Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC12-237 Holy Cross Energy Line Services Construction AgreementGROss F
O
O
d_�>` 'P
4/� ss0'60
October 28, 2011
Chris Anderson
P. O. Box 850
Eagle, CO 81631
Re: Eagle Airport North Hangars
Dear Chris:
3799 HIGHWAY 82 • P.O. BOX 2150
GLENWOOD SPRINGS, COLORADO 81602
(970) 945-5491 • FAX (970) 945-4081
Holy Cross Energy has completed a design and cost estimate for relocating power lines for the above
referenced project, hereinafter the "Project". The owner or developer of the subject Project is hereinafter
referred to as the "Owner".
The estimated cost of construction if"as follows:
Total estimated cost of construction as
a non-recoverable contribution required
before starting work on the project $20,900.00
The above figures are only estimates. After the job has been completed, the actual cost of construction
will be determined. The Owner's contribution and deposit will be adjusted to reflect the actual cost by
making a refund or further assessment. Execution of this document constitutes the Owner's agreement to
pay any further assessment in a timely manner.
Our power facilities must be installed on an easement. Please execute and return the enclosed document.
The following conditions are hereby noted:
Holy Cross Energy has implemented a policy which requires that the Owner provide all excavation,
backfill, compaction and cleanup needed for installation of the underground power system
extension to serve the Project. The Owner must also set all vaults and install all conduits as
specified by Holy Cross Energy's design for the Project and the enclosed construction
specifications. Holy Cross Energy will supply all material which can be picked up by the Owner at
the appropriate storage yard. The cost of this material is included in the job cost estimate. The
attached Trench Agreement must be properly executed by the Owner and returned prior to the
start of excavation.
2. No excavation will be undertaken within five (5) feet of existing underground power lines except
under the on site supervision of a Holy Cross Energy employee.
3. The route of our proposed underground power line extension must be at final grade and free of
obstructions before power line construction is started.
4. It shall be the Owner's responsibility to ensure that splice vaults, switchgear vaults and
transformer vaults installed hereunder for the Project are accessible by Holy Cross boom trucks
and other necessary equipment and personnel at all times. The use of such access by Holy Cross
A Touchstone Energy Cooperative jEa
Chris Anderson
Page Two
October 28, 2011
shall not require removal or alteration of any improvements, landscaping, or other obstructions.
The ground surface grade shall not be altered within ten (10) feet of said splice, switchgear and
transformer vaults, nor along the power line route between the vaults. The ground surface grade
at said transformer and switchgear vaults shall be six (6) inches below the top of the pad. The
ground surface grade at said splice vaults shall be even with the top of the pad. The manhole
opening of said splice vaults shall be uncovered (excluding snow) and accessible at all times.
Improvements, landscaping or any other objects placed in the vicinity of said transformers and
switchgear shall be located so as not to hinder complete opening of the equipment doors. The
ground surface within ten (10) feet of said transformer and switchgear doors shall be flat, level
and free of improvements, landscaping, and other obstructions. Improvements, landscaping and
other objects will be kept a minimum of four (4) feet from non -opening sides and backs of said
transformers and switchgear. Owner hereby agrees to maintain the requirements of this
paragraph and further agrees to correct any violations which may occur as soon as notified by
Holy Cross Energy. Said corrections will be made at the sole cost and expense of Owner.
5. Secondary voltage available will be 120/240, single-phase.
6. Secondary facilities shall be installed in accordance with National Electrical Code and Holy Cross
Energy specifications. All meter locations must be approved. Any service over 200 amps or 240
volts must have prior written approval from Holy Cross Energy,
All Meters in a meter stack must be marked with a permanently attached brass tag identifying the
unit it serves.
7. It will be the Owner's responsibility to extend underground secondary entrance conductors from
the pad -mounted transformer to points of power usage.
8. All underground services shall be installed in conduit ahead of the meter. All underground
services must be in conduit beneath roads, driveways, and other areas of difficult excavation.
9. The meter housing must be positioned so the meter faces a driveway or road.
10. It shall be the Owner's responsibility to protect their electric equipment from temporary over
voltage or under voltage situations resulting from causes beyond the control of Holy Cross
Energy.
1 1. The above mentioned cost estimate does not include connect fees or meter deposits, if required.
Arrangements for payment of these items and for scheduling the actual meter installation should
be made through the local Holy Cross Energy office.
12. We attempt to complete all projects in a timely manner. However, highest priority is given to
maintaining service to our existing consumers. This fact, along with inevitable construction
delays, will not allow us to guarantee a project completion date.
13. All Holy Cross Energy rules and regulations will be followed.
Chris Anderson
October 28, 201 1
Page Three
When Holy Cross Energy is in receipt of the Owner's check in the amount of $20,900.00, all necessary
executed easements, other permits, if required, a completed "Residential Load Information and Meter
Location" form or "Commercial Load and Metering Equipment Information" form, the executed trench
agreement, and the signed original of this letter agreement (below), the job can be scheduled for
construction.
Sincerely,
HOLY CROSS ENERGY
.-7
Keith HnerF andez,
Engineering Department
(970) 947-5439
Email khernandez@holycross.com
KH:smh
Enclosure
The above terms and c_onditi
are hereby a end d
BY:
Title:
Date: _ '-�, �5 ,1 -2--
W/O#1
W/O#1 1-21473:39-55:Eagle Airport North Hangars
c1r)
r -
w
C\j
z CO 4tj 4
z
C)
LOTLINE m
LU
Of
0
F -
z
U -
w
D
zo
z Lu
r-7 —2,'4:M Cw
x cc
D
5 w Ut;DERGROUIND POW RUt4F-
0
z
mxx CO
Ho W CC
m -i <
Rz 0
e, -o F-
�)-Jb 0 Z
Z z < <
—1 cr
IIS
Lu
z
0 F-
C) CC
jla 0
Hoz z
..
j! of-
:icr
1: >< 0
Ld CL
cc
w
0
w
E
co
Z
-0
0
LU
QO
X
LLJ 0
>— LU cc
< LLJ CL
a.
ZJ <
U) zU)
LLI 09
LLJ 3:
0 F-
0-
0 z
0
Cl- f-,%
�7-
LLJ 0 z
cr- in z)
Lj —0
mwzz)w U�
w 0
LL. 0 p
0 V) i= (D w w
Z
LL. Z (_) LJ
(1) < Z W 0
LLJ z
D 0
w
D
L- 05
LLJ Ld LLJ a) 7
O U) V) 0 (n C
zoozo w
H 0- C1. F- C1. Cl)rn
LA 0 0 L/) C) (1)
0
x Ct Cr-' x W CL
a_ w 0- L- U)
C) II II II II II U a
z o
< 0 c
F- W •SON! -r-2
wf- i: 0
oz it
ZLJ