No preview available
HomeMy WebLinkAboutC96-003 The Landplan Design GroupUtl. Oe4 1b OU LH ILh-LHIY 1L51k_Iti ll[VUr C "99 THE LANDPLAW DESIGN GROUP 2529 GMT" WADBWOFITH OLVO. SUITE 104 LAkEW000. C04PA00 5=7 PHONE" 303 98? -3933 FAX: 3OU87.3W December 45, 1995 Kathy Eastley Eagle County Community Development PO Box 179 Eagle CO 81631 RE: WIT. SOPRIS TREE FARM PLANNING CONTRACT - lUdE EXTENSION After reviewing current status of the planning scope of services we propose an extension of the completion date to this revision of date is acceptable m the County, authorization si ture line below can formally amend our contract. 4 S• aly, x NeaMBL%table Theplan Design Groupue Eagle C rCoiVnu*iuty Development 351 Ms. Eastley, This letter is 'intended as a formal request for a time extension to the existing contract between Eagle County and the l andplan Design Group for the AftD ,P A� a aforementioned project. A►iCt09CTs uNIM COM As we have currently completed the first draft of the planning document it PLANNING appears unl&6y that county and potentially Task Force review of the draft will N��� ` be completed in time to complete our scope of services by the previously UABAN DE61GN modified date or December 1, 1995. After the draft text is reviewed and LANDSCAPE DESIGN comments are received at our office we will complete the formatting for the final document complete with photo inserts and mapping. This process will take approximately one week after we receive county comments. After reviewing current status of the planning scope of services we propose an extension of the completion date to this revision of date is acceptable m the County, authorization si ture line below can formally amend our contract. 4 S• aly, x NeaMBL%table Theplan Design Groupue Eagle C rCoiVnu*iuty Development 351