Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC96-075 Paramount Fabrics IncAGREEMENT
FOR
PURCHASE AND INSTALLATION OF MINI BLINDS
THIS AGREEMENT is made this 15th day of
April , 1996, by and between the County of Eagle, State of
Colorado, by and through its Board of County Commissioners
(hereinafter "the County") ; and Paramount Fabrics Inc. doing
business as Paramount Fabrics Inc. (hereinafter
"Contractor"
The County and the Contractor, in consideration of the mutual
covenants hereinafter set forth, agree as follows:
SECTION I. SCOPE OF WORK
Contractor will provide all labor, equipment and materials to
perform the following "Work":
1. THEIR ARE 27 WINDOWS IN DIFFERENT WIDTHS AND LENGTHS.
CONTRACTOR SHALL MEASURE EACH WINDOW FOR PROPER
SIZING OF BLINDS.
2. COLOR SELECTION WILL BE BY EAGLE COUNTY'S REPRESENTATIVE:
JANET REUZELMAN, TECHNICAL SUPPORT SPECIALIST.
3. ALL BLINDS ARE TO THE SPECIFICATIONS OF CLASSICS.
4. STEEL HEADRAIL CHANNEL: 1 INCH HIGH BY 1/2 INCH DEEP "U"
SHAPED CHANNEL.
5. ENCLOSED METAL BOTTOMRAIL: TUBULAR SHAPE, 0.28" THICK
ELECTRO -ZINC COATED STEEL. PAINTED WITH VINYL PRIMER AND
BAKED POLYESTER ENAMEL FINISH COAT.
6. THE BLINDS WILL BE ALUMINUM ALLOY, SLATS SHALL BE
NOMINALLY 1 - INCH WIDE, AND .006" THICK.
7. CORD LOCK: SNAP -IN -DESIGN USING POLISHED WEAR SURFACES.
CORD LOCK WILL BE A CRASH PROOF DESIGN THAT WILL LOCK
UPON RELEASE OF LIFT CORD. CORD SEPARATORS SHALL PREVENT
CORDS FROM TWISTING OR TANGLING.
8. SHAFT TYPE TILTER: SHALL BE OF A WORM AND GEAR TYPE
ENCLOSED IN AN ACETAL HOUSING. TILTER SHAFT SHALL BE
CLEAR POLYCABONATE AND THE GEAR SHALL BE NYLON. TILER
SHALL BE A SNAP -IN COMPONENT.
9. BRAIDED LADDER: SHALL BE OF BRAIDED POLYESTER YARN WHICH
WILL PROVIDE MAXIMUM STRETCH. HORIZONTAL COMPONENTS
SHALL BE NOT LESS THAN TWO THREADS. DISTANCE BETWEEN END
LADDER AND END OF SLATS WILL NOT EXCEED 22 -INCHES.
10. LIFT CORD: SHALL BE BRAIDED WITH POLYESTER JACKETS AND
RAYON CENTER CORE AND SHALL BE 1.4MM. SHALL BE
SUFFICIENT LENGTH TO CONTROL THE RAISING OR LOWERING OF
THE BLIND AND BE SECURELY ANCHORED TO THE BOTTOMRAIL.
11. END STIFFENERS: SHALL BE ELECTROPLATED STEEL AND
INSERTED AT EACH END OF HEADRAIL TO ADD RIGIDITY. FIELD
ADJUSTMENT TABS ELIMINATE LATERAL MOVEMENT.
12. END SUPPORT BRACKETS: SHALL BE TREATED WITH STEEL WITH
A VINYL PRIMER AND POLYESTER BAKED ENAMEL FINISH COAT TO
MATCH HEADRAIL.
13. HOLD-DOWN BRACKETS: UNIVERSAL HOLD-DOWN BRACKETS FOR
SILL OR JAMB INSTALLATION.
14. COLOR: COLOR OF HEADRAIL, BOTTOMRAIL LADDER, CORD AND
PLASTIC ACCESSORIES SHALL COORDINATE WITH SLATS.
15. INSTALLATION OF ALL BLINDS, AS PER MANUFACTURES
SPECIFICATIONS.
SECTION II. COUNTY'S REPRESENTATIVE
Janet Renzelman, the County's Buildings and Grounds Technical
Support Specialist, is designated as the County's representative
for purposes required hereunder.
SECTION III. PRICE
The price is $ > > 4n _ nn , payable in one lump sum upon
County's acceptance of the materials and installation. The price
excludes any sales or similar tax and County will assist Contractor
to obtain exemption from such tax.
SECTION IV. TERM
Services under this Agreement shall commence immediately upon
the execution of this agreement, and shall be completed on or
before April 30, 1996.
SECTION V. INSURANCE
The Contractor shall purchase and maintain during the term of
this Agreement insurance in the following types and coverages
protecting him from claims which may arise out of or result from
the Installation operations under this Agreement, whether such
operations be by himself, or by anyone for whose acts he may be
liable.
A. Worker's Compensation Insurance as required by the
laws of the State of Colorado.
SECTION VI WARRANTY
Contractor shall warrant installation free from defect for a
period of one year following acceptance, and shall repair or
replace the same upon receipt of notice of defect. Contractor
shall provide the materials manufacturer's standard warranty; if
none, Contractor shall warrant the materials free from defect for
a period of one year following acceptance, and shall repair or
replace same upon receipt of notice of defect.
SECTION VII. INDEMNITY
Contractor agrees to indemnify, defend and hold harmless the
County, its respective agents, officers, servants, and employees of
and from any and all loss, costs, damage, injury, whatsoever, of
any nature arising out of or related to the Contractor's intention-
al or negligent acts, errors or omissions and those of its agents,
officer, servants and employees, whether contractual or otherwise
in the performance of this agreement.
ARTICLE VIII. MISCELLANEOUS
A. No assignment or subcontracting by a party hereto of any
rights or duties under, or interest in, this Agreement
will be binding on another party without the written
consent of the party sought to be bound. No assignment
will release or discharge the assignor form any duty or
responsibility under this agreement unless expressly
provided in the consent.
B. Venue and jurisdiction for any action arising out of this
Agreement shall be in the County Court, Eagle County
Colorado or the District Court sitting in Eagle County,
Colorado, as appropriate in accordance with the remedy
jurisdictions of those courts.
IN WITNESS WHEREOF, the parties hereto have signed this
document the year and date first set forth above.
COUNTY OF EAGLE, STATE OF COLORADO,
By and Through Its BOARD OF COUNTY
COSSIONERS
Chairman
�',� P.O. Box 850
Eagle, Colorado 81631
4 a (970) 328-8685
ATTEST: * n �p
BY:
er to tkfe Board of
County Commissioners
IN WITNESS WHEREOF, the parties hereto have signed this
document the year and date first set forth above.
ATTEST:
BY:
Clerk to the Board of
County Commissioners
COUNTY OF EAGLE, STATE OF COLORADO,
By and Through Its BOARD OF COUNTY
COMMISSIONERS
BY:
James E. Johnson, Jr., Chairman
P.O. Box 850
Eagle, Colorado 81631
(970) 328-8685
"CON CTOR"
t f �
BY
The foregoin was acknowledged before me this day of
1996, by d6'c•� for 1��
My commission expires:
i�1