No preview available
HomeMy WebLinkAboutC96-065 Atlas Steel IncC°96 6563 AGREEMENT BETWEEN COUNTY OF EAGLE, STATE OF COLORADO AND ATLAS STEEL, INC. THIS AGREEMENT is made this —Oday of 1996, by and between the Board of County Commissioners, C unty of Eagle, State of Colorado, (hereinafter referred to as "Owner"), and Atlas Steel, Inc. (hereinafter referred to as "Contractor"). In consideration of the mutual promises herein, the parties agree as follows: Article 1 - Scope of the Work The Contractor shall furnish one (1) Log/Tin Baler and perform all of the work described herein on the Owner's property in a location to be determined by Owner. Article 2 - Payment Contractor will pay Owner for material crushed per documented weight at Owner's scales at the Landfill. Article 3 - Cooperation Both parties shall cooperate -with one another and coordinate their activities to facilitate their respective duties. Article 4 - General Provisions 1. All work shall be completed in a workman -like manner and in compliance with all applicable laws. 2. Contractor may at its discretion engage subcontractors and in all instances remain responsible for the proper completion of this Agreement. 3. Contractor shall at its own expense obtain all permits necessary for the work to be performed. 4. Contractor shall not be liable for any delay due to circumstances beyond its control including, but not limited to, strikes, casualty or general mechanical breakdowns. 5. Contractor shall maintain general liability insurance, with minimums in accordance with Federal and State laws, but not less than $150,000 per person and $600,000 per occurrence for personal injury and death and $600,000 per occurrence for property damage, and workers' compensation and employer's liability coverage with minimums in accordance with all applicable State laws, and shall save harmless and indemnify the Owner from and against any and all claims, demands, damages and expenses of any nature whatsoever, relating to or arising from this Agreement and Contractor's performance of this Agreement. Contractor shall provide Owner current Certificates of Insurance, before commencing the work, naming Owner as an additional insured on the liability policy(ies) and proving coverage by a workers' compensation policy. 6. Contractor agrees to assume all liabilities pertaining to scrap materials, including white goods. Article 5 - Assignment of Rights Neither party may assign or delegate their rights, under this Agreement without the written permission of the other party. This Agreement shall inure to the benefit of, and be binding upon the parties, their successors nd assigns permitted hereunder. Article 6 - Amendment This Agreement may only be amended by an agreement between the parties, in writing and executed by both parties with the same formality as this Agreement. Article 7 - Integration This document embodies the entire understanding between the parties. There are no terms, covenants, or conditions, expressed or implied, other than those set forth herein. This document supersedes all earlier negotiations, understandings and agreements between the parties and represents the sole intentions of the parties. Article 8 - Other Terms A. Length of Agreement - sixty (60) days from the first day of arrival of the baler on the work site, i.e., Eagle County Landfill, provided that the Contractor shall 6�ne IS commence the work no later than )Way -,J, 1996, subject to weather and site conditions. B. Description of work to be performed - loose tin/scrap and white goods to be baled and shipped out. Title to materials passes to Contractor upon his removal of them from the Landfill. C. Quantity - all available. Owner makes no representations as to quantity or quality of the materials. D. Price - $10.00 per net ton. E. F.O.B. - Eagle County Landfill G. Shipping - trucking or as arranged by Contractor H. Terms - to be paid in full within thirty ( 3 0 ) days of the completion of job, payment is to include documentation of loads/weights shipped. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first above written. The parties hereto have signed this Agreement in quadruplicate. One counterpart each has been delivered to the Owner and the Contractor. ATTEST: Clerk to trfe Board o County Commissioners c\atlas.con COUNTY OF EAGLE, STATE OF COLORADO, By and Through Its BOARD OF COUNTY COMMISSIONERS By: Georg A. Gates, Chairman ATLAS STEEL, INC. By: 3