HomeMy WebLinkAboutECAT11-002 BNP Associates Change Order No. 2 CHANGE ORDER NO. 2 AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN EAGLE COUNTY MR TERMINAL CORPORATION AND BNP ASSOCIATES, INC. FOR DESIGN SERVICES AND CONSTRUCTION MANAGEMENT RELATED TO EAGLE COUNTY REGIONAL AIRPORT CHECKED BAGGAGE INSPECTION SYSTEM Project Name: Eagle County Regional Airport Checked Baggage Inspection System Project Address or Location Eagle County Airport Eldon Wilson Road City: Gypsum State: CO Zip Code: 81637 BNP Associates, Inc. "Consultant" and Eagle County Air Terminal Corporation "Owner ", "Corporation" or "ECAT" are parties to an agreement dated the 24th day of August, 2010 ( "Agreement ") and wish to amend the Agreement as follows: A. Consultant has agreed to request and subcontract with M. Arthur Gensler Jr. & Associates, Inc. to subcontract with, Swanson Rink and Jviation Engineering & Planning ("sub - consultants") to perform the following Additional Services: o Provide engineering and design services to upgrade the existing current electrical service which does not have the correct voltage or the amperage capacity to power the new Inline Explosive Detection System and the new Baggage Handling System (BHS). o Provide calculations and electrical design for the interface for a new generator into the existing electrical system. o Provide specification documents and drawings for inclusion in the construction documents to decommission the existing generator and install a new generator. o Coordination of the exact requirements for the generator with the owner, and site coordination of the exact location for the placement of the new generator with owner and design team. o Provide engineering and design services for a weatherproof enclosure to house the new generator; the engineering and design services will include, exhaust muffler, vibration isolators, an above ground UL 142 certified tank, and an underground feeder from the generator to the building to feed a generator. o Provide a remote enunciator panel, and underground power from the new 100A, 120 /208V, HVAC panel to the generator to feed the battery charger, jacket heaters, and battery warmers. o Provide a 1600A/4 -pole service entrance automatic transfer switch. o Civil design and coordination for a new trenching for 5 new 4" conduits from the generator to the transfer switch will be required. o Provide civil /electrical /fire alarm services and management coordination for this design and engineering effort. Impact — The need for additional stud and work involved to u Schedule pact e eed o study upgrade electrical n for larger enera r along with longer than anticipated service and create a specificatio o a g to , g g ated p TSA internal review periods, along with the decision of Owner to pause design at 70% gfiell (-c2- level while it selects a GC to develop design from 70% to 100% design will cause delay in schedule. The Services are currently paused at the 70% design level. Owner will issue a Notice to Proceed with design coordination once Owner has selected a general contractor and any required feedback has been received from TSA. Once the Notice to Proceed is issued Consultant shall have fourteen (14) days to complete design coordination and complete 100% Design Drawings. The Schedule attached to the Agreement and as Appendix B to the OTA shall be extended by the number of days associated with this delay. C. The compensation for said Additional Services in this Change Order Number 2 shall be billed in monthly progress payments to a maximum of $30,160, as stated in the below. This Additional Services Amount $ 30,160.00 Previous Additional Services Amount $ 105,792.00 Total Additional Services Amount $ 135,952.00 to date Original Contract Amount $ 491,125.00 Contract Amount to date $ 627,077.00 No Out -of Pocket expenses shall be charged to Owner in addition to the Additional Services Amount set forth above. All Out -of- Pocket expenses (including, but not limited to travel, copies, courier services) associated with the Additional Services identified in this Change Order Number 2 are included in the Additional Services Amount set forth above. D. ECAT hereby consents to the Additional Services as set forth in this Change Order Number 2 to be performed by BNP Associates, Inc. and the sub - consultants to BNP Associates, Inc. Any sub - consultant shall be bound by the terms of the Agreement in all respects. In the event of any inconsistency between the terms and conditions in the Agreement and any agreement between Consultant and sub- consultant(s), the Agreement between ECAT and Consultant shall control. Consultant shall be responsible for the completeness and accuracy of the Services and any Additional Services, and shall correct, at its sole expense, all errors or omissions therein. Further, any sub - consultant shall be bound by the terms of the Other Transaction Agreement between Department of Homeland Security and ECAT relating to Eagle County Regional Airport Checked Baggage Screening Project E. Any individual or entity performing Services or Additional Services shall be considered subconsultants for purposes of the Agreement and this Change Order Number 2. or modified herein, the A F. Except as expressly amended o Agreement shall remain unmodified r p �P Y and in full force and effect. This Amendment is executed o n the day of 2011. • EAGT F CO lefi_ • 1' '� ►, II► CORPORATION: CONSU ' Its: Its: # 0640 T Dated: AA R, ao i 1 Dated: _p_r 7.40/7 Consultant's Contact Information: / Street Address: 1999 Broadway City: Denver State: CO Zip Code: 80202 Contact Name: Calvin P. Trudeau Tax ID Number: 06- 0871669