400%
200%
100%
75%
50%
25%
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C95-91-47 Shaw Construction Change Order
CHANGE C95-91-47- Distribution to: ( ORDER OWNER ❑ C1 ARCHITECT ❑ AIA DOCUMENT 0701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Eagle County Justice Center Annex CHANGE ORDER NUMBER: 2001 (name, address) Eagle, CO INITIATION DATE: TO (Contractor): �j ARCHITECT'S PROJECT NO: 11/20/95 I Shaw Construction L.L.C. CONTRACT FOR:General Construction 760 Horizon Drive Grand Junction, CO 81506 CONTRACT DATE: May 1, 1995 You are directed to make the following changes in this Contract: Change Order #1 ADA sitework $2,000 Site signage 3.095 Total Add $5,095 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ 960,322 Net change by previously authorized Change Orders ................................... $ 0 The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $ 965,417 The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order......................................................... $ 5,095 The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ 965,417 The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is ARCHITECT CONTRACTOR Mortcr Architects Shaw Construction L.L.C. Address 143 E. Meadow Drive Address 760 Horizon Drive Vail, CO 81657 Grand Junction, CO 81506 BY BY 6l" DATE DATE 11'120 A S AIA DOCUMENT G701 CHANGE ORDER APRIL 1978 EDITION AIA® © 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 2000G Auth rized: OWNE Eagle County*00 Address PO Box 850 O 81631 w� BY DATE G701 —1978