ROA. AAINTENANCE AGREEMENT BE l EEN
EAGLE COUNTY AND THE UTE CREEK
PLANNED UNIT DEVELOPMENT
C"96 TP51.
This Agreement is made and entered into this 2a day of 1996, by
C. J. C. PROPE TEES, LTD., a Colorad Lirm*teq Liability Co oration ("Owner") whose
address is % 1�, Gr,°D OF COUNTY
COMMISSIONERS OF EAGLE COUNTY, COLORADO.
WITNESSETH:
WHEREAS, Owner owns real property more specifically described as The Ute Creek
Planned Unit Development, recorded in Plat Book �, a 1 , at Paged (p , of the
Eagle County, Colorado records (hereinafter referred to as the "Property"), which Property shall
be developed primarily as a contractor's outside storage yard, along with other uses as described
in the The Ute Creek Planned Unit Development Guide as approved by the Board of County
Commissioners pursuant to Resolution No. 5 - 72 recorded in Book 669 at Page 891
Reception No. 565911 of the Eagle County Clerk and Recorder's Office.
WHEREAS, access to the property is partially along a road (known as Eagle County
Road No. 49) currently maintained and supervised by Eagle County.
WHEREAS, it is the intent and desire of both parties to this agreement to cooperate in the
future maintenance and repair of said road on a pro rata basis determined by actual use of the
parties.
NOW, THEREFORE, in consideration of the mutual promises and obligations contained herein,
the Owner and Eagle County hereby covenant and agree as follows:
A. Gates
The existing gate located on Road 49 near Highway 131 is to remain in
place. It will be operated by separate locks; one under the complete
control of Eagle County, which also allows Upper Eagle Valley
Consolidated Sanitation District its use; and one controlled by authorized
leasehold users of the storage facility. Eagle County and Ute Creek will
each monitor use and be open for further discussions and operational
adjustment if problems occur.
2. The existing gate near the landfill entrance will remain in place and
continue to be controlled by Eagle County.
Ute Creek will construct a gate to control access to its facility. A location
will be selected by Ute Creek to be reviewed and approved by Eagle
County and the Bureau of Land Management. It is suggested that it should
be located near one of the gulches which will help to physically restrict
uncontrolled access.
�.l
R
WW
C
Di
Road Improvements
Ute Creek will be responsible for construction of a gravel road including
dust control measures from Road 49 to its facility in accordance with plans
approved by Eagle County in the P.U.D. process.
2. Projected traffic counts based on use, operation and phasing of the Ute
Creek facility will be provided to Eagle County. Eagle County keeps
records of all traffic related to use of the land fill. Upon joint analysis, a
plan for future improvements will be developed with a subsequent cost Cn
sharing arrangement based on attributable impacts.
rn
Road maintenance:
Similar to the above listed cost sharing arrangement, an analysis of �
attributable traffic will be jointly completed. This is to be based on the use
pattern and phasing of Ute Creek, along with traffic presently using the
land fill and projected future use. As a baseline figure, the 1995 average b
number of vehicle movements per day was 150 (a vehicle movement can be
counted in either direction along the road).
2. A program to monitor the use based on actual experience is key to thisCD
agreement. Ute Creek will minimize traffic due both to its permitted uses
o
and lease agreements. It is anticipated that in the course of time a greater
level of use will occur on both facilities. Therefore, actual traffic counts
rn
will be made, analyzed jointly and a cost sharing program revised as
o
necessary. It is suggested that a review and any necessary adjustments be
made on a yearly basis.
b
3. Eagle County will notify Ute Creek in advance of pending dust control
�
applications. Ute Creek will arrange for dust control treatment on the
Lv
portion of the road it uses solely -
Electric Service
0
W
1. Ute Creek agrees to follow the standard cost sharing arrangement
instituted by Holy Cross Electric Association to reimburse a pro rata share
of the cost the County paid to extend the line. Ute Creek will be fully
responsible for the cost of the further extension of the line.
2. The Bureau of Land Management has required that the line be placed along
the proposed road to the Ute Creek Facility.
3. It is anticipated that if and when a major trash processing facility is
constructed, three phase electrical power will be needed. Ute Creek would
be responsible for such extension. The BLM has required that, at the time
a three phase line is installed, the single phase line be removed and the
three phase line be put in its place along the access road.
IN WITNESS HEREOF, the parties hereto have executed this instrument on this date and
year above first written.
C. J. C. PROPERTIES, LTD BOARD OF COUNTY COMMISSIONERS
OF EAGLE COUNTY, COLORADO
By: By: v G�
Chris P. Jou s Chairman
STATE OF COLORADO )
ss.
COUNTY OF EAGLE )
This instrument was acknowledged before me this day of
1996, by Chris P. Jouflas.
Witness my hand and official seal.
My commission expires: My commission expires 11/21/98
w
NotaryPublic 61
STATE OF COLORADO )
ss.
COUNTY OF EAGLE )
This instrument was acknowledged b fore me this day of�
1996, by _ as Chairman =,
of the Board of County Commissioners of Eagle County, Colorado.
Witness my hand and official seal.
My commission expires: f'o/t S q {v �� - -
Notary Public
s
587665 B-691 P-667 04/04/96 05:46P PG 3 OF 3