Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC97-288 Castle Rock Construction CompanyC'97 X8 8 7 0
' w � - F B F- 1 Q F 1
STATE OF: Colorado AIP PROJECT NO.: 3-08-0020-24
NAME OF AIRPORT: Eagle County Regional LOCATION: Apmlo1Q��c�0
CONTRACTOR: Castle Rock Construction, Co. SCHEDULE `�j� , , 11l //
CHANGE ORDER NO. One FAA DEN -ADO
TO Castle Rock Construction, Co. CONTRACTOR: YOU ARE HEREBY ORDERED TO MAKE THE
FOLLOWING CHANGE IN THE PLANS AND/OR SPECIFICATIONS FOR THE ABOVE DESIGNATED
PROJECT.
1. DESCRIPTION OF CHANGE TO BE MADE:
See Attached Sheet
2. REASON FOR ORDERING CHANGE:
Plan quantity was increased to account for four inch section under P-501 in Schedule I. Modified bituminous
material was also adjusted to better match the mix design of 5.2 percent oil. The bond breaker between a
bottom flexible pavement and a rigid top pavement was deleted.
3. SETTLEMENT FOR THE COST OF THE MENTIONED CHANGE IS TO BE MADE AS FOLLOWS:
See Attached Sheet
THIS CHANGE ORDER (INCREASES) (DECREASES) THE CONTRACT TIME BY 0 WORKING DAYS.
4. SUMMARY OF COSTS:
NET (INCREASE) (^Fi��E) OF THIS CHANGE ORDER $56,645.50
TOTAL (INCREASE) (BF=GR€4SF=) OF ALL PREVIOUS CHANGE ORDERS 477,010.60
TOTAL (INCREASE) (B€SR€A6F=) OF ALL CHANGE ORDERS TO DATE 533,656.10
TOTAL ESTIMATED CONTRACT COSTS $1,501,048.35
NOTE: THIS ORDER IS NOT EFFECTIVE UNTIL SIGNED BY THE ENGINEERING SECTION AIRPORTS
DIVISION FEDERAL AVIATION ADMINISTRATION.
AGREED TO BY: /D-rU 19 Q 7
NSOR'S AUTHOR D REP. TITLE DATE
AGREED TO BY: /C">— 'fig 19
CONTRACTOR'S AUTHORIZED REP. TI E DATE
APPROVED BY:2 �0 2�l' '19,97
EN NEER S 10 , AlRTS DIVISION, FAA DATE
(INCREASE) (DECREASE) - STRIKE OUT THE ONE WHICH DOES NOT APPLY
CHANGE ORDER NO. ONE
ADD - SCHEDULE I
P-401 a Bituminous Paving, Surface Course,
3/4 Inch Mix
2063 Tons @ $35.00 Ton
$72,205.00
P-401 c Modified Bituminous Material
55 Tons @ $270.00 Ton
14,850.00
TOTAL
$87,055.00
DELETE - SCHEDULE I
P-311 a Bond Breaker (Fabric)
4800 S.Y. @ $1.50
$7,200.00
P-311 b Bituminous Material
1200 Gal. @ $2.00
2,400.00
DELETE - SCHEDULE II
P-311 a Bond Breaker (Fabric
2945 S.Y. @ $1.50
$4,417.50
P-311 b Bituminous Material
736 Ga. c@ $2.00
1,472.00
DELETE - SCHEDULE III
P-311 a Bond Breaker (Fabric)
7460 S.Y. @ $1.50
$11,190.00
P-311 b Bituminous Material
1865 Ton @ $2.00
3,730.00
TOTAL - DELETE SCHEDULES I, II AND III
$30,409.50
TOTAL $56,645.50