HomeMy WebLinkAboutC13-036 AMEC Earth and Environmental Second AmendmentAMENDMENT NO. 2 TO AGREEMENT BETWEEN EAGLE COUNTY, COLORADO AND AMEC EARTH & ENVIRONMENTAL, INC. FOR PROFESSIONAL DESIGN SERVICES FOR EAGLE COUNTY BRIDGE EAG -301 -23.5 REPLACEMENT AMEC Earth & Environmental, Inc. a Colorado corporation ( "Consultant" or "Contractor ") and Eagle County, Colorado a body corporate and politic ( "County ") are parties to a contract with an effective date of the 13 day of September, 2011 ( "Contract "). Consultant and County, for good and valuable consideration as set forth herein agree to amend the Contract ( "Second Amendment ") as follows: A. County has requested that Consultant modify the scope of Services and perform certain Additional Services all as set forth in Exhibit A -2 which is attached hereto and incorporated herein by reference. Consultant agrees to furnish all services, labor, personnel and materials necessary to perform and complete these Additional Services in accordance with the terms of the Contract. Consultant agrees to furnish the Additional Services within the timeframe and within the deadlines identified in Exhibit A -2. In the event a completion date for a particular item is not set forth in Exhibit A -2, then Consultant agrees to furnish the Additional Services and modified scope in a timely and expeditious manner consistent with the applicable professional standard of care. B. The total Compensation for the modified scope of Services and Additional Services identified in Exhibit A -2 shall not exceed zero dollars ($0) and shall be based on Consultant's fee summary set forth in Exhibit B -2 which is attached hereto and incorporated by reference. Nothing in Exhibit B -2 shall modify the not to exceed figure established in this paragraph B. C. A summary of the Compensation for the Additional Services and modified scope of Services identified in this Second Amendment is as follows: PKM: SB 40 Addition 3,023.80 Benesch (LONCO): Design Revisions 4,955.34 Transportation Resource Services: Acquisition Services 7,887.00) AMEC Direct Costs: Mileage 92.14) Not to Exceed Amount for Additional Services 0.00 D. All definitions set forth in the Contract shall apply to this Second Amendment unless a different definition is expressly set forth herein. E. In the event of a conflict between any exhibit and the Contract or this Second Amendment the terms of the Contract shall control. F. Except as expressly amended or modified herein, the Contract shall remain unmodified and in full force and effect. 1 This Second Amendment is executed on the 4]-11 day of ehrtfebi , 2013. COUNTY OF EAGLE, STATE OF COLORADO, by through its County Manager: By: Keith Montag, County Man. .er AMEC EARTH & ENVIRONMENTAL, INC. By:4. Don Connors Principal STATE OF 1:0( -A-00 ss. COUNTY OF I(jOYC-ti. The foregoing instrument was acknowledged before me by t»i 4 ci CBS S , this ) day of yt WU t.(2013. My commission expires: II II OU ALAWIL ..,.,74"ileei Notary Public JENNIFER A ZWEIGBAUM Notary Public State of Colorado Notary ID 20124073564 My Commission Expires Nov 9, 2016 2 Exhibit A -2 Eagle County Bridge EAG -301 -26.5 Replacement Project Scope of Work - Addendum 2 Continued Survey Issue in the Colorado River — Continued selected by Eagle County, does not redesign the Abutments and therefore is an additional 4,955.34. Please note that there is effort required by AMEC to address the survey change that was related to project management, hydraulics and contour revisions to the mapping that is not addressed by this contract modification. Reduction in Right -of -Way Scope of Work The Right -of -Way acquisition work is anticipated to be smaller than estimated in the Addendum 1 Scope of Work and Fee Estimate provided by TRS. After discussions between AMEC and TRS, a revised estimate was submitted by TRS that will reduce the scope of work and fee for this work. The total of this reduction is the total of the original and Addendum 1 fee minus the new fee estimate estimated to complete the work. In math this is $27,380.00 - $19,493.00 = 7,887.00. As a result the scope and fee reduction is ($7,887.00). See the attached TRS Fee Estimate in Exhibit S -3 for more information about the details of the $19,493.00 of services to be provided by TRS. Increase in AMEC Direct Costs The estimated cost of mileage charges for the project was decreased by 184.28 miles ($92.14) Wage Eagle County Bridge EAG- 301 -23.5 Replacement Project - Addendum 2 Exhibit B -2 Prepared for Ben Gerdes, PE, Eagle County Prepared by AMEC 30- Jan -13 Fee Summary Tasks Fee Comments Task 0 Total AMEC Labor Cost Fixed Fee (10 %) Direct Expenses 92)', Reduction in mileage Subconsultants Marcin Yeh PKM 3,024 Addition of SB-40 Scope (See Attachment S -1) Benesch 4,955 Revision of Bridge Plans due to Survey Issue (See Attachment S -2)Transportation Resource Services 7,887) Reduction in ROW Acquisition Services (See Attachment S -3) Total Subconsultants 92 Total Estimated Cost 0 Exhibit S -1 Environmental Process Scope and Estimate Proposal 16Jan - 13 Eagle Burns Bridge Prepared by PKM Design Group, Inc. For AMEC TASK 1: PREPARE SB 40 WILDLIFE CERTIFICATION CLEARANCE Resource Hours Hrly Rate Subtotal 1. Conduct field survey of impacted trees and shrubs (trees over 2" in caliper) C.Schrader 24 92.00 2,208.00 2. Prepare tree and shrub planting plan for riparian area at bridge site or other P.Miers 2 $120.00 240.00 acceptable site as determined by Colorado Parks and Wildlife (CPW).C. Fisher 4 59.07 236.28 3. Prepare SB40 Clearance letter for CDOT use in requesting CPW approval. M. Workmon 2 47.26 94.52 SUBTOTAL =2,778.80 SUBTOTAL PKM LABOR COSTS = 2,778.80 Mileage @ $.50 /mile - 400 200.00 Meals - $45 per day 45.00 Total Other Direct Costs:245.00 TOTAL ESTIMATE FOR PKM = 3,023.80 t,z- AlfredAlfred h Companybene $ C h 1700 Broadway, Suite 1512 engineers • scientists • planners Denver, C080290 www.benesch.com 20 -0098P303 - 620 -OQ98 F 303 - 620 -9397 January 21, 2013 Dan Krueger, P.E. AMEC Environment & Infrastructure, Inc. 2000 S. Colorado Blvd. Suite 2 -1000 Denver, CO 80222 Reference: Burns Bridge Extra Services Benesch Engineering Proposal Dear Dan, As you are aware, a survey problem has resulted in the need to modify our bridge substructure design. We consider the effort to revise the bridge design, due to the changes in the survey elevations in the Colorado River, to be outside of our scope of work. We also understand that the County is requesting changes to accommodate three 2 -inch diameter conduits in the project documents. The information shown below provides our scope of work for these additional items. Scope of Work: The survey problem was limited to the grading in the Colorado River below the existing water surface. The revisions to correct this problem have two related impacts on our work that was completed to reach the FOR submittal stage. The first impact is the direct impact of the existing grade being approximately 3 -feet lower than the previous contours indicated. The second impact is the indirect impact that results from revisions to the hydraulic modeling. The design water surface elevation and velocity has changed (both have an impact on the substructure design). Changes to the scour results also have a significant impact on the substructure design. The scope of work, therefore, includes the design revisions for the abutment and pier designs. In addition, we understand that the County wants to add three 2 -inch conduits to the project. The late addition of these utilities makes this an out of scope item of work. Required Information: We received the revised contours on 1/15/13. We are beginning the revisions to the substructure design. We received comments from AMEC on our superstructure design on 1/7/13. Since the FOR meeting, we have primarily been addressing both AMEC and CDOT comments on our superstructure design. We will need to coordinate with AMEC concerning the type of conduit and the details for the utility work. Approximate Work Effort for Additional Services: We feel that the abutment revisions will require about 40 hours of effort. We feel that the pier redesign will require about 80 hours of effort. Revisions for the utility work will require approximately 16 hours of effort. r S —Z. Dan Krueger, P.E.beneschPage12 engineers . scientists • planners Annroximate Fee for Services: Our fee proposal for the additional services listed above is shown below. The proposal is shown in accordance with the cost plus fixed fee basis used in our contract. Labor Cost: Abutment Redesign 2,053.20 Pier Redesign 4,106.40 Utility Addition 821.28 Total Labor Cost =6,980.88 Additional Fees: Overhead 171.38% of $6,980.88 11,963.83 Fixed Fee 10.00% of $18,944.71 1,894.47 Total Additional Fees 13,858.30 Total Feetal for Additional Services 20,839.18 Remaining Budget As of 1/20/13, we appear to have a remaining budget of $12,053.09. This appears to leave us with approximately 78 hours of additional work time. We feel that approximately 15 additional hours of work effort remain to complete the in scope work. The breakdown of this is show below. Remaining Budget 12,053.09 Estimated Remaining Effort 2,298.45 Remaining Fee 9,754.64 Estimated Additional Fee to Complete Additional Services: Estimated Additional Services 20,839.18 Remaining Fee 9354.64> Estimated Fee Required 11,084.54 Potential Options for Reducing Extra Services Fee As mentioned previously, the abutment design is currently based on substantially higher scour results than are currently required by the revised scour analysis. If the design of the abutment is left without revision, the effort to complete the additional services could be reduced by about 40 hours. Estimated Fee Required 11,084.54 Savings for reduced effort 6.129.20> Revised Additional Fee Required 4955.34 Ext# t1 S -Z Dan Krueger, P.E.beneschPage 3 engineers scientists • planners This letter documents our understanding of the scope of work required to complete the required additional services. Please call or email me (or Steve) if you have any questions. Thank you for the opportunity to present this proposal. Sincerely, Daniel Bechtold, P.E., S.E. cc: Steven Banks, P.E. File: F:\2011\P11188- Eagle -Bums Bridge Replacement \correspondencc\OUTGOING CORRESPONDENCE\Benesch Extra Services Scope.docx M 1 i 1 V) I M 1 z'WeC W G i 6.)0 o' W c L 3 1 12 C N1 1 r C O 11 cu M O N O n O 0 b ui O ci ci rri 1.4 N n Q in is 0 E7 5 4va0ovv8 0 8c Nom ° E° S An IA Q o > h t Q O W u m rg M O Q C 0 V' co O a IN ID N 0 a0 co tD -1 rl rl yOre7NC p O w O 8 0CV0 N d N Qi r =IA M 00 3 1 vi C y,.n N` 1 7 a 1 1 NI 611 0 C0 W 1 0CQQ00Wo8 m rl N M O CV N N W 0 0 Op ONalO ter .n g C 01 g N tI6 o an ry 1 0 a C 1 a 0 1 To ii 1 RI a 1 n o c C C o u O C O N m o O m . O c oci E c uC 1 v Q u- c o c a`,N o n v co u m o c a te N E m c G V J c NNncricN c . m 3 a c 7 Ond cyouymmooy ihllMhi y N K > O/ • f0 ¢ j v W N O > m m L y c N - o C 5 C t N C C O u y 0 y m m° W y c u oc ti 3 m t m t d omo 0 a o m o .° O m = a o o C ; o o + ., O O u W a. ..h0 - w a . c a I- u a` j C z o a Z -m -.O a aU1mNMt7uNNicNTNNC. U N M V n N N N M .4 tl13au a a z to 401. O a •m Li p o Is n1 6 M V 0 Crt Al di. X 1,/} SA cr N. C,wi 1:;m QJiAiA (coCD v O O S esi ca Q!v Q S 8 O I o 0 0 0 0 Nei L Ii « O t ° O H 10 E o w o o o ° Q C Q try j k NW1VM aQ a CO a 'o 0 W oo 0 rs0f0 = N C O O O OO D V N 0 0 N w CC it 00 2" 3 ui V?O 0 O N c N co h 0'C N C V -. ,`n m In W 8F. Q N d t0 O o a O r, po. m EO 11 inN g ti 2 n n v a v a . ° n o k z a` r. O L W a,Qw 2 0, 3Hu ac ' u cg H c 2 E c a,WmdWvQWO7 a a oo Is p-W c y ,0 m N a,W E u a U.. 2 n v u ac,gRm N a W LL p c j n c v VcccouFava r0 m ' C N 0 E a,CC4. c c y ti ' v 0 a W y u c o F—E p o ar c E E VI o N o a ti N d cS a r a u x co J o v u p a, m 2 a 3 Z w v p a C ao 3 co a , .c . ti c a ° -c u_t' Z c • T o 0 9 o o a ~ v v a '' 03tVva ° °v° . ° ° o0 0o c 42 O Y .--1 N ryi 0) N 5 ', N N N et a n d 1...1 c u_ CI f=al W 0cu >, 1cu u+LL Z Ln CC Q. n ?;k CCisWccWF-