatment before distribution to a soil treatment area.
114. "Sand filter, unlined" means an engineer designed OWTS that includes a layer of specified sand
used as a treatment media without a liner between the sand and the existing soil on which it is
placed.
115. "Seepage pit" means an excavation deeper than it is wide that receives septic tank effluent and
from which the effluent seeps from a structural internal void into the surrounding soil through the
bottom and openings in the side of the pit.
116. "Septage"means a liquid or semisolid that includes normal household wastes, human excreta,
and animal or vegetable matter in suspension or solution generated from a residential septic tank
system. Septage may include such material issued from a commercial establishment if the
commercial establishment can demonstrate to the Division that the material meets the definition
for septage set forth in this subsection. Septage does not include chemical toilet residuals.
117. "Septic tank"means a watertight, accessible, covered receptacle designed and constructed to
receive sewage from a building newer, settle solids from the |iquid, digest organic matter, store
digested solids through a period of retention, and allow the clarified liquids to discharge to other
treatment units for final disposal.
118. "Sequential distribution"means a distribution method in which effluent is loaded into one trench
and fills it to a predetermined level before passing through a relief pipe or device to the
succeeding trench. The effluent does not pass through the distribution media before it enters
succeeding trenches.
9
43.3 Definitions
119. "Serial distribution"means a distribution method in which effluent is loaded into one trench and
fills it to a predetermined level before passing through a relief pipe or device to the succeeding
trench. The effluent passes through the distribution media before entering succeeding trenches
which may be connected to provide a single uninterrupted flow path.
120. "Sewage"means a combination of liquid wastes that may include chemicals, house wastes,
human excreta, animal or vegetable matter in suspension or solution, and other solids in
suspension or solution, and that is discharged from a dwelling, building, or other establishment.
See also Wastewater, domestic.
121. "Sewage treatment works"has the same meaning as"domestic wastewater treatment works"
under section 25-8-103, C.R.S.
122. "Site evaluation"means a comprehensive analysis of soil and site conditions for an OWTS.
123. "Site evaluator"means a practitioner who conducts preconstruction site evaluations, including
visiting a site and performing soil analysis, a site survey, or other activities necessary to
determine the suitability of a site for an OWTS.
124. "Slit trench latrine"means a temporary shallow trench for use as disposal of non-water-carried
human waste.
125. "Soil"means 1. unconsolidated mineral and/or organic material on the immediate surface of the
earth that serves as a medium for the growth of plants and can potentially treat wastewater
effluent; 2. unconsolidated mineral or organic matter on the surface of the earth that has been
subjected to and shows effects of: a)pedogenic and environmental factors of climate(including
water and temperature effects)and b)macro and microorganisms, conditioned by relief, acting on
parent material over a period of time.
126. "Soil evaluation"means a percolation test, soil profile, or other subsurface soil analysis at the
depth of a proposed soil treatment area or similar component or system to determine the water
absorption capability of the soil, the results of which are normally expressed as the rate at which
one inch of water is absorbed or as an application rate of gallons per square foot per day.
127. "Soil horizon"means layers in the soil column differentiated by changes in texture, color,
redoximorphic features, bedrock, structure, consistence, and any other characteristic that affects
water movement or treatment of effluent.
128. "Soil morphology" means 1. physical constitution of a soil profile as exhibited by the kinds,
thickness, and arrangement of the horizons in the profile; and by the texture, structure,
consistence, and porosity of each horizon; and 2. visible characteristics of the soil or any of its
parts.
129. "Soil profile test pit excavation"means a trench or other excavation used for access to evaluate
the soil horizons for properties influencing effluent movement, bedrock, evidence of seasonal high
ground water, and other information to be used in locating and designing an On-site Wastewater
Treatment System.
130. "Soil structure" means the naturally occurring combination or arrangement of primary soil
particles into secondary units or peds; secondary units are characterized on the basis of type,
size class, and grade(degree of distinctness).
131. "Soil texture"means proportion by weight of sand, silt, and clay in a soil.
10
43.3 Definitions
132. "Soil treatment area" means the physical location where final treatment and dispersal of effluent
occurs. Soil treatment area includes drainfields, mounds and drip fields.
133. "Soil treatment area, alternating"means final treatment and distribution component that is
composed of two soil treatment areas that are independently dosed.
134. "Soil treatment area, sequencing"means a soil treatment area having more than two sections
that are dosed on a frequent rotating basis.
135. "State Waters"has the meaning set forth under section 25-8-103. C.R.S.
136. "Strength,wastewater"means the concentration of constituents of wastewater or effluent; usually
expressed in mg/L.
137. "Suitable soil"means a soil which will effectively treat and filter effluent by removal of organisms
and suspended solids, which meets long-term acceptance rate requirements as defined in Table
10-1, and has the required vertical thickness below the infiltrative surface and above a limiting
layer.
138. "Systems cleaner"means a person engaged in and who holds himself or herself out as a
specialist in the cleaning and pumping of On-site Wastewater Treatment Systems and removal of
the residues deposited in the operation thereof.
139. "Systems contractor" means a person engaged in and who holds himself or herself out as a
specialist in the installation, renovation, and repair of On-site Wastewater Treatment Systems.
140. "Total suspended solids"means measure of all suspended solids in a liquid; typically expressed
in mg/L.
141. "Transfer of Title"means change of ownership of a property.
142. "Treatment level"means defined concentrations of pollutants to be achieved by a component or
series of components of an OWTS.
• 143. "Treatment media" See Media,treatment.
144. "Treatment unit"means a component or series of components where solids or pollutants are
removed from wastewater or effluent from a preceding component.
145. "Trench"means 1. below-grade soil treatment area consisting of a shallow excavation with a
width of 3 feet or less containing distribution media and one lateral; and 2. excavation for
placement of piping or installation of electrical wire or conduit.
146. "Uniformity coefficient"means a value which is the ratio of D60 to D10 where D60 is the soil
diameter of which 60 percent of the soil weight is finer and D10 is the corresponding value at 10
percent finer. (A soil having a uniformity coefficient smaller than 4 would be considered "uniform"
for purposes of this regulation.)
147. "Vault"means a watertight, covered receptacle,which is designed to receive and store excreta or
wastes either from a building sewer or from a privy and is accessible for the periodic removal of
its contents. If the vault is intended to serve a structure or structures that are projected to
generate a domestic wastewater flow of two thousand gallons per day or more at full occupancy,
the vault is a domestic wastewater treatment works. Vaults are On-site Wastewater Treatment
Systems.
11
43.3 Definitions
148. "Visual and tactile evaluation of soil"means determining the properties of soil by standardized
tests of appearance and manipulation in the hand.
149. "Volume, effective" means the amount of effluent contained in a tank under normal operating
conditions;for a septic tank, effective volume is determined relative to the invert of the outlet. For
a dosing tank, the effective volume under normal conditions is determined relative to the invert of
the inlet and the control off level.
150. 'Wastewater, domestic"means combination of liquid wastes(sewage)which may include
chemicals, household wastes, human excreta, animal or vegetable matter in suspension or
solution, or other solids in suspension or solution which are discharged from a dwelling, building
or other structure.
151. 'Wastewater, high strength"means 1. wastewater from a structure having BOD 5 greater than
300 mg/L; and/or TSS greater than 200 mg/L; and/or fats, oils, and grease greater than 50 mg/L;
or, 2. effluent from a septic tank or other pretreatment component(as defined by NSF/ANSI
Standard 40 testing protocol)that has BOD 5 greater than 180 mg/L; and/or TSS greater than 80
mg/L; and/or fats, oils, and grease greater than 25 mg/L and is applied to an infiltrative surface.
152. 'Wastewater pond"means a designed pond which receives exclusively domestic wastewater
from a septic tank and which provides an additional degree of treatment.
153. "Water Quality Control Commission"See Commission.
154. "Water Quality Control Division"See Division.
155. "Wetland, constructed"See Rock-plant filter.
156. "Wetlands" means those areas that are inundated or saturated by surface or groundwater at a
frequency and duration sufficient to support, and that under normal circumstances do support, a
prevalence of vegetation typically adapted for life in saturated soil conditions.Wetlands generally
include swamps, marshes, bogs and similar areas.
Table 3-1 Abbreviations and Acronyms
AASHTO American Association of
State Highway and
Transportation Officials
ANSI American National
Standards Institute
ASTM American Society for
Testing and Materials
BOD Biochemical Oxygen
Demand
C.R.S. Colorado Revised Statutes
CBOD Carbonaceous Biochemical
Oxygen Demand
12
_
43.3 Definitions
CPOW Colorado Professionals in
Onsite Wastewater
CSA Canadian Standards
Association
ECPHA Eagle County Public Health
Agency
ETL Electrical Testing
Laboratories
gpd gallons per day
|APMO International Association of
Plumbing and Mechanical
Officials
ISDS Individual Sewage Disposal
System
LTAR Long-term Acceptance Rate
mg/L milligrams per Liter
MPI Minutes Per Inch
NAWT National Association of
Wastewater Technicians
NDDS Non-pressurized Drip
Dispersal System
NPCA National Precast Concrete
Association
NRTL Nationally Recognized
Testing Laboratory
NSF National Sanitation
Foundation
OWTS On-site Wastewater
Treatment System(s)
STA Soil Treatment Area
|L Treatment Level
TN Total Nitrogen
TSS Total Suspended Solids
13
43.4 Applicability
UL Underwriters' Laboratories
43.4 Applicability
A. Regulations Adopted By Local Boards of Health
1. Regulation Coverage
a. An OWTS with design capacity less than or equal to 2,000 gpd must comply with
this regulations and the OWTS Acwithin the jurisdiction of ECPI-IA,the
regulations promulgated by the Board of Health govern all aspects of OWTS
permits, performance, location, construction, alteration, installation, and use.
b. An OWTS with design capacity greater than 2.000 gpd must comply with this
regulation, site location and design approval in section 25-8-702, C.R.S., and the
discharge permit requirements in the Water Quality Control Act, 25-8-501, et seq.
C.R.S.
(1) Applicable Commission regulations include, but are not limited to, the
following:
(i) Regulation 22-Site Location and Design Approval Regulations
for Domestic Wastewater Treatment Works(5 CCR 1002-22).
(ii) Regulation 41 -The Basic Standards for Ground Water(5 CCR
1002-41).
(iii) Regulation 42-Site-Specific Water Quality Classifications and
Standards for Ground Water(5 CCR 1002-42).
(iv) Regulation 61 -Colorado Discharge Permit System Regulations
(5 CCR 1002-61).
(v) Regulation 62- Regulations for Effluent Limitations(5 CCR
1002-62).
(2) For systems greater than 2,000 gpd,the Division is also authorized to
determine those parts of this regulation identified as the prerogative of
the local public health agencies.
(3) The requirements for maintenance and standards of performance for
systems greater than 2,000 gpd shall be determined by the site
application approval and discharge permit.
(4) In the interest of facilitating communication of LPHA concerns regarding
a design being reviewed by the Division, the local public health agency
can provide comments to the Division for consideration during the
Division's review of the proposed design and discharge permit
application. Under such a coordinated process, the Division retains final
authority for approval or denial of each domestic wastewater treatment
works that is regulated under the site location approval and Colorado
Discharge Permit System regulations. Prior to approval or denial of each
OWTS domestic wastewater treatment works, the Division must
14
_
43.4 Applicability
acknowledge and consider local OWTS regulations when they are more
stringent and restrictive than this regulation.
2. Procedures to Adopt or Revise Regulations by the Board of Health:
a. The Board of Health must submit its proposed regulations to the Division for
preliminary review at least 30 days prior to a public hearing before a local board
of health.
b. The Board of Health must hold a public hearing on the proposed regulations
before adopting final regulations.
c. The Board of Health must give notice of the time and place of the public hearing
at least once and at least 20 days in advance in a newspaper of general
circulation within its area of jurisdiction.
d. The Board of Health may make changes or revisions to the proposed regulations
after the public hearing and prior to final adoption, and no further public hearing
is required regarding the changes or revisions.
e. All local regulations must be transmitted to the Division no later than five days
after final adoption and become effective 45 days after final adoption unless the
Division notifies the Board of Health before the forty-fifth day that the regulations
or any portions of the local regulations determined by the Division are not as
stringent as the OWTS Act or with this regulation.Any portions of the local
regulations determined by the Division not to be in compliance with the OWTS
Act and this regulation will not take effect or be published as regulations of the
Board of Health. For those portions of its regulations that do not comply, the
Board of Health may submit revisions to the Division. Only after the Division has
determined that the Board of Health's revised regulations comply with the OVVTS
Act and this regulation may the Board of Health's revised regulations take effect
and be published. Until the Division makes this determination, this regulation
controls the unapproved portions of the local regulations.
B. Permit Application Requirements and Procedures
1. Prior to installing, altering, or repairing an onsite wastewater treatment system in Eagle
County, Colorado, the applicant must obtain a permit from the ECPHA.
2. An applicant must submit a complete application that is consistent with section 43.4.B.3.
to the ECPHA prior to installing, altering or repairing a system.
3. Minimum Permit Application Requirements:
a. Owner name and contacinformation;
b. Property address;
c. Parcel number;
.
d.. Property legal description;
e. Type of permit;
f. Source of water;
15
43.4 Applicability
g. Report from Site and Soil Evaluation (section 43.5);
h. System design with a |agib|a, accurate site plan which shows pertinent physical
features on subject property, and on adjacent properties, as noted in Table 7-1;
and
Other information, data, p|nno, specifications and tests as required by the
ECPHA, such as:
(1) When specific evidence suggests undesirable soil conditions exist,
additional hydrological, geological, engineering or other information
provided by a professional engineer or geologist may be required to be
submitted by the applicant. This requirement will not prejudice the right of
the local public health agency to develop its own information from its own
source at its own expense.
4. Permit Fees
a. The Board of Health may set fees for permits that are no greater than required to
offset the actual indirect and direct costs of the ECPHA. 25'10'107. C.R.S.
b. Permit application fees must not exceed the maximum fees established in
section 25-10-107. C.R.S. Permit application fees must be submitted by an
applicant with the permit application, and are due and payable upon receipt of
the permit application.
5. Other Fees
a. A local board of health may set fees for inspections, percolation tests, soil
evaluation, and other services performed by the ECPHA. The fees must be no
greater than required to offset the actual indirect and direct costs of the services,
and must not exceed the maximum amounts specified in section 25'10-107.
C.R.S.
b
Surcharge-the ECPHA must colleca fee of twenty-three dollars for each permit
issued for a new, repaired, or upgraded OWTS. Of that fee, the ECPHA must
retain three dollars to cover the ECPHA's administrative costs and twenty dollars
must be transmitted to the Colorado Department of Public Health and
Environment for use in funding the state's OWTS program.
6. Permit Term
a. An OWTS permit expires12UdayaaftarthodoteofiaouanomifnonstruuUonhao
not commenced. After expiration, a new application must be required to begin
construction. b.Any change in plans or specifications of the OWTS after the
permit has been issued invalidates the permit unless the permittee receives
written approval from the ECPHA for such changes.After a permit is invalidated,
a new application and subsequent permit is required to begin construction.
7. Repair Permit
a. The owner or occupant of a property on which an OWTS is not in compliance
must obtain a repair permit from the ECPHA. The applicant must apply for a
repair permit within two business days after receiving notice from the ECPHA
that the system is not functioning in compliance with the OWTS Acor applicable
16
43.4 Applicability
regulations, or otherwise constitutes a nuisance or a hazard to public health or
water quality.
b. The repair permit must provide for a reasonable period of time within which the
owner or occupant must make repairs.At the end of that period, the ECPHA
must inspect the system to ensure it is functioning properly. Concurrently with the
issuance of a repair permit, the ECPHA may issue an emergency use permit
authorizing continued use of a malfunctioning system on an emergency basis for
a period not to exceed the period stated in the repair permit. Such an emergency
use permit may be extended,for good cause shown, in the event repairs may not
be completed in the period stated in the repair permit through no fault of the
owner or occupant and only if the owner or occupant will continue to make
repairs to the system.
8. A permit must be required for the expanded use of an OWTS. The OWTS must be
replaced or modified to handle the increased design flow unless it is determined that the
existing system is adequately designed and constructed for the higher design flow rate.
Q. When an application is denied by the ECPHA, an applicant may request review by the
Board of Health. Such a request for review by the Board of Health must be received
within 30 days of the date of denial.The review will be conducted by the Board of Health
at the next regularly scheduled Board of Health hearing. 10.The issuance of a permit and
specifications of terms and conditions therein will not constitute assumption of liability,
nor create a presumption that the ECPHA or its employees may be liable for the failure or
malfunctioning of any system. Permit issuance will not constitute a certification that the
system, the equipment used in the system, or any component used for system operation
will ensure continuous compliance with the provision of the OWTS Act,the regulations
adopted thereunder, or any terms and conditions of a permit.
11. No OWTS permit shall be issued to any person when the subject property is located
within a municipality or special district that provides public sewer service, except where
such sewer service to the property is not feasible in the determination of the municipality
or special diothot, or the permit is otherwise authorized by the municipality or special
district.
C. Determination
1. The ECPHA must determine whether the information provided in the permit application,
site and soil evaluations, assumptions and calculations, and design of the proposed
OWTS are in compliance with the requirements of the OWTS Act and regulations
adopted pursuant thereto. If the submittal is determined to be in compliance,
authorization to begin installation may be given.
O. Access to Site
1. For the purpose of inspecting and enforcing applicable regulations and the terms and
conditions of any permit issued and investigating and responding to complaints, the the
ECPHA is authorized to enter upon private property at reasonable times and upon
reasonable notice for the purpose of determining whether or not an operating OWTS is
functioning in compliance with the OWTS Act and applicable regulations adopted
pursuant thereto and the terms and conditions of any permit issued and to inspect and
conduct tests in evaluating any permit application. The owner or occupant of every
property having an OWTS must permit the ECPHA access to the property to make
inspections, conduct required tests,take samples, and monitor compliance.
17
43.4 Applicability
E. Final Inspection
1. Before a system is placed in use, the owner, applicant or the systems contractor must
provide the ECPHA and the design engineer,with a minimum of two days' notice that the
progress of the work has been sufficiently completed to allow inspections to determine if
all work has been performed in accordance with the permit requirements and to
determine compliance of the system with the OWTS Act and the regulations adopted
thereunder so the ECPHA and the design engineer can conduct a field inspection of the
septic tank, soil treatment area, and other OWTS components before backfilling. OWTS
designed by a Professional Engineer(PE)must be inspected by the design engineer to
certify construction of the system as designed.
F. Final approval of the permit by the ECPHA must include, but is not limited to:
1. Receipt of letter from the engineer,certifying construction of the OWTS as per the
approved design plan, if the OWTS was engineer designed;
2. Receipt of a record drawing which includes the following:
a. A scale drawing showing all components of the OWTS including their location
from known and findable points
b. Dimensions, depths, and sizes
c. Manufacturers' names and models as available
d. Other information relative to locating and maintaining the OWTS components;
3. Final inspection prior to backfilling the OWTS by the ECPHA and design engineer
confirming that it was installed according to the permit requirements and regulations or
variances to the regulations; and
4. Identification of system contractor.
G. Division Authority to Administer and Enforce
1. Wherever the term Board of Health or the ECPHA is used in this regulation, said terms
must also include the Division under its designated authority for the purposes of
administering and enforcing the provisions of this regulation where necessary to protect
the public health and environment.
H. Primary Enforcement Responsibility
1. The primary responsibility for enforcement of the provisions of the OWTS Act and the
regulations adopted under said article will lie with the Board of Health.
2. In the event that the Board of Health fails to administer and enforce the provisions of said
section and the regulations adopted under the OWTS Act,the Division may assume such
functions of the ECPHA or The Board of Health as may be necessary to protect the
public health and environment. 25-10-110, C.R.S.
Product Development Permit
1. For products that have not received Division acceptance under section 43.13.D, the
manufacturer may apply to the ECPHA for a product development permit. Requirements
18
43.4 Applicability
for proprietary treatment product acceptance are located in section 43.13.D of this
regulation.
2. For products or types of systems which have not been otherwise accepted by the
Division pursuant to section 43.13.D,the Board of Health may approve an application for
product development permit only if the system has been designed by a professional
engineer, and only if the application provides proof of the ability to install a replacement
OWTS in compliance with all local requirements in a timely manner in the event of a
failure or malfunction of the system installed.
3. Before a product development permit is issued, the Division must determine that the
product to be tested qualifies for testing under the product development evaluation based
on information submitted to the Division.
a. Applicant must provide evidence of nationally accepted third-party testing of the
product to be evaluated, or;
b. Provide test data from multiple single-family homes under normal working
conditions that meet the following criteria:
(1) Test data must be provided from a minimum of four sites.
(2) Each system must be tested over a period of at least one year.
(3) Each system must be sampled at least three times during the year with
at least one sample obtained during cold weather conditions.
(4) Laboratory results for all parameters for which acceptance is being
requested must be submitted.
4. The Board of Health must not arbitrarily deny any person the right to consideration of an
application for such a system and must apply reasonable performance standards in
determining whether to approve such an application; 25-10-108 (2), C.R.S.
5. A completed application for a product development permit must be submitted to the
ECPHA at least 30 days in advance of installation of the product.
6. An application for a product development permit must include the following:
a. Proof of the ability to install a replacement OWTS in compliance with all local
requirements in a timely manner in the event of a failure or malfunction of the
system under testing;
b. A description of the product under development including performance goals;
c. Documentation signed by the owner of the proposed product development site
allowing access to the ECPHA and Division for inspection of the site; and
d. Design documents as required in section 43.5.G of this regulation.
7. Other than the performance standards identified in section 43.4.1(3)above, the ECPHA
may stipulate additional requirements for the product development permit necessary to
ensure that the system performs as intended.
19
43.4 Applicability
8. A product development permit is a site-specific permit. Product development testing at
multiple sites requires a product development permit for each site.
9. During the term of the product development permit, all data collected is to be submitted to
the Division and the ECPHA.
10. The ECPHA may revoke or amend a product development permit, if the continued
operation or presence of the product under development:
a. Presents a risk to the public health or environment;
b. Causes adverse effects on the proper function of the OWTS on the site;
c. Leaks or discharges effluent on the surface of the ground; or
d. If the developer of the product fails to comply with any requirements stipulated on
the permit by the ECPHA or the Division.
11. If the product development permit is revoked, the product developer must install the
replacement system within the time frame established by the ECPHA.
12. Once the system is installed and approved, the ECPHA must supply the Division with a
copy of the completed OWTS permit.
J. Prohibition of OWTS in Unsuitable Areas
1. The Board of Health may prohibit issuance of OWTS permits in accordance with
applicable land use laws and procedures for defined areas in which the Board of Health
determines that construction and use of additional OWTS may constitute a hazard to
public health or water quality.
K. Licensing of Systems Contractors and Systems Cleaners
1. No person shall install, renovate, or repair an OWTS without a valid Systems Contractor
License. Employees of a validly licensed Systems Contractor or Systems Cleaner shall
not be required to be licensed separately. The fees for licensing Systems Contractors
and Systems Cleaners shall not exceed the actual costs of licensing by the ECPHA.
Licenses shall expire on December 31 of each year. A license which expires because of
failure to renew or which is revoked shall be subject to the fee established for new
licenses. Application for a new license for a Systems Contractor or Systems Cleaner
whose license has been revoked shall not be considered for at least a year after
revocation.
2. Performance Standards for Systems Contractors and Systems Cleaners
a. Prior to the issuance or renewal of a license, the ECPHA may require the
applicant to demonstrate adequate knowledge of these Regulations and standard
OWTS installation practices.
b. Installation, renovation, or repair of any OWTS shall be in compliance with these
Regulations and with the conditions set out in the permit. Failure to obtain an
OWTS permit or comply with these Regulations or conditions placed upon OWTS
permits may result in revocation of the Systems Contractor's License.
20
43.4 Applicability
c. A Systems Contractor shall have the OWTS permit posted on the job site or in
their possession at all times during the construction process.
d. The Board of Health may set minimum qualifications for Licensed Systems
Contractors and Cleaners.
e. A Systems Cleaner shall remove the sludge and scum, leaving no more than
three(3)inches depth of sewage in a septic tank.
f. A Systems Cleaner shall maintain their equipment so as to insure that no spillage
of sewage will occur during transportation.
g. A Systems Cleaner shall dispose of the collected sewage only at approved
facilities.
h. Licensed Systems Cleaners must submit a report to the ECPHA within 10 days
of cleaning an OWTS. Said report shall include a site map showing the location
of the septic tank access lids measured from at least two fixed points, and shall
include a statement as to the general condition and functionality of the OWTS
and whether any repairs to the system are recommended.
3. Systems Contractors and Systems Cleaners License Revocation
a.• The Board of Health may suspend or revoke the license of a systems contractor
or cleaner for violation of the applicable provisions of the OWTS Act and the
regulations adopted under said section or for other good cause shown after a
hearing conducted upon reasonable notice to the systems cleaner and at which
the systems cleaner may be present, with counsel, and be heard.
b. Written notice of revocation particularizing the violations shall be served upon the
holder of the Systems Cleaner or Systems Contractor license. Service of notice
shall in accordance with the Colorado Rules for Civil Procedure, or in person, or
by certified mail, return receipt requested, deliverable to the addressee only.
M. Variance Procedure
1. General
a. The purpose of this section is to provide a procedure for ECPHA to consider
variances from the design and/or siting requirements of the OWTS regulations.
b. The Board of Health may set fees for processing an OWTS permit with a
variance in accordance with section 25-10-107, C.R.S.This permit fee may be
the standard OWTS permit fee or may be a separate fee based upon the cost of
processing a permit with a variance.
2. Requirements for Variance Consideration
a. The Board of Health may approve a variance from a requirement of this
Regulation.Variances cannot be granted by staff.
b. Approval of a variance must be based upon evidence presented by the applicant,
or their designee, showing that the variance would not be injurious to the public
•
21
43.4 Applicability
health,water quality, or environment; and would prevent a substantial hardship to
the applicant.
c. Variances must not be granted under the items identified in section 43.4(M)(5)of
this regulation.
d. All OWTS variances will require public hearings.
e. Variance requests must be prepared by a professional engineer and submitted to
ECPHA for a determination of completeness and sufficiency. Once the request is
deemed complete and sufficient the request will be scheduled for public hearing
before the Board of Health within 30 days.
f. The hearing must be the subject of a public notice or notice must be sent via
certified mail, with a minimum 20-day reply time from the date of mailing, to all
adjacent property owners.
g. Variance requests must be accompanied by:
(1) Site-specific request identifying the specific criteria from which a variance
is being requested;
(2) Technical justification by a professional engineer or professional
geologist,which indicates the specific conditions which exist and/or the
measures which will be taken that support a finding that the variance will
result in no greater risk than that associated with compliance with the
requirements of the regulation. Examples of conditions which exist, or
measures which might be taken, include but are not limited to the
following: evidence of a natural or manmade physical barrier to the
movement of effluent to or toward the feature from which the variance is
requested; placement of a manmade physical barrier to the movement of
effluent to or toward the feature from which the variance is requested;
soil replacement with sand filter media to reduce the infiltration rate of
the effluent such that the travel time of the effluent from the absorption
field to the physical feature is no less than the travel time through the
native soils at the prescribed setback and Treatment Level 2;
(3) A discussion of alternatives considered in lieu of the requested variance;
(4) Technical documentation for selected alternative,which may include a
testing program,which confirms that the variance does not increase the
risk to public health and to the environment; and
(5) A statement of the hardship that creates the necessity for the variance.
h. The applicant has the burden of proof to demonstrate that the variance is justified
and will pose no greater risk to public health and the environment than would a
system meeting the regulations.
3. The Board of Health has the authority to impose site-specific requirements and conditions
on any variance granted.
4. Outcome of the Variance Proceeding
a. The applicant must be notified, in writing, of the Board of Health's decision
regarding the request for a variance.The notice of a denial of a variance must
22
43.4 Applicability
include those reasons which form the basis for the denial. The notice of an
approval of a variance must include any conditions of the approval.The variance,
and any conditions thereof, must be recorded on the deed to the property and
any expenses associated with that recording must be the responsibility of the
party obtaining the variance.
5. Prohibitions on the Granting of Variance Requests
a. No variance shall be issued where the property can accommodate a conforming
OWTS.
b. No variance shall be issued to mitigate an error in construction involving any
element of property improvements.
c. No variance shall be allowed solely for economic gain.
d. No variance shall be issued, if it will result in a setback reduction to an offsite
physical feature that does not conform to the minimum setbacks defined in Table
7-1 of this regulation without the board of health considering any concerns of the
owner of property containing said feature. Property lines are considered offsite
features. The property owner containing said feature must be notified of the time
and date of the hearing.
e. No variance shall be issued, if it reduces the separation to ground water or
bedrock based on the level of treatment in Table 7-2.
f. No variance from the horizontal setback from a well shall be issued unless it also
meets the variance requirements of the Board of Examiners of Water Well
Construction and Pump Installation Contractors.
g. No variance shall be issued for the installation of a higher level treatment system
based on sizing or separation reductions without having a maintenance and
oversight program as defined in section 43.14.D.
6. Variances for Repair of Failing Systems
a. When a proposed variance for a system repair or upgrade would result in
encroachment on minimum distances to physical features on neighboring
properties required by the Division, the hearing procedures in 4.M.2,
Requirements for Variance Consideration above must be followed.
b. For the repair of or upgrade to an existing system where the existing system
does not meet the required separation distances and where conditions other than
lot size precludes adherence to the required distances, a variance to the
separation distances may be requested.The repairs or upgrade must be no
closer to features requiring setbacks than the existing facilities. Variances
requesting setbacks no closer than existing setbacks do not have to provide
technical justification from a professional engineer or professional geologist.
7. Findings on Appeal
a. A request for review must be made within 60 days after denial of an application
by the ECPHA.
23
43.4 Applicability
b
The applicant must bear the burden of supplying the Board of Health with
sufficient evidence to document that the denied system will be constructed and
used in such a manner that will result in no greater risk than that associated with
compliance with the requirements of the regulation, comply with the declaration
and intent of this regulation, and comply with all applicable state and local
regulations and required terms and conditions in any permit.
c. Such review must be conducted pursuant to the requirements of section 24-4-
105, C.R.S.
N. General Prohibitions; Section 25-10-112, C.R.S.
1. No city, county, or city and county shall issue to any person:
a. A permit to construct or remodel a building or structure that is not serviced by a
sewage treatment works until the ECPHA has issued a permit for an OWTS.
b. An occupancy permit for the use of a building that is not serviced by a sewage
treatment works until the ECPHA makes a final inspection of the OWTS,
provided for in section 25-10-106 (1)(h), C.R.S. and the ECPHA approves the
installation.
2. The construction of new, or the repair of existing cesspools is prohibited.Where an
existing cesspool is failing, a conforming OWTS must be installed.Where space is not
available for a conforming OWTS, the criteria for repairs established within section
43.10.1 must be followed.
3. A person must not connect more than one dwelling, commenoia|, buninaso, institutional or
industrial unit to the same OWTS unless such multiple connection was specified in the
application submitted and in the permit issued for the system.
4. No person shall construct or maintain any dwelling or other occupied structure which is
not equipped with adequate facilities for the sanitary disposal of sewage.
5. All persons shall dispose of septage removed from systems in the process of
maintenance or cleaning at an approved site and in an approved manner.
O. Cease and Desist Orders
1. ECPHA may issue an order to cease and desist from the use of any OWTS or sewage
treatment works which is found by the health officer not to be functioning in compliance
with the OWTS Act or with applicable regulations or is found to constitute a hazard to
public health, or has not otherwise received timely repairs under the provisions of section
25-1O-1O0(1)(j). C.R.S. Such anorder may beissued only after ahearing which shall be
conducted by the health officer not less than 48 hours after written notice thereof is given
to the owner or occupant of the property on which the system is located. The order shall
require that the owner or occupant bring the system into compliance or eliminate the
health hazard within thirty days, or thereafter cease and desist from the use of the
system. A cease and desist order issued by the health officer shall be reviewable in the
district court for the county wherein the system is located and upon a petition filed not
later than ten days after the order is issued.
P. Penalties; Section 25'10'113. C.R.S.
24
43.5 Site and Soil Evaluation
1. Any person who commits any of the following acts or violates any of the provisions of this
section commits a Class 1 petty offense as defined in section 18-1.3-503, C.R.S.:
a. Constructs, alters, installs, or permits the use of any OWlS without first having
applied for and received a permit as provided for in section 25-10-106, C.R.S.;
b. Constructs, alters, or installs an OWTS in a manner which involves a knowing
and material variation from the terms or specifications contained in the
application, permit or variance;
c. Violates the terms of a cease and desist order that has become final under the
terms ofsection 254O40G (1)(h). C.R.S.;
d. Conducts a business as a systems contractor without having obtained the license
provided for insection 25'1U'1UA(1). C.R.G,
e. Conducts a business as a systems cleaner without having obtained the license
provided for in section 25-10-109(2), C.R.S
f. Falsifies or maintains improper records concerning system cleaning activities not
performed or performed improperly; or
g. Willfully fails to submit proof of proper maintenance and cleaning of a system as
required by regulations adopted by the Board of Health.
2. Upon a finding by the Board of Health that a person is in violation of this regulation, the
Board of Health may assess a penalty of up to fifty dollars for each day of violation. In
determining the amount of the penalty to be assessed, the Board of Health shall consider
the seriousness of the danger to the health of the public caused by the violation, the
duration of the violation, and whether the person has previously been determined to have
committed a similar violation.
D. A person subject to a penalty assessed pursuant to section 43.4.Q.2 may appeal the
penalty to the Board of Health by requesting a hearing before the appropriate body. The
request must be filed within thirty days after the penalty assessment is issued. The
Board of Health shall conduct a hearing upon the request in accordance with section 24-
4-105, C.R.S.
43.5 Site and Soil Evaluation
A. A site and soil evaluation must be conducted for each property on which an OWTS is proposed,
to determine the suitability of a location to support an OWlS, and to provide the designer a sound
basis to select the most appropriate OWlS design for the location and application.
1. Each site evaluation must consist of:
a. Preliminary investigation;
b. Reconnaissance;
c. Detailed soil investigation; and
d. Report and site plan.
43.5 Site and Soll Evaluation
B. Preliminary investigation: Research of information relative to the site and anticipated conditions
must be conducted. Information gathered as part of the preliminary investigation must include, but
is not limited to:
1. Property Information:
a. Address;
b. Legal description;
c. Existing structures; and
d. Location of existing or proposed wells on the property.
2. Local public health agency records.
3. Published site information:
a. Topography; and
b. Soil data.
4. Location of physical features, on and off the property that will require setbacks as
identified in Table 7-1.
5. Preliminary soil treatment area size estimate based on information on existing or planned
facility and local regulations.
6. Other information required by the ECPHA.
7. Additional information that may be useful to the specific evaluation as available:
a. Survey;
b. Easements;
c. Floodplain maps;
d. Geology and basin maps and descriptions;
e. Aerial photographs;
f. Climate information; and
g. Delineated wetlands maps.
C. Reconnaissance
1. A visit to the property to evaluate the topography and other surface conditions that will
impact the location and design of the OWTS must be conducted. Information gathered as
part of the site reconnaissance may include, but is not limited to:
a. Landscape position;
b. Topography;
26
43.5 Site and Soil Evaluation
c. Vegetation;
d. Natural and cultural features; and
e
Current and historic land use.
D. Detailed Soil Investigation
1. Soil investigations to determine the long-term acceptance rate of a soil treatment area
must be conducted per the following criteria:
a. Visual and tactile evaluation of two or more soil profile test pit excavations must
be conducted to determine soil type as well as to determine whether a limiting
layer is encountered.
b. In addition to the two soil profile test pit excavations, percolation testing may be
conducted to obtain additional information regarding the long-term acceptance
rate of the soil.
c. If the site evaluation includes both a visual tactile evaluation of soil profile test pit
excavations and percolation tests, and the results from these two evaluations do
not coincide with the same LTAR as noted in Table 10-1,the designer must use
the more restrictive LTAR in determining the size of the soil treatment area.
2. Procedure for performing visual and tactile evaluations of soil in order to determine a
long-term acceptance rate:
a. Evaluation of two or more soil profile test pit excavations must be performed to
determine soil types limiting layers, and best depth for the infiltrative surface. The
total number of soil profile test pit excavations beyond the required two shall be
based on the judgment of the competent technician.
b. At least one of the soil profile test pit excavations must be performed in the
portion of the soil treatment area anticipated to have the most limiting conditions.
c. The minimum depth of the soil profile test pit excavation must be to any limiting
layer, or four feet below the infiltrative surface of the in-situ soil, whichever is
encountered first.
d. Layers and interfaces that interfere with the treatment and dispersal of effluent
must be noted. Thus, any limiting soil characteristic such as consistence also
needs to be evaluated. The evaluation of consistence may also include an
evaluation of excavation difDcu|ty, rupture nasiotmnce, and/or penetration
resistance.
e. The soil observations must be conducted at or immediately adjacent to the
location of the proposed soil treatment area, but if possible, not under the final
location of a trench or bed.
f. Each soil profile test pit excavation observed at the proposed soil treatment area
must be evaluated under adequate light conditions with the soil in an unfrozen
state.
g. The soil observation method must allow observation of the different soil horizons
that constitute the soil profile.
27
- �� �
43.5 Site and Soil Evaluation
h. Soil profile tespit observations must be conducted prior to percolation tests to
determine whether the soils are suitable to warrant percolation tests and, if
oui1ob|e, at what depth percolation tests must be conducted.
The soil type at the proposed infiltrative surface of the soil treatment area or a
more restrictive soil type within the treatment depth must be used to determine
the long-term acceptance rate from Table 10-1 or Table 10-lA. The treatment
depth is two to four feet depending on the required thickness for the treatment
level below the infiltrative surface from Item 4,Table 7-2.
j. Soils data, previously collected by others at the site can be used for the purposes
of an OWTS design at the discretion of the ECPHA. It is recommended that the
data be verified, at a minimum, by performing an evaluation of a soil profile test
pit excavation.
3. Soil descriptions for determination of a limiting layer must include:
a. The depth of each soil horizon measured from the ground surface and a
description of the soil texture, and structure of each soil horizon;
b. Depth to the bedrock;
c. Depth to the periodically saturated soil as determined by:
(1) Redoximorphic features and other indicators of water levels, or
(2) Depth of standing water in the soil observation excavation, measured
from the ground surface, if observed, unless redoximorphic features
indicate a higher level.
4. Procedure for performing percolation tests:
a. The percolation testing shall be performed by a professional engineer or by a
trained person under the supervision of a professional engineer or by a
competent technician.
b. Number of test holes; Location
(1) Soil percolation tests shall be performed in at least three test holes in the
area in which the soil treatment area is to be located, spaced evenly over
the proposed area.
(2) If the likely depth of a proposed infiltrative surface is uncertain,
percolation tests must be performed at more than one depth to
determine the depth of the infiltrative surface.
c. Dimensions
(1) The percolation test hole must have a diameter of eight to 12 inches and
be terminated a minimum of six inches and a maximum of 18 inches
below the proposed infiltrative surface.
d. Change in Soil
28
43.5 Site and Soil Evaluation
(1) If a change of soil type, color or structure is present within those soils
comprising the depth of soil below the infiltrative surface as required in
Table 7-2 for vertical separation, a minimum of two soil percolation holes
must be terminated in the changed soil, and percolation tests must be
conducted in both holes.
e. Percolation Tests
(1) The percolation tests must be conducted using the hole preparation, soil
saturation and rate measurement procedures described below.
(2) Preparation of Percolation Test Holes
(i) Excavate the hole to the depth and diameter required.
(ii) Carefully scrape the bottom and sides of the hole with a knife
blade or sharp instrument to remove any smeared soil surfaces
and provide a natural soil interface into which water may
percolate.
(iii) Remove all loose soil from the hole.
(iv) Add two inches of very coarse sand or fine gravel to protect the
bottom of the hole from scouring and sediment.
(3) Presoak
(i) The hole must be presoaked adequately to accomplish both
saturation,which is filling the void spaces between the soil
particles, and swelling, which is the intrusion of water into the
individual soil particles.
(ii) To presoak the hole, carefully fill the hole with clean water to a
minimum depth of 12 inches over the gravel placed in the bottom
of the hole. In most soils, it is necessary to refill the hole by
supplying a surplus reservoir of clean water, possibly by means
of an automatic siphon, to maintain water in the hole for at least
four hours and preferably over night. Determine the percolation
rate 24 hours after water is first added to the hole.This
procedure is to ensure that the soil is given ample time to swell
and to approach the condition it will be in during the wettest
season of the year. In sandy soils containing five percent or less
particles passing the#200 sieve, by weight, the swelling
procedure is not essential and the test may be conducted after
the water from one filling of the hole has completely seeped out
of the hole.
(4) Percolation Rate Measurement
(I) With the exception of sandy soils containing five percent or less
particles passing the#200 sieve, by weight, percolation rate
measurements must be made on the day following the presoak
procedure.
29
43.5 Site and Soil Evaluation
(ii) If water remains in the percolation test hole after the swelling
period, adjust the depth to approximately six inches above the
gravel in the bottom of the hole. From a fixed reference point,
measure the drop in water level over a 30 minute interval.The
drops are used to calculate the percolation rate.
(iii) If no water remains in the hole after the swelling period, carefully
add clean water to bring the depth of water in the hole to
approximately six inches above the top of the gravel in the
bottom of the hole. From a fixed reference point, measure the
drop in water level at 30 minute intervals for four hours, refilling
to six inches over the top of the gravel as necessary. The drop in
water level that occurs during the final 30-minute period is used
to calculate the percolation rate. If the water level drops during
prior periods provide sufficient information,the procedure may
be modified to suit local circumstances. The requirement to
conduct a four hour test under this section is waived if three
successive water-level drops do not vary by more than 1/16 inch;
however, in no case shall a test under this section be less than
two hours in duration.
(5) Sandy Soils
(i) In sandy soils or other soils in which the first six inches of water
seeps out of the hole in less than 30 minutes, after the 24 hour
swelling period, the time interval between measurements must
be ten minutes and the test conducted for one hour. The drop
that occurs during the final ten minutes must be used to calculate
the percolation rate.
(ii) If the soil is so sandy or coarse-textured that it will not retain any
water,then the infiltration rate must be recorded as less than one
minute per inch.
(6) Special Soil Types
(i) The ECPHA may identify soil types in its area for which different
procedures such as extra presoaking or an extended testing time
to obtain a valid percolation rate will be required.
(7) Percolation Rate Determination and Reporting
(i) The field percolation rate will be the average rate of the
percolation rates determined for all percolation test holes
observed in the proposed soil treatment area in minutes per inch.
The average percolation rate determined by the tests must be
used in determining the long-term acceptance rate for the
proposed system from Table 10-1.
(ii) The technician performing the percolation tests shall furnish an
accurate scale drawing, showing the location of the soil profile
test pit excavations and/or percolation holes tied to lot corners or
other permanent objects. The drawing must meet the criteria in
section 43.5.F.1.g.The information in the subsections following
section 43.5.F.1.g.(1)through 43.5.F.1.g.(5) may be included but
30
43.5 Site and Soil Evaluation
is not required for this drawing. All holes must be clearly labeled
to relate to the information provided for the profile test pits and
percolation tests.
(8) Alternate Percolation Testing
(i) Alternate percolation test procedures may be approved, provided
the test results of alternate procedures are substantially
equivalent to those determined using the test procedures
described in this section.
(ii) Prior approval from the ECPHA of alternate percolation test
procedures is required.
E. Marking of Soil Profile Test Pit Excavations or Percolation Holes
1. The engineer or technician conducting the soil profile test pit excavations or percolation
tests must, upon completion of the tests, flag or otherwise mark each excavation or hole
to allow easy location by others. Excavations must be suitably barricaded to prevent
unauthorized access and to address safety concerns.
F. Report and Site Plan
1. A written report must describe the results of the preliminary investigation,
reconnaissance, and detailed evaluations. The report may be in text and/or tabular form
and must include a drawing locating features relative to the proposed OWTS location and
test locations. The report may be included as part of the OWTS design document. The
report must include, but is not limited to:
a. Company name, address, telephone number, e-mail address, and name of
individual, credentials and qualifications of the individual conducting the site
evaluation;
b. Preliminary and detailed evaluations, providing information from the surface site
characteristics assessment and soils investigation;
c. Dates of preliminary and detailed evaluations;
d. A graphic soil log, to scale, indicating depth of the soil test pit excavation, soil
description and classification, depth to any limiting layer encountered, type of
equipment used to excavate the soil profile test pit and date of soils investigation.
e. Setback distances to features listed in Table 7-1;
f. Setback distances to features listed in Table 7-2, existing on the site or within
applicable setback limits,whichever is greater;
g. A drawing created to a scale that provides the complete property boundary lines.
The minimum drawing size is 8.5-inches by 11-inches. If the property is too large
to adequately indicate and label the profile test pits and percolation test holes, a
detail of the portion of the site containing the soil profile test pits and percolation
test holes must be submitted. If the property is too large to adequately show site
evaluation information, a detail drawing that includes the information required
from the site and soil evaluation that will impact the location of the OWTS must
31
43.5 Site and Soil Evaluation
be submitted. Drawings must indicate dimensions, have a north arrow and
graphic scale and include:
(1) Fixed, non-degradable temporary or permanent benchmark, horizontal
and vertical reference points of the proposed soil treatment area; soil
observations; percolation testing results and pertinent distances from the
proposed OWTS to all required setbacks, lot improvements, easements;
ordinary high water mark of a pond, creek, stream, lake,wetland or other
surface waters, and detention or retention ponds; and property lines;
(2) Contours or slope direction and percent slope;
(3) The location of any visible or known unsuitable, disturbed or compacted
soils;
(4) The estimated depth of periodically saturated soils and bedrock, or flood
elevation, if applicable; and
(5) The proposed elevation of the infiltrative surface of the soil treatment
area,from an established datum (either ground surface or a benchmark);
h. Anticipated construction-related issues, if applicable;
An assessment of how known or reasonably foreseeable land use changes are
expected to affect the system performance, including, but not limited to, changes
in drainage patterns, increased impervious surfaces and proximity of new water
supply wells, if applicable; and
j. A narrative explaining difficulties encountered during the site evaluation,
including but not limited to identifying and interpreting soil and landform features
and how the difficulties were resolved, if applicable.
G. Design Document
1. Qualified Professional Engineer Design Required
a. The OWTS design document, report and site plan as well as record drawings
must be prepared by a qualified Professional Engineer.
2. The report and site plan may be attached to the design document or the report and site
plan may be combined with the design information as a single document.
3. The design document must include a brief description of the facility and its proposed use,
basis and calculations of design flow, and influent strength.
4. The design document must contain all plan details necessary for permitting, installation
and maintenance, including:
a. Assumptions and calculations for each component, including total dynamic head
(TDH)and gallons per minute (GPM)for all dosing systems;
b. A fixed, non-degradable temporary or permanent benchmark, (North America
Vertical Datum or assumed elevation is acceptable);
32
43.5 Site and Soil Evaluation
c. A scale drawing showing location of each OWTS component and distances to
water supplies, surface water, physical and health impact features on both the
subject and adjacent properties requiring setbacks;
d. Layout of soil treatment area, dimensions of trenches or beds, distribution
method and equipment, distribution boxes, drop boxes,valves, or other
components used;
e. Elevation or depth of infiltrative surface of the soil treatment area, the septic tank
invert, and all other components of the OWTS;
f. Special structural design considerations, as applicable to ensure the long-term
integrity of each component;
g. References to design manuals or other technical materials used;
h. Installation procedures, as applicable;
Operation and maintenance manuals or instructions; and
j. Other information that may be useful such as photos and cross-section drawings.
H. Site protection: Prior to and during construction, the proposed soil treatment area and
replacement area, if any, must be protected from disturbance, compaction, or other damage by
means of staking,fencing, posting, or other effective methods.
Qualifications for a Competent Technician
1. Percolation Tests
a. Competencies needed:
(1) Set up equipment;
(2) Perform and run percolation tests according to the procedure in this
regulation; and
(3) Record results and calculate percolation rates.
b. The ECPHA may approve training for percolation testing.
2. Visual and Tactile Evaluation of Soil
a. Competencies needed:
(1) Identify soil types by hand texturing and observation;
(2) Identify presence or absence of soil structure;
(3) Identify type and grade of soil structure;
(4) Recognize evidence of highest seasonal water surface;
(5) Identify layers and interfaces that will interfere with effluent movement;
33
43.6 Wastewater Flow and Strength
(6) Determine the most promising depth for infiltrative surface of OWTS and
for percolation tests, if used; and
(7) Understand basic principles of OWTS siting and design.
b. Possible demonstrations of competence in visual and tactile evaluation of soil:
(1) Degree in soil science, agronomy, geology, other majors if a course(s) in
soil morphology was included; or
(2) Attendance at training or workshop for soil evaluation for OWTS
including both class and field work.
(i) If the training or workshop includes an exam to verify acceptable
completion of the course, a passing grade on the exam must be
attained.
c. The Division must approve training for visual and tactile evaluation of soil.
43.6 Wastewater Flow and Strength
A. Wastewater Flows
1. The ECPHA may require the installation of a meter to measure flow into the facility or the
OWTS.
2. Single-Family Residential Homes:
a. Design flow per person must be 75 gallons per day(gpd).
b. The ECPHA may only increase the wastewater design flow per person to 100
gpd on a case by case basis, where justified.
c. The minimum design flow for a new home must be for a two-bedroom house
unless otherwise noted in this regulation. The minimum design flow for the repair
or replacement of an OWTS of an existing one-bedroom home must be for one-
bedroom unless bedrooms are added.
d. For homes up to and including three bedrooms, the assumed number of persons
per bedroom is two for design purposes.
e. For homes with more than three bedrooms, the assumed number of persons is
six persons(first three bedrooms x two persons per bedroom)plus one additional
person for each bedroom more than three bedrooms.
g. Table 6-1 summarizes the design flows for single-family residential homes up to
six bedrooms.
34
43.6 Wastewater Flow and Strength
Table 6-1 Single-Family Residential Design Flows
#Bedrooms Occupancy(#of Wastewater Flow Per Design Flow
Persons) Pmrswn (gaUqna/dao) (gallons/day)
2 4 75 300
3 6 75 450
4 7 75 525
5 8 75 600
6 9 75 675
3. Auxiliary Buildings
a. If a single-family home has an auxiliary building, such as a non-commercial shop
with plumbing fixtures, the flow may be conveyed to the OWlS of the home, or to
a separate OWTS constructed to handle the flow from the auxiliary facility.
b. If the flow from the auxiliary building is only generated by residents of the home,
it will be assumed that the OWTS for the home will be adequately sized to
include the auxiliary building if the flows are combined.
c. If the auxiliary building will have users in addition to residents and the flow from
the auxiliary building will flow to the OWTS of the home, the design flow of the
home must include the increased use.
d. If the auxiliary building has a separate OWTS, the facility must be sized on the
basis of Table 6-2 and a septic tank detention time of 48 hours.
4. Multi-Family and Commercial On-site Wastewater Treatment Systems
a. Design flow values and strengths for multi-family and commercial systems must
be determined from:
(1) Table 6-2; or
(2) An analysis of flows and strengths from at least three comparable
facilities or from the facility, if it is an existing facility, must be submitted
to the local public health agency for approval. The analysis must include:
(I) Metered water flows for inside use only for at least a year, or if
use is seasonal, for a full season. If metered flows are less than
full capacity, they must be paired with actual use in units of
persons present or meals served or other units as appropriate so
that an actual daily rate per unit can be determined. The daily
rate per unit times the number of units at full occupancy will be
the design flow.
(ii) Total Suspended Solids and BOD or CBOD tests at times of
full use. At least three samples taken at least one week apart are
35
43.6 Wastewater Flow and Strength
required. Sampling that provides equivalent and representative
data through "composite sampling" may be allowed
(iii) Explanation and justification for the comparability of the tested
facilities with the proposed facility.
5. Flow Equalization
a. Flow equalization may be used if a facility has flows that vary from day to day by
more than four times the average flow.
b. The highest peak assumed must be at least equal to the full capacity of the
facility.
c. The stored flow must be distributed to the soil treatment area before the next
greater-than-average peak.
d. Flow equalization may be used only if:
(1) The facility is non-residential;
(2) The facility is only used for one purpose;
(3) Flows will follow a predictable pattern; and
(4) There is a long-term expectation that size and pattern of the flows will
remain the same.
e. Timed dosed pressure distribution or timed dosed NDDS must be used. The soil
treatment area reduction for pressure distribution (Table 10-2) must not be used
in addition to the flow equalization reduction.
f. Contingency plans must be made for expanding the capacity of the OWTS in the
event of changed use at the facility.
TABLE 6-2 For Design Purposes,the Estimated Daily Wastewater Flow and BOD 5 Load Per
Person Unless Otherwise Noted
RESIDENTIAL GPD BOD 5 IN POUNDS PER
WASTEWATER DAY
Single-family dwellings 75 .20
Auxiliary buildings, by
fixture type
Bath/Shower 14.7 .014
Dishwasher 1.8 .002
Kitchen sink with garbage 5.8 .052
grinder
Laundry washer 19.5 .037
36
43.6 Wastewater Flow and Strength
Lavatory 8.4 .021
Water closet(toilet) 24.8 .029
Hotels and motels per room 75 .15
Multiple-family dwellings or 75 .20
apartments
Boarding and rooming 50 .15
houses(users absent
during working hours)
Tiny Homes3, per unit 150 .40
Mobile home 75 .20
Mobile home park per 300 .80
space
COMMERCIAL GPD BOD 5 IN POUNDS PER
WASTEWATER DAY
Facilities with short-term or
transient visitors
Examples: Airports or bus 5 .02
stations per passenger;
fairgrounds per person
attending; ball parks, race
tracks, stadiums, theaters or
auditoriums per seat
Airport per employee 10 .06
Barber and beauty shops 100 .701
per chair
Bowling alleys per lane- 5 .031
toilet wastes only
Country club per member 30 , .02
County club per employee 20 .06
Dentist offices per non-wet 50 .141
chair
Doctor offices per doctor 250 .801
37
43.6 Wastewater Flow and Strength
Factories and plants 20 .05
exclusive of industrial
wastewater per employee
per eight-hour shift—no
showers
Factories and plants 35 .08
exclusive of industrial
wastewater per employee
per eight-hour shift-
showers provided
Kennels per dog 30 .20
Laundries, self-service per 400 .75
commercial washer
Office buildings per 15 .06
employee per eight-hour
shift
Service stations per toilet 250 .501
fixture
Stores and shopping .1 .011
centers per square foot of
retail space
Work or construction camps 50 .17
semi-permanent with flush
toilets
Work or construction camps 35 .02
semi-permanent without
flush toilets
FOOD SERVICE GPD BOD 5 IN POUNDS PER
ESTABLISHMENT DAY
Restaurant open 1 or 2 50 .06/meal
meals per seat
24-hour restaurant per seat 75 .07/meal served
Restaurant with paper 25 .01/meal served
service only per seat
Additional for bars and 30 .02
cocktail lounges per seat
Drive-in restaurant per car 50 .02
space
38
43.6 Wastewater Flow and Strength
INSTITUTIONAL GPD BOD 5 IN POUNDS PER
WASTEWATER WITHOUT DAY
KITCHENS UNLESS
OTHERWISE NOTED
Churches per seat;without 3.5 .01
any food service, or other
uses
Churches, per seat; 5 .01
warming kitchen only, no
major food service
Churches, per seat; with 4 .02
food service, per meal
served/
Hospitals per bed space 250 .20
Nursing homes; Group 125 .20
homes for developmentally
disabled, per bed space
Schools, Boarding per 100 .17
person
Schools, Day without 15 .04
cafeteria, gym or showers
Schools, Day with 20 .08
cafeterias, no gym or
showers
Schools, Day with 25 .10
cafeterias, gym and
showers
Schools, Day additional for 15 .06
school workers
RECREATIONAL AND GPD BOD 5 IN POUNDS PER
SEASONAL DAY
WASTEWATER USE
Camps, day, no meals 15 .12
served
Luxury resort 125 .17
Resort night and day 50 .12
Campground per campsite2 50 .12
39
43.6 Wastewater Flow and Strength
Public park flush toilet per 36 .04 lbs./fixture
fixture per hour when park
is open
Public park urinal per fixture 10 .01 lbs./fixture
per hour when park is open
Public park shower per 100 .10 lbs./fixture
fixture per hour when park
is open
Public park faucet per 15 .04 lbs./fixture
fixture per hour when park
is open
Swimming pools and 10 .06
bathhouses
Travel trailer parks with 100 .24
individual water and sewage
hookup per unit 2
Travel trailer park without 50 .12
individual water and sewage
hookup per unit 2
1 BOD levels need further verification depending on the specific use of the facility.
2 Laundry facilities are to be calculated on a per commercial washer basis in accordance with other elements of this table.
3 For the purposes of this Table,a'Tiny home"is a structure(a non-recreational vehicle)that has only one bedroom and
has<400 sq.ft.of livable space,including lofts.In this instance,the OWTS may be sized for only one bedroom.
4 For churches with food service,the 4 gal/meal must be added to the 3.5 gal/seat to determine projected design flows.
B. Wastewater Strength
1. Table 6-3 includes levels of treatment that can be achieved by various OWTS
components, excluding the soil treatment area. Systems qualifying for these treatment
levels except TL1 produced by a septic tank alone must be approved under section
43.13. of this regulation.
2. High strength waste must be reduced to at least Treatment Level TL1 quality or lower
before applying to a soil treatment area. Waste strength levels defined in Tables 6-3 and
6-4 must be used to determine compliance.
Table 6-3 Treatment Levels
Treatment Level BODS CBOD51 TSS Total Nitrogen
(mg/L) (mg/L) (mg/L) (mg/L)
TL12 180 - 80 60-80
25 30 N/A
TL2N 25 30 >50%`reduction4
40
43.7Minimum Distances Between Components of an On-site Wastewater Treatment System and Physical
Features
Shading indicates higher treatment levels.
1 Requirements for CBOD5 are only related to effluent samples from a higher level treatment system.
2 Domestic septic tank effluent prior to soil treatment or higher level treatment has a wide range of concentrations.These
values are typical,but values used for design must account for site-specific information.
3 Total Nitrogen does not apply to Treatment Levels TL2 and TL3.Processes intended to reduce total nitrogen are
addressed in Treatment.Levels TL2N and TL3N.Any total nitrogen reductions that may be observed for TL2 and TL3 are
as a result of the treatment process for BOD5 and TSS reductions.
4 NSF/ANSI Standard 245—Wastewater Treatment Systems—Nitrogen Reduction requires reduction of 50 percent rather
than an absolute value.
Table 6-4 High Strength Wastewater*
BOD5 TSS Fats,Oils, Grease
(mg/L) (mg/L) (FOG)
(mg/L)
Septic Tank Influent >300 >200 • >50
Septic Tank Effluent >180 >80 >25
*High strength effluent prior to a septic tank has a wide range of concentrations.These values are typical,but values used for
design purposes must account for site-specific information.
43.7 Minimum Distances Between Components of an On-site Wastewater Treatment System
and Physical Features
A. Horizontal distances from the various components of a system to pertinent terrain features,
including streams, lakes, water courses, springs, wetlands, wells, subsurface drains, cisterns,
water lines, suction lines, dry gulches, cut banks, dwellings, other occupied buildings and
property lines, must be in accordance with Table 7-1. The setback requirements are applicable
for minimum system performance and treatment levels with specific modifications allowed for
higher treatment levels as provided in Table 7-2. All distance setback modifications must be
analyzed and approved by the Board of Health or the ECPHA and be in complete compliance
with the variance procedures of this regulation and those of the Board of Health. Acceptable
methods of analyzing horizontal separation distances with higher treatment levels include but are
not limited to:
1. Analyzing the intended uses of impacted surface and/or ground waters;
2. Contacting adjacent property owners for potential conflicts with property line
encroachments; and
3. Analyzing potential impacts that system locations may have on building foundations and
other potentially affected features.
B. Reductions in separation distances with higher level treatment must include provisions for
operation and maintenance for the life of the system, as described in section 14.D.
C. Dry Gulches, Cut Banks and Fill Areas
41
43.7Minimum Distances Between Components of an On-site Wastewater Treatment System and Physical
Features
1. Separation distances to dry gulches, cut banks and fill areas in Table 7-1 must apply
unless the designer or design engineer determines by observation of the exposed slope
of the dry gulch or cut bank or by soil profile test pit excavations that a limiting layer is
present that will direct or allow the effluent from the soil treatment area to move laterally
and surface. In this instance, a greater distance may be required.
2. A lesser distance may be used if it can be demonstrated by a professional engineer or
professional geologist that the use of a barrier, such as a minimum 30 mil PVC liner
placed between the soil treatment area and the slope of the dry gulch, cut bank or fill
area will prevent effluent surfacing laterally.
3. The separation distance between a component and the crest of a dry gulch or cut bank
will be evaluated for potential erosion or slope instability if the component and the slope
are too close together. If there is potential for erosion or instability, the separation
distance must be increased until the risk is minimized.
D. Components of an OWTS listed in Table 7-1 shall be installed or located in accordance with the
minimum distance requirements provided in the table or such increased distances provided by
local board of health regulations.
E. Table 7-2 provides the required site evaluation, design, and treatment level considerations
necessary to evaluate the site and to design and locate the soil treatment area component of an
OWTS.
1. Items 1, 2 and 3 in Table 7-2 address the allowable horizontal setback distance between
the soil treatment area and the following physical features:
a. Setback distance from soil treatment area to on-site well;
b. Setback distance from soil treatment area to water features;.and
c. Setback distance from soil treatment area to a dry gulch or cut bank.
2. Item 4 in Table 7-2 addresses the required vertical separation distance between the
infiltrative surface of the soil treatment area and the limiting layer or the required depth of
soil comprising the soil treatment area.
3. The designer may select the level of treatment from Table 7-2 to be applied to the soil
treatment area that is necessary in order to accommodate the site conditions, if higher
level treatment for that purpose is permitted by the ECPHA.
42
co
-a-
------- o
-A 4e, c ...• z• 11111 1%1 1 .c-•
111
*A-
,.. - --- e 0 --
0 a) t- t-• ..-• -t• i-
t).
= 0-9?t--• • ‘-* o
*ea -0 a) -1, <-•
U-
4)
tl.. ia 01111111011
Tcs ...•
to ,---
.,•
.0 o
17) ..S . .• .4: o o)
->••
0,_ 0
44 oi.:64. <-•
us
111
C ".• Z.0 ........:„ cr)
co to 0 o 0
E ...•
C -o o to
>, 0
(I)
0
E.
-1 --
E.
t 0 o
0111
sii) tr) 0 5.1), p ca •.• 0
TtS es coe. itt,Se o .4•"'
-, i... — t 0 ....• -e- o
(i)- 0
V)
ca
3
0 0 c c o
.<--
c , 0..•0..-
C ,13 .-000e-I-P .10 ,
0 *s 0 0
C
0
0 .... 0 ,... 0.. .1111
0 .. 0..
-0. 0
00 0 <-
0 .,... u... ., 03 ° ..... 0
0 0 0 00e0 0 ,-
0_ t) 1$.
CS i %
o 0
0 a)--c. 0') .0
C
a)
a) 01 0 o
- a)
to
' . ...%
0,) 0 .0
° 0
. Ix-
a)
0 • o ,... 00 %-0 .--
as
To' 0 3 cc)
5 0 A
os to o
..,-• 0- 0 o
0 .,-
o ti l'a (•-0 0- .3) •,- o
E 40 "15 ••••• o. c o (0
c ..-• 0 05
t 0 (r)
0
0 `0 0- C•I
0 ...
G - "rr
-- ‘1"
CI - 15 0 .00
(2,) iii) a)
..- cil 0- C• ,c,
-CI -
dr -.9. 0 o 0 o V- lo -o (8 .-• b c"E5 .°,) 0 3.
es)
3. tf) 0 .•-
4 cis 0 ..-0
if)
S..,..t, (5'-) (I) :1-...
.... ..— (j)
.s. a. tt
050
.--• a)
'2 0
,-
s
0. co." k- u-• 0- ° ..C- -1 ."'
, c 3) c 1.-- .-• c. S 4.-6 s .,..e. 0 ...1
0
-e-z
%IA
.0 o ...,- ‘..- -
es (I) -1-
t-
co
L -s N cdi-
� .
°
- o - c a)N p TO ° a °
0)@ N L
(0 O N o (au) v-° • v
U Z N o 0 O E m p N °) 2 N p E
• Lo co °ods > 3 n._ c
j� o(aa E .o 2 ' mEv_, aNi
a 8 j a) -o
(Q L 70_C O•° p N L U) N— a) E
E °•am c v aNi 3 y o CO
4? `o n N y > 3 o E3In tcz
CO L() O 06 N > N=00- CO o CD C N.c)
(� N C 5 C N o.c N a) 'a)N
O co(o °) °) °�N.. a) E o w a)
N w N^co C.0 a) C pp )
Q) w •w > a) c N co 3 ° O CO
v.EU N 0 _N a N c C E F- (a CCS0 c
N 0 CO co co 0 d a) as 0 >o ami CO m.. rn c
L O a)CV N.r N c(00.0 L N N c ' o a)
N a)00.2 >' a) >.0•O(� O O c p c
C >.f6 N w
N co o CD c�� E a) -°o 5_w n
Ca 0 °O E d' c6•n w N a) o•.c
N ro' N as N C)U d C n°)O
a) °L E a O g N.c01 2 co O O
ca aco
a)) N c y co 30co� o a) c c
.0 O C >. .0 a) Q a) ,- a) C C a)
N a) (n v O a3_ O W
4E'
0 0 (6 co co D)N co n °)U ° leo N
3 c E O 0) 3 C C ° y m o> N L E
N 0 IN .-CO C 0 to N E CO 7 0 n•L
N 7 F-LN :,452
O E m 0' CV-- V n
wn d u,oo0-a)
O w e0 ° 3Mv 8.9-ma co E2C
4.. C N 2 a) - -Q'O w a O c) C L
O E•co (o C 0)•c N.L.+ °- 0 E 0:�'- O.
CO Cr) 0 coca) ° la wtm CUNV_c c-c0 ° p
[ N co m •p m N c c a°)) E m a) m
Ca° N C 0 v co'V C a) s p C > c
o Ec0a) ca > 0 E•- E w' E3°
Q p O °- o `O N c a) a) L O)al 0�p
Q U U N n 7 O N N �u) N C U1 U
o cow N 0 N a) N N O a) O 30.co o O 0-
F- '- c p >L 0 C n a
V c6� n O O spa-N L a) C..•0 a1
Ln 3 N J N a)CO U L~ O m L °N a)
a)
in O ci a) O E 0 U°1 T"�
O Lf) N w . N .- ° acid o.•N0 :3 a� ` CO cn
_ c
3 N >o o o a°L° °'L > CO o
16 N> a) 3 c c -a C 0.)
° f0 0 > vl
m as E. o m ECCc E E >.•ca °8p
a) aCO ° _ (0 c"4-c m aEi N L w ° c 0 w
_ 0 a 3 a3 co �N�aa c p-en °o
C.)--
i Nca
_ co a) C w•E. ac) O N w E L
La C a)co c 0 .9 O o c N" 0 m N L N
Ln N Ew ° m o CLE o = O N co N CO
(NiE ° °pm E c)a� ° an �O NL 3 o
-0 11) Nya L >`QE
E
15c°25
o (cou €aa,CSO.' a) @U-0 E
L a)
° c2 N a a) a c c_c..'-' wo ^0)N O.0
c,� N N o2 o c m o 8� p o c0 o_ c c°)
d' m W O 0. c„N„a c-0 o a)
3 To= 'c O - m cNJ
o L N n. *E °C'.L... N oo a`a)) E N z 0)C
{p N
L'0-GU '- E O U4- no-- >, oo.
NW N U ° a)L n°a COL j 0 E
co c°) v1-y 3 oy0tc°;0U -o0)_IC
W '0 0 0 O
O O N a)O-0 .0 co c°a 0-3 > N- m °as a w E
0-
>,C j ° ° c ° a) cc c ) (o(o 2
ED E!)1 0 0. os 0 C O° 70•° L ° N 2 N
EN � a a) c ° cPna) m> w°)F- o)°°'
) 4- s_ L. 'c a)= 015a a •0 N c co L O 0 C N C
0
o w L .c O E cCCS � ° 20) 0 °75-° °- V 0) O N
CO ,-c-) f co E E o Q o .`- Q a)yc O'0oNwOt° Q dEl�v
ct O ca : a) a) O I Co F- H v m v
c � d o (n CO L Z c� O r0 J +�w '_ • 0)
O c6 L O- >. C . 0
O Oo. o f (/) o CO E o C cu 0 O Z O p 0 j
c6 co o LL1 cO a N N co C E Q 0 > E rn 12 z CD O N A- CV M
co) 3 = c ate) }' 7 .S I) �'•>,m C F- d °= >. a
du) 2D11 •aOD > oCtF- w ci) d u) ceO
$
Cl)
ƒ tas \
7 \7%
a \/a
\\�
13 %\ 3
E
co\\\
�\c
Cl) =
f $ §
3 3 \k
E $ °G «
% #$ a
E tE0 o
¥ %_ > ®
udi �� � /
\ �\» $
e
if-) I
as \ %t 5
\ \
2 % 4 a
\ % f_ «
C o- 5 a
0 \\ § ? 7
§ a6/ \ 0)
® oak / /
0 22\ { J
\ \\$ >, 2
O. f $Z f \
/ /k/ \
c o §� e =
S
% \ƒ± 2 •
5
\ fk\ \ '
CO §/ f = E
4 EQ
$ °
t %ƒƒ to �
C
�k} \ G
»& ° . )
� \t\ o \
k\E \ƒ kƒk ff f \\® am =2
-45
ri
\0 \
sib \ %
-0"6 7
/k/ - f
em, 3 .
U)0 \ \
�/ /\$ k§ ) $C
\ƒ) \ /
m 6
43.8 Design Criteria—General
Table 7-2 On-site Wastewater Treatment System Design Consideration and Treatment
Requirements—Separation Distances from Soil Treatment Area
PRESSURE PRESSURE PRESSURE
DOSING DOSING DOSING
REQUIRED REQUIRED REQUIRED
ITEM OWTS DESIGN Treatment Treatment Treatment Treatment
CONSIDERATION Levels 1 and 2 Level 2N Level 3 Level 3N
Horizontal Separation
Distances
1 Distance from soil Greater than Greater than Greater than Greater than
treatment area to on- or equal to 100 or equal to or equal to or equal to 100
site well feet 100 feet 100 feet feet 1
2 Distance from soil Greater than Greater than Greater than Greater than
treatment area to pond, or equal to 50 or equal to or equal to or equal to 25
creek, lake, or other feet 25 feet 25 feet feet
surface water feature
3 Distance from soil Greater than Greater than Greater than Greater than
treatment area to dry or equal to 25 or equal to or equal to or equal to 10
gulch or cut bank feet 10 feet 10 feet feet
Vertical Separation
Distances
4 Treatment depth in feet 4 feet2 (3 feet Greater than Greater than Greater than
from infiltrative surface with pressure or equal to or equal to or equal to 2
to a limiting layer dosing) 2.5 feet 2.5 feet feet
NOTE:Treatment levels are defined in Table 6-3.Reductions in separation distances with higher level treatment may be granted
only if the local public health agency regulations have included provisions for operation and maintenance.
1 All setback distance reductions to the 100 foot requirement for wells and soil treatment areas must be in full compliance
with the minimum standards and variance requirements of the State of Colorado Division of Water Resources:Rules and
Regulations for Water Well Construction,Pump Installation.Cistern Installation,and Monitoring and Observation
Hole/Well Construction.For TL 3N effluent,a reduction to 75 feet is allowed if a variance from the Water Well Construction
Regulations is obtained.
2 Reductions in the vertical separation requirements for the use of higher level treatment systems with seepage pits are not
allowed,The bottom of the excavation of a seepage pit must be a minimum of four feet above a limiting layer.
43.8 Design Criteria—General
A. The OWTS for single-family homes shall be designed to accommodate the proposed flows from
the structure as defined in 43.6.A.2. Flow estimates for multi-family or commercial OWTS must
comply with 43.6.A.4 Expected waste strength as noted in Table 6-3 and Table 6-4 must also be
addressed, where applicable. Installation of low flow fixtures or the separation of toilet waste or
other sources of wastewater does not allow for the reduction in the size of an OWTS.
46
•
43.8 Design Criteria—Genera
8
OWTS shall be designed and constructed to achieve the treatment levespecified by the design.
C. OWTS must be designed and constructed such that each component shall function, when
installed and operated, in a manner not adversely affected by normal operating conditions
including erosion, corrosion, vibration, shock, climatic conditions, and usual household chemicals.
Each component must be free of non-functional protrusions or sharp edges, or other hazards,
which could cause injury to persons, animals, or properties. Design must be such as to exclude
flies and rodents and other vectors and to prevent the creation of nuisances and public health
hazards and must provide for efficient operation and maintenance.
O. Accessibility for Inspection, Maintenance, and Servicing
1. Septic tanks must have watertight risers over each access manhole and all risers must
extend to or above final grade.
2. For new construction, the top of any septic tank, dosing tank or vault must be no deeper
than four feet below finished grade.
3. Each treatment component of an OWTS other than the septic tank and soil treatment
area must be equipped with access manholes with risers that extend to or above final
grade, located to permit periodic physical inspection, collection and testing of samples
and maintenance of all components and compartments.
4. Riser Lids
a. Each riser lid must be watertight, brought to or above the surface, and must have
a secure closing mechanism, such as a lock, special headed bolts or screws, or
sufficient weight(defined as 59 pounds)to prevent unauthorized access.
b. The ECPHA may require a secondary plug, cap, cover or screen be provided
below the riser cover to prevent tank entry if the cover is unknowingly damaged
or removed.
5. Components that require access for maintenance must include but not be limited to
submerged bearings, moving parts, pumps, siphons, valves, tubes, intakes, slots,
distribution boxes, drop boxes, cleanouts, effluent screens, filters, inlet and outlet baffles,
aerators, treatment equipment and other devices.
6. Components must be designed and constructed so that,when installed, they must be
easily maintained, sampled, and serviced according to the manufacturer's
recommendations. Easy physical access to treatment components by maintenance
personnel and equipment must be provided.
E. Plumbing Codes: Plumbing fixtures, building sewers, vents, sewer lines and other appurtenances
must be designed, operated and maintained so as to comply with the minimum requirements of
the most recently revised locally enforceable plumbing code. In absence of a local plumbing
code, designs must adhere to the Colorado Plumbing Code (3 CCR 720-1). A local plumbing
permit may be required.
F. Electrical Equipment, If Used
1. All electrical work, aqu/pment, and material must comply with the requirements of the
currently applicable National Electrical Code as designated by the State Electrical Board
Rules and Regulations(3 CCR 710-1).A local electrical permit may be required.
47
43.8 Design Criteria—General
2. Electrical components must be protected from moisture and corrosive gases.
G. Indicators of Failure or Malfunctioning for Systems Utilizing Mechanical Apparatus:A signal
device must be installed which will provide a recognizable indication or warning to the user that
the system or component is not operating as intended. This indication or warning must be a visual
signal and an audible signal, and be located in a centralized area within visual and audible range
of the system user.A signal or message may also be sent remotely to a maintenance provider.
H. Sampling Access
1. If sampling for testing or as a requirement for a permit will be required of effluent from a
component other than the soil treatment area, an accessible sampling point must be
provided.
2. If sampling of the treated wastewater from the soil treatment area will be required for
testing or as a requirement for a permit, a monitoring well or wells must be constructed.
Monitoring wells must be located down gradient from the soil treatment area, accessible,
and provided with a properly securable cover at or above the ground surface. Monitoring
wells up gradient of the system may also be required. Lysimeters or other collection
devices under the soil treatment area may be used instead of a monitoring well if
approved by the ECPHA or other issuer of a permit.
Component Operating Instructions
1. The manufacturer of proprietary treatment units utilizing mechanical components must
provide clear, concise written instructions covering the components which,when
followed, must assure proper installation and safe and satisfactory operation and
maintenance.
2. If the OWTS uses public domain technology, the design engineer must provide clear,
concise written-instructions covering the components which, when followed, must assure
proper installation and safe and satisfactory operation and maintenance.
J. Surface Activity:Activity or use on the surface of the ground over any part of the OWTS must be
restricted. The soil treatment area must not be subject to damage or soil compaction from
livestock, vehicular traffic, recreational use, or other site development activity. Construction
equipment not necessary to install the OWTS must be kept off of the soil treatment area to
prevent undesirable compaction of the soils. If compaction occurs, the disturbed or compacted
soil must be re-evaluated and/or new soil evaluations performed. The system must be redesigned
if the soil permeability have changed.
K. Floodplains
1. A new, expanded or repair/replacement OWTS installed in a 100-year floodplain must
meet or exceed the requirements of the Federal Emergency Management Agency and
the local emergency agency. Repairs of an existing system must meet the requirements
as feasible. The system as approved by the ECPHA must be designed to minimize or
eliminate infiltration of floodwaters into the system and discharge from the system into the
floodwaters. The OWTS must be located to avoid impairment to floodwaters or
contamination from them during flooding.
2. A new or expanded OWTS must not be installed in a floodway designated in a 100-year
floodplain where a conforming OWTS outside the floodway can be installed. For any new
OWTS or system repair that may affect the floodway delineation, appropriate procedures
must be followed including revision of the floodway designation, if necessary.
48
43.9 Design Criteria—Components
L. Business Commercial, Industrial, Institutional or Multi-Family Dwelling Wastewater Systems
1. An OWTS that will serve a business, commercial, industrial or institutional property, or a
multifamily dwelling must:
a. Be designed by a professional engineer;
b. Receive only such biodegradable wastes for treatment and distribution as are
compatible with those biological treatment processes as occur within the septic
tank, any additional treatment unit and the soil treatment area; and
c. Receive authorization by rule or a class V underground injection permit from the
United States Environmental Protection Agency(EPA) before an application for
an OWTS permit is approved if the system may receive non-residential
wastewater or is otherwise covered by the EPA underground injection control
program. Subsequent to acceptance by the EPA, the ECPHA may choose to also
issue a permit for this type of use.
43.9 Design Criteria—Components
A. Tanks and Vaults
1. Watertightness
a. Septic tanks, vaults, dosing tanks, other treatment components, risers and lids
must not allow infiltration of ground water or surface water and must not allow the
release of wastewater or liquids through other than designed openings.
b. When the final compartment of a tank is being proposed for use as a pump or
siphon chamber, the wall between this chamber and the previous chamber must
be watertight except for the intended hydraulic opening.
c. Acceptable watertightness testing methods performed at a manufacturer's site or
in the field include water filling the tank or vacuum testing.
2. Tank Anchoring: In locations where ground water or floodwaters may cause instability
problems to the septic tank, vault, or other treatment unit in the OWTS due to flotation,
the tank, vault or unit must be anchored in a manner sufficient to provide stability when
the tank is empty. Risers must be included in the buoyancy calculations.
a. If a manufacturer provides recommendations for anchoring designs,they may be
used if they meet the conditions present at the site.
b. If a manufacturer does not provide recommendations for provisions to
compensate for buoyancy, or if the professional engineer chooses to provide
his/her own designs, the anchoring system design must be prepared by the
professional engineer.
3. Identification and Data Marking:All tanks and treatment units must be permanently and
legibly marked in a location for the purpose of inspection that is readily visible when
inspected before backfilling.The marking inscription must include the following:
a. Name of manufacturer;
b. Model or serial number, if available;
49
43.9 Design Criteria—Components
c. Effective volume and unit of measure;
d. Maximum depth of earth cover and external loads the tanks is designed to resist;
and
e. Inlet and outlet identifications, if relevant.
B. Septic Tanks
1. The manufacturer must provide sufficient information to demonstrate that the tank will
meet the design specification.
2. Sizing Requirements:
a. Sizing for residential capacity for new installations must be based upon the
number of bedrooms according to Table 9-1:
Table 9-1 Minimum Septic Tank Size Based on Number of Bedrooms
Number of Bedrooms Tank Capacity(gallons)
2 or 1,000
4 1,250
Each Additional 250
b. For multi-family and non-residential applications, a septic tank must be sized to
permit detention of incoming wastewater design flows for a minimum of 48 hours.
c. For systems that remove toilet waste for separate treatment, tank capacity may
be less than 1,000 gallons, if it provides a minimum of 48 hours detention time.
d. Minimum tank size for new installations other than for a single-family residence is
400 gallons.
3. Inspection and Testing of Septic Tank Watertightness
a. Testing of septic tanks must be performed and evaluated as specified in section
9 of ASTM C1227-13(2013 version)(Standard Specification for Precast Septic
Tanks)for concrete tanks or in Standard IAPMO/ANSI Z1000-2013 (2013
version)(American Standards for Prefabricated Septic Tanks)for other
prefabricated septic tanks.
b. Each unit must be inspected in the field for conditions that may compromise its
watertightness.
c. The inspection in the field must be conducted by the local public health agency
and be performed after the tank installation but before backfilling.
d. If the inspection in the field indicates that the tank may be damaged or is not
watertight, the inspector may require that the tank be tested for watertightness by
the tank manufacturer or the system contractor.
4. Septic Tank Design and Dimension Criteria
50
43.9 Design Criteria—Components
a. A septic tank must have two or more compartments or more than one tank may
be used in series.The first compartment of a two-compartment tank or the first
tank in a series must hold no less than one-half of the required effective volume.
b. Inlet invert must be at least two inches higher than the outlet invert.
c. Inlet tee or baffle must extend above the surface of the liquid at least five inches
and must extend a minimum of eight inches below the liquid surface. However
the inlet tee or baffle must not extend to a depth of more than 40 percent of the
liquid depth measured from the liquid surface.
d. Outlet tee or baffle must extend at least 5 inches above and 14 inches below the
outlet invert, however it must not extend to more than 40 percent of the liquid
depth measured from the liquid surface. The outlet tee or baffle that
accommodates an effluent screen must be located so that the effluent screen
has sufficient clearance to be removed through the access opening with a riser in
place.
e. The distance from the outlet invert to the underside of the tank top must be at
least ten inches.
f. Liquid depth must be a minimum of 30 inches and the maximum depth must not
exceed the tank length.
g. The transfer of liquid from the first compartment to the second or successive
compartment must be made at a liquid depth of between 35 and 40 percent of
the liquid depth measured from the liquid surface.
h. At least one access opening no less than 20 inches across must be provided in
each compartment of a septic tank.
A septic tank must have a minimum of 25 square feet of liquid surface area and
have at least a six-foot separation between inlets and outlets. Septic tanks in
series, combined, must have a minimum of 25 square feet of liquid surface area
and the sum of the distances between inlets and outlets of all tanks must be at
least six feet. The requirements for liquid surface area and separation between
inlet and outlet may be waived for tanks with less than 750 gallon effective
volume.
5. Concrete Septic Tank Structural Design
a. Concrete septic tanks must comply with the structural design criteria of ASTM
C1227-13(2013 version)(Standard Specification for Precast Septic Tanks).
b. The design for each tank model and size by each manufacturer must be certified
by a professional engineer as complying with these design and structural
requirements and the watertightness standard of this regulation.
c. Certification by a professional engineer must be submitted to the Division for
acceptance.
d. Tank slab lids, mid-seam tanks, and the connections between the tank and risers
must be designed to provide for a watertight seal.
6. Fiberglass, Fiberglass-Reinforced Polyester, and Plastic Tanks
51
43.9 Design Criteria—Components
a. All fiberglass,fiberglass-reinforced polyester, and plastic tanks must meet the
minimum design and structural criteria of IAPMO/ANSI Z1000-2013 (2013
version) (American Standards for Prefabricated Septic Tanks)and be certified by
a professional engineer as meeting these standards. The professional engineer
certifying the criteria must be registered or licensed in the United States, but
need not be registered in Colorado.
b. All tanks must be sold and delivered by the manufacturer or manufacturer's
designated representative, preferably completely assembled. On-site tank
assembly will be allowed on an as-needed basis.
c. Tanks must be structurally sound and support external forces as specified in the
standard referenced above when empty and internal forces when full. Tanks
must not deform or creep resulting in deflection of more than five percent in
shape as a result of loads imposed.
d. All tanks must be constructed of sound, durable materials and not be subject to
excessive corrosion, decay,frost damage, or cracking.
e. All seams or connections including to risers must be sealed to be watertight.
7. Metal tanks are prohibited.
C. Abandonment of Tank
1. A tank may be completely removed and the parts disposed of safely.
2. If the tank will remain in place:
a. The tank must be pumped to remove as much waste as possible;
b. The bottom of the tank must be broken so the tank neither floats nor fills with
water;
c. The top must be collapsed and the sides may be broken into the void;
d. The remaining void must be filled with gravel, sand or compacted soil; and
e. The filled excavation will be graded to surroundings, allowing for settling.
3. The ECPHA may require abandonment of a tank that is deemed to be a hazard.
D. Pipe Standards and Bedding Requirements:
1. Pipe Standards
a. All wastewater pipes used in portions of an OWTS that are pressurized must be
constructed of compatible pipe, primer, bonding agent, and fittings. Flexible
couplings to connect pipes may only be used in portions of an OWTS that are
intended for gravity flow of the wastewater.
b. Where unperforated plastic pipe and fittings are used for gravity flow, the
minimum wall thickness of the pipe must conform to ASTM Standard D 3034-16
(2016 version)or equivalent or greater strength. Schedule 40 pipe is preferred.
52
4I9 Design Criteria—Components
•
c. Perforated distribution pipe surrounded by rock within a soil treatment area must
have a minimum wall thickness and perforations conforming to ASTM Standard
D 2729-17(2017 version)or equivalent or greater strength. Corrugated
polyethylene pipe with smooth interior that meets ASTM F405-13 (2013 version)
or AASHTO M252-09(2009 version)specifications or equivalent may be used.
d. Schedule 40 [ASTM Standard D 3034-16(2016 version)]or pipe of equivalent or
greater strength must be used for the placement of piping under driveways or
roadways and in instances where sewer line setback distances are granted a
variance for any reason.
e. Tile pipe, open-joint pipe, and cast iron pipe must not be used in an OWTS.
f. Pressure pipe must be rated for the intended use to accommodate pump
discharge pressure.
2. Bedding: All system piping, except for distribution laterals within the soil treatment area,
must be bedded with select material before final inspection by the local public health
agency. Select bedding material must consist of loose, granular material, free from
utoneu, n/odo, frozen soil, or other deleterious material. Select material may consist of on-
site job-excavated or imported material. Bedding material must be mechanically
compacted to support piping.
E. Cleanouts required between the building and the septic tank:
1. Cleanouts must have a secure cap and a riser extending to or easily accessible from
grade.The installation of a straight tee or sanitary tee is acceptable.
2. Cleanouts must be provided within five (5)feet of the outside of the building.
3. Where a sewer has a change of horizontal direction greater than 45 degrees, a cleanout
must be installed at the change of direction unless a cleanout already exists within 40
feet upstream of this fitting.Where more than one change of direction greater than 45
degrees occurs within 40 feet of a developed length of piping, the cleanout for the first
change of direction may serve as the cleanout for all changes within that 40 feet of
developed length of pipe.
4. Cleanouts must be provided at intervals within the building sewer from the structure to
the tank of not more than 100 feet. The effluent pipe between the septic tank and soil
treatment area is exempt from this requirement
F. Distribution Box: A distribution box, if used, must be of sufficient size to distribute effluent equally
to the laterals of a trench or absorption bed system. The box must be constructed with the inlet
invert at least one inch above the level of the outlet inverts. Flow equalizers or similar devices
must be used to adjust the flow between laterals.Access to the box must be provided with a
manhole riser with access lid at or above grade if the top of the box does not reach final grade.
G. Drop Box: In sequential or serial diathbubon, a watertight box may be used to transfer the effluent
to the following trench when the effluent in a trench has received the designed level for overflow
to the next trench.A drop box shall have a riser at or above final gnedo, if the top of the drop box
does not reach final grade. Outlet pipes in sequential distribution must be designed and installed
so that they may be capped off for resting periods.
53
43.9 Design Criteria—Components
H. Stepdown/Relief Pipe: In sequential or serial distribution, an unperforated pipe may be used to
transfer the effluent to the following trench when the effluent in a trench has received the
designed level for overflow from that trench.
Wastewater Pumping and Dosing Siphon Systems
1. Pumps
a. Non-clog pump opening must have at least two-inch diameter solids handling
capacity where raw wastewater is pumped.A pump opening must not have more
than 3/4-inch diameter solids handling capacity if previously settled effluent is
pumped.
b. Pumps must be certified to the UL778(Edition 6 or earlier version)electrical
safety standard, bear the seal of approval of CSA, UL or an equivalent testing
program, and be constructed of corrosion resistant materials.
c. Grinder pumps must also be certified to NSF/ANSI Standard 46 (2017 or earlier
version)and bear the seal of approval of the NSF or equivalent testing and
certification program.
2. Floats and Switches
a. Automatic liquid level controls must be provided to start and shut off pumps at a
frequency or level specified in the design.
b. Floats must be mounted on a stem separate from the pump discharge piping to
allow for removal, adjustment, and replacement of the float from grade without
removing the pump.
c. Float switches must be certified to the UL60947-4-1 (Edition 3 or earlier version),
or CSA C22.2 No. 205-17(2017 or earlier version)electrical safety standards,
bear the seal of approval of CSA, UL or an equivalent certification program, and
be constructed of corrosion resistant materials.
d. Dosing siphons for pressure dosing and higher level treatment systems must
provide for a means of determining the number of dosing events.
3. Location of Pump or Siphon
a. A pump or a siphon may be installed in a separate tank following the septic tank.
The tank must be of sufficient volume to allow pump or siphon cycling
commensurate with the design capacity.
b. The second compartment of a two-compartment septic tank may only be used as
the pump tank when the tank is specifically designed for this purpose and it can
be demonstrated to the satisfaction of the ECPHA that the minimum 48-hour
detention time will not be decreased. The pump must be screened or provided
with an approved filtering device to assure that only liquid effluent will be
discharged. The transfer of liquid from the first to the second compartment must
be at an elevation that is between the inlet and outlet invert elevations, and
through a standard tee designed and located as per the requirements of section
43.9.6.4 .d. Siphons must not be installed in the second compartment of a two
compartment tank.
54
43.9 Design Criteria—Components
c. The use of a three-compartment septic tank, sized to provide the required
effective volume in the first two compartments with the pump or siphon in the
third compartment ioacceptable for tanks npeoifiom||ydesigned for this purpose.
The transfer of liquid from the second to the third compartment must be at an
elevation that is between the inlet and outlet invert elevation, and through a
standard tee designed and located as per the requirements of section 43.9.B.4.d.
4. Pump or Siphon Discharge Piping
a. The discharge pipe from the pumping or siphon chamber must be protected from
freezing by burying the pipe below frost level or sloping the pipe to allow it to be
self-draining. Drainage must be provided through the bottom of the pump or
through a weep hole located in the discharge pipe prior to exiting the tank.
b. The pump discharge piping must have a quick disconnect that is accessible from
grade to allow for easy pump access and removal.
c. The pipe must be sized to maintain a velocity of two or more feet per second.
d. Pressure pipes must be designed to prevent air or vacuum locking and allow self
draining of the pipes.
5. Access
a. The pump or dosing system tank, chamber, or compartment must have a
minimum 24-inch diameter access riser, made of corrosion-resistant maherim|,
extending to or above ground level. A smaller diameter riser may only be
installed if it is accepted by the Division as an integral component of a specific
product during the product review process.
b. The access riser must have a watertight connection to the pump or dosing
chamber/compartment to prevent infiltration or exfiltration. All other intrusions to
the riser for electrical or other component access must also be watertight.
G. Splice Box
a. Splice boxes must be located outside the pump system access riser and be
accessible from the ground surface.
b. Wire splices are prohibited inside the tank, dosing chamber or riser.Wire splicing
must be completed with corrosion-resistant, watertight connectors.
7. Controls
a. Control panels or other electrical boxes used to control the functions of an OWTS
must comply with the following, as appropriate:
(1) The pump system must have an audible and visual alarm notification in
the event an excessively high water condition occurs.
(2) The pump must be connected to a circuit breaker separate from the
alarm breaker and from any other control system circuits.
(3) An electrical disconnect must be provided within the line of sight of the
pump chamber.
55
43.10 Design Criteria—Soil Treatment Area
(4) The pump system must be provided with a means that will allow the
pump to be manually operated; such as an H.O.A. switch
(Hand/Off/Auto).
(5) The pump system for pressure dosing and higher level treatment
systems must have a mechanism for tracking both the amount of time
the pump runs and the number of cycles the pump operates.
(6) Must bear the seal indicating acceptable product testing from a U.S.
Department of Labor, Occupational Safety and Health Administration
Nationally Recognized Testing Laboratory(NRTL)
(httpo:/kxwvw.00ha.gov/dto/otpoa/nrtVnrtU/oLhbn|). ouchosULorETL
J. Effluent Screens
1. Effluent screens must be installed in all septic tanks in new installations and repairs
where the septic tank is replaced.
2. If a pump or dosing siphon is used to remove septic tank effluent from the final
compartment of the septic tank, the effluent must be filtered prior to dispersal into the soil
treatment area. An effluent screen, pump vault equipped with a filter cartridge, or a filter
on the discharge pipe, would all be considered acceptable.
3. The effluent screen must be cleaned at manufacturer-recommended intervals, or more
often, if use patterns indicate.
4. An alarm may be installed on an effluent screen indicating need for maintenance.
5. Where an ejector pump, grinder pump or non-clog pump is proposed for use prior to the
septic tank, an effluent screen must be installed on the outlet of the septic tank.
6. The handle of the effluent screen must extend to within 12 inches of grade.
K. Grease Interceptor Tanks
1. All commercial food service facilities and other facilities generating fats, oils and greases
in their waste must install a grease interceptor tank.
2. Grease interceptor tanks shall treat only those portions of the total wastewater flow in
which grease and oils are generated.
3. The grease interceptor must have a minimum of two compartments and must be sized
proportionate to the amount of fats, oils and grease it receives, the peak flow rate through
the tank, and the expected cleaning frequency.
4. The inlet and outlet tees or baffles must extend into the bottom 1/3 of the liquid volume,
but must be at least 12 inches off the inside floor of the interceptor.
5. The inlet and outlet tees or baffles must extend at least 5 inches above the liquid level
and must provide for a free vent area across the liquid surface.
43.10 Design Criteria—Soil Treatment Area
A. The size and design of the soil treatment area must be based on the results of the site and soil
evaluation, design criteria, and construction standards for the proposed site and OWTS selected.
56
43.10 Design Criteria—Soil Treatment Area
B. At proposed soil treatment area locations where any of the following conditions are present, the
system must be designed by a professional engineer and approved by the ECPHA:
1. For soil types 3A, 4, 4A, 5, R-0, R-1 and R-2, and Treatment Levels TL2,TL2N,TL3, and
TL3N as specified in Tables 10-1 and 10-1Aof this regulation;
2. The maximum seasonal level of the ground water surface is less than four feet below the
bottom of the proposed infiltrative surface;
3. A limiting layer exists less than four feet below the bottom of the proposed infiltrative
surface;
4. The ground slope is in excess of thirty percent; or
5. Pressure distribution is used.
C. Calculation of Infiltrative Surface of Soil Treatment Area
1. The infiltrative surface of a trench or bed receiving any treatment level of effluent is only
the bottom area. No sidewall credit is allowed except in deep gravel trenches and
seepage pits that are permissible in repairs.
2. Long-term acceptance rates(LTARs)are shown in Tables 10-1 and 10-1A.
3. Factors for adjusting the size of the soil treatment area are in Tables 10-2 and 10-3.
4. The required area for a soil treatment area is determined by the following formula:
Soil Treatment Area in square feet required = Design Flow (in gallons per day)
LTAR (in gallons per day per square foot)
a. Adjusted Soil Treatment Area = Required Soil Treatment Area x Size Adjustment
Factor(s).
b. Size adjustment factors for methods of application are in Table 10-2.
c. Size adjustment factors for types of distribution media are in Table 10-3.
d. A required soil treatment area receiving TL1 effluent may be multiplied by one
size adjustment factor from Table 10-2, Table 10-3, or both.
e. A soil treatment area receiving TL2, TL2N, TL3, or TL3N effluent must be
pressure dosed.
(1) For products that combine distribution and higher level treatment within
the same component, pressure distribution of the effluent over the soil
treatment area must be used.
(2) TL2—TL3N effluent may be applied by gravity flow in soil types 3, 3A, 4,
4A, or 5 for designs where reductions in the soil treatment area size or
vertical/horizontal separation reductions are not being requested.
f. The distribution media in Table 10-3 may be used for distribution of higher level
treatment system effluent, but an additional reduction factor from Table 10-3
57
43.10 Design Criteria—Soil Treatment Area
must not be used. Sizing reductions for higher level treatment systems are
achieved through increased LTAR's provided in Table 10-1
Table 10-1 Soil Treatment Area Long-term Acceptance Rates by Soil Texture,Soil Structure,
Percolation Rate and Treatment Level
Long-term Acceptance Rate(LTAR);
Soil Type,Texture,Structure and Percolation Rate Range Gallons per day per square foot
USDA Soil USDA Soil Percolatio
Soil Structure- Structure- n Rate Treatment Treatment Treatment Treatment Treatment
Type USDA Soil Texture Type Grade (MPI) Level 1' Level 21 Level 2N' Level 3' Level 3N1*
R >35%Rock(>2mm):See Table 10-1A ,>35%o Rock(>2mm):_,See Table'10 l A.,::;. :" ,.","
1 Sand,Loamy Sand 0 5-15 0.80 1.40 1.40. Y:1.55;;;.';;: ° >.1.55,;.:;:
Grain (Structureless)
PR
(Prismatic)
Sandy Loam, Loam,Silt BK 2(Moderate)
2 Loam 16-25 0.60 1:0 1.0 `1.1. ,.:;. ".,..;:.1:1.
(Blocky) 3(Strong)
GR
(Granular)
Sandy Loam,Loam,Silt PR,BK, 1 (Weak)
2A Loam GR 0 26-40 0.50 0.80 0.80 t.0.90::.;. „..,A.90;
Massive (Structureless)
Sandy Clay Loam,Clay PR,BK,
0.55 p.66;.`r: ' .- '0.65..'..:'t:
Loam,Silty Clay Loam GR
Sandy Clay Loam,Clay . PR,BK, 1
3A GR 0 61-75 0.30 0.45 0.45 0.55 0.55:,
Loam,Silty Clay Loam Massive (Structureless)
Sandy Clay,Clay,Silty PR,BK,
4 Clay GR 2,3 76-90 0.20 0.30. 0.30 `.<. 0.30 .:. .,` 0.30. 1
Sandy Clay,Clay Silty, PR,BK, 1
4A Clay GR 0 91-120 0.150.20 0.20 0.20 0 20:
Massive (Structureless)
5 Soil Types 2-4A Platy 1,2,3 121+, 0.10 0.15 0.15 0.15- >.0.15.
NOTE: Shaded areas require system design by a professional engineer.
1 Treatment levels are defined in Table 6-3.
* • Higher long-term acceptance rates for Treatment Level 3N may be allowed for OWTS required to have a discharge
permit,if the capability of the design to achieve a higher long-term acceptance rate can be substantiated.
58
43.10 Design Criteria—Soil Treatment Area
Table 10-1A Design Criteria for Soils with High Rock Content(Type"R" Soils) 1.2,3,4
Soil Type,Percentage of Rock,LTAR,Distribution Required Sand or Media Depth Relative to the Quality of Effluent Applied to the
Distribution System
Soil Percentage and Maximum LTAR Type of Treatment Treatment Treatment Treatment Treatment
Type Size of Rocks (Gal./sq.ft./day) Distribution Level 16 Level 2 Level 2N Level 3 Level 3N
Required
7 Miniri um 2.5 Minimum 2.57,, 4.:,,,,,,:,,.. ,.r. :.. .:
Soil Type,1 With Unlined Sand Filter; 1 U Minimum 3-fopt Minimum,3-foot nt .2o
more than 35% for:"Preferied Sand .' Pre rsu"re foot deep foot deep dee Untined`:,
R-0 -, .. 8 deep Unlined , ,dSand mined : , Unlined Sand ' ".Sand F
Rock,?2mm Media",t}.8 for. :..:.:. ...Dis#ribution a Unci ter ,.
( „ }
;Fi teSand c. _. ., :Ftitec=<.-;y; : �i,.z;
ry .
Sand Filter: ',Sand Filter.::
Soil Type'2—5, Use TL1 LTAR from
R-1; >35-65%Rock Table 10-1 for the soil Minimum 2-foot Minimum 1-foot Minimum 1-foot
Pressure Sand media Sand media
Option (>2mm);with type corresponding to Distribution8 deep Unlined deep Unlined deep Unlined not required not required
1 >50%of the Rock the soil matrix,with a Sand Filter Sand Filter Sand Filter
<20 mm(3/4 inch) maximum LTAR of 0.8
Remove,mix, Remove,mix, Remove,mix, Remove,mix, Remove,mix,
replace 4 feet replace 2 feet replace 2 feet replace 2 feet replace 2 feet
Soil Type'2 and The allowable LTAR's of existing of existing of existing of existing of existing
R-1; 2A,>35-65% are defined in each Pressure material;with a material;with a material;with a material;with a material;with a
Option Rock(>2mm);with maximum maximum maximum maximum maximum
2 >50%of the Rock individual treatment level Distribution
column in this Table LTAR of 0.6 LTAR of 0.7 LTAR of 0.7 LTAR of 0.8 LTAR of 0.8
<20 mm(3/4 inch)
7 Use TL1 LTAR from Minimum 2,5- Minimum 2.5-:Soil Type 2 5 Table 10 1 for the soil Timed Minimum 3-foot Minimum 3 footMinimum 2-foot
>65 Rock(>2mm) type correspondin to Pressure dee Unlined deep Unlined foot deep foot deep deep Unlined
R-2 OR>50°Io of Rock g a p Unlined Sand Unlined Sand
>.20,mm(3/4 inch) the soli matrix,with a 'Distribution sand filter Sand Filter
Filter l=itter Sand Fitter,
maximum LTAf2 of 4.8
1. General guidance for Table 10-1A:The intent of the soil type R-0 is to define a material that consists of a high percentage
of rock,or rock fragments,and has a percolation rate of less than 5 mpi.Soil types R-1 and R-2 consist of a high
percentage of rock or rock fragments,but have a percolation rate of greater than 5 mpi. Soil types R-0 and R-2 are
considered to be a"limiting layer".
2. No sizing adjustments are allowed for systems placed in type"R"soils.The maximum LTAR's are provided in this table
3. The design of type"R"soil treatment systems must conform to sections 43.11.C.2 and 3.
4. All systems installed in a type"R"soil must be designed by a professional engineer.
5. The percentage of rock may be determined by a gradation conducted per ASTM standard D 6913-17(2017 version),
6. Type"R"soil treatment systems that are designed per the criteria noted in the Treatment Level 1 column of this table do
not require O/M oversight by the LPHA.
7. The"Percentage and Size of Rock"column references the soil types noted in Table 10-1.
8. Design of the pressure distribution system for type"R"soils shall comply with the requirements of sections 43.11.C.2.b,c,
e,f,g,h and i.
59
43.10 Design Criteria—Soil Treatment Area
D. Allowable Soil Treatment Area Sizing Adjustments:
1. The soil treatment area size determined by dividing the design flow rate by the long-term
acceptance rate may be adjusted by factors for method of treatment, soil treatment area
design, and type of distribution media.
2. For the purpose of the table, a "baseline system,"i.e. adjustment factor of 1.00, is
considered to be Treatment Level 1 (TL1)applied by gravity to a gravel-filled trench.
3. Sizing adjustments for use of the higher level treatment categories listed in Tables 10-1
will only apply provided the system is inspected and maintained as specified in the
requirements of section 43.14.D, Permitting and Oversight of Maintenance for Soil
Treatment Area Reductions and Vertical and Horizontal Separation Distance Reductions
Based on Use of Higher Level Treatment.
Table 10-2 Size Adjustment Factors for Methods of Application in Soil Treatment Areas
Accepting Treatment Levels 1,2, 2N, 3 and 3N Effluent
Method of Effluent Application from Treatment Unit
Type of Soil Preceding Soil Treatment Area
Treatment Area Dosed(Siphon or
Gravity Pump) Pressure Dosed
Trench 1.0 0.9 0.8
Bed 1.2 1.1 1.0
Table 10-3 Size Adjustment Factors for Types of Distribution Media in Soil Treatment Areas
for Treatment Level 1 Systems
Type of Distribution Media Used in Soil Treatment Areal
Category 1 Category 2 Category 3
Type of Soil Treatment Area
Rock or Tire Chips Other Manufactured Chambers or Enhanced
Media Manufactured Media
Trench or Bed 1.0 0.9 0.7
1. All proprietary distribution products must receive acceptance and the applicable reduction through Division review per the
applicable requirements of section 43.13.
E. Design of Distribution Systems
1. General
60
43.10 Design Criteria—Soil Treatment Area
a. The infiltrative surface and distribution laterals must be level.
b. The infiltrative surface must be no deeper than four feet below grade unless TL2
or higher effluent is applied to the distribution media and the system is inspected
and maintained as specified in the requirements of section 43.14.D.The depth of
the infiltrative surface will be measured on the up-slope side of the trench or bed.
c. Trenches must follow the ground surface contours so variations in infiltrative
surface depth are minimized. Beds must be oriented along contours to the
degree possible.
d. Pipe for gravity distribution must be no less than three inches in diameter.
e. A final cover of soil suitable for vegetation at least ten inches deep must be
placed from the top of the geotextile or similar pervious material in a rock and
pipe system, chamber, or manufactured media up to the final surface grade of
the soil treatment area.
f. Following construction,the ground surface must be graded to divert stormwater
runoff or other outside water from the soil treatment area. The area must be
protected against erosion. Subsurface drains upslope of the soil treatment area
may be installed to divert subsurface flow around the area.
g. Backfilling and compaction of soil treatment areas must be accomplished in a
manner that does not impair the intended function and performance of the
storage/distribution media and soil and distribution laterals, allows for the
establishment of vegetative cover, minimizes settlement and maintains proper
drainage.
h. Dosing may be used for soil treatment area distribution.The dose must be sized
to account for the daily flow and the dosing frequency.
2. Distribution Laterals; Must meet the requirements of section 43.9.D as applicable.
a. Distribution between laterals in a soil treatment area must be as level as
possible. Uneven settling of portions of the distribution system following
construction must be addressed by provisions in the design to adjust flows
between laterals.
b. The maximum length of distribution laterals must not exceed 150 feet.
c. Distribution laterals longer than 100 feet must be pressure dosed or the
application of the effluent must be at the center of the lateral through a
distribution box.
d. For absorption beds, the separating distance between parallel gravity distribution
laterals must not exceed six feet(center-to-center), and a distribution lateral must
be located within three feet of each sidewall and endwall.
e. The end of a distribution pipe must be capped, unless it is in a bed or trenches in
a level soil treatment area, where the ends of the pipes may be looped.
f. To promote equal distribution to the soil treatment area,the forcemain or effluent
pipe must be connected to as near to the middle of the distribution header as
61
43.10 Design Criteria—Soil Treatment Area
possible. However it must be offset from any distribution lateral to prevent
preferential flow.
g. Orifices must be oriented downward unless pressure distribution is used and
provision for pipe drainage is included.
3. Pressure Distribution
a. Design of pressure distribution systems must include:
(1) Dose size and frequency for either proposed flows and soil type, or
media long-term acceptance rate;
(2) Pipe diameter and strength requirements;
(3) Orifice size and spacing;
(4) A 30—72 inch operating head at the distal end orifice;
(5) Pump/siphon information; Total Dynamic Head; gallons/minute;
(6) Drain-back volume from forcemain; and
(7) Calculations, or a design software reference, that indicates the selected
component sizing will provide equal flow within each active zone of the
distribution system, and provide no more than a 10%flow differential
from the initial orifice to the most distal end orifice within each zone.
b. The separating distance between parallel distribution pipes in a pressure
distribution absorption bed must not exceed four feet, and the outer distribution
pipe must be located within two feet of each sidewall and endwall. Specific
requirements for the design of sand filters are noted in section 43.11.C.2.
c. Flushing assemblies must be installed at the distal end of each lateral and be
accessible from finished grade. A sweeping 90 degree or bends limited to 45
degree must be provided.
d. All effluent must be screened prior to discharging to a pressure distribution
system. This may be accomplished by an effluent screen in the septic tank or
pump chamber,or a filter placed on the discharge pipe from the pump or siphon.
F. Soil Treatment Area Requirements
1. Trenches
a. Trenches must be three feet wide or less.
b. The separating distance between trenches must be a minimum of four feet
sidewall-to-sidewall.
c. Distribution laterals used in a trench must be as close to the center of the trench
as possible.
2. Beds
62
43.10 Design Criteria—Soil Treatment Area
a. Maximum width for a bed must be 12 feet, unless the bed receives effluent
meeting Treatment Level 2 quality or better.
b. The separating distance between beds must be a minimum of six feet sidewall-
to-sidewall.
3. Serial and Sequential Distribution:
a. A serial or sequential distribution system may be used where the ground slope
does not allow for suitable installation of a single level soil treatment area unless
a distribution box or dosing chamber is used.
b. The horizontal distance from the side of the absorption system to the surface of
the ground on a slope must be adequate to prevent lateral flow and surfacing.
c. Adjacent trenches or beds must be connected with a stepdown/relief pipe or a
drop box arrangement such that each trench fills with effluent to the top of the
gravel or chamber outlet before flowing to succeeding treatment areas.
4. Alternating Systems
a. An alternating system must have two or more zones that must be alternated on
an annual or more frequent basis.
b. For repairs, each section must be a minimum of 50 percent of the total required
soil treatment area. For new installations, each separate soil treatment area must
meet the minimum sizing requirements of this regulation.
c. A diversion valve or other approved diversion mechanism that requires the owner
or operator to manually alternate zones of the OWTS may be installed on the
septic tank effluent line allowing soil treatment area sections to be alternated.
d. The diversion mechanism must be readily accessible from the finished grade.
5. Sequencing Zone Systems
a. Sequencing zone systems have two or more soil treatment area sections that are
dosed on a frequent rotating basis.
b. Where soil conditions are similar between the sections, each section area must
be the same size. If soil conditions are such that long-term acceptance rates are
different, each section may be sized for the same dose, but different long-term
acceptance rates.
c. An automatic distribution valve must be used.
d. Dosing of each system must be evaluated by the design engineer based on
projected daily flow rates, number of zones, and soil types.
6. Inspection Ports
a. A 4-inch inspection port accessible from ground surface must be installed at both
ends of each lateral in a trench system and at each corner of a bed system.The
bottom of the inspection port tube must extend to the infiltrative surface and not
be connected to the end of a distribution pipe.
63
43.10 Design Criteria—Soil Treatment Area
b. Inspection ports in chambers may be installed according to manufacturer's
instructions if the infiltrative surface is visible and effluent levels can be observed
from the inspection port
c. Additional inspection ports connected to distribution pipes may be installed.
d. The top of inspection ports may be terminated below the final grade if each is
housed in a component such as a valve box for a lawn irrigation system and has
a removable cover at the ground surface.
G. Storage/Distribution Media
1. Rock and Pipe
a. The perforated pipe must be surrounded by clean, graded gravel, rock, or other
material of equal efficiency which may range in size from 1/2 inch to 2 1/2 inches.
AASHTO M 43-05(2005 version) size No.3 coarse aggregate meets this
specification.
b. At least six inches of gravel, rock or other material must be placed below the
pipe. The gravel, rock or other material must fill around the pipe and be at least
two inches above the top of the distribution pipe.
c. The top of the placed gravel or such material used must be covered with non-
woven permeable geotextile meeting a maximum thickness rating of 2.0 ounces
per square yard or equivalent pervious material.An impervious covering must not
be used.
2. Chambers
a. Chambers must be installed with the base of the unit on in-situ soil or, if placed
on acceptable media, the manufacturer's installation instructions must be
followed so as to prevent chambers from settling into the media.
b. Installation must be according to manufacturer's instructions.
c. Effluent may be distributed by gravity, pump or siphon.
d. For width and square footage requirements, refer to section 43.13.E.1.d.
3. Media, Enhanced, or Other Manufactured
a. Manufactured media must be installed with the base on the in-situ soil or placed
on acceptable media meeting the manufacturer's specifications for proprietary
distribution products or combined treatment/distribution products.
b. Installation must be according to manufacturer's instructions.
c. Pressure distribution is required for TL2-TL3N effluent, unless otherwise noted in
this regulation.
4. Driplines
64
43.10 Design Criteria—Soil Treatment Area
a. The infiltrative surface area must be calculated using the long-term acceptance
rate for the site or a more conservative value if recommended by the
manufacturer.
b. Driplines must be installed on manufacturer's spacing recommendations.
c. Drainback must be provided for all drip lines, pipes and pumps.
d. Provisions must be made to minimize freezing in the distribution pipes, driplines,
relief valves, and control systems.
e. Provisions must be made for filtering, back-flushing, or other cleaning.
5. Tire Chips
a. The pipe may be surrounded with clean, uniformly-sized tire chips.
b. Tire chips must be nominally two inches in size and may range from 1/2 inch to a
maximum of four inches in any one direction.
c. Wire strands must not protrude from the tire chips more than 0.75 inches.
d. Tire chips must be free from balls of wire and fine particles less than two mm
across.
e. The top of the tire chips used must be covered with non-woven permeable
geotextile meeting a maximum thickness rating of 2.0 ounces per square yard or
equivalent pervious material.An impervious covering must not be used.
H. Soil replacement systems
The construction of a soil replacement system is permitted to bring the soil treatment area into
compliance with the requirements of this regulation
1. When a soil type"R" is removed, the following requirements must be met:
a. All added soil must comply with the following specifications:
(1) Added soil must meet the specifications of either"preferred" or
"secondary" sand filter media, as specified in section 43.11.C.2.
(2) The long-term applicable rates as specified in Table 10-1A must be
used. No additional sizing adjustments are allowed.
(3) The depth of the added media must comply with the requirements of
Table 10-1A.
(4) A gradation of the sand media used must be provided. The gradation
must be dated no more than one month prior to the installation date.
However, a gradation of the actual material placed in the excavation is
recommended.
(5) All added soil must be completely settled prior to installation of
components as specified and approved by the design engineer.
65
43.10 Design Criteria—Soil Treatment Area
(6) Pressure distribution must be used.
2. The removal and reinstallation of in-situ soil may only be allowed where the soils are
determined to be a soil type"R-1" (Option 2). The design must comply with the
requirements for this soil type noted in Table 10-1A(Soil Type R-1, Option 2).
3. When a sand media is added to soil treatment area or to an excavation where a soil type
1-5(Table 10-1)is the underlying soil,the following requirements must be met:
a. Added soil must meet the specifications of either"preferred" or"secondary"sand
filter media, as specified in section 43.11.C.2.d.
b. Unless the design follows the criteria for a sand filter or mound system design as
required in section 43.11, the TL1 long-term acceptance rate for the receiving soil
must be used.
c. A gradation of the sand media used must be provided. The gradation must be
dated no more than one month prior to the installation date. However, a
gradation of the actual material placed in the excavation is recommended.
d. All added soil must be completely settled prior to installation of components.
I. Repairs
1. When space is not available or if there are other site limitations that preclude other soil
treatment area options for OWTS repairs,wide beds, deep gravel trenches, deep beds
and seepage pits may be considered for repairs only. Other options are vaults or higher
level treatment systems.
2. Repairs to failing systems must conform to setbacks identified in Table 7-1 when
possible.When this is not possible using all available methods described above, the
jurisdiction with authority may permit reductions to setbacks.At no point will a setback
reduction be approved by the jurisdiction less than what the existing separation is to
existing OWTS. In maximizing this setback distance, all methods available in section
43.10.1.1 must be utilized including but not limited to the use of Higher Level Treatment,
wide beds, seepage pits, etc.,where allowed.Any setback reduction beyond what the
existing failing system presents must be approved by the Board of Health as outlined in
section 43.4.M.
3. Wide Beds: For repairs, beds may be wider than 12 feet without being required to receive
effluent meeting Treatment Level 2 quality or better.
4. Deep Beds: For repairs, the infiltrative surface of a bed may be no deeper than five feet.
Size adjustments as provided for in Tables 10-2 and 10-3 must not be applied. System
sizing will be based strictly on the soil type and corresponding LTAR.
5. Deep Gravel Trenches
a. The length of an absorption trench may be calculated by allowance for the
sidewall area of additional depth of gravel in excess of six inches below the
bottom of the distribution pipe according to the following formula:
Adjusted Length= L x +2)
(W+1+2D)
66
43.10 Design Criteria—Soil Treatment Area
Where:
L=length of trench prior to adjustment for deep gravel
W=width of trench in feet
D=additional depth in feet of gravel in excess of the minimum required six
inches of gravel below the distribution pipe
b. Maximum allowable additional depth is five feet.
c. Percolation tests or soil profile test pit excavations must be performed at the
proposed infiltrative surface depth.
d. Size adjustments as provided for in Tables 10-2 and 10-3 must not be applied to
deep gravel trenches.
6. Seepage Pits
a. For repairs, potential for risk to public health and water quality may be evaluated
by the ECPHA. If risk is low in the determination of the local public health
agency, a seepage pit without higher level treatment may be used.
b. If the risks are not low, higher level treatment of at least TL2 must be attained
prior to discharge to these systems for final dispersal.
c. A seepage pit must consist of a buried structure of precast perforated concrete,
or cinder or concrete block laid dry with open joints.
(1) Pits must be provided with both vertical sidewall and top supporting
structural concrete or other material of equal structural integrity. ,
(2) The excavation must be larger than the structure by at least 12 inches on
each side and may not exceed 5 feet beyond the structure wall.
(3) The over-excavated volume must be filled with clean, graded gravel or
rock,which may range in size from '/ inch to 2'/2 inches.AASHTO M 43-
05(2005 version)size No 3 coarse aggregate meets this specification.
(4) The capacity of the pit must be computed on the basis of long-term
acceptance rates determined for each stratum penetrated. The weighted
average of the results must be used to obtain a design figure.
(5) Soil strata in which the percolation is slower than 30 minutes per inch
must not be used for absorption or seepage. These strata must not be
included in the weighted average to determine the long-term acceptance
rate.
(6) The infiltrative surface of the pit is the vertical wall area(based on dug
perimeter)of the pervious strata below the inlet plus the bottom of the
excavated area.
(7) The bottom of the pit excavation must be greater than four feet above a
limiting layer.
67
43.10 Design Criteria—Soil Treatment Area
d. Pits must be separated by a distance equal to three times the greatest lateral
dimension of the largest pit. For pits over 20 feet in depth, the minimum space
between pits must be 20 feet.
e. The requirements for the design and construction of seepage pits for the
treatment and dispersal of on-site wastewater on new sites is defined in section
43.12.C.
7. Wastewater Ponds
a. Construction of new wastewater ponds is prohibited.
b. For repairs of an existing wastewater pond, the potential for risk to public health
and water quality may be evaluated by the ECPHA. If risk is low in the
determination of the ECPHA,the repair of a wastewater pond may be permitted,
however the following criteria must be followed:
(1) A septic tank must precede the wastewater pond.
(2) The depth of the design volume of the wastewater pond must be at least
five feet.
(3) A wastewater pond must have two feet of free board above the design
volume of the pond.
(4) A wastewater pond must be fenced to keep out livestock, pets, vermin,
and unauthorized people.
(5) Wastewater ponds must be designed on the basis of monthly water
balance including design flow, precipitation, evaporation, and seepage.
(6) Wastewater ponds must be constructed so the seepage out of the
bottom or sides does not exceed 1/32 of an inch per day. If this limit
cannot be achieved using compacted natural soil materials including soil
additives, an impermeable synthetic membrane liner must be used.
(7) If the evapotranspiration does not exceed the rate of inflow of effluent
from the structure, a soil treatment area meeting the requirements of this
regulation must be installed to accept the excess flow.
(8) Maintenance must include preventing aquatic and wetland plants from
growing in or on the edge of the pond, protecting sides from erosion, and
mowing grasses on the berm and around the pond.
(9) Wastewater ponds must be designed by a professional engineer.
8. Vaults
a. The continued use of vaults for repairs in Eagle County is allowed.
b. Criteria for vaults are in section 12.C. of this regulation.
9. Higher Level Treatment Options
68
43.11 Design Criteria—Higher Level Treatment Systems
a. Reduction in required soil treatment area for repairs is possible with higher level
treatment.
b. Design criteria for higher level treatment systems are in section 43.11.
10. Remediation Systems
a. The intent of a remediation technology or process is to sufficiently increase the
infiltration rate through the infiltrative surface at the bottom of an existing trench
or bed and restore permeability to the soil below.Treatment levels as defined in
Table 6-3 are not granted to remediation technologies.
b. The ECPHA may permit the use of remediation technologies or processes to
address an existing failure or malfunction within a soil treatment area.
c. The use of a remediation technology or process constitutes an alteration to the
OWTS, and therefore the owner must obtain a permit for this work from the
ECPHA.
d. Upon approval of the ECPHA, a system owner may choose to try a remediation
technology or process to see if an existing problem with the soil treatment area
will be resolved. The system owner bears the risk and cost of this attempt and is
aware that an additional repair may be required.
e. Remediation technologies and processes must not adversely affect groundwater,
surface water, any existing components, the long-term effectiveness of the soil
treatment area, or the environment.
f. If the remediation technology or process does not correct the problem with the
system, a conforming OWTS must be installed per the requirements in this
regulation within a time frame determined by the ECPHA.
g. The ECPHA may require monitoring and/or maintenance of the remediation
technology or process as a stipulation of permit issuance.
43.11 Design Criteria—Higher Level Treatment Systems
A. General
1. Higher level treatment systems must be designed by a professional engineer.
2. Higher level treatment systems may be public domain technology systems or proprietary
systems.
a. Public domain technology systems must be designed, installed and maintained
according to established criteria and additional criteria established by the local
public health agency. When design criteria are not specifically provided in this
regulation, the criteria used in the design must be from a reference commonly
used as an industry standard and the criteria must be cited in the design.
b. Proprietary systems must be designed, installed, and maintained according to
manufacturer's instructions and additional criteria identified in the Technology
Review and Acceptance process, section 43.13.
69
43.11 Design Criteria—Higher Level Treatment Systems
3. Soil treatment areas for higher level treatment systems must be pressure dosed.
4. Systems must be capable of accommodating all anticipated flows and organic loads.
5. Ventilation and air systems: Mechanical components must be installed in a properly
vented location and all vents, air intakes, and air hoses must be protected from snow, ice,
or water vapor accumulations.
6. Covers, barriers, or other protection:All systems must be installed to include protection of
openings against entry of insects, rodents, other vectors and unauthorized people.
B. The treatment levels identified in Table 6-3 are specified in this section for public domain
technology, and proprietary treatment systems will be assigned a treatment level by the
technology review and acceptance process in section 43.13.Adequate maintenance for each
must be required and documented as in section 43.14.D.
C. Sand Filters
1. A lined or unlined intermittent sand filter, or recirculating sand filter, may be used as a
higher level treatment system prior to dispersing the effluent into a soil treatment area.
2. Intermittent(Single Pass)Sand Filters; General Requirements
a. The treatment level for intermittent sand filters is considered TL3.
b. General Design Parameters: Not all combinations of the variables noted below
will result in a proper distribution system design. The design engineer must justify
through calculations or design software that the selected values will concur with
industry standards.
(1) Distribution pipe size: 3/4 inch—1.5 inches(PVC Class 200, min.)
(i) 2 inch distribution pipe may only be used where other design
modifications cannot overcome a greater than 10%variation in
the pressure head between the initial and distal orifices.
(2) Distribution pipe spacing: 18 inches—48 inches
(3) Orifice size: 1/8 inches—3/8 inches (Also see section 43.11.C.b.5 below)
(4) Orifice spacing: 18 inches—48 inches
(5) Operating head at the distal end of distribution pipes: 30 inches—72
inches(60 inches typ.). Larger orifices allow for an operating head at the
lower end of this range,while smaller orifices will necessitate an
operating head at the higher end of this range.
c. Dosing:
(1) Pressure distribution is required. The design of the distribution system
must also comply with the requirements of 43.10.E.3.a.
(2) Number of cycles/day:Will vary with design (Short, frequent doses are
preferred.)
70
•
43.11 Design Criteria—Higher Level Treatment Systems
(3) Proposed dose volume:Will vary with design (0.25—1.0)
gallons/orifice/dose, or 3-5 times distribution pipe volume
(4) Timed dosing is recommended where design considerations allow.
d. Sand Filter Treatment Media
(1) The depth of the sand media below the distribution system must be at
least 24 inches unless otherwise noted in Table 10-1A for type"R" soils.
(2) "Preferred"sand media requirements:
(i) Effective size: 0.25-0.60 mm
(ii) Uniformity coefficient: <_4.0
(iii) Percent fines passing#200 sieve: s 3.0
(3) "Secondary" sand media requirements:
(i) Effective size: 0.15-0.60 mm
(ii) Uniformity coefficient:
(iii) Percent fines passing#200 sieve: 5 3.0
(4) A gradation of the sand media used must be provided. The gradation
must be dated no more than one month prior to the installation date.
However, a gradation of the actual material placed in the excavation is
recommended.
e. Gravel Requirements
(1) Clean, graded gravel, or rock, must range in size from 1/2 inch to 2 1/2
inches.AASHTO M 43-05(2005 version)size No.3 coarse aggregate
meets this specification.
(2) The gravel must surround the distribution pipes used to disperse the
effluent and must be at least 6 inches below and 2 inches above the
pipes.
(3) Division accepted manufactured media may be used as an alternative to
specified gravel.
f. Filter Fabric Requirements
(1) The top layer of gravel must be covered with a non-woven permeable
geotextile fabric meeting a maximum thickness rating of 2.0 ounces per
square yard or equivalent pervious material.
g. Final Cover Material
(1) 8 inches—10 inches of Type 1 or 2 soil with an additional 2 inches top
soil
71
43.11 Design Criteria—Higher Level Treatment Systems
h. Size adjustment factors provided in Tables 10-2 and 10-3 are not applicable for
sand filters.
Sand filters must not be used to treat wastewater that does not conform to TL1
treatment level or better.
3. Unlined(Open Bottom)Sand Filters
a. All requirements of 43.11.C.2.a-i will apply to unlined sand filters.
b. Application rates:
(1) Maximum hydraulic loading rate for TL1 effluent applied to"Preferred
Sand Media" in an unlined sand filter is 1.0 gal./sq.ft./day, or the long-
term acceptance rate of the receiving soil for TL3 (Table 10-1)whichever
results in the larger area.
(2) Maximum hydraulic loading rate for TL1 effluent applied to"Secondary
Sand Media" in an unlined sand filter is 0.8 gal./sq.ft./day, or the long
term acceptance rate of the receiving soil for TL3(Table 10-1)whichever
results in the larger area.
(3) Maximum hydraulic loading rate for TL2, TL2N,TL3, or TL3N effluent
applied to "Preferred" or"Secondary" Sand Media in an unlined sand
filter must be the long-term acceptance rate of the receiving soil for TL3,
(Table 10-1).
c. The upper infiltrative surface of an unlined sand filter receiving TL1 —TL2 effluent
must be at least three feet above a limiting layer.
d. The upper infiltrative surface of an unlined sand filter receiving TL2N-TL3 effluent
must be at least two and one-half feet above a limiting layer.
e. The upper infiltrative surface of an unlined sand filter receiving TL3N effluent
must be at least two feet above a limiting layer.
4. Lined Sand Filters
a. All requirements of 43.11.C.2.a-i will apply to unlined sand filters.
b. Application rates:
(1) Hydraulic loading rate for TL1 effluent applied to"Preferred Sand Media"
in a lined sand filter is 1.0 gal./sq.ft./day.
(2) Hydraulic loading rate for TL1 effluent applied to"Secondary Sand
Media" in a lined sand filter is 0.8 gal./sq.ft./day.
c. The minimum depth of the sand media in a lined sand filter must be two feet.
d. An intermediate layer of pea gravel, two inches in thickness, must be placed
between the sand filter media and the course under-drain media to prevent the
migration of sand into the lower layer of under-drain gravel. ASTM C 33-16 (2016
version), No. 8, coarse aggregate meets this specification.
72
43.11 Design Criteria—Higher Level Treatment Systems
e. A minimum four-inch diameter slotted Schedule 40 PVC [ASTM Standard D
2729-17(2017 version)] under-drain pipe must be used to collect the treated
effluent. The under-drain pipe must be installed in the center of a 5 inches thick
bed of washed, graded gravel, or rock ranging in size from 1/2 inch to 2 1/2
inches. AASHTO M 43-05(2005 version), No.3 coarse aggregate meets this
specification.
f. Lined sand filters must have an impervious liner on the sides and bottom of the
filter. The liner must consist of a minimum 30 mil thick PVC material or
equivalent.
g. Effluent collected by the under-drain must be dispersed to a soil treatment area.
The soil treatment area may be sized with a maximum long-term acceptance rate
of the receiving soil for TL3 effluent.
5. Recirculating Sand Filter, Minimum Requirements:
a. Treatment level:
(1) Treatment level provided within recirculating sand filters is TL3.
b. General Design Parameters: Not all combinations of the variables noted below
will result in a proper distribution system design. Engineer must justify through
calculations or design software that the selected values will concur with industry
standards.
(1) Distribution pipe size: 3/4 inch—2 inches (PVC Class 200, min.)
(2) Distribution pipe spacing: 18 inches—36 inches (24 inches typ.)
(3) Orifice size: 1/8 inch—14 inch
(4) Orifice spacing: 18 inches—36 inches(24 inches typ.)
(5) Pressure head at end of distribution pipe: 24 inches—72 inches(60
inches typ.)
c. Dosing:
(1) Timed dosed, pressure distribution is required.The design of the
distribution system must comply with the requirements of section
43.10.E.3.a.
(2) Recirculation ratio: 3:1 —5:1
(3) Gallons/orifice/dose: 1 —3 (2.0 typ.)
(4) Hydraulic loading: 3-5 gal./sq.ft./day(4—5 typ.)
(5) Dosing time"ON"; <2.5 min. (<2.0 typ.)
(6) Number of cycles/day: 48—120
d. Top gravel requirements:
73
43.11 Design Criteria—Higher Level Treatment Systems
(1) Washed, graded gravel, or rock, must range in size from 1/2 inch to 2 1/2
inches.AASHTO M 43-05(2005 version), No.3 coarse aggregate meets
this specification.
(2) The gravel must surround the distribution pipes used to disperse the
effluent and must be at least 6 inches below and 2 inches above the
pipes.
(3) State accepted manufactured media may be used as an alternative to
specified gravel.
(4) Soil cover is prohibited. The upper gravel layer must be open to the
atmosphere.
e. Filter media requirements:
(1) Effective size: 1.5—2.5 mm
(2) Uniformity coefficient: <_3
(3) Fines passing#200 sieve: <_ 1.0
(4) Media depth (min.): >_24 inches
f. Intermediate gravel layer:
(1) An intermediate layer of pea gravel, two inches in thickness, must be
placed between the coarse underdrain media and the sand filter media to
prevent the migration of sand into the lower layer of under-drain gravel.
ASTM C 33-16 (2016 version), No. 8 coarse aggregate meets this
specification.
g. Under-drain requirements:
(1) A minimum four-inch diameter slotted Schedule 40 PVC[ASTM
Standard D 2729-17(2017 version)] under-drain pipe must be used to
collect the treated effluent. The under-drain pipe must be installed in the
center of a 5 inches thick bed of washed, graded gravel, or rock ranging
in size from 1/2 inch to 2 1/2 inches.AASHTO M 43-05(2005 version),
No.3 coarse aggregate meets this specification.
h. PVC liner requirements:
(1) Lined sand filters must have an impervious liner on the sides and bottom
of the filter. The liner must consist of a 30 mil thickness PVC material or
equivalent.
Effluent collected from the recirculating sand filter must be discharged to a soil
treatment area. The soil treatment area may be sized with a maximum long-term
acceptance rate of the receiving soil for TL3N effluent.
D. Mound Systems
1. When the infiltrative surface area of the media receiving wastewater effluent is at or
above the natural ground surface at any point, it shall be considered a mound system.
74
43.1/ Design Criteria—Higher Level Treatment Systems
2. Mound systems that provide a minimum of 24 inches of sand treatment media may use
the application rates for the in-situ receiving soil for TL3 effluent(Table 10-1). Size
adjustment factors within Table 10-3 must not be applied to mound designs where TL3
application rates are used. However they may be applied if TL1 application rates are
used.
3. Mound systems must conform to the design requirements of sections 43.11.C.3.a
through e for unlined (open bottom)sand filters, with the following exceptions.
a. A mound system may include less than 24 inches of imported sand media on a
site where a lesser depth of sand media is sufficient to meet vertical separation
requirements above a limiting layer.Application rates for the in-situ receiving soil
for TL1 effluent must be used when less than 24 inches of sand media is used,
unless higher level treatment is provided prior to dispersal into the mound
system.
b. For the design of a mound system where less than 24 inches of sand media is
proposed, and application rates for TL1 are used, the size adjustment factors
within Table 10-3 may be used.
4. The basal area must be determined using the LTAR from Table 10-1 for the in-situ
receiving soil under the mound.
5. Linear loading rates must be determined. The evaluation of many factors is required for
an accurate determination of the linear loading rate. While application rates for the in-situ
receiving soil under the mound is a main component, placement on the slope, and
percent of slope must also be addressed when defining the linear loading rate. If the
movement of the effluent is primarily vertical, then the linear loading rate is not as critical.
However, if the movement of the effluent will be primarily horizontal, as would be
expected in soil types 3A through 5(Table 10-1), then the linear loading rate is extremely
important and long narrow mounds are strongly recommended.
a. When TL1 effluent is applied to the distribution media of a mound system
installed above in-situ soil types 1 through 3(Table 10-1)and R-0 through R-2
(Table 10-1A), the suggested linear loading rate is between 6 gpd/lin.ft. and 12
gpd/lin.ft. The maximum width of the distribution media in a mound system
installed above these soil types is 12 feet when TL1 effluent is applied to the
distribution media of a mound system.
b. When TL2 through 3N effluent is applied to the distribution media of a mound
system installed above in-situ soil types I through 3 (Table 10-1)and R-0
through R-2 (Table 10-IA), the linear loading rate may exceed 12 gpd0n.ft.;
subsequently the mound may be wider than 12 feet.
c. When TL1 through TL3N effluent is applied to mound systems installed above in-
situ soil types 3A through 5 (Table 10-1), the suggested linear loading rate is
between 3 gpd/lin.ft. and 5 gpd/lin.ft. The maximum width of the distribution
media in a mound system placed above these soil types is 12 feet.
G. The final cover over a mound system must extend at least twelve inches horizontally
beyond the perimeter of the distribution media prior to sloping down to existing grade.
The final slope of the mound must be no greater than three feet horizontal to one foot
vertical.
7. The surface of the mounded area must be planted with a suitable vegetative cover.
75
43.12 Design Criteria—Other Facilities
8. A suggested reference for the design and installation of mound systems is, "The
Wisconsin Mound Soil Absorption System: Siting, Design, and Construction Manual,
January 2000". Note that this is suggested guidance, and where the requirements of this
regulation differ from those in the referenced mound document, the requirements of this
regulation will govern in those cases.
E. Rock Plant Filter(Constructed Wetland)Treatment Before a Soil Treatment Area
1. A rock plant filter system must be designed by a professional engineer.
2. The design must be site specific and include specifications for: loading, capacity,
dimensions, liner material,filter media, effluent depth and depth control mechanism,
density and species of plant material, and other site specific information.
3. The treated effluent from a rock plant filter must be distributed to a soil treatment area.
4. Although producing higher level treatment, rock plant filters must not be assigned a
treatment level higher than TL1 because of system and seasonal variability.
43.12 Design Criteria—Other Facilities
A. Evapotranspiration and Evapotranspiration/Absorption Systems:
1. Non-Pressurized Drip Dispersal System (NDDS):
a. An NDDS is considered a type of evapotranspiration/absorption system.
However as specific design criteria is provided for an NDDS, they are exempt
from the additional requirements of section 43.12.A.2, 3 and 4.
b. The design of a NDDS must follow the procedures stated in the document titled:
The Colorado Professionals in Onsite Wastewater Guidelines for the Design and
Installation of Non-Pressurized Drip Dispersal Systems (NDDS), Revision:
September, 2016. The document is available from Colorado Professionals in
Onsite Wastewater(www.cpow.net).
c. The width of an NDDS system may be wider than 12 feet.
2. The following section provides general criteria which must be followed when an
evapotranspiration or evapotranspiration/absorption bed is proposed.
a. The design may only be permitted in arid climates where the annual evaporation
rate exceeds the annual precipitation rate by more than 20 percent, and where
site characteristics dictate that conventional methods of effluent dispersal are not
appropriate.
b. The design may only be permitted in soil types 4, 4A and 5.
c. The system must be designed by a professional engineer.
d. If data for the Pan Evaporation Rate is provided, it must be multiplied by 0.70, or
less, to obtain the equivalent Lake Evaporation Rate.
e. The width of the bed may be wider than 12 feet.
76
•
43.12 Design Criteria—Other Facilities
f. The required capillary or wicking sand must meet the gradation requirements in
Table 12-1 and be approved by the design engineer. This sand is to be covered
by a crowned, thin layer of loamy-sand mix and appropriate vegetation that will
assist in drawing the water to the surface.
g. Adjustment factors as provided in Tables 10-2 and 10-3 must not be used. r
Table 12-1 Gradation of Wicking Sand for Evapotranspiration Beds(Fine Sand)
Sieve Size Percent Passing
4 100
40 50-70
200 <15
3. For systems designed strictly as an evapotranspiration bed, the following criteria must be
met:
a. Design data to be furnished must include, but shall not be limited to: system
dimensions, distribution system design, specifications of distribution media and
wicking sand, liner material if used, bedding, properties of the soil under the
system, vegetation cover, and a water balance calculation including annual
precipitation and storage requirements for periods of the year when
evapotranspiration does not occur.
b. The following formula must be used for determining the minimum area necessary
for total evapotranspiration of septic tank effluent:
Area(in square feet)*= Design Flow(in gallons per dav)x 586
Lake Evaporation Rate at the Site(in inches per year)
*Additional area may be required based on the annual water balance
calculations.
c. Designs will include a rock and pipe, or other Division approved proprietary
distribution product,with the centerline of the distribution system 6 to 8 feet on
center. A thin non-woven fabric may be placed above the distribution system.
Capillary wicking of the effluent is accomplished by a uniform depth layer of the
specified sand media (capillary wicks), no more than 24 inches deep, placed
between and above the distribution media.The base of the evapotranspiration
bed may be no more than 30 inches below finished grade.
d. Capillary wicks which penetrate between the distribution system to the bottom of
the bed, must be at least 15 percent of the bed surface area. The wicks must be
uniformly spaced throughout the system.
e. Except for dwellings, if the system is designed for summer use only, as
determined by the local public health agency, the surface area may be multiplied
by 0.6 to obtain the required area.
4. For systems designed as an evapotranspiration/absorption bed, the following criteria
must be met.
77
43.12 Design Criteria—Other Facilities
a. Data to be furnished must include, but is not limited to: system dimensions,
distribution system design, specifications of wicking sand, properties of the soil
under the,evapotranspiration/absorption bed, provision for vegetation cover, and
a water balance calculation including annual precipitation and storage
requirements for periods of the year when evapotranspiration does not occur.
b. Design will include a rock and pipe, or other Division approved proprietary
distribution product,with the centerline of the distribution system 6 to 8 feet on
center. A thin non-woven fabric may be placed above the distribution media.
Capillary wicking of the effluent is accomplished by a uniform depth layer of the
specified sand media (capillary wicks)no more than 24 inches deep placed
between and above the distribution media. The infiltrative surface may be no
more than 30 inches below finished grade.
c. Capillary wicks which penetrate between the distribution system to the bottom of
the bed, must be at least 15 percent of the bed surface area. The wicks must be
uniformly spaced throughout the bed.
d. Amount of storage and evapotranspiration capacities may be reduced by the
volume of effluent absorbed by the underlying soil based on the long-term
acceptance rate for that soil type and the formulas provided in section
43.12.A.4.e below.
e. The following formula must be used for determining the minimum area necessary
for evapotranspiration/absorption of septic tank effluent:
(1) Area(sq. ft.)*= Flow(qpd)
(LTAR+ ETR)
(i) LTAR refers to the long-term acceptance rate of the underlying
soil as provided in Table 10-1 for TL1 effluent.
(ii) ETR refers to the evapotranspiration rate derived from the
following formula:
ETR(gal./day sq.ft.)= Lake Evaporation Rate at the Site (in inches per year)
586
*Additional area may be required based on the annual water balance
calculations.
B. Seepage Pits
1. The construction of new seepage pits for the treatment and dispersal of on-site
wastewater on new sites is prohibited unless:
a. A trench or bed system will not meet the design, sizing or setback requirements
of this regulation on the proposed site;
b. The seepage pit is designed by a professional engineer; and
c. The design includes higher level treatment of at least TL2.
2. The design requirements for new seepage pits must also comply with requirements as
defined in 43.10.I.6.c and d.
78
43.12 Design Criteria—Other Facilities
3. Pressure distribution is not required for dispersal into a seepage pit.
C. Vaults Other Than Vault Privies
1. Vaults for full time use in new construction are prohibited where a property can
accommodate an OWTS with a soil treatment area.
2. The ECPHA allows vaults for use at a permanently occupied facility, except where
section 43.12.D.1 applies.
3. Vaults for full time use may be permitted when a failing OWTS cannot be replaced.
4. Vaults may be permitted for limited use occupancy on a property which cannot
accommodate an OWTS with soil treatment area.
5. A vault may be permitted if the facility is on land where the installation of an OWTS with
soil treatment area is not permitted.
6. Vaults may be permitted for systems where some of the wastewater flows are separated,
such as toilet wastes only, into a vault. The portion not retained in the vault must be
treated in an OWTS sized per the requirements of this regulation.
7. Variances may be granted for specialized commercial uses.
8. A vault must have a minimum 500 gallon effective volume or be capable of holding a
minimum of the 48-hour design wastewater flow, whichever is larger.
9. A visual or an audible signal device or both, indicating filling to a maximum of 75 percent
capacity, must be installed to indicate when pumping is necessary.
10. Concrete vaults must meet the strength and watertightness requirements for septic tanks.
Prefabricated fiberglass, fiberglass-reinforced polyester, and plastic tanks may be used
as vaults, if the tank manufacturer provides testing criteria certifying them for this use.
D. Privies
1. Vault Privy
a. The ECPHA allows for the new construction of vault privies.
b. The ECPHA allows for the continued use of existing vault privies.
c. Effective volume of the vault must be no less than 400 gallons and it must be
constructed of concrete or plastic. The vaults for privies must meet the structural
and watertightness standards of vaults.
d. A vault privy must be built to include:fly-and rodent-tight construction, a
superstructure affording complete privacy, an earth mound around the top of the
vault and below floor level that slopes downward away from the superstructure
base, a floor, and a riser of concrete or other impervious material with hinged
seats and covers of easily cleanable, impervious material.All venting must be fly-
proofed with No. 16 or tighter mesh screening.
2. Pit Privy
79
43.12 Design Criteria—Other Facilities
a. The ECPHA allows the new construction of pit privies in the event that other
means of sanitary disposal of human waste are deemed infeasible by the
ECPHA and where a property cannot accommodate an OWTS with a soil
treatment area, vault, or vault privy
b. Continued use of existing pit privies is prohibited in areas where other means of
sanitary disposal of human waste are deemed feasible by the ECPHA or where a
property can accommodate an OWTS with a soil treatment area, vault, or vault
privy.
c. If a pit privy is permitted by the ECPHA:
(1) The bottom of the pit must be located above at least four feet of suitable
soil and four feet above a limiting layer;
(2) The pit must have at least 400 gallons of effective volume; and
(3) The superstructure must provide complete privacy and have fly-and
rodent-tight construction, an earth mound around the top of the pit and
below floor level that slopes downward away from the superstructure
base, a floor, and a riser of concrete or other impervious material with
hinged seats and covers of easily cleanable, impervious material. All
venting must be fly-proofed with No. 16 or tighter mesh screening.
E. Incinerating, Composting and Chemical Toilets
1. The ECPHA may permit incinerating, composting and chemical toilets. The use of an
incinerating, composting or chemical toilet will not reduce the required size of the OWTS
as noted in section 43.8.A.
2. Permitting of an incinerating or composting toilet may also be subject to the jurisdiction of
a local agency regulating plumbing or the Colorado Plumbing Board,whichever has
jurisdiction over plumbing in the location.
3. An incinerating or composting toilet may be used for toilet waste where an OWTS is
installed for treating wastewater remaining after removal of toilet waste. Subject to local
board of health or other applicable regulations or codes(e.g., Colorado Plumbing Code if
a local code does not exist), the compartment may be located within a dwelling or
building provided the unit complies with the applicable requirements of this regulation,
and provided the installation will not result in conditions considered to be a health hazard
as determined by the ECPHA. Compartment and appurtenances related to the unit must
include fly-tight and vector-proof construction and exterior ventilation.
4. Incinerating Toilets:An approved incinerating toilet must be designed and installed in
accordance with all applicable federal, state, and local air-pollution requirements and
manufacturer's instructions.
5. Composting Toilets
a. Composting toilets must meet the requirements of NSF/ANSI Standard 41 (2016
version)and bear the seal of approval of the NSF or an equivalent testing and
certification program.
80
43.12 Design Criteria—Other Facilities
b. An approved composting toilet must treat deposits of feces, urine, and readily
decomposable household garbage that are not diluted with water or other fluids
and are retained in a compartment in which aerobic composting will occur.
c. The effective volume of the receptacle must be sufficient to accommodate the
number of persons served in the design of the unit installed. The effective volume
of the unit must include sufficient area for the use of composting materials which
must not be toxic to the process or hazardous to persons and which must be
used in sufficient quantity to assure proper decomposition.
d. Residue from the composting toilet must be removed when it is filled to 75
percent of capacity. Residue from the unit must be properly disposed of by
methods recommended by the manufacturer and acceptable to the local public
health agency. Disposal methods must prevent contamination of water and not
cause a public health nuisance. Disposal using solid waste practices is
recommended.
e. If a system will be installed where low temperature may be a factor, design and
installation must address the effects of the low temperature.
f. Composting toilets must be operated according to manufacturer's specifications.
6. Incinerating Toilets Acceptance Requirements
a. Incinerating toilets must meet the requirements of the NSF Protocol P157 (2014
version)and bear the seal of approval of the NSF or an equivalent testing and
certification program.
b. Incinerating toilets must be operated according to manufacturer's specifications.
7. Portable Chemical Toilets
a. A portable chemical toilet may be used by permit from the ECPHA or other
agency with authority to issue permits for portable chemical toilets.
b. Use of a portable chemical toilet in permanently occupied buildings is prohibited
except during construction or under emergency circumstances as determined by
the local public health agency. Proper ventilation of a chemical toilet used inside
must be required.
F. Slit Trench Latrine
1. If permitted by the ECPHA, a slit trench latrine must be utilized only in remote or
emergency situations when other approved sanitary means are unavailable. Other
agencies may have more stringent regulations that must be adhered to.
2. A slit trench latrine must be considered a temporary convenience to be used no longer
than seven days and must be backfilled and graded to match its surroundings when its
use is discontinued.
3. A slit trench latrine must be located only in a place that does not adversely affect public
health or the environment. The location must provide ample privacy and should be
exposed to several hours of sunlight each day. A slit trench latrine must not be located:
a. In a building;
81
43.12 Design Criteria—Other Facilities
b. In a covered or partially covered location such as a cave or overhanging cliff; or
c. On a slope of greater than 30 percent.
4. A slit trench latrine must be installed only in suitable soil.
5. A slit trench latrine must be excavated approximately one foot wide and two feet deep for
the required length.All human waste and tissue placed into the slit trench latrine must be
covered with at least two inches of soil at least once a day or more frequently if requested
by the ECPHA.
G. Treatment Systems Other Than Those Discharging Through a Soil Treatment Area or Sand Filter
System
1. For systems discharging to State Waters, see section 2.C.
2. Systems that discharge other than through a soil treatment area or a sand filter system
must:
a. Be designed by a professional engineer;
b. Be reviewed by the Board of Health; and
c. Not pose a potential health hazard or private or public nuisance or undue risk of
contamination.
d. Not allow drainage of effluent off of the property of origin.
3. The Board of Health may choose to permit only systems that do not allow drainage of
effluent off the property of origin.
4. The following minimum performance criteria must be required for all permitted systems
pursuant to this section:
a. If effluent discharge is made into areas in which the possibility exists for
occasional direct human contact with the effluent discharge, the effluent at the
point of discharge must meet the minimum treatment criteria of TL3 effluent and
specifically adhere to each of the following standards:
(1) The geometric mean of the E. coli density must not exceed 15 per 100
milliliters when averaged over any five consecutive samples, and no
single sample result for E. coli can exceed 126 per 100 milliliters.
(2) The arithmetic mean of the standard five-day carbonaceous biochemical
oxygen demand (CBOD 5) must not exceed ten milligrams per liter when
averaged over any three consecutive samples.
(3) The arithmetic mean of the total suspended solids must not exceed ten
milligrams per liter when averaged over any three consecutive samples.
b. If the effluent discharge is made into an area so restricted as to protect against
the likelihood of direct human contact with the discharged effluent, the effluent at
the point of discharge must meet the treatment criteria of TL2 effluent and
specifically adhere to each of the following standards:
82
43.13 Technology Review and Acceptance
(1) The geometric mean of the E. coli density must not exceed 126 per 100
milliliters when averaged over any five consecutive samples, and no
single sample can exceed 325 E. coli per 100 milliliters.
(2) The arithmetic mean of the standard five-day carbonaceous biochemical
oxygen demand (CBOD5)must not exceed 25 milligrams per liter when
averaged over any three consecutive samples.
(3) The arithmetic mean of the total suspended solids must not exceed 30
milligrams per liter when averaged over any three consecutive samples.
5. To determine compliance with the standards contained in this section, the required
sampling frequency for E. coli, CBOD5, and total suspended solid levels must be
performed at least once per month when the system is in operation and the results
submitted to the ECPHA for compliance with the permit requirements.
6. Methods of Analysis-Sampling Points:
a. All effluent samples must be analyzed according to the methods prescribed in the
American Public Health Association, American Water Works Association, and
Water Environment Federation: Standards Methods for the Examination of Water
and Wastewater, 22nd edition, 2012 (International Standard Book Number:
9780875530130).
b. The sampling point must be a location that is representative of final discharge
from the system.
43.13 Technology Review and Acceptance
A. OWTS technologies must either be public domain, including but not limited to rock and pipe
distribution systems, sand filters with pressure distribution and mound systems,with criteria for
design, installation, maintenance and use as described in this regulation, or proprietary products
that have received Division review and acceptance before the local public health agency may
permit them for use.
B. The Division must review and provide either comment or acceptance to the manufacturer for
proprietary products in these technology categories:
1. Proprietary treatment products(e.g. treatment systems);
2. Propriety distribution products(e.g. manufactured distribution products or subsurface
dripline);
3. Septic tanks;
4. Others as needed.
C. Product Acceptance Requirements—General:
1. To qualify for product acceptance, manufacturers desiring to sell or distribute proprietary
products in Colorado must submit a completed application to the Division in the format
provided by the Division and a report describing in detail the test procedures and data
confirming the performance and properties of the product claimed by the manufacturer.
Products within a single series or model line sharing distinct similarities in design,
materials, capacities, configuration, and claiming the same level of treatment may be
83
43.13 Technology Review and Acceptance
accepted under a single application. Products outside of the series or model line must be
accepted under separate applications. The following information must be included in the
application:
a. Manufacturer's name, mailing address, street address, and phone number;
b. Contact individual's name, mailing address, street address, phone number and
email address. The contact individual must be vested with the authority to
represent the manufacturer in the acceptance process;
c. Category of product(e.g., proprietary treatment product, proprietary distribution
product, septic tank);
d. Name, including specific brand and model, of the proprietary product;
e. A description of the functions of the proprietary product, along with any known
limitations on the use of the product;
f. Product description and technical information, including dimensioned drawings;
materials and characteristics; component design specifications; and volumes,
design capacity, and flow assumptions and calculations, as relevant;
g. Siting and installation requirements;
h. Product performance information in appropriate product section;
Detailed description, procedure and schedule of routine service and maintenance
events;
j. Copies of manufacturer's literature to include sales and promotion, design,
installation, operation and maintenance, and owner instructions; and
k. Identification of information subject to protection from disclosure and trade
secrets, if any.
2. Upon receipt of an application, the Division must verify that the application is complete
and meets the requirements for which the product is being evaluated. If the application is
found to be complete, and the requirements of this section needed to accept the product
are met,the Division will place the product on a list of accepted proprietary products for
the type of product. Installation and use of accepted products must comply with the
requirements noted on the acceptance document provided by the Division.
3. Manufacturers must have readily accessible and up to date information for designers,
regulators, product owners, and other interested parties about their product including:
a. Product manuals;
b. Design instructions;
c. Installation instructions;
d. Operation and maintenance instructions; and
84
43.13 Technology Review and Acceptance
e. A list of representatives and manufacturer-certified service providers in Colorado,
if any. If none exist, information on how service on the product will be provided in
Colorado.
4. If, at any time after a proprietary product has been accepted for use, the Division receives
information that the product so accepted does not meet the required standards, or in any
way constitutes a public health or environmental hazard,the Division may, at its
discretion, revoke the product acceptance.The Division shall notify the manufacturer and
local public health agencies within 30 days of any revocation.
D. Proprietary Treatment Product Acceptance Requirements
1. If a proprietary treatment product is submitted to meet a specific treatment level, a report
with test procedures and data must be submitted to the Division to demonstrate that it
can meet the treatment level for which the approval is being requested on a consistent
basis in actual installations. The Division must approve the test methods and programs.
Test results from product certification testing must also be submitted.
2. If a product is accepted for a specific treatment level, the product may also be used for
applications requiring lower treatment levels. Reductions based on higher level treatment
may not be applied unless the local public health agency has a maintenance oversight
program in place as described in section 43.14.D.
3. Field Performance Testing
a. Testing must be performed by a neutral third party.
b. Testing for residential applications must be performed on a minimum of 12
single-family homes under normal operating conditions unless otherwise noted
below:
(1) If the proprietary treatment product is requesting TL2 acceptance and
that product has received NSF/ANSI 40 (2013 or earlier version)
certification,the number of home sites to be tested may be reduced to
six. The NSF/ANSI 40 (2013 or earlier version)certification must be
submitted if the reduced number of test sites is requested.
(2) If the proprietary treatment product is requesting TL2N acceptance and
that product has received NSF/ANSI 245(2013 or earlier version)
certification, the number of home sites to be tested may be reduced to
six. The NSF/ANSI 245(2013 version)certification must be submitted if
the reduced number of test sites is requested.
c. Each system must be tested over a period of at least one year.
d. Each system must be sampled at least four times during the year with the
sampling evenly distributed throughout the year.
e. Laboratory results for all parameters for which acceptance is being requested
must be submitted.
f. Testing may be performed in Colorado under a Product Development Permit.
g. Testing may be performed in locations other than Colorado.As part of the
testing, the manufacturer must define,to the acceptance of the Division, what
85
43.13 Technology Review and Acceptance
adjustments or modifications to the product will be required to compensate for
the following conditions:
(1) Increased elevation results in lower atmospheric pressure and lower
oxygen content. Adjustments or modifications to the treatment process
may be required to compensate for these conditions and those
adjustments or modifications must be specified.
(2) Winter season conditions in Colorado include cold temperatures that
may affect product performance. Adjustments or modifications to the
treatment process may be required to compensate for these conditions
and those adjustments or modifications must be specified. This item
must be addressed if nitrogen reductions are claimed.
h. The report conclusions must indicate the proprietary treatment unit can
consistently be expected to meet the treatment level for which acceptance is
being requested.
The report must include estimated operating costs for the first five years of the
treatment system's life. This must include both estimated annual electricity or
other energy costs, and routine inspection and maintenance costs, including
replacement of parts.
(1) Energy and other costs are to be based on typical Denver, Colorado,
costs at the time of the acceptance request.
(2) Replacement part costs must include shipping and handling.
(3) If media or other major part replacement is expected during the normal
life of the system, the cost of replacement and the typical replacement
interval must be included even if replacement is not expected within five
years.
j. If a proprietary product had been previously accepted for use in Colorado under
NSF/ANSI 40 (2013 or earlier version)or equivalent testing and at least one
product unit had been installed in Colorado prior to June 30, 2013,the
acceptance for use in Colorado may continue as treatment level 2. A request for
this continued acceptance must be submitted to the Division on the forms
provided by the Division. Documentation of a product installation must be
provided.
E. Proprietary Distribution Product Acceptance Requirements
1. Proprietary manufactured distribution products must:
a. Be constructed or manufactured from materials that are non-decaying and non-
deteriorating and do not leach chemicals when exposed to septic tank effluent
and the subsurface soil environment;
b. For gravity distribution systems, the product must provide a liquid storage volume
at least equal to the storage volume within the assumed 30 percent void space in
a rock and pipe distribution system assuming six inches of rock below the pipe
and two inches above the pipe;
86
43.13 Technology Review and Acceptance
c. Maintain the integrity of the trench or bed. The material used, by its nature and its
manufacturer-prescribed installation procedures, must withstand the physical
forces of the soil sidewalls, soil backfill and the weight of equipment used in the
backfilling; and
d. If the width of a proprietary manufactured distribution product is within 90 percent
of the width of the excavation, it may be approved as being equivalent to the full
width of the excavation, if information is provided that demonstrates distribution
over the full width. Thus, the product must cover at least 90 percent of the
excavated area in either a trench or bed configuration in order to receive sizing
adjustments provided in Table 10-3.
2. Chambers:
a. Include a sidewall that is structurally sound and capable of allowing aeration of
the infiltrative surface and exfiltration of effluent while minimizing the intrusion of
soil.
3. Enhanced manufactured media:
a. The product must be wrapped in a fabric that promotes movement of the effluent
through the fabric and prevents intrusion of soil. Manufacturer must demonstrate
that the product has been adequately tested and functions as intended.
b. For enhanced manufactured media that requires a specified layer of sand or
other media to be placed below the actual product, the vertical separation
requirements of this regulation will be determined from the base of the sand or
other media, as the sand or media is an integral part of the component.
c. For products that allow for sand extensions beyond the actual manufactured
component, the distance of sand allowed from the edge of the excavation to the
manufactured component may be up to six inches in a trench system and 24
inches in a bed system.
d. If sand media is proposed by the manufacturer as an integral part of the
distribution product, it must meet the size and uniformity specifications as noted
by the manufacturer.
4. Other manufactured media:
a. In order to receive sizing adjustments provided in Table 10-3, the product must
cover at least 90 percent of the excavated area in either a trench or bed
configuration without the use of gravel, stone or other aggregate containing fines,
which may compromise soil permeability.
5. Proprietary subsurface dripline products must:
a. Be warranted by the manufacturer for use with OWTS effluent;
b. Specify required treatment level of influent to the driplines;
c. Be designed for resistance to root intrusion; and
d. Incorporate emitters that may be controlled either by use of pressure-
compensation emitters or with a pressure regulator.
87
43.14 Operation and Maintenance
F. Septic Tank Acceptance Requirements
1. Septic tank design must conform to the requirements of section 43.9.B. of this regulation.
2. Each manufacturer must annually test five percent of its tanks for watertightness at the
manufacturing facility, unless the tanks are certified for use as a septic tank by the
International Association of Plumbing and Mechanical Officials (IAPMO)or Canadian
Standards Association (CSA), or the manufacturer participates in the Plant Certification
Program of the National Precast Concrete Association (NPCA).
3. Watertightness results must be sent to the Division on an annual basis unless otherwise
addressed in section 43.13.F.2 above. The manufacturer must provide information that
specifies measures taken to repair a tank that fails the watertightness test. The
manufacturer must also define the measures taken to prevent similar problems in future
tanks.
4. IAPMO, CSA, and NPCA certifications must be submitted to the Division for acceptance.
Current certifications must be submitted to the Division on an annual basis.
G. Other Product Acceptance Requirements
1. The Division may adopt review and acceptance requirements for additional products as
needed.
43.14 Operation and Maintenance
A. Responsibility: The owner must be responsible for maintenance of an OWTS unless the
responsibility has been contractually assigned to a tenant or a third party or a public, quasi-public,
or political subdivision.
B. Service Label: For higher level treatment systems or other components under a service contract,
a clearly visible, permanently attached label or plate giving instructions for obtaining service must
be placed at a conspicuous location.
C. The oversight program of inspections, maintenance, recordkeeping and enforcement for higher
level treatment systems adopted by the Board of Health accounts for:
1. Scheduling of maintenance and cleaning;
2. Practices adequate to ensure performance of an OWTS; and/or
3. Submission of proof of maintenance and cleaning to the ECPHA by the owner of the
system.
D. Permitting and Oversight of Maintenance for Soil Treatment Area Reductions and Vertical and
Horizontal Separation Distance Reductions Based on Use of Higher Level Treatment
1. Purpose: Reductions in requirements for soil treatment areas, vertical separation
distances to limiting layers or reductions in horizontal separation distances by using
higher level treatment systems are based on the criteria that these systems are
functioning as designed. If these criteria are not met, failure or malfunction is likely, which
could result in damage to public health and water quality.
2. The ECPHA permits reductions in the size of soil treatment areas and horizontal and
vertical separation distances based on higher level treatment of effluent.. The ECPHA
88
43.14 Operation and Maintenance
may designate a separate entity to conduct and maintain the oversight of this program.
However, enforcement of the requirements of this regulation will remain with the Board
of Health. System monitoring may be required.
3. Before permitting systems with a reduced soil treatment area as a result of higher level
treatment the ECPHA requires inspections, maintenance, recordkeeping and
enforcement to ensure and document that the systems are meeting the designed higher
level treatment standards.At a minimum:
a. Maintain accessible records that indicate:
(1) Owner and contact information;
(2) Address and legal description of property;
(3) Location of OWTS specifying location of septic tank, higher level
treatment system, soil treatment area and other components;
(4) Description of OWTS installed;
(5) Level of treatment to be provided;
(6) Copy of current contract with a service provider;
(7) Inspection and maintenance performed:
(i) Dates system was inspected and/or maintained;
(ii) Name and contact information of inspector and/or maintenance
provider;
(iii) Condition of system at inspection; and
(iv) Maintenance tasks performed;
(8) Permits, if required by the local public health agency for the work
performed; and
(9) Condition of system at completion of any maintenance activity.
b. Frequency of inspection and maintenance must be the most frequent of:
(1) Manufacturer recommendations for proprietary systems or design criteria
requirements for public domain technology;
(2) The ECPHA or Division requirements;
(3) For higher level treatment systems, two inspections at six-month
intervals for the first year of operation, followed by annual inspections for
the life of the system.
5. Owner responsibilities:
a. Ensure OWTS is operating, maintained and performing according to the required
standards for the designated treatment level;
89
43.15 Severability
b. Maintain an active service contract with a maintenance provider at all times; and
c. Each time his/her current contract with a maintenance provider is renewed or
replaced, send a copy to the ECPHA within 30 days of signing.
6. Maintenance provider responsibilities:
a. Must notify the ECPHA when a service contract has been terminated.
b. Must obtain appropriate training/certification for specific proprietary treatment
products as provided by the manufacturer necessary to provide the required
operation and maintenance for said products.
E. Monitoring and Sampling
1. For an OWTS for which monitoring of effluent is required, the ECPHA or delegated third
party must collect and test effluent samples to ensure compliance with the provisions of
this regulation.
2. Sampling may be required by the ECPHA in conjunction with an enforcement action.
3. Any owner or occupant of property on which an OWTS is located may request the
ECPHA to collect and test an effluent sample from the system. The ECPHA may perform
such collection and testing services. The owner or occupant must pay for these services.
a. If the ECPHA or a delegated third party collects and tests effluent samples, a fee
not to exceed that which is allowed by the OWTS Act may be charged for each
sample collected and tested. Payment of such charge must be stated in the
permit as a condition for its continued use.
b. Conditions when the ECPHA can require routine monitoring:
(1) Indications of inadequate performance;
(2) Location in sensitive areas;
(3) Experimental systems; and/or
(4) Systems under product development permits.
c. Sampling and analysis must be performed according to American Public Health
Association,American Water Works Association, and Water Environment
Federation: Standards Methods for the Examination of Water and Wastewater,
22nd edition, 2012(International Standard Book Number: 9780875530130).
43.15 Severability
The provisions of this regulation are severable, and if any provisions or the application of the provisions to
any circumstances are held invalid,the application of such provision to other circumstances, and the
remainder of this regulation will not be affected thereby.
43.16 Materials Incorporated by Reference
90
43.16 Materials Incorporated by Reference
Throughout these regulations, standards and requirements by outside organizations have been adopted
and incorporated by reference. The materials incorporated by reference cited herein include only those
versions that were in effect as of March 12, 2018, and not later amendments to the incorporated material.
Materials incorporated by reference are available for public inspection during normal business hours from
the Water Quality Control Division,4300 Cherry Creek Drive South, Denver, Colorado 80246. Copies may
be purchased from the source organizations listed below.
AASHTO, American Association of State Highway and Transportation Officials
444 North Capitol Street, NW, Suite 249
Washington, DC 20001
Phone: 202-624-5800
Email: info@aashto.org
www.transportation.org
ANSI, American National Standards Institute
25 West 43rd Street, 4th floor
New York, NY 10036
Phone: 212.642.4900
www.ansi.org
ASTM,American Society for Testing and Materials
ASTM International
100 Barr Harbor Drive
PO Box C700
West Conshohocken, PA 19428-2959
Phone: 610.832.9500
Email: service@astm.org
www.astm.org
CPOW, Colorado Professionals in Onsite Wastewater
P.O. Box 918
Strasburg, CO 80136
Phone: 720-626-8989
www.cpow.net
CSA, Canadian Standards Association
CSA Group Testing and Certification Inc.
178 Rexdale Boulevard
Toronto, Ontario M9W 1 R3
Canada
Phone: 800-463-6727
Email: sales@csagroup.org
www.csagroup.org
ETL, Electrical Testing Laboratories
The ETL Listed Mark is from Intertek Testing Services NA, Inc. (ITSNA)
545 East Algonquin Road, Suite F
Arlington Heights, Illinois 60005
Phone: 800 967 5352
www.intertek.com
IAPMO, International Association of Plumbing and Mechanical Officials
International Association of Plumbing and Mechanical Officials EGS(IAPMO)
4755 East Philadelphia Street
Ontario, CA 91761
91
43.16 Materials Incorporated by Reference
Phone: 909-472-4100
Email: iapmo@iapmo.org
www.iapmo.org
NPCA, National Precast Concrete Association
1320 City Center Drive, Suite 200
Carmel, IN 46032
Phone: 800-366-7731
www.precast.org
NSF, National Sanitation Foundation
NSF International (NSF)
789 North Dixboro Road
Ann Arbor, Michigan 48105
Phone: 734-769-8010
Email: info@nsf.org
www.nsf.org
UL Underwriters Laboratories
Underwriters Laboratories Inc.
333 Pfingsten Road
Northbrook, Illinois 60062
Phone: 847.272.8800
Email: CustomerExperienceCenter@ul.com
www.ul.com
Standard Methods for the Examination of Water and Wastewater, 21st edition.
A joint publication of the American Public Health Association,American Water Works Association,
and Water Environment Federation
Phone: 877-574-1233
Email: standardmethods@wef.org
www.standardmethods.org/Buy/
92
A CDPHE COLORADO
CO of' Water Quality Control Division
.` I1et':+t h'uw>d� Fq.bi.c p:,,p i;i,t E",ivornrCnP
Dedicated to protecting and improving the health and environment of the people of Colorado
July 19, 2018
Ray Merry, Environmental Health Director
Eagle County Public Health Agency
P.O. Box 179
590 Broadway
Eagle, CO 81631
Subject: Post-Local Adoption Review of Proposed Regulation - Acceptance
On-site Wastewater Treatment System Regulations
Eagle County
Dear Mr. Merry:
The Water Quality Control Division (Division) has reviewed the proposed revisions to Eagle County On-site
Wastewater Treatment System Regulations (local regulation), adopted on July 10, 2018, and received by the
Division on July 11, 2018. The Division's review of this document was conducted pursuant to section
43.4(A)(2)(a) of the On-site Wastewater Treatment System Regulation 5 CCR 1002-43 (Regulation 43).
The Division found no inconsistencies or conflicts in the proposed revisions to the local regulation with
regard to the On-site Wastewater Treatment Systems Act (Act) Article 10 of Title 25, C.R.S. or Regulation
43. The Division has no objections to the local regulation on that basis.
Should the local board of health make any changes or revisions to the local regulations in the future, please
send the revisions to the Division for review. Only after the Division has determined that the local board of
health's revised regulations comply with the OWTS Act and Regulation 43 may the local board of health's
revised regulations take effect and be published [Section 43.4(A)(3)(e)].
If you have any questions regarding the Division's review or findings, please contact me at (303) 692-2366 or
chuck.cousino@state.co.us.
Sincerely,
Digitally signed by Chuck Cousin°,REHS
DN:cn=Chuck Cousin°,RENS,
/ o=Engineering Section,ou=Water
t« i..«fl.i •(, ,ry,% -I Quality Control Division,
7 email=chuck.cousino@state.co.us,c=US
Date:2018.07.19 09:4139-06'00'
Charles J. Cousino, REHS
On-site Wastewater Treatment System Coordinator
Engineering Section I Water Quality Control Division
Colorado Department of Public Health and Environment
cc: Files
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-3500 NW://www.colorado,goy/cdvfie wacci I
John W. Hickenlooner. Governor I tarn,Wolk. MD. MSPH. Executive Director and Chief Medical Officer