Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC96-003 The Landplan Design GroupUtl. Oe4 1b OU LH ILh-LHIY 1L51k_Iti ll[VUr
C "99
THE LANDPLAW
DESIGN GROUP
2529 GMT" WADBWOFITH OLVO.
SUITE 104
LAkEW000. C04PA00 5=7
PHONE" 303 98? -3933
FAX: 3OU87.3W
December 45, 1995
Kathy Eastley
Eagle County Community Development
PO Box 179
Eagle CO 81631
RE: WIT. SOPRIS TREE FARM PLANNING CONTRACT -
lUdE EXTENSION
After reviewing current status of the planning scope of services we propose an
extension of the completion date to this revision of date
is acceptable m the County, authorization si ture line below can
formally amend our contract. 4
S• aly,
x
NeaMBL%table
Theplan Design Groupue
Eagle C rCoiVnu*iuty Development
351
Ms. Eastley,
This letter is 'intended as a formal request for a time extension to the existing
contract between Eagle County and the l andplan Design Group for the
AftD ,P A� a
aforementioned project.
A►iCt09CTs
uNIM
COM
As we have currently completed the first draft of the planning document it
PLANNING
appears unl&6y that county and potentially Task Force review of the draft will
N��� `
be completed in time to complete our scope of services by the previously
UABAN DE61GN
modified date or December 1, 1995. After the draft text is reviewed and
LANDSCAPE DESIGN
comments are received at our office we will complete the formatting for the
final document complete with photo inserts and mapping. This process will take
approximately one week after we receive county comments.
After reviewing current status of the planning scope of services we propose an
extension of the completion date to this revision of date
is acceptable m the County, authorization si ture line below can
formally amend our contract. 4
S• aly,
x
NeaMBL%table
Theplan Design Groupue
Eagle C rCoiVnu*iuty Development
351