HomeMy WebLinkAboutC17-084 Miller Engineering Consultants dba Souder, Miller and AssociatesFIRST AMENDMENT TO AGREEMENT BETWEEN
EAGLE COUNTY, COLORADO
AND
MILLER ENGINEERS, INC.
DBA SOURER, MILLER & ASSOCIATES
THIS FIRST AMENDMENT ("First Amendment") is effective as of
03/14/2017
by and
between Miller Engineers, Inc. a New Mexico corporation d/b/a Souder, Miller & Associates
(hereinafter "Consultant" or "Contractor") and Eagle County, Colorado, a body corporate and
politic (hereinafter "County").
RECITALS
WHEREAS, County and Consultant entered into an agreement dated the 6`h day of December,
2016, for certain Services (the "Original Agreement"); and
WHEREAS, the parties recognize that the Original Agreement incorrectly identified the
contracting party as Miller Engineering Consultants, Inc. d/b/a Souder, Miller & Associates
rather than Miller Engineers, Inc. d/b/a Souder, Miller & Associates and the parties desire to
correct this error; and
WHEREAS, the Original Agreement contemplated that the Consultant would perform certain
duties with compensation in an amount not to exceed $85,000.00; and
WHEREAS, County and Consultant desire by this First Amendment to expand the scope of
Services and compensation as set forth in the Original Agreement.
FIRST AMENDMENT
NOW THEREFORE, in consideration of the foregoing and the mutual rights and obligations as
set forth below, the parties agree as follows:
1. The Original Agreement shall be amended to correct the entity name as follows: all
references to Miller Engineering Consultants, Inc. d/b/a Souder, Miller & Associates
are hereby changed to Miller Engineers, Inc. d/b/a Souder, Miller & Associates.
2. The Original Agreement shall be amended to include additional Services as described
in Exhibit 1, which is attached hereto and incorporated herein by reference.
3. The compensation for the additional Services set forth in Exhibit 1 shall not exceed
$15,000.00 or a total maximum compensation under the Original Agreement and this
First Amendment of $100,000.00.
4. Capitalized terms in this First Amendment will have the same meaning as in the
Original Agreement. To the extent that the terms and provisions of the First
Amendment conflict with, modify or supplement portions of the Original Agreement,
C17-084
the terms and provisions contained in this First Amendment shall govern and control
the rights and obligations of the parties.
5. Except as expressly altered, modified and changed in this First Amendment, all terms
and provisions of the Original Agreement shall remain in full force and effect, and are
hereby ratified and confirmed in all respects as of the date hereof.
6. This First Amendment shall be binding on the parties hereto, their heirs, executors,
successors, and assigns.
IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to the Original
Agreement the day and year first above written.
Attest:
By:
Regina O'Brien, Clerk to the Board
COUNTY OF EAGLE, STATE OF COLORADO,
By and Through Its BOARD OF COUNTY
COMMISSIONERS
By: .. . .
JilHan H. Ryan, Chair
CONSULTANT:
MILLER ENGINEERS, INC.
DBA SOURER, MILLER & ASSOCIATES
LE
1:7 ......................
Print Name: Reid Allan
Title: Senior Vice President
2
Eagle County Am Scope and Comp Final 5/14
EXHIBIT 1
Eagle County Am Scope and Comp Final 5/14
F b'rGo_SIC Amanda Nolan <amanda.nolan@eaglecounty.us>
EAGIF COQ
Rate Study
Winn Cowman <winn.cowman@soudermiller.com> Thu, Dec 22, 2016 at 11:09 AM
To: Amanda Nolan <amanda.nolan@eaglecounty.us>
Cc: Jesse Masten <jesse.masten@eaglecounty.us>
Mandi,
The rate study will cost approximately $10,000. Below is a brief description of the scope of work:
SMA will gather pertinent information to evaluate the current rate structure for the Eagle County Solid Waste Facility.
Three previous years will be studied and projections will be provided for the next 5 years, All aspects of operations
will be evaluated to determine operating costs and capital outlay needs for the next 20 years. Recommendations will
be made for future adjustments to rates. The findings will be presented in a detailed report, which will be presented
to County Staff, County Commissioners, and the public.
The cost for moving GMP -3 will be approximately $5,000. The following is a description of what that entails:
Preparations will be made for installing the new probe, including utility locating. A drilling contractor will mobilize to
the site to drill, install the pipes and casing, and backfill. SMA will provide oversight, documentation of the process,
including a figure of the probe following installation.
Best,
SMA
Winn Cowman
Project Manager/Scieni*ist !I
Corporate Reg Istradon s: A2 Engineering/GeaIagy15urveying Firm (14070), So Surveying Firm IC -74361, TX Engineering Firm (8877), TX GeaIagy Firm (50254), TX PST CAPM (CS-OOQ0051j,
TX Surveying Firm (10162204), WY Surveying Firm (5-1704)