C'9723570
IAI No. EGE 1961
AIP PROJECT NO. 3-08-0020-24
AMENDMENT NO. FOURTEEN TO CONTRACT
DATED MAY 24, 1993
BETWEEN
ISBILL ASSOCIATES
RAYTHEON INFRASTRUCTURE INC.
AND
EAGLE COUNTY, COLORADO
The Sponsor and the Engineer agree to amend their contract for improvements to Eagle County
Regional Airport, Eagle, Colorado to include fees for engineering services. The improvement
Item No. 3 is included in the Scope of Work of the original contract, this amendment being
effective only upon Eagle County receiving a grant from the FAA for the project to which it
relates. The items covered by this amendment are described as follows:
3. Expand Air Carrier Apron
The Sponsor agrees to pay the Engineer for the services listed under Article II of the original
contract in the following manner:
PART A - BASIC SERVICES
A lump sum for Item No. 3 ........................................ $123,654.10
BIDDING AND CONSTRUCTION ADMINISTRATION
A lump sum for Item No. 3 ......................................... $18,318.00
Method of payment shall be as follows:
Interim payments up to 90 percent based on work performed by the Engineer and
detailed in a report submitted to the Sponsor with the request for payment. The
remaining ten percent to be paid upon Notice to Proceed for construction.
PART B - SPECIAL SERVICES (SOILS AND PAVEMENT INVESTIGATIONS/
TOPOGRAPHIC SURVEYS)
The maximum estimated SPECIAL SERVICES engineering is as follows:
SOILS AND PAVEMENT INVESTIGATIONS (FOR DESIGN)
A lump sum for Item No. 3 ................... Not Applicable to this Amendment
TOPOGRAPHIC SURVEYS (FOR DESIGN)
A lump sum for Item No. 3 .......................................... $2,000.00
Page 1 of 3
l
If work is abandoned or terminated after obtaining approval by the Sponsor and the
FAA of the final construction plans and specifications, the Sponsor shall reimburse up
to 100 percent of the total lump sum as listed under PART A and 100 percent of the
invoiced costs for soils and pavement investigations and topographic surveys listed
under PART B.
FIELD ENGINEERING
The Engineer shall be reimbursed on a Cost Plus Fixed Fee Basis. The Engineer's costs
shall be determined on the basis of time (i.e., the number of hours worked), multiplied
by the Engineer's standard hourly rates for each applicable employee classification, plus
direct non -hourly expenses including labor, overhead, and general administrative costs.
Overhead costs are based on the most recent audit on the Engineer's records. See
attached page for hourly rates and billing procedure.
The estimated maximum for FIELD ENGINEERING is:
For Item No. 3 .................................. Maximum of $92,715.96
For this Amendment, the Sponsor shall pay the Engineer's costs to a maximum of
$82,911.10 plus a fixed fee of $9,804.86.
The Engineer's costs, exclusive of the fixed fee, shall not be exceeded without the
Sponsor's written prior approval.
The above estimated maximum is based on a construction project taking 60 working
days.
Method of payment shall be as follows:
For services rendered under PART B - SPECIAL SERVICES, the Sponsor agrees to make
monthly payments based upon the work performed by the Engineer less 10 percent. The
final 10 percent of the fee shall be due and payable when the project final inspection
and the construction report have been completed, and when reproducible "Record
Drawings" have been submitted to the Sponsor and when the revised Airport Layout
Plan has been approved by the FAA. The "Record Drawings" and Construction Report
shall be submitted within a period of 90 days from end of construction period. This
Amendment shall be considered concurrent with completion of audit.
Page 2 of 3
All other terms and conditions of the original contract shall remain in effect.
IN SS WHEREOF the parties hereto have affixed their signatures this
day of 1997.
SPONSOR:
Board of County Commissioners
Eagle County, Colorado
By
Title Of Signator(s)
CA
,J
o
A
Attest
ENGINEER:
ISBILL ASSOCIATES
Raytheon Infrastructure Inc.
By
President
Page 3 of 3
HOURLY RATES* AND BILLING PROCEDURES
Projects Billed with Fixed Fee
Principal.................................................................. $ 83.10
Staff Engineer/Planner...................................................... 71.40
Engineer/Planner/Construction Coordinator .................................... 53.60
Assoc. Engineer/Planner/Constr. Coordinator ................................... 38.30
Draftsman/CADD Operator .................................................. 31.30
Clerical/Data Processor...................................................... 34.00
Auto-CADD Work Station .................................................... 25.00
Auto -TR OL Work Station .................................................... 35.00
* Includes labor overhead, general and administrative costs.
Company car and Personal car usage will be billed at the rate of $27.70 per day and $0.31 per
mile. Auto rental and out-of-town expenses will be billed at actual costs. Out-of-town meals
will not exceed $30.00 per day; or $7.00 for breakfast, $9.00 for lunch and $14.00 for dinner.
Soils and pavement investigations, topographic surveys, and other engineering support will be
billed at actual costs.
(01.04.96)