HomeMy WebLinkAboutC15-303 Schmueser Gordon Meyer, Inc. First AmendmentFIRSTAMENDMENT TO AGREEMENT BETWEEN
EAGLE COUNTY, COLORADO
AND
SCHMUESER GORDON MEYER, INC. FOR
PROFESSIONALSERVICES FOR
EAGLE COUNTY BRIDGE EAG- 301 -27.7 REPLACEMENT
H FIRSTAMENDMENT ( "First Amendment ") is effective as of the I +P---day of
2015 by and between Schmueser Gordon Meyer, Inc. a Colorado corporation
ere after
"SGM ", "Consultant" or "Contractor ") and Eagle County, Colorado, a body
corporate and politic (hereinafter "County ").
RECITALS
WHEREAS, County and Consultant entered into an agreement dated the 9th day of April, 2013,
for certain Services (the "Original Agreement "); and
WHEREAS, the Original Agreement contemplated that the Consultant would perform certain
duties with compensation in an amount not to exceed $283,135.66; and
WHEREAS, County and Consultant desire by this First Amendment to expand the scope of
Services and compensation as set forth in the Original Agreement.
FIRST AMENDMENT
NOW THEREFORE, in consideration of the foregoing and the mutual rights and obligations as
set forth below, the parties agree as follows:
The Original Agreement shall be amended to include Additional Services as
described in Exhibit 1, which is attached hereto and incorporated herein by reference.
2. The compensation for the additional Services set forth in Exhibit I shall not exceed
$269,798.79 or a total maximum compensation under the Original Agreement and
this First Amendment of $552,934.45. Consultant shall bill for its time on an hourly
basis as set forth in Exhibit 2 subject to the not to exceed amount set forth herein.
3. Capitalized terms in this First Amendment will have the same meaning as in the
Original Agreement. To the extent that the terms and provisions of the First
Amendment conflict with, modify or supplement portions of the Original Agreement,
the terms and provisions contained in this First Amendment shall govern and control
the rights and obligations of the parties.
4. Except as expressly altered, modified and changed in this First Amendment, all terms
and provisions of the Original Agreement shall remain in full force and effect, and are
hereby ratified and confirmed in all respects as of the date hereof.
ooh O
This First Amendment shall be binding on the parties hereto, their heirs, executors,
successors, and assigns.
IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to the Original
Agreement the day and year first above written.
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its BOARD OF
COUNTY COMMISSIONERS
0thylandler -Henry, Chair
Attest:
e
I:
Teak J. Simonton, Clerk to the
SCHMUESER GORDON MEYER, INC
By:�
Print Name: 67/ n'' �T
Title: �a r1j C r P A-L--
State of
County of
The for of instrument was acknowledged before me this day of , 2V J�
its
dor C a l
Schmueser Gordon Meyer, Inc.
My commission expires: —A ft 3 -ZO 17
Notary Pub is 44'
SHARON HUBER
NOTARY PUBLIC
STATE OF COLORADO
NOTARY ID #20134030143
MY Commission Expires May 13, 2017
by
of
2
Eagle County Am Scope and Comp Final 5114
Exhibit 1
Catamount Bridge Replacement Project
BRO C440 -007 (18601)
CONSTRUCTION PHASE SCOPE OF SERVICES
PROJECT DESCRIPTION
The engineering design for the replacement of the Catamount Bridge (EAG- 301 -27.7) over the
Colorado River has been completed and construction is anticipated to begin in 2015. This
project was designed by SGM with Off - System Bridge Replacement (BRO) funding through
CDOT. This bridge was combined with the Burns Bridge Replacement Project for bidding to
realize overall cost savings between the two bridges. Bids were received on April 23, 2015 and
the project has been awarded to American Civil Constructors (ACC).
SGM is submitting this proposed scope of work to provide construction management for the
Catamount Bridge Replacement project. The SGM project team will be responsible for the
construction management and inspection work for the bridge. The SGM project team will
consist of the same members that were on the Catamount design team — Yeh and Associates
and Centennial Engineering. Additionally, SGM will also be responsible for the Engineer of
Record reviews of submittals (e.g. shop drawings) associated with the Catamount Bridge.
Project documentation will be in accordance with the CDOT Construction Manual and will be
completed using the applicable CDOT Forms. At the end of the project, all documentation will
be compiled and provided to Eagle County for their use.
II. WORK TASKS
A. Project Setup
Project setup will include preparing for the Pre - Construction Conference, accounting
setup and project documentation setup.
B. Project Management
Project management will be an ongoing effort through the duration of the project. This
will include coordination between the field and office staff and with the County. It will
also include managing the project budget and invoicing subject to the Contract
documents and approval by Eagle County.
C. Meetings
Meetings will be conducted on a regular basis and at key milestone points.
Weekly Meetings — It is anticipated that weekly meetings will be held at the project site
and these meetings will be attended by the Contractor, the SGM Construction
Manager and Project Manager, Eagle County and CDOT. SGM will prepare agendas
and minutes for these meetings. It is anticipated that frequency of the meetings may
be adjusted as the project nears completion, so we have assumed only 40 weekly
meetings will require attendance by SGM office personnel.
Milestone Meetings — These meetings will be held at predefined points as the
construction progresses. It is anticipated that these meetings will be attended by the
Contractor, the SGM Construction Manager and appropriate design staff, Eagle
County and CDOT.
Catamount Version 1.1 Page 1 of 3 SSGM
7/8/15
• Pre - Construction Conference
• Pre - Erection Conference for bridge girders
• Pre -Pour Conference for significant concrete pours (e.g. bridge decks)
• Pre - Paving Conference for asphalt paving
Additional Site Visits — SGM recommends including an allowance in the budget for
additional site visits to address issues that may arise during construction. This
allowance has been included in the fee proposal.
D. Submittal Reviews
SGM technical staff will be responsible for reviewing construction submittals for which
SGM was the design Engineer of Record. Anticipated submittals include:
• Cofferdam Plan
• Prestressed Girder Shop Drawings
• Concrete Mix Design(s)
• Rebar Shop Drawings
• Bridge Rail Shop Drawings
• Girder Erection Plan
• Traffic Control Plan
• Stormwater Management Plan and Construction Permits
• Asphalt Mix Design
E. Construction Management and Inspection
The SGM Construction Manager will be responsible for overall construction
management of the project. He will maintain close contact with the SGM Project
Manager and the Eagle County Project Engineer. It is understood that although both
bridges will be combined under one construction project, the actual funding sources for
each bridge will remain separate. Therefore, a key aspect to the construction
management task will be maintaining separate project records for each bridge.
The SGM Construction Manager will be responsible for day -to -day construction
inspection and documentation. Given the proximity of the two bridges and the
anticipated construction sequencing, we believe that one full -time inspector will be able
to provide adequate coverage for both projects for the majority of the project duration.
However, there may be times when a full -time inspector is required to remain onsite at
one of the bridges and will need assistance on the other bridge. An example of this
situation may be when a major concrete pour is taking place on one bridge which will
require full -time inspection for the duration of the concrete pour. For these instances,
SGM will provide additional personnel to ensure adequate coverage for both bridges.
SGM will utilize the services of Centennial Engineering to perform the QA inspections
of the prestressed concrete girders. Centennial Engineering is located in Arvada
within an hour's drive from all three prestressed concrete girder fabricators which
allows them to be more responsive to the fabricator's production schedule.
F. Materials Testing
Yeh and Associates will be responsible for all aspects of Quality Assurance (QA)
materials testing. The contractor will be responsible for providing Quality Control (QC)
testing and the Pile Dynamic Analysis (PDA) testing.
Catamount Version 1.1 Page 2 of 3 J{. M
7/8/15
G. Construction Engineering
SGM recommends including an allowance in the budget for issues that may arise
during construction that require additional engineering or responses to Requests for
Information. This allowance has been included in the fee proposal.
H. Project Closeout
The SGM Construction Manager will be responsible for compiling the project
documentation and providing a Final Project Notebook to the County. This
documentation can be provided in either hard copy or electronic format, or both.
As -Built Plans
As -Built plans can be prepared, if requested by the County or CDOT. SGM would only
be responsible for updating the electronic drawings to reflect as -built conditions for the
Catamount Bridge.
III. DELIVERABLES
1. Meeting Agendas and Minutes
2. Daily Reports
3. CDOT Forms
4. Testing Results
5. As -Built Plans
6. Final Project Notebook
IV. SCHEDULE
For purposes of preparing the fee estimate, we have assumed a total construction duration of
45 weeks for the combined project. This will be completely dependent upon the contractor's
schedule and performance.
V. COSTS
A detailed Schedule of Fees in Cost Plus Fixed Fee format has been prepared and is attached.
The total costs to provide the work outlined herein will not exceed $269,798.79 without written
approval from Eagle County.
Catamount Version 1.1 Page 3 of 3 6SGM
7/8/15
Exhibit 2
SGM ESTIMATED BY: Mike Fowler
PROJECT: CATAMOUNT BRIDGE - BRO C440 -007 (18601) DATE: 6/23/2015
CLIENT: EAGLE COUNTY REVISION: CM 1.1
COST PLUS FIXED FEE CONTRACT FIXED FEE: 10%
1
PIC
SGM Hours
Principal -In- Charge
and Labor Charges
Bill Swigert
$150.00
10 $ 1,500.00
2
PM
Project Manager
Mike Fowler
$122.73
143 $ 17,550.00
3
CM
Construction Manager
Blaine Wright
$100.00
1015' $101,500.00
4
CT
Construction Technician
Dave Shepard
$90.91
370' $ 33,636.36
5
SE
Structural Engineer
Mike Fowler
$122.73
86 $ 10,554.55
6
TE
Transportation Engineer
Dan Cokley
$131.82
60 $ 7,909.09
7
DRA
Drainage Engineer
Dave Kotz
$122.73
40 $ 4,909.09
8
SWE Stormwater Engineer
Angie Fowler
$122.73
30 $ 3,681.82
9
CAD 'CAD Drafter
Diane Williams
$68.18
60 $ 4,090.91
10
SPM Survey Project Manager
Bob Brandeberry
$90.91
20 $ 1,818.18
11
FS1 Field Survey Crew (1 Man)
1- Person Crew
$136.36
8' $ 1,090.91
12
ST Survey Technician
Kyle Tesky
$68.18
8'
$ 545.45
13
ADM 'Admin. Assistant
Joan Preisner
1 $59.09
54
$ 3,190.91
Subtotals 1904 $191,977.27
TOTAL LABOR $191,977.27
FIXED FEE 10% $ 19,197.73
OTHER DIRECT COSTS $ 11,541.25
SGM TOTAL COSTS $222,716.25
Subtotals $40,153.36 $ 2,913.84
TOTAL LABOR $ 40,153.36
FIXED FEE 10% $ 4,015.34
OTHER DIRECT COSTS $ 2,913.84
OUTSIDE TOTAL COSTS $ 47,082.54
TOTAL PROJECT COSTS $269,798.79
(THIS CONTRACT)
Date: 6/23/2015 Page 1 of 3 SGM Confidential
Cl)
0
N
N
f6
CL
m
c
d
"
tl/
N
`
WRY
m
YIN
m"
_
y-
M
N
W
Q
Q
m
01
N
O
N
m
Q
m
01
W
N
W
N
O
O
N
r
r
W
O
y
U
w
Q
w
w
w
w
w
w
rn
O
O
0
M
W
U/
V!
Q
LU
LU
LL
R
>
O
W
cm
J
W
�
W N
N
a
O
_
N
N
d
4S3
W
an
wdS
Q
Wo
N
v
m N
O
A*
E2
!1 "O
l
N
Q
Q
W
Q
Q
W
W
O
O
M
A2
n >
Yl. CO
�
� r
N
r
Ol++tU1d �ss N
''
Q
I
Q
3
� 0
0
Q
cc
00
y
Y
r
n
y
Q
N
y
r
3
y
p >
N
CL
a
(D
°v
�
N
U
N
Q
N
Im
0
w
l0
N
Y
E
C
O
N
O
E
3
y
N
m
C
N
C
0
p
y
C
d
y
O
C
N
>'
Y
J
¢
N
y
E
m
N
Q
y
U
N
0 3
=
U
C
y
O)
G
E
C
3
y
7
N
W
III
" �`
¢
c
a)
o
o u
Q
d
II
.y
cm
rn
E
E_
O
c
g
O
C_
m
v
Q
C
N
O
N
U'I C
'y
C
O
0=
O
Ol
N~
y
N
'i
d
C
l0
—
..
d
E
N
U
w
C
C
N w.
y
3
d
'O
X
d_
O
O`
0
co
C¢
y
i
0-
C
0)
y
Y
5
0
m
N
IM
C
O
'-
O
U
C
o
d>
N
E
N
y
N
O
t
'�
C
O
Y
X
N
d
O
n
N
N
Of
C
C
W
J
o
l0
v
y
p
y p
d
y
C
Z
" v. 7
d m
C
2
C
o
O U
U m_
d
�_
II
d
N
N
b
m
N
rn
W
d
U
E
R
t
C
°-
E
O�
a�
d
F-
C
°-
"�
4)
y
N
m
o
y N
y
m
d
m
a
°>
c
m
0
o
d
v
v
A
a
.�
a
v
K
v
O
U
w`
a° a
°£
V
a
U
ao
(7
F
in
¢
w
L
¢
C7
'�
y
v
y
c
0
i
LL
F
ti
a°i
O
api
O
y
N
d
N
d
N N
V
j
CO
l0
COO
N
>
0
y
T
'cc
0 y
m d
O
Q
a`
a`
a
a` a`
¢
cn
U
2
0
a`
o
2
o
U F¢
a
Vco
0o
0o
W
W
w
m
w
w
Cl)
0
N
N
f6
CL
m
c
d
CATAMOUNT BRIDGE - BRO C440 -007 (18601) a SGM
OTHER DIRECT COSTS
SGM
Per diem (CONUS Rate)
$219.00
per day
0 $0.00
Mileage (from GWS office)
$0.565
per mile
20250 $11,441.25
Plotting, 2436, B/W
$5.50
per plot
0 $0.00
Plotting, 2436, Mylar
$19.00
per plot
0 $0.00
Plotting, 2436, Color
$30.00
per copy
0 $0.00
Photocopies
$0.25
per copy
0 $0.00
Newsletters, Tri -fold, Color
$0.75
per copy
0 $0.00
Newspaper Notice
$500.00
per copy
0 $0.00
Postage
$5.00
each
20 $100.00
Subtotal $11,541.25
Subtotal $2,642.64