STATE OF: Colorado AIP PROJECT NO.: 3-08-0020-24
NAME OF AIRPORT: Eagle County Regional Airport LOCATION: Eagle County
CONTRACTOR: Castle Rock Construction Co. SCHEDULE NO.: III
SUPPLEMENTAL AGREEMENT NO. One
TO Castle Rock Construction Co. CONTRACTOR: YOU ARE HEREBY ORDERED TO MAKE THE
FOLLOWING CHANGE IN THE PLANS AND/OR SPECIFICATIONS FOR THE ABOVE DESIGNATED
PROJECT.
1. DESCRIPTION OF CHANGE TO BE MADE:
Add Schedule III to the existing contract.
2. REASON FOR ORDERING CHANGE:
A decision was made by Eagle County Regional Airport to incorporate Schedule III (Construct Westerly Portion
of Aircraft Parking Apron) to the existing contract.
3. SETTLEMENT FOR THE COST OF THE MENTIONED CHANGE IS TO BE MADE AS FOLLOWS:
See Attached Sheet.
THIS AGREEMENT (INCREASES) (DECREASES) THE CONTRACT TIME BY 0 WORKING DAYS.
4. SUMMARY OF COSTS:
NET (INCREASE) (DEGREASE) OF THIS AGREEMENT $477,010.60
TOTAL (INCREASE) (DECREASE) OF ALL PREVIOUS AGREEMENTS 0.00
TOTAL (INCREASE) (DEGREASE) OF ALL AGREEMENTS TO DATE $477,010.60
TOTAL ESTIMATED CONTRACT COSTS $1,444,402.85
NOTE: THIS AGREEMENT IS NOT EFFECTIVE UNTIL SIGNED BY THE ENGINEERING SECTION
AIRPORTS DIVISION FEDERAL AVIATION ADMINISTRATION.
AGREED TO BY: 19 Z2
SP SOR'S AUTHORIZE EP. TITLE DATE
AGREED TO BY. iP�re.7 S 1 g
O TRACTOR'S AUTHORIZED REP. TITLE DATE
APPROVED BY: Q- // 19 —.z
ENGINEER ION, PORTS DIVISION, FAA DATE
(INCREASE) (DECREASE) - STRIKE OUT THE ONE WHICH DOES NOT APPLY
SL- PLEMENTAL AGREEMENT . , O. 1
EAGLE COUNTY REGIONAL AIRPORT
AIP PROJECT NO. 3-08-0020-24
Schedule III - Additions
EGE-1961
Ifet1A Nti;
T fjpti4tl
mfeti
Ouantity
uwt
Unit Cost
'fatal Cost
P -152a
Unclassified Excavation
765
C.Y.
$5.00
$3,825.00
P -152b
Borrow Excavation
4100
C. Y.
$3.30
$13,530.00
P -152c
Sub rade Preparation
7600
S.Y.
$1.50
$11,400.00
P -311a
Bond Breaker Fabric
7460
S.Y.
$1.50
$11,190.00
P -311b
Bituminous Material
1865
Gal.
$2.00
$3,730.00
P -401a
Bituminous Paving, Surface
Course 3/4 Inch Mix
1660
Ton
$35.00
$58,100.00
P -401c
Modified Bituminous Material
108
Ton
$270.00
$29,160.00
P -501a
12 -Inch Portland Cement Concrete
Pavement
7460
S.Y.
$38.61
$288,030.60
P -603a
Bituminous Tack Coat
375
Gal.
$3.00
$1,125.00
P -620c
Permanent Apron and Taxiway
Markin
565
S.F.
$2.00
$1,130.00
L -108c
Install Cable 1/C #2 600V XHHW
2800
L.F.
$1.50
$4,200.00
L -110a
Install 2-3 Inch PVC Duct CE
475
L.F.
$18.00
$8,550.00
L -150b
Install Floodlight Pole, 50 Foot,
3-1000 HPS Fixtures
2
Ea.
$8,000.00
$16,000.00
L -150c
Install Floodlight Power and
Control Equipment
1
L.S.
$8,000.00
$8,000.00
L -150d
Masonry Screen Wall
1
L.S.
$10,000.00
$10,000.00
L -220a
Install Electrical Pullbox
2
Ea.
$4,100.00
$8,200.00
L -221a
I Install Groundin Electrode
4
Ea.
$210.00
$840.00
Schedule III - Total Items Added $477,010.60
Schedule III - Total Items Added $477.010.60
Total Increase - Supplemental Agreement No. 1 $477,010.60