HomeMy WebLinkAboutC97-288 Castle Rock Construction CompanyC'97 X8 8 7 0 ' w � - F B F- 1 Q F 1 STATE OF: Colorado AIP PROJECT NO.: 3-08-0020-24 NAME OF AIRPORT: Eagle County Regional LOCATION: Apmlo1Q��c�0 CONTRACTOR: Castle Rock Construction, Co. SCHEDULE `�j� , , 11l // CHANGE ORDER NO. One FAA DEN -ADO TO Castle Rock Construction, Co. CONTRACTOR: YOU ARE HEREBY ORDERED TO MAKE THE FOLLOWING CHANGE IN THE PLANS AND/OR SPECIFICATIONS FOR THE ABOVE DESIGNATED PROJECT. 1. DESCRIPTION OF CHANGE TO BE MADE: See Attached Sheet 2. REASON FOR ORDERING CHANGE: Plan quantity was increased to account for four inch section under P-501 in Schedule I. Modified bituminous material was also adjusted to better match the mix design of 5.2 percent oil. The bond breaker between a bottom flexible pavement and a rigid top pavement was deleted. 3. SETTLEMENT FOR THE COST OF THE MENTIONED CHANGE IS TO BE MADE AS FOLLOWS: See Attached Sheet THIS CHANGE ORDER (INCREASES) (DECREASES) THE CONTRACT TIME BY 0 WORKING DAYS. 4. SUMMARY OF COSTS: NET (INCREASE) (^Fi��E) OF THIS CHANGE ORDER $56,645.50 TOTAL (INCREASE) (BF=GR€4SF=) OF ALL PREVIOUS CHANGE ORDERS 477,010.60 TOTAL (INCREASE) (B€SR€A6F=) OF ALL CHANGE ORDERS TO DATE 533,656.10 TOTAL ESTIMATED CONTRACT COSTS $1,501,048.35 NOTE: THIS ORDER IS NOT EFFECTIVE UNTIL SIGNED BY THE ENGINEERING SECTION AIRPORTS DIVISION FEDERAL AVIATION ADMINISTRATION. AGREED TO BY: /D-rU 19 Q 7 NSOR'S AUTHOR D REP. TITLE DATE AGREED TO BY: /C">— 'fig 19 CONTRACTOR'S AUTHORIZED REP. TI E DATE APPROVED BY:2 �0 2�l' '19,97 EN NEER S 10 , AlRTS DIVISION, FAA DATE (INCREASE) (DECREASE) - STRIKE OUT THE ONE WHICH DOES NOT APPLY CHANGE ORDER NO. ONE ADD - SCHEDULE I P-401 a Bituminous Paving, Surface Course, 3/4 Inch Mix 2063 Tons @ $35.00 Ton $72,205.00 P-401 c Modified Bituminous Material 55 Tons @ $270.00 Ton 14,850.00 TOTAL $87,055.00 DELETE - SCHEDULE I P-311 a Bond Breaker (Fabric) 4800 S.Y. @ $1.50 $7,200.00 P-311 b Bituminous Material 1200 Gal. @ $2.00 2,400.00 DELETE - SCHEDULE II P-311 a Bond Breaker (Fabric 2945 S.Y. @ $1.50 $4,417.50 P-311 b Bituminous Material 736 Ga. c@ $2.00 1,472.00 DELETE - SCHEDULE III P-311 a Bond Breaker (Fabric) 7460 S.Y. @ $1.50 $11,190.00 P-311 b Bituminous Material 1865 Ton @ $2.00 3,730.00 TOTAL - DELETE SCHEDULES I, II AND III $30,409.50 TOTAL $56,645.50