No preview available
HomeMy WebLinkAboutC97-256 Castle Rock Construction Company0972567n F( -,F- 104 1 STATE OF: Colorado AIP PROJECT NO.: 3-08-0020-24 NAME OF AIRPORT: Eagle County Regional Airport LOCATION: Eagle County CONTRACTOR: Castle Rock Construction Co. SCHEDULE NO.: III SUPPLEMENTAL AGREEMENT NO. One TO Castle Rock Construction Co. CONTRACTOR: YOU ARE HEREBY ORDERED TO MAKE THE FOLLOWING CHANGE IN THE PLANS AND/OR SPECIFICATIONS FOR THE ABOVE DESIGNATED PROJECT. 1. DESCRIPTION OF CHANGE TO BE MADE: Add Schedule III to the existing contract. 2. REASON FOR ORDERING CHANGE: A decision was made by Eagle County Regional Airport to incorporate Schedule III (Construct Westerly Portion of Aircraft Parking Apron) to the existing contract. 3. SETTLEMENT FOR THE COST OF THE MENTIONED CHANGE IS TO BE MADE AS FOLLOWS: See Attached Sheet. THIS AGREEMENT (INCREASES) (DECREASES) THE CONTRACT TIME BY 0 WORKING DAYS. 4. SUMMARY OF COSTS: NET (INCREASE) (DEGREASE) OF THIS AGREEMENT $477,010.60 TOTAL (INCREASE) (DECREASE) OF ALL PREVIOUS AGREEMENTS 0.00 TOTAL (INCREASE) (DEGREASE) OF ALL AGREEMENTS TO DATE $477,010.60 TOTAL ESTIMATED CONTRACT COSTS $1,444,402.85 NOTE: THIS AGREEMENT IS NOT EFFECTIVE UNTIL SIGNED BY THE ENGINEERING SECTION AIRPORTS DIVISION FEDERAL AVIATION ADMINISTRATION. AGREED TO BY: 19 Z2 SP SOR'S AUTHORIZE EP. TITLE DATE AGREED TO BY. iP�re.7 S 1 g O TRACTOR'S AUTHORIZED REP. TITLE DATE APPROVED BY: Q- // 19 —.z ENGINEER ION, PORTS DIVISION, FAA DATE (INCREASE) (DECREASE) - STRIKE OUT THE ONE WHICH DOES NOT APPLY SL- PLEMENTAL AGREEMENT . , O. 1 EAGLE COUNTY REGIONAL AIRPORT AIP PROJECT NO. 3-08-0020-24 Schedule III - Additions EGE-1961 Ifet1A Nti; T fjpti4tl mfeti Ouantity uwt Unit Cost 'fatal Cost P -152a Unclassified Excavation 765 C.Y. $5.00 $3,825.00 P -152b Borrow Excavation 4100 C. Y. $3.30 $13,530.00 P -152c Sub rade Preparation 7600 S.Y. $1.50 $11,400.00 P -311a Bond Breaker Fabric 7460 S.Y. $1.50 $11,190.00 P -311b Bituminous Material 1865 Gal. $2.00 $3,730.00 P -401a Bituminous Paving, Surface Course 3/4 Inch Mix 1660 Ton $35.00 $58,100.00 P -401c Modified Bituminous Material 108 Ton $270.00 $29,160.00 P -501a 12 -Inch Portland Cement Concrete Pavement 7460 S.Y. $38.61 $288,030.60 P -603a Bituminous Tack Coat 375 Gal. $3.00 $1,125.00 P -620c Permanent Apron and Taxiway Markin 565 S.F. $2.00 $1,130.00 L -108c Install Cable 1/C #2 600V XHHW 2800 L.F. $1.50 $4,200.00 L -110a Install 2-3 Inch PVC Duct CE 475 L.F. $18.00 $8,550.00 L -150b Install Floodlight Pole, 50 Foot, 3-1000 HPS Fixtures 2 Ea. $8,000.00 $16,000.00 L -150c Install Floodlight Power and Control Equipment 1 L.S. $8,000.00 $8,000.00 L -150d Masonry Screen Wall 1 L.S. $10,000.00 $10,000.00 L -220a Install Electrical Pullbox 2 Ea. $4,100.00 $8,200.00 L -221a I Install Groundin Electrode 4 Ea. $210.00 $840.00 Schedule III - Total Items Added $477,010.60 Schedule III - Total Items Added $477.010.60 Total Increase - Supplemental Agreement No. 1 $477,010.60