HomeMy WebLinkAboutECHDA15-002 Generator Interconnection Agreement HOLY CROSS ENERGY 3799 HIGHWAY 82•P.O.DRAWER 2150 GLENWOOD SPRINGS,COLORADO 81602 ATt hhmoeEncgy'Qivet(b (970)945-5491 •FAX(970)945-4081 GENERATOR INTERCONNECTION AGREEMENT This Generator Interconnection Agreement("Agreement") is made and entered into this 30th day of September, 2014,by and between Holy Cross Electric Association, Inc., dba Holy Cross Energy("Holy Cross"), a Colorado cooperative electric association and Lake Creek Village LLC ("Consumer"). The parties to this Agreement may each hereinafter be referred to individually as "Party"or both referred to collectively as the "Parties". In consideration of the mutual covenants set forth herein,the Parties agree as follows: 1. Definitions. (a) "Electric Tariffs"means Holy Cross's Electric Service Tariffs, Rules and Regulations as in effect on the effective date of this Agreement and as the same may be amended from time to time. (b) "Generating Facility"means the Consumer's device for the production of electricity identified in an interconnection request,but shall not include the Interconnection Facilities not owned by the Consumer, as schematically depicted on Attachment A, attached hereto and incorporated herein by this reference. (c) "Interconnection Facilities" include Holy Cross's Interconnection Facilities and the Consumer's Interconnection Facilities. Collectively, Interconnection Facilities include all facilities and equipment between the Generating Facility and the Point of Interconnection, including any modification, additions, or upgrades that are necessary to physically and electrically interconnect the Generating Facility to Holy Cross's system. Interconnection Facilities are sole-use facilities and shall not include Distribution Upgrades. (d) "Point of Interconnection"means the point where the Consumer's Interconnection Facilities connect with Holy Cross's system. The location of the Point of Interconnection will be determined by Holy Cross in accordance with standard industry practice or as individual circumstances may dictate. (e) "System"means the electric distribution facilities owned, controlled, or operated by Holy Cross that are used to provide electric service under the Electric Tariffs. 2. Intent of Parties: It is the intent of the Consumer to interconnect a 3.8 kW Photovoltaic Generating Facility to the System, located at 4923 Lake Creek Village Drive 10-101, Edwards, CO 81632. It is the intent of Holy Cross to operate its System in a manner which will maintain a high level of service to all of its customers. It is the intent of both parties to operate the Interconnection Facilities in a manner that ensures the safety of the Consumer,the public, and the employees of each party. 3. Service to be Provided. Holy Cross shall deliver and sell to Consumer, and Consumer shall receive and purchase from Holy Cross, during the term of, and subject to,the provisions of this Agreement, all electric power and energy as may be required by Consumer in addition to the Revised January 31, 2014 Page 1 of 8 electric power and energy produced by the Consumer's Generating Facility. All electric power and energy delivered by Holy Cross to the Consumer at the Point of Interconnection shall be paid for by the Consumer at the applicable rates established in the Electric Tariffs. 4. Term. This Agreement shall be in full force and effect for an initial period of one(1) year from the date hereof, and shall remain in full force and effect each year thereafter, unless terminated by either party as set forth herein. 5. Facilities Provided by Holy Cross.Holy Cross shall install, own, operate and maintain the System up to the Point of Interconnection. All such facilities will be installed in accordance with theiline extension policy as contained in the Electric Tariffs. 6. Facilities Provided by Consumer. Consumer shall, own, operate, and maintain all facilities on the load side of the Point of Interconnection necessary to enable Consumer to take and use the electric energy provided by Holy Cross in accordance with the Electric Tariffs. Such Consumer facilities shall include the Generating Facility and all appurtenant equipment necessary to own, operate, and maintain the Generating Facility. Consumer shall provide suitable space on Consumer's premises for Holy Cross meters and metering equipment. A utility accessible and lockable switch to disconnect the Generating Facility must be properly labeled and installed at or near the Consumer's meter panel and labeled with an engraved yellow placard with permanent adhesive designed for outdoor use to ensure adhesion over time through extreme weather conditions. 7. No Construction of Facilities.Holy Cross shall not be required to construct any facilities in order to accommodate the installation or operation of a Generating Facility. 8. Design, Construction, Operation. Consumer shall be responsible for the design, construction, installation, operation,maintenance, and replacement or repair of the Generating Facility and the Consumer's Interconnection Facilities so that, at all times,the Consumer compli with Holy Cross's Interconnection Policy and Guidelines as set forth in the Electric Tariffs. onsumer shall also install, operate, and maintain the Generating Facility and Interconnection Facilities in a safe manner in accordance with the rules for safety and reliability set forth in the National Electrical Code, all other applicable local, state, and federal codes, and prudent electrical practices. 9. Design Review. Consumer shall provide Holy Cross an electrical one-line diagram and a relaying and metering one-line diagram prior to completion of detailed designs, unless the Consumer is installing a packaged system that is pre-certified to IEEE 1547.1 and UL 1741 standards. Packaged systems pre-certified under IEEE Standard 1547.1 and UL Standard 1741 will not require a relaying and metering one-line diagram. The submitted application and diagrams will be processed, reviewed, and acted upon in accordance with the Holy Cross Interconnection Policy. 10. Inspection and Testing. Prior to parallel operation of the Generating Facility, Holy Cross may inspect the Generating Facility for compliance with industry standards and the Electric Tariffs. Holy Cross's inspection may include a witness test and Holy Cross may require Revised December 17, 2008 Page 2 of 8 appropriate metering replacement, if necessary. If the witness test is not satisfactory in the sole judgment of Holy Cross, Holy Cross has the right to disconnect the Generating Facility. The Consumer shall have no right to operate in parallel until a witness test has been performed, or previously waived in writing by Holy Cross. Holy Cross must complete the witness test within ten(10)business days of receipt of a"Certificate of Completion" from the Consumer. The Consumer shall be responsible for all costs associated with witness tests conducted by Holy Cross. 11. Commissioning Tests. Commissioning tests of the Consumer's installed Generating System shall be performed pursuant to applicable codes and standards, including IEEE 1547.1. Holy Cross must be given at least five(5)business days' written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests. The Consumer shall be responsible for all costs associated with Commissioning tests conducted by Holy Cross. 12. Confidentiality.All design features, operating specifications, and metering data provided by the Consumer shall be deemed confidential information by Holy Cross regardless of whether it is clearly marked or otherwise designated as such. Confidential Information shall not include information previously in the public domain or required by governmental authorities to be publicly submitted or divulged. 13. No Company Warranty of Generation Facility. Any approval or acceptance by Holy Cross of Consumer's designs, analyses, operating and maintenance procedures, instructions, drawings, specifications, and installation shall not be construed as confirming or endorsing the design or operation of the Generating Facility or as a warranty of its safety, durability,reliability, or fitness for the purpose intended. Holy Cross shall not, by reason of such review or failure to review,be responsible or liable for the performance of the Generating Facility in any manner, including,but not limited to, the strength, details of design, adequacy, safety, capacity, or fitness for the purpose intended. 14. Future Design Changes.No changes to the Generating Facility or to the Consumer's Interconnection Facilities shall be made without the prior written approval of Holy Cross. If changes are made without Holy Cross's written approval, Holy Cross may, at its sole discretion and upon reasonable notice to the Consumer,require the Consumer to conform the Generating Facility or the Consumer's Interconnection Facilities to specifications set forth in the Electric Tariffs at the Consumer's sole expense within thirty(30) days after informing the Consumer of the required changes, or Holy Cross may disconnect the Generating Facility from the System and terminate this Agreement. 15. Right to Locate Facilities. Consumer hereby grants to Holy Cross the right to use the premises of Consumer for the purpose of providing the Interconnection Facilities necessary to connect the Consumer's Generating Facility to the System, and agrees to provide any required rights-of-way by separate instrument without cost, if so requested by Holy Cross. Revised December 17, 2008 Page 3 of 8 16. Access. Holy Cross shall have access to the disconnect switch and metering equipment of the Generating Facility at all times. Holy Cross shall provide reasonable notice to the Consumer when possible prior to using its right of access. 17. Disconnection. The interconnection of the Consumer's Generating Facility shall not compromise the operational requirements of the System. The operation of the Generating Facility and the quality of electric energy supplied by the Generating Facility shall meet the standards as specified by Holy Cross. If the operation of the Generating Facility or quality of electric energy supplied does not meet the standards as specified, Holy Cross will require the Consumer to take reasonable and appropriate corrective action. Holy Cross shall have the right to disconnect the Generating Facility until compliance is reasonably demonstrated. Holy Cross may in its sole discretion disconnect the Generating Facility from the System without notice if operation of the Generating Facility poses a threat, in Holy Cross's sole judgment, to life and/or property. 18. Maintenance Outages. Maintenance outages will occasionally be required on the System, and Holy Cross will provide as much notice as practical to the Consumer to minimize downtime. 18. Killing and Payment. Consumer shall reimburse Holy Cross for all of the costs that Holy Cross incurs under this Agreement in accordance with the Electric Tariffs. Holy Cross agrees that,when performing or causing to be performed any work for Consumer's account, Holy Cross will use the same degree of care and diligence in controlling and minimizing the costs of the work it performs as if the work were being performed for Holy Cross's own account. Holy Cross shall invoice Consumer for reimbursement of Holy Cross's costs, from time to time, as those costs are incurred,but no more frequently than once each month. Payment shall be due within thirty(30) days of the date of Holy Cross's invoice. If payment in full is not made by the Consumer within that time,the unpaid balance shall bear interest at the rate of one and one half percent 1.5%)per month. If the Consumer is more than ninety(90) days delinquent in reimbur ing Holy Cross's costs,Holy Cross may, in its sole discretion, terminate this Agreem nt, in which event the Consumer shall be liable for all costs Holy Cross has incurred to the date'of termination of this Agreement. If Holy Cross must bring a legal action to obtain reimbursement of its costs from Consumer, Holy Cross shall be entitled to recover from Consumer its reasonable attorney's fees, expenses, and court costs 19. Force Majeure. Holy Cross shall not be liable for failure or fault in the delivery of electrical energy to the Consumer or for total or partial interruption of service caused by accidents,breakdown of equipment, acts of God, floods, storms, fires, strikes,riots, war,terrorist attacks,sabotage, labor disputes, shortage of materials, the forces of nature, the authority and orders of government, and other causes or contingencies of whatever nature beyond the reasonable control of Holy Cross, or which reasonably could not have been anticipated and avoided by Holy Cross. 20. Indemnification.Each party shall save and hold harmless the other party, its officers, employees, agents, affiliates, and subsidiaries from any and all damages, losses,judgments, claims, including claims and actions relating to injury or death of any person or damage to Revised December 17, 2008 Page 4 of 8 property, demand, suits, recoveries, costs, and expenses, court costs, attorney fees, and all other obligations by or to third parties, arising out of or resulting from the other party's actions or inactions in performing its obligations under this Agreement on behalf of the indemnifying party, except in cases of gross negligence or intentional wrongdoing by the indemnified party. In the event of concurrent negligence on the part of each party,there shall be contribution in the percentage of each party's respective negligence; and,provided further,that each of the parties hereto shall be solely responsible for injury or damage, wherever occurring, due solely to any defect in equipment installed, furnished, or maintained by such party. 21. Limitation of Liability.Each party's liability to the other party for any loss, cost, claim, injury, liability,judgment or expense, including reasonable attorney fees, relating to or arising from any act or omission in its performance of this Agreement, shall be limited to the amount of direct damage actually incurred. In no event shall either party be liable to the other party for any indirect, incidental, special, consequential, or punitive damages of any kind whatsoever. 22. Insurance. Consumer shall, at its own expense, secure and maintain in effect during the term of this Agreement, liability insurance in the amounts set forth in Holy Cross's Interconnection Policy. Such liability insurance shall not exclude coverage for any incident related to the subject Generating Facility, its installation, maintenance, operation,repair, or replacement. Holy Cross shall be named as an additional insured under the liability policy unless the system is installed on a residential premise and has a design capacity of 10 kW or less. The insurance policy shall include a provision that written notice shall be given to Holy Cross at least thirty(30) days prior to any cancellation or reduction of any coverage. A copy of the liability insurance certificate must be received by Holy Cross prior to the date of interconnection of the Generating Facility. The liability insurance shall include as an endorsement to the policy, that Holy Cross shall not,by reasons of its inclusion as an additional insured, incur liability to the insurance carrier for the payment of any premium of such insurance. Certificates of insurance evidencing the requisite coverage and provision(s) shall be furnished to Holy Cross and attached to this Agreement and appended hereto as an attachment prior to the date of interconnection of the Generating Facility. Holy Cross shall be permitted to periodically obtain proof of current insurance coverage from the Consumer in order to verify proper liability insurance coverage. Consumer will not be allowed to commence or continue interconnected operations unless evidence is provided that satisfactory insurance coverage is in effect at all times. 23. Termination. This Agreement may be terminated by the Consumer with thirty(30) days written notice to Holy Cross. In the event Consumer terminates this Agreement, Holy Cross shall have a reasonable amount of time to remove its Interconnection Facilities as described in Sections 15 and 16 of this Agreement. This Agreement may be terminated by Holy Cross for non-performance by the Consumer of any of the terms of this Agreement or the Electric Tariffs. The Consumer shall have thirty(30) days from the date that Holy Cross sends written notice to the Consumer to remedy the item of non-performance. Upon expiration of the thirty(30) day remedy period and if the item of non-performance has not been corrected Holy Cross may terminate this Agreement. Unless terminated earlier by the Consumer or Holy Cross as described herein,this Agreement shall terminate when the Generating Facility is permanently removed from service or becomes inoperative for a period in excess of one year. Revised December 17, 2008 Page 5 of 8 24. Governing Law. The validity,interpretation, and enforcement of this Agreement and each of its provisions shall be governed by the laws of the state of Colorado. 25. Amendment. The Parties may amend this Agreement only by a written instrument duly executed by both Parties. 26. No Third-Party Beneficiaries.This Agreement is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any person, corporation, association, or entity other than the parties hereto, their successors and assigns and the obligations herein assumed are solely for the use and benefit of the parties,their successors in interest and,where permitted,their assigns. 27. Waiver. The failure of a party to this Agreement to insist, on any occasion,upon strict performance of any provision of this Agreement will not be considered a waiver of any obligation,right or duty of, or imposed upon, such party. Any waiver at any time by either Party of its respective rights relating to this Agreement shall not be deemed a continuing waiver or a waiver with respect to any other failure to comply with any other obligation, right, duty of this Agreement. Termination or default of this Agreement for any reason by Consumer shall not constitute a waiver of the Consumer's legal rights to obtain an interconnection from Holy Cross. Any waiver of this Agreement shall, if requested,be provided in writing. 28. Multiple Counterparts. This Agreement may be executed in two or more counterparts, each of which is deemed original but all constitute one and the same instrument. The Parties agree that a facsimile copy of a signature will be deemed original and binding. 29. No Partnership. This Agreement shall not be interpreted or construed to create an association,joint venture, agency relationship, or partnership between the parties or to impose any partnership obligation or partnership liability upon either party. Neither party shall have any right,p er or authority to enter into any agreement or undertaking for, or act on behalf of, or to act as o be an agent or representative of, or to otherwise bind,the other party. 30. everability. If any provision or portion of this Agreement shall for any reason be held or adjudged to be invalid or illegal or unenforceable by any court of competent jurisdiction, (1) such portion or provision shall be deemed separate and independent, (2)the parties shall negotiate in good faith to restore insofar as practicable the benefits to each party that were affected by such ruling, and(3)the remainder of this Agreement shall remain in full force and effect. 31. Subcontractors.Nothing in this Agreement shall prevent a party from utilizing the services of any subcontractor as it deems appropriate to perform its obligations under this Agreement;provided,however,that each party shall require its subcontractors to comply with all applicable terms and conditions of this Agreement in providing such services and each party shall remain primarily liable to the other party for the performance of such subcontractor. The creation of any subcontract relationship shall not relieve the hiring party of any of its obligations under this Agreement. The hiring party shall be fully responsible to the other party for the acts or omissions of any subcontractor the hiring party hires as if no subcontract had been made; Revised December 17, 2008 Page 6 of 8 provided,however,that in no event shall Holy Cross be liable for the actions or inactions of the Consumer or its subcontractors with respect to obligations of the Consumer under this Agreement. Any applicable obligation imposed by this Agreement upon the hiring party shall be equally binding upon, and shall be construed as having application to, any subcontractor of such party. The obligations under this article will not be limited in any way by limitation of subcontractors' insurance. 32. Notices.Notices to be given hereunder shall be deemed sufficiently given and served after receipt of notice sent by United States certified mail,return receipt requested and respectively addressed as follows: Holy Cross: Consumer: Holy Cross Energy Lake Creek Village LLC Power Supply and Contracts Department Housing Department P.O. Box 2150 PO Box 850 Glenwood Springs, CO 81602-2150 Eagle, CO 81631 33. Assignment-Consent. This Agreement shall be binding upon and inure to the benefit of the successors and assigns of the respective parties hereto, and shall not be assigned by either party without the written consent of the other party, which consent shall not be unreasonably withheld. 34. Total Agreement. Subject to the Electric Tariffs, this Agreement, together with the Generator Interconnect Policy and its Attachments, represents the entire agreement between the parties relating to the rates, terms, and conditions for electric service provided to Consumer by Holy Cross and to electric energy supplied to Holy Cross by the Consumer. 35. Binding Effect. This Agreement, as it may be amended from time to time, shall be binding upon and inure to the benefit of the parties hereto and their respective successors, legal representatives, assigns, affiliates and subsidiaries. 36. Breaches Ongoing. All breaches of this Agreement shall be considered ongoing breaches until such breaches are remedied or until there may be a written waiver of the breach by the nonbreaching party. 37. Remedies for Breach. This Agreement and the respective rights and duties of the parties are unique and of such a special nature that it is enforceable through the remedy of specific performance and injunctive relief, in addition to any other remedies that may exist at law or in equity. 38. Disputes. In the event of a dispute related to this Agreement, either party may exercise whatever rights and remedies it may have at law or in equity consistent with the terms of this Agreement. The prevailing party shall be entitled to recover from the nonprevailing party its reasonable attorney fees, expenses, and costs of any civil legal action brought for the purpose of resolving the dispute or enforcing its rights under the Agreement. Revised December 17, 2008 Page 7 of 8 IN WITNESS WHEREOF, the Parties have caused this Interconnection Agreement to be executed in their respective names by the proper officers hereunto duly authorized as of the date and year first above written. AGREED TO BY: Cons er 1 Holy Cross kilt, I LPL_L / ` i� Nan e:KMi4 4 { i Name: Titlik{ Title: Date: (ail Date: Revised December 17, 2008 Page 8 of 8 1 t TIN Iii 147 (E F l 77 I ICJ i._V Ai1 1 S1)IJA R.,,,, Solar Installation information Vendor: Active Energies Solar LLC PO Box 7627 Avon, CO 81620 (970-306-4233/info @activeenergies.com) Site: Lake Creek Village 4923 Lake Creek Village Drive Edwards, CO 81632 System Layout: Single Panel=5.38ft tall X 3.26ft wide System Size= 16.4ft tall X 17ft wide(including mounting equipment) Panel Arrangement: 3rows of 5 panels oriented in the portrait position,mounted flush on the south facing roof Equipment: Panels: 15 Phono Solar PS250P-20/U black solar panels @ 250watts(or equivalent) Inverter: 1 SMA SB 3800TL-US Inverter+Dual MPPT and Off-Grid Emergency Outlet Mounting Equipment:Unirac racking system with Sunmodo mounting feet Net Meter PV Disconnect I I ammi� / ��_ w I .. , •-,- g pi @ Mi.reo . 1 1r lr.li ,. I -. 1I \A me ,fir. wit=i II■ 'IlI�IIirEirh 11-limii Iimiximixiswin11Eliill ipplaiRlimil mi:inmilimlyylpl[1111i1 IIIilIIq IEII[IlEI1 i 11111111 11111111111111 I E'IY'1.1'1'I�1 1;1111 1 111111 - I I IIIIli.17 I I I'I`I'11111II1I`I I111 illi111111I1i�� illlt1111111111€1IIIli1113111I11111 i 11E " .Illl[ ijiilllilllllilli llilli11111ii111 :......4...w.....%.111 IIPI tl111i11111 0111111 11111111111111 111_ - I�EIl1111111111111 111111111111111 hi. I_I'_.II1111 1.I°1111 .11111.11"`1€II,�.I6.Lill ill 1 1 = "S`.- i i.l[_I11 1111 11[,111111 1 [1111, 111;1 I IIII_ $I}}$I,,I. 11111111111111[i1d1111111'1111h111111i117.° .15.4 .ISt"'L`�tlI 1�111h1111 i I111111i1i111i1111i1iI"IIIii 1I"il li i "1 1111111 III[l(llll 11111 I,IyI ,,yI 1 it"6. W Z �1 1Eili1lE11illlif fif '1 ill 11�11 IIX1111�'11!1iEil1�1111r111I1�1111.a�'C�.rT -� ��ii�11i�1 I IIIEIIIIIEIIIIIEII{11�111'�1 i�1111 11E�11111E1i11111111111i111l11111111111117 R.B. rr- :111111131111 �EI11111Ii IIEI�III�s I 11�i'iI!' 1 1111111111111Illlli 1111 lillii 111111 1111 I111111111'il:111111111 lids,t/ III I�I•I�il 1 1 1 l l 1 1 1[1 1 1 1 •i �"' 1 1 1 1 1 V I I I E f t I 1 1R 1 i - ��yy �IIEIIEE 11111117 .�. 11 i1 Ilfil Eil 11 1 II II li ijij1.11 111111,1 riti 1�E1j iliiIIIj/j111h 11) W st 'N Ilillilii 111i111E0001111i i 11111i61I��1 € it� i � 1 11 II dH I + 1 !1 1 IE 111 i MOWNIll 111[1![il[fl`III['lId[Illllill .0 "' ."1E1""Lffi317-.11CL4Lt-7LR. 'S,:3fii 7.7-riIi�l` 11:111[1 114rP11f[r1' I]llilllilpl�fl.iI11111I14111111111$1111111i,! API i111i1i11 1i 11i1i11 i111111Iiligii".. E 7. �Illil i IiIIi Illli1i11[P,Irlll/ii11 Il Ell Ili:$.xSGx.wr .. f.lilt Ii111ii11111i11111I 1..1 illililiii!i1. 1- I 11111 E [ 11-if II EI11.d'i�.�' ����- .. 711 fif III 1 i i 111 IIEj[�fil 1 �II[1 I1 11 '�,����.�...: �113111[111111 I M I iIl I I�IIIINI I.II �1 11111111111111111 111111111Y' 1 IP1111111EIillli i'iLIGi3..iC Illiill IIIf.�1�Il4IIi;Iliil;IIyI I III�IIII;Il1�' I ititi Iti.6# Wi11i:i ll1 III1111111111 1 _ _ _--r __� "'`AII�f.yl I4111111i�II1111i�ili111i Iii!1:111.1 1 F fiI'IililNifil{ll ��;[ei4k11[Iil-i: ly t�lElli�Iillls w sr�.111[IIEr[�[IIi�N1911111111111A11111 IIA�11�¢�1EtIINi E i,,..„I IlJIIIili '['llil[€ I i ililillI I liiliil. L"liliiill i liiii11111iii1i11111�III i�JAI IlII I Ii, ii(Ii1111l1illili lil ii VIII III Iliilll 1,� .�.� ii1ll1 Iliil�llil�llllllll it �i�1�1i11 ill 1 i i)(�11111111111 111 1111,/, I 11lI1111111Il11I111 1111111„ 31111i1111111111111I1 1, i*14111,1.11 1 I111111if111li 1 I III'M Ilii1111�1111i11 _IIIII'I 1I11111III1i11111111l11111 'r''I I:FI�i[VIII 11I1i1111f11I1 1111111 i i€iE1I111111111111111! 1 = II1I�III1111Ii111111I11111111i11I1 IrI11i1IlIlIi11 11�,1]11111 7f 1[111�,1i�I ((I,I�l�l,e 1 11 1 1[1 1iII11y1i1 1 i "..... :. i[1 ii7 1114 I�III I 1 1 t 111 I i�I 1 L111 IAj!11i111�1511i�1jli4i1111 IIile#jlll j11111f1I11111111111 ( 1° 1 .T- .T7�iS�iL.'�i�111�Hit a Mill�f_1.1_i:��11 �a I ,1 1" I l l l i l I 1 I 1[! 1(1p I(r1 1 1 ( 1 Ili! 111 11 11mlop II ;11111C�llllllli1111. 17'1IEI I"11 �r.Y 7 171 11 F1117111 I i.� �/ 111 EI EiYEl1 IIIilE11111I " I��i 1y i t 1 1 11 11 l i l l i i l l - r. �tsH111 Eii1111ii 1 I I� l 1 1 I E 1 1 III 11`1'11111 1 1 1 1A �III(i! i 11111 31111ii1111ii IIii1111ii11IE i IIE�i 1'i 1 1 111 4� 1 Y 1 1 11 II Ills.1 Y I l 1 1 lIl t ti i �. IIIi,w44 A 1 1 311111 CII�I i11Iii1 III III 11111 II(�I�I I IuI Iii 111I¢i�I Iiili 1�ItI I I�1p1�111.1.11 1.1 I .111 1 Ipp�I�Ii 1 13111 11 I I I I III 1 1111 III I�Idi 1. 4'llt:i Ida 111Tiirilfa liti .l.:W.174I.Ia di i111.1.141.4 4I 1 P1S JIIN 41.11.71.11.1.+.1>t�$fi4ki4Iliilz[.4LE i I I Izi Sd'J= .113-- / i -■ __.1 , \ s.1 %i� . 1 iia + - - - - f:`_ -1 r, I I Holy Cross electric meter and PV disconnect located on the north side of the building. Minimum Designed Temperature: -40°F Maximum Ambient Design Temperature: 140°F All AC wiring to be completed by a Colorado licensed master electrician All DC wiring to be overseen by NABCEP certified installer Page 1 of 4 10/17/2014 P.O.Box 7627,Avon,CO 81620 I P: 970.306.4233 I F: 866.403.3485 1 www.activeenergies.com Arr7l�7�_]�/r]I��I i, ENE G I 13 J1X Calculations 3.75kW System Size(STC) • 15 Phono Solar PS250P-20/U solar modules @ 250watts • 1 SMA SB 3800TL-US 208v(2 strings of 7/8 modules) • Fixed array tilt angle: 14.04° • Array azimuth: 170°(where 180°is south) • Estimated annual power production: 5,507kWh Maximum PV System Voltage: 690.7 Voc= 37.8V/module 37.8V x 8 module=302.4V Temperature correction factor 690.7(A) Temperature Coefficient(Voc) = -0.31%/°K (-60°C(-.0031)= .186% ((.186%x 37.8V)x 8 panels)+302.4V=358.6V Maximum PV Source Circuit(String) Current: 690.8 (A)(1) Isc= 8.7A 8.7A x 1.25 = 10.9A Maximum PV Output Circuit(Array) Current: 690.8 (A)(2) 10.9A x 2 strings=21.8A Inverter Output Circuit Current: 690.8 (A)(3) 16A @ 208V John Wiles, "Photovoltaic Power Systems and the National Electrical Code: Suggested Practices", 2005, pp. El-E25. pdf version online at: http://www.nmsu.edu/%7Etdi/Photovoltaics/Codes- Stds/PVnecSugPract.html Page 2 of 4 10/17/2014 P.O.Box 7627,Avon,CO 81620 I P: 970.306.4233 I F: 866.403.3485 I www.activeenergies.com AcruivE Conductor Sizing Pass Thru Box to Inverter(per string): 10.9A x 125%= 13.6A 690.8 (B)(1) #10 USE-2 Table 310.16 40A (90°C column, see note 240.4(D)) Conduit fill adjustment Table 310.15 (B)(3)(a) For 4 Current Carrying Conductors use .8 40Ax .8 =32A Temperature correction factor Table 310.15 (B)(2)(b) 32A x .77 =24.6A Inverter to Disconnect to Itron Meter to Service Panel: Nameplate maximum continuous output current: 16A @ 208V 16A x 125%=20A 210.19 (A)(1) #10 THWN-2 Table 310.16 30A No temperature correction factor No conduit fill adjustment Overcurrent Protection Device 20A two pole breaker Per Manufacturer Specification Conductors may be oversized for voltage drop Page 3 of 4 10/17/2014 P.O.Box 7627,Avon,CO 81620 I P: 970.306.4233 I F: 866.403.3485 I www.activeenergies.com -- --U c,N O a) 7 0 7 - a > I �T y N :RI y N N O LD E 'O Q N a a) r ` , .o > ao U) > 0L rne0 o o E oo c w '3 U y O � � Q � o T o N a o E N o oW Owl i+rt o N N J CD 00 _ >� = U) C U o ..- U Q U) Z `r d � � oN � MN � � > O C -0O Z 'co CCU-) CO f5 Ca a tit l ✓ > f0go00 C) ai c o) a) _E . - i o 0. 0 o u °ate 4T ` co o � M 00 � 0 j off? dj E � a 0 p) N � d a a) o o N o >, C II II Q U 0•N E a) O I� _ U C = C O N U f0 CU) 0 C-) 02 of � c < o •c am ; O m •Eg < c + 2 To � c> � U) ccY _a QT•� u.) 92 Jy6 a) °o � oEcQcrn _ (0 O — as 7 C a l ? - 0 ? y N O c o O c X to r � r y Qv) � ~ Q o . o � '. •cu� v) o � � o 0_53 m o f0 .. o m aNiN c00 m � d 3 otc°oa �'� o � o � o � � U) - .) c a`) U) a00 boo ccoo E , 'ym M o NI N CO) -V ate) C a) Zco •cr + U 0) E 0 ZS 2 a) - a) > > Q a) c8r, E Z''Ico < o c aE a) co�l co .e •� c8) 5 orn o i C i 7 , a 8 ■ CON 1 L co .,_ Co U .n a) O > d co I Q - o c C Q)"0 y=p V h 0 N N L m1 m�� O)c 6 co y C.t0) > ca coI N N 0 a rn u p T N ` _ d-° 3 n N N ui m h o a o 3 U L(((((I Y CO a 2 J cc J J W O • m _ o � J N a s co I I fi o z v zx U �. U x � oo I xF g�Co 00 NIc.'2 c (o° a it O G.o c 0 l 41;o 7 U y i Cr) O N mU r _ I 0 0 d w M o U 2:2 z N 0 t 75 7r C C C) ( (1) W a o N Q O V C) M • D—E o 0_ co I 0< a, (a,-.'I Z 1 - a o Nl. z I _ .-n-g pi2 0 1 I- 1 O pp C 2 o 00 Clot)�1 c7 O o a I C) E a o) T c O Q(n(V I a) > o Q O mil c co o ev o_ o R' @)'c x Lo 3U�CCmt G QOM U = 1 CD y-2 CO aE o z N -a Q c N ::,1 m U O a x c �� x °- co co 3 cC N LL 0,W N CZ S O 1 s-—!- J N 2 O (N f0 IL(7 C J uim C ' U(no D cO u I o c)u = 2 c0 .- 'I I 7 U y p O 1 co w O a) (C L1. .....-• '...,- .7 - ,,,,,'"F,'".•' .:, ,, . .., :_ .4. , 1 ABOUT PHONO SOLAR 1 , i t , , . 1 F ■ ...I Phono Solar Technology Co., Ltd. is one of the world's , . , leading renewable energy product manufacturers and a well ::.. ; . .. 44; '. , 1,'*!:•• ' trusted brand provider. The Phono Solar brand has become ' ' •41. . ' '''' ':' , . ...,..„A.C. .•41:'''* , • „ .:.1 synonymous with high performing, top quality photovoltaic i ' ... •.i.frr ..*",,, „ :„,..,___..,,, ,: - — ,.* • . . , 1 t..• .r ,,,,, , ,. - .... I ) 1 panels that are ideal for use in large scale power plants, , : commercial And residential installations. , ,_ . ' , , . '•' '. ""'' 'i i I ,,i 4 ' '""" • a'A.: X . I I ' . . . -1 , i,i 5 , pleasing . H C; ;',Ici „ . ..=. . , . . -...,..., ... ..,..,,__ , 1 %by RELIABLY HIGH YIELDS QUALITY ASSURANCE WARRANTIES a High efficiency solar cells together a Durability assured in even the • 10-year product warranty* with high transmission textured glass harshest environments with AMMONIA a 25-year performance warranty* deliver module efficiency of over 16.0%, CORROSION, SALT MIST CORROSION, a Free module recycling through PV leading to minimized installation costs and FIRE TEST certifications. Cycle Association membership** and maximized system output. a Certified to withstand increased snow a High output due to excellent and wind loads of up to 5400Pa. performance in weak-light conditions. a Manufacturing facility certified by ISO '. * Higher specific yields due to positive 9001, ISO 14001 and OHSAS 18001. power sorting. a Internal quality control with standards a Product quality is assured through the higher than both IEC and UL 4:! use of branded components. ' — ( E ",„ . (;) .,....„ ,.., c 0. Sus, CEC 4> ( ) aeon Energy Council PV CYCLE *IN COMPUANCE WITH OUR WARRANTY TERMS AND CONDITIONS. ** IN PV CYCLE MEMBER COUNTRIES ONLY,SEE WWW.PVCYCLE.COM ( ICHA)J)(°.:'). C HARACT1 R1S 1E(..,:s AU/O1.El)E. t1Ax(Ilt.JJM RA((MU ,,/ Polycrystalline 156mm x 156mm square, 6 x 10 pieces in series i ��`".Len h: 1640mm(64.6 inch) From Length: Operating Temperature From -40 to+85°C Width:992mm(39.1 inch) i Typical Application 20V DC yP APP Height:45mm(1.8 inch) Hail Diameter @ 80km/h Up to 25mm " »- 20kg(44.11bs) Surface Maximum Load Capacity Up to 5400Pa 3.2mm toughened glass 1.. g g Maximum Series Fuse Rating 15A Anodized aluminium alloy i IEC Application Class(IEC 61215) A •'.. •i ;090m wire(04mm2) Fire Rating(UL 1703) C '6 pieces Schottky by-pass diodes 1000V DC(IEC 61215) ............_.. _....... .._........._. ___.. Maximum System Voltage IP 65 rated 1000V DC(UL 1703) H.t:'(.TRM(A).. TYPICAL VALUE'S° a Q as qt @�' . ��:� sm•>�z,..--a a�� d PS235P-20/U 235W 0-+5W 7.94A 29.6V 8.40A 37.3V 14.44 PS240P-20/U 240W 0-+5W 8.06A 29.8V 8.50A ! 37.5V 14.75 PS245P-20/U 245W 0-+5W 8.18A 30.0V 8.60A 37.7V 15.06 : PS250P-20/U 250W 0-+5W 8.30A 30.2V 8.70A 37.8V 15.37 PS255P-20/U ! 255W 0-+5W 8.42A 30.4V 8.80A '': 37.9V 15.67 PS260P-20/U 260W 0-+5W " 8.53A 30.6V 8.90A 38.0V 15.98 PS265P-20/U 265W 0-+5W 8.61A 30.8V 9.00A 38.1V 16.29 T4; .k1TiTkl CHARACTERISTICS r)l.i NU)rf 1 ...... ........ � -0.31%/K "� F£lkkti �� +0.07%/K -0.40%/K Section A-A .... ... ._.......... ........ ...... r 7 . _i_ ' -- t' ∎ 1000 .____...._... 1.:: 1 rr 800 i 0.8 0.996 - .5. .'.. 600 0.6 0.99 400 0.4 0.983 ----------- - - - ..200 0.2. _...... 0.952 100 0.1 0.921 i""A(Y(MU €VUUf(U1.TRAT(V1l : 22 28 ._,...: . �+ y � 616' _ , � PAUTULU (NF vl )/Ui) (lr•t Note: This datasheet summarises product warranty and specifications, which are subject to change without notice. The exact module specification will be subject to the description in the sales contract. Further information can be found on our website: www.phonosolaccom 1.Defined as standard deviation of thousands measurements.Absolute power values depend on the measuring system.They can differ by+/-5%from one measuring system to another. 2.Measurement conditions under Irradiance level of Standard Test Conditions(STCI 1000W/m�, Air mass 1.5 Spectrum,cell temperature of 25°C. .,z:.",`:r (° c :c.isO1:r_cor: EN U P BB 1210 SMA er .• 0,„ THE WORLD'S ONLY SECURE POWER SUPPLY • • Certified Innovative Powerful Flexible •UL 1741 and 16998 compliant •Secure Power Supply provides •97.2%maximum efficiency •Two MPP trackers provide •Integrated AFCI meets the require- daytime power during grid outages •Wide input voltage range numerous design options ments of NEC 2011 690.11 •Shade management with OptiTrac •Extended operating Global Peak MPP tracking temperature range SUNNY BOY 30001L-US / 380011-US / 4000TL-US / 5000TL-US / 6000TL-US Setting new heights in residential inverter performance The Sunny Boy 3000TL-US/3800TL-US/4000TL-US/5000TL-US/6000TL-US represents the next step in performance for UL certified inverters. Its transformerless design means high efficiency and reduced weight. Maximum power production is derived from wide input voltage and operating temperature ranges. Multiple MPP trackers and OptilracTM Global Peak mitigate the effect of shade and allow for installation at challenging sites.The unique Secure Power Supply feature provides daytime power in the event of a grid outage.High performance,flexible design and innovative features make the Sunny Boy TL-US series the first choice among solar professionals. ENGINEERED IN GERMANY ASSEMBLED IN THE USAL t Technical data Sunny Boy 3000TL-US Sunny Boy 3800TL-US 208 VAC 240 V AC 208 VAC 240 V AC Input(DC) Max.usable DC power(lgi,cos p—1) 3200 W 4200 W Max.DC voltage 600 V 600 V ' Rated MPPT voltage range 175-480 V 175-480 V More efficient MPPT operating voltage range 125 V-500 V 125 V-500 V Min.DC voltage/start voltage 125 V/150 V 125 V/150 V Max.input current/per MPP tracker 18A/15A 24 A/15 A Number of MPP trackers/strings per MPP tracker 2/2 E:j z Output(AC) AC nominal power 3000 W 3330 W 3840 W Max.AC apparent power 3000 VA 3330 VA 3840 VA 0. Nominal AC voltage/adjustable 208 V/• 240 V/• 208 V/• 240 V/• AC voltage range 183-229V 211 -264 V 183-229V 211 -264V Shade management AC grid frequency;range 60 Hz/59.3-60.5 Hz 60 Hz/59.3-60.5 Hz Max.output current 15 A 16 A Power factor(cos ip) 1 1 ' `'? Output phases/line connections 1/2 1/2 Harmonics <4% <4% Efficiency Max.efficiency 96.8% 97.1% 96.8% 97.2% CEC efficiency 96% 96.5% 96% 96.5% ,,,,,, Protection devices DC disconnection device • Easier DC reverse-polarity protection • Ground fault monitoring/Grid monitoring •/• AC short circuit protection • i All-pole sensitive residual current monitoring unit • + Arc fault circuit interrupter(AFCI)compliant to UL 1699B • Protection class/overvoltage category I/IV 40 General data Dimensions(W/H/D)in mm(in) 490/519/185 (19.3/20.5/7.3) DC Disconnect dimensions(W/H/D)in mm(in) 187/297/190 (7.4/11.7/7.5) Broad temperature range Packing dimensions(W/H/D)in mm(in) 617/597/266 (24.3/23.5/10.5) DC Disconnect packing dimensions(W/H/D)in mm(in) 370/240/280 (14.6/9.4/11.0) Weight/DC Disconnect weight 24 kg (53 lb)/3.5 kg (8 lb) rf. Packing weight/DC Disconnect pocking weight 27 kg (601b)/3.5 kg [8 lb) Operating temperature range -40°C...+60°C (-40°F...+140°F) Noise emission(typical) <25 dB(A) <25 dB(A) Internal consumption at night <1 W <1 W Topology Transformerless Transformedess Cooling concept Convection Convection Secure Power Supply Electronics protection rating NEMA 3R NEMA 3R Features Secure Power Supply • • Display:graphic • • Interfaces:RS485/Speedwiref Webconnect 0/0 O/O Warranty:10/15/20 years •/O/O •/0/0 Certificates and permits(more available on request) U1 1741,U1t998,uu6998,IEEti547,FCC Part 15(Coss A&BLCvN/CSA C22.2 107.1-1 NOTE:US inverters ship with gray lids Flexible communications Type designation SB 3000TL-US-22 SB 3800T1-US-22 Technical data continued on back