Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC15-176 Energy and Mineral Impact Assistance Program Tier I Application Revised 2.20.15
A DOLA COLORADO
Co Department of Local Affairs
Division of Local Government
ENERGY AND MINERAL IMPACT ASSISTANCE PROGRAM APPLICATION
Tier I or Tier II
Applications Must Be Submitted Electronically-Directions on Last Page
-You are Highly Encouraged to Work with your Regional Field Manager when Completing your Application-
A. GENERAL AND SUMMARY INFORMATION
1. Name/Title of Proposed Project: Eagle County Regional Transportation Authority Propane Cutaway Bus
2. Applicant: Eagle County Regional Transportation Authority(ECRTA)
(In the case of a multi-jurisdictional application,name of the"lead"municipality,county,special district or other political subdivision).
In the case of a multi-jurisdictional application, provide the names of other directly participating political subdivisions:
3. Chief Elected Official (In the case of a multi jurisdictional application, chief elected official of the"lead"political
subdivision):
Name: Kathy Chandler-Henry Title: County Commissioner
Mailing Address: PO Box 850 Phone: 970-328-8605
City/Zip: Eagle, CO 81631 Phone:
E-Mail Address: Kathv.Chandlerhenry,,7a,eaglecounty.us
4. Designated Contact Person(will receive all mailings)for the Application:
Name: Jared Barnes Title: Multi-Modal Planner
Mailing Address: PO Box 1070 Phone: 970-328-3528
City/Zip: Gypsum, CO 81637 Phone:
E-Mail Address: Jared.Barnes(aeaglecountv.us
5. Amount of Energy/Mineral Impact Funds requested:
(Tier I; Up to$200,000 or Tier II; Greater than$200,000 to$2,000,000)
$68,400
6. Description of the Project Scope of Work:
(Project Description of the various tasks involved in the project including specific data such as quantities,mileage,square feet,lineal ft.etc.as well as
specific project location within city and or county etc.)
The project will cover the incremental costs of purchasing three(3)cutaway buses utilizing liquid propane instead of
diesel. The procurement of the cutaway buses has been completed through a purchasing collective, therefore the exact
cost of each bus as well as the incremental cost of purchasing the Liquefied Petroleum Gas(LPG)Propane is set forth.
Each cutaway bus can be purchased through this contract as funding becomes available.
7. Local priority if more than one application from the same local government(1 of 2,2 of 2,etc.) 1 of 1
Page 1 of 10
Revised 2.20.15
B. DEMOGRAPHIC AND FINANCIAL INFORMATION.
1. Population
a. What was the 2010 population of the applicant jurisdiction? 52,197
b. What is the current population? 53,665
(Current/most recent conservation trust fund/lottery distribution estimate is acceptable.)What is the source of the estimate? State
Demography
Office
c. What is the population projection for the applicant in 5 years? 59,284
What is the source of the projection? State
Demography
Office
2. Financial Information (Current Year):
In the column below labeled"Applicant"provide the financial information for the municipality,county,school district or special district directly
benefiting from the application. In the columns below labeled"Entity",provide the financial information for any public entities on whose behalf the
application is being submitted(if applicable).
Complete items "a through j"for ALL project types:
Applicant Entity Entity
a. Assessed Valuation(AV)Year: 201_ N/A
b. Mill Levy N/A
c. Property Tax Revenue(mill levy x AV) N/A
d. Sales Tax(Rate/Estimated Annual Revenue) 0.45%/$6,175,692 %/$ %/$
e. Total General Fund Budget Revenue $8,508,152
f. Total Applicant Budget Expenditures
$8,201,865
(Sum of General Fund and all Special Funds)
g. General Fund Balance as of January 1 of this $2,050,466
current calendar year.
h. General Fund Balance(Unrestricted)as of $752,127
January 1 of this current calendar year. has since be allocated
to a project
i. Total Multi-year Debt Obligations(all funds*) $0
j. Total Lease-Purchase and Certificates of $0
Participation obligations*
For projects to be managed through a Special Fund other than the General Fund(e.g. County Road and Bridge
Fund)or managed through an Enterprise Fund(e.g.water,sewer, county airport),complete items "k through o":
Identify the relevant Special Fund or Enterprise Fund:
k. Special or Enterprise Fund Budget Amount $0
I. Special or Enterprise Fund Multi-Year Debt $0
Obligations*
m.Special or Enterprise Fund Balance as of $2,050,466
January 1 of this calendar year
n. Special or Enterprise Fund Balance
(Unrestricted)as of January 1 of this calendar $752,127
year
o. Special or Enterprise Fund Lease-Purchase $0
and Certificate of Participation Obligations*
p. Special Fund Mill Levy(if applicable) $0
For Water and Sewer Project Only complete items "q through s":
q. Tap Fee N/A
r. Average Monthly User Charge
(Divide sum of annual(commercial and residential)
revenues by 12 and then divide by the number of total taps N/A
served.)
NOTE:Commercial and Residential Combined
Page 2 of 10
Revised 2.20.15
s. Number of total Taps Served by Applicant N/A
*Include the sum of the year-end principal amounts remaining for all multi-year debt obligations,lease purchase
agreements or certificate of participation notes
Page 3 of 10
Revised 2.20.15
C. PROJECT BUDGET.List expenditures and sources of revenue for the project. The totals on each side of the ledger must equal.
Expenditures Sources of Revenue Funding
(Dollar for Dollar Cash Match is Encouraged) Committed
List Budget Line Items including project contingency(Examples: List the sources of matching funds and indicate either cash or Yes/No
architect,engineering,construction,equipment items,etc.) documentable in-kind contribution
Line Item Expenditures Line Item Costs Cash In-Ki
3 Glaval Ford Cutaway Bus with Standard $348,495 Energy/Mineral Impact Fund Grant $68,400 No
ECO Transit options Request
Liquefied Petroleum Gas(LPG)Propane 68,400 'Energy/Mineral Impact Fund Loan $ No
Dedicated Fuel System Roush or Al Request(If applicable)
Alternative 65 Gasoline Gallon Equivalent
(GGE)
FTA Section 5317 Grant Award 96,000
FTA Section 5311 Grant Award 104,000
CDOT FASTER/FTA Section 76,666
5311 Grant Award
ECRTA Local Match 71,829
Project Contingency 0
TOTAL $416,895 TOTAL $416,895 $
Please attach a more detailed budget if available *Loans with a 5%interest rate may only be awarded for potable
water and sewer projects. Leave blank if a loan is not requested.
Page 4 of 10
Revised 2.20.15
D. PROJECT INFORMATION.
The statutory purpose of the Energy and Mineral Impact Assistance program is to provide financial assistance to
"political subdivisions socially or economically impacted by the development, processing or energy conversion of
minerals and mineral fuels."
1. Demonstration of Need:
a. Why is the project needed at this time?
ECRTA's bus replacement schedule sets forth standards for both years and miles for bus replacement. This schedule
allows ECRTA to comply with FTA and CDOT regulations as well as apply for grant funding to assist with the replacement
of ECRTA's bus fleet. ECRTA needs to replace 3 cutaway buses pursuant to our replacement schedule and has received
CDOT/FTA funding for each of the vehicles.
Eagle County Government has a sustainability initiative to reduce carbon emissions and energy consumption 15% by the
end of 2015. In order to achieve this goal ECRTA has identified utilizing alternative fuels as a mechanism to reduce its
carbon emissions. LPG Propane is the preferred alternate fuel for ECRTA due to its cleanliness in both production and
emissions. The additional cost of LPG Propane modifications to cutaway buses is prohibitive for ECRTA to implement as
the return on investment(ROI)will exceed the useful life of the cutaway buses.
b. How does the implementation of this project address the need?
By purchasing LPG Propane cutaway buses, ECRTA can reduce its reliance on diesel fuel and reduce our carbon
footprint through production, delivery, and emissions of locally sourced LPG Propane. This reduction in carbon emissions
will allow ECRTA to help achieve the goals of Eagle County Government's 15% by 2015 energy policy.
c. Does this project, as identified in this application, completely address the stated need? If not, please describe
additional work or phases and the estimated time frame. Do you anticipate requesting Energy and Mineral Impact
Assistance funds for future phases?
Yes,the project completely addresses the need at this time. As future cutaway bus replacements are needed, ECRTA
will apply to the EMIA program for assistance with the incremental cost of purchasing a LPG Propane vehicle over a
diesel vehicle.
d. What other implementation options have been considered?
ECRTA has considered utilizing diesel fuel vehicles as it is the most economical option. Compressed Natural Gas(CNG)
has also been considered, but the cost of facility improvements is financially prohibitive. LPG Propane is the most
economical alternative fuel options for ECRTA's current service needs. ECRTA has considered other grant opportunities
as well to fund the cost of conversion to LPG Propane.
e. What are the consequences if the project is not awarded funds?
ECRTA will not pursue LPG Propane vehicles if the project is not awarded funds. Due to the timing of the purchase and
timing grant cycles,the EMIA Alternative Fuels Program is the only option for financial assistance available to ECRTA.
2. Measurable Outcomes:
a. Describe measurable outcomes you expect to see when implementation of this project is complete. How will the
project enhance the livability*of your region, county, city,town or community(e.g. constructing a new water plant will
eliminate an unsafe drinking water system and provide safe and reliable drinking water;the construction of a new
community center will provide expanded community services, or projects achieving goals regarding energy conservation,
community heritage, economic development/diversification, traffic congestion, etc.)?
*(Livability means increasing the value and/or benefit in the areas that are commonly linked in community development such
as jobs, housing,transportation,education,emergency mitigation, health and environment)
The purchase of three(3)LPG Propane cutaway buses will improve the livability of Eagle County by reducing energy
consumption and carbon emissions. The savings in capital costs from this grant and the savings in fuel costs of using
LPG Propane instead of diesel,will allow ECRTA to direct those savings to improving operations and facilities for transit
users.
b. How many people will benefit from the project?(i.e., region, county, city,town, community, subdivision, households or
specific area or group; or any portion thereof)
ECRTA transported approximately 900,000 passengers on a variety of routes. Each of these passengers will benefit from
this project by allowing ECRTA to redirect the cost savings from a conversion to LPG Propane into service and facility
improvements. In addition, all Eagle County residents will benefit from the reduced carbon emissions of LPG Propane
over diesel fuel.
c. How will the outcome of the project be measured to determine whether the anticipated benefits to this population
actually occur?
ECRTA tracks all fuel usage and costs on a monthly basis. These savings in fuel costs and capital costs will be
compared to the existing data from non-LPG Propane cutaway buses and we will be able to quantify the financial impact
to the ECRTA passengers and county residents. The environmental impacts will be more difficult to measure, but through
emission figures for LPG Propane, miles driven, and gallons consumed, estimates of carbon reductions can be made
Page 5 of 10
Revised 2.20.15
which will be presented to Eagle County Commissioners to ensure compliance with the 15% by 2015 goals.
d. Does this project preserve and protect a historic building,facility or structure? If yes, please describe.
Year of construction:
No,the purchase of LPG Propane cutaway buses will not preserve or protect a historic building,facility, or structure.
e. Will this project implement an energy efficiency/strategy that could result in less carbon footprint or conserve energy
use or capitalize on renewable energy technology? If yes, please describe.
Yes,the use of LPG Propane cutaway buses will implement a carbon footprint reduction when compared to a similar
cutaway bus using diesel fuel. LPG Propane has a 24% reduction in greenhouse gas emissions, 20% reduction in
nitrogen oxide emissions, and 60% reduction in carbon monoxide emissions through the production and"tail pipe"
emissions. With 90% of all propane used in the US coming from US and an additional 7%coming from Canada, it is a
clean and domestic source of fuel.
3. Relationship to Community Goals
a. Is the project identified in the applicant's budget or a jurisdictionally approved plan (e.g. capital improvement plan,
equipment replacement plan, comprehensive plan, utility plan, road maintenance and improvement plan or other local or
regional strategic management or planning document)? What is its ranking?
The replacement of 3 cutaway buses is identified in ECRTA's bus replacement schedule and has been budgeted. The
use of alternative fuels and initiatives to implement Eagle County's 15% by 2015 goal has been identified in ECRTA's
2015 Strategic Plan. The 2015 Strategic Plan doesn't rank specific tasks or goals, but Eagle County has made the 15%
by 2015 Goal a priority, therefore implementing this goal is a top priority for ECRTA.
4. Local Commitment and Ability to Pay/Local Effort
a. Why can't this project be funded locally?
The purchase of three(3)LPG Propane cutaway buses cannot be funded locally due to the lack of budget available.
ECRTA only budgeted for the purchase of three(3)diesel cutaway buses and does not have funding available for the
incremental cost of an LGP Propane conversion.
b. Has this project been deferred because of lack of local funding? If so, how long?
Yes, the incremental cost of purchasing an alternative fuel vehicle has been a deterrent for ECRTA to implement this
project.
c. Explain the origin of your local cash match. (Note:Whenever possible, local government cash match on a dollar for
dollar match basis is encouraged.)
The local match for the purchase of three(3)cutaway buses has been budgeted by ECRTA. The funds are available
immediately for the purchase of these vehicles.
d. What other community entities, organizations, or stakeholders recognize the value of this project and are
collaborating with you to achieve increased livability of the community? Please describe how your partners are
contributing to achieve the improvement to the livability of the community through this project. If in-kind contributions are
included in the project budget, detailed tracking will be required on project monitoring report.
No other entities are collaborating with ECRTA to purchase LPG Propane cutaway buses. CDOT and FTA through a
variety of grants has provided funding for three(3)diesel cutaway buses, but not for the incremental costs of LPG
Propane conversions.
i. Please describe the level of commitment by each collaborator. (e.g.fee waivers, in-kind services,fundraising,
direct monetary contribution, policy changes.)
The budget on page 4 of this grant application provides specific funding commitments from ECRTA, CDOT/FTA, and the
Alternative Fuels Program Grant.
ii. Please list the value of the resources that each collaborator is bringing to the program.
e. Has the applicant dedicated the financial resources in their current budget, reserve funds and/or unused debt capacity
that are being used for the local matching funds? Explain if No
Yes the local matching funds have been identified in ECRTA's capital fund budget.
f. Have the applicant's tax rates, user charges or fees been reviewed recently to address funding for the proposed
project?
ECRTA is funded through a 0.5% sales tax. In addition, ECRTA collects fares for riding the bus. These funding sources
cannot be changed to fund the purchase of LPG Propane vehicles.
g. If the tax rate, user charges or fees were modified,what was the modification and when did this change occur?
N/A
h. Has the applicant contacted representatives from local energy or mineral companies to discuss the project? If yes,
when was the contact and what was discussed.
Yes, ECRTA has contacted both Collett Enterprises, our petroleum supplier, and Ferrellgas, a Propane supplier, in the
past month to inquire about providing LPG Propane. Collett Enterprises declined to provide LPG Propane,while
Page 6 of 10
Revised 2.20.15
Ferrellgas was willing to provide LPG Propane. In addition, Ferreligas has the facilities in place for ECRTA to immediately
begin using LPG Propane. If desired from ECRTA, Ferrellgas has indicated that they can provide additional facilities to
ensure that LPG Propane is available and accessible for ECRTA purposes.
i. Has the applicant requested financial support from the industry? If yes,when was the contact, what amount did you
request? What were the results? If no, why not?
All facility costs for ECRTA to use LPG Propane are assumed by Ferrellgas.
5. Readiness to Go
a. Assuming this project is funded as requested, how soon will the project begin? Select One(x)Within 3 months,
(_)3-6 months, (_)6-9 months or(_)9-12 months? What is the time frame for completion? Select One(_)Within 3 months,
(x)3-6 months, (_)6=9 months, (_)9-12 months or(_)>12 months.
b. Describe how you determined that the project can be completed within the proposed budget as outlined in this
application? Are contingencies considered within the project budget?
ECRTA has completed a purchasing consortium for cutaway vehicles. The purchasing consortium set forth then number
of vehicles each entity can purchase as well as wet prices for base vehicles and a variety of options. Those figures are
being used to provide exact costs to purchase a cutaway vehicle as well as a LPG Propane conversion.
c. Has the necessary planning been completed? How? What additional design work or permitting must still be
completed, if any? When? How did the applicant develop project cost estimates? Is the project supported by bids,
professional estimates or other credible information? Please attach a copy of any supporting documents.
There are no additional planning, design work, or permitting required to purchase three(3)cutaway buses using LPG
Propane.
6. Energy& Mineral Relationship
a. Describe how the applicant is, has been, or will be impacted by the development, production, or conversion of energy
and mineral resources.
LPG Propane has been used to power vehicles for decades. It has been consistently available over this period of time
and will continue to be available. Propane is a byproduct of CNG harvesting,therefore the development of domestic CNG
will only increase the availability for Propane.
b. To further document the impact in the area, name the company or companies involved,the number of employees
associated with the activities impacting the jurisdiction and other relevant, quantitative indicators of energy/mineral impact.
N/A
7. Management Capacity
a. How will you separate and track expenditures, maintain funds and reserves for the capital expenditures and
improvements as described in this project?
As stated previously, ECRTA has budgeted for the purchase of cutaway buses. Furthermore, ECRTA has been a grant
recipient of numerous FTA grants since its inception and has the staff resources to provide any and all documentation for
the purchase, delivery and acceptance of a new cutaway bus.
b. Describe the funding plan in place to address the new operating and maintenance expenses generated from the
project?
ECRTA will replace existing cutaway buses with the new LPG Propane vehicle, therefore operating these vehicles will
continue as they do today. Furthermore, Eagle County Fleet Services provides maintenance of all buses. Fleet Services
has indicated that minor training will be required for service and maintenance, but that the facilities existing have the
capacity to provide all service and maintenance required for LPG Propane vehicles.
c. Describe the technical and professional experience/expertise of the person(s)and/or professional firms responsible to
manage this project.
ECRTA has been a grant recipient of FTA Sections 5311, 5309, 5310, 5304, FASTER and State of Good Repair grants.
ECRTA has successfully completed these grants and has the professional and technical expertise to administer these
grants. ECRTA has also purchased buses each year and has the expertise and experience to execute contracts and
accept buses.
d. Does the project duplicate service capacity already established? Is the service inadequate? Has consolidation of
services with another provider been considered?
No,this project does not duplicate service capacity. The use of LPG Propane vehicles will replace the use of diesel
vehicles.
Page 7 of 10
Revised 2.20.15
E. HIGH PERFORMANCE CERTIFICATION (HPCP) PROGRAM COMPLIANCE.
Colorado Revised Statutes(C.R.S. 24-30-1305.5)require all new facilities, additions, and renovation projects that meet
the following eligibility criteria to conform with the High Performance Certification Program(HPCP)policy adopted by the
Office of the State Architect(OSA)if:
• The project receives 25% or more of state funds; and
• The new facility, addition, or renovation project contains 5,000 or more building gross square feet; and
• The building includes an HVAC system; and
• In the case of a renovation project, the cost of the renovation exceeds 25%of the current value of the property.
The HPCP requires projects that meet the eligibility criteria above to achieve third party verification with the target goal of
LEED Gold or Green Globes-Three Globes. Projects are strongly encouraged to meet the Office of the State Architect's
(OSA)Sustainable Priorities in addition to the LEED prerequisites. Projects funded through DOLA that meet the above
eligibility criteria are required to complete the DOLA registration and tracking process. See DOLA's HPCP web page for
more information or contact your DOLA regional manager.
In instances where achievement of LEED Gold or Green Globe-Three Globes certification is not achievable, an applicant
may request a modification of the HPCP policy or a waiver if certain conditions exist. DOLA staff will work with applicants
to identify workable solutions to meet the program's intent to maximize building energy efficiencies.
Please answer the following questions:
(Complete this section only if your project application is for a building project, both new construction as well as
renovation.)
1. Is the applicant seeking state funding for 25% or more of the total project cost(including all phases, if
applicable)?
Yes No
(If no,the project does not meet the HPCP requirement and the rest of this section does not need to be completed)
2. Does the building include an HVAC system? Yes No
If yes, please check whether the proposed project includes a HVAC upgrade or new HVAC
system.
3. Is this project(check all that apply): new construction _renovation new and renovation
New building square footage: SF Renovation square footage: SF
Is the building square footage(new construction and/or renovation)5,000 SF or more? Yes No
4. For building renovation projects:
What is the current property value?(Determine based on assessed or appraised value)$
What is the total project cost for the renovations? $
Does the cost of renovation exceed 25% of the current value of the property? Yes No
5. If you answered "yes"to questions 1, 2, 3, and if applicable,4,then your project meets the HPCP
eligibility criteria. Complete the HPCP registration form and preliminary checklist and submit with this
grant application.(See DOLA's HPCP web page for registration and checklist form.)
ADDITIONAL QUESTIONS:
6. Have you included any additional costs in this grant application for third party verification to comply with the
High Performance Certification Program? Yes No If yes, please specify the estimated cost for
third participation verification/certification:$
7. Will you need assistance locating resources, third party consultants, or technical assistance for HPCP third party verification
requirements, preparing cost estimates, or otherwise complying with the HPCP?
Yes No Explain
Note:If this application is for design services for a planned building project that meets the HPCP eligibility criteria and the applicant
intends to seek state funding for 25%or more of the total project cost,then the design should maximize high performance building
certification standards(by completing the HPCP checklist)and build in anticipated project costs,as appropriate.
Page 8 of 10
•
Revised 2.20.15
F. TABOR COMPLIANCE.
1. Does the applicant jurisdiction have voter authorization to receive and expend state grants without regard to TABOR
spending limitations? If yes, explain:
Yes, in 1995 the voters of Eagle County approved a ballot issue allowing Eagle County to"collect, retain and expend all
revenues and other funds collected"each year notwithstanding any restrictions imposed by TABOR.
2. If the applicant jurisdiction receives a grant with State Severance funds, will the local government exceed the TABOR
limit and force a citizen property tax rebate?
No. See the answer to Question#1 above.
3. Has the applicant jurisdiction been subject to any refund under TABOR or statutory tax limitations? Explain.
No. See the answer to Question#1 above.
4. Has the applicant sought voter approval to keep revenues above fiscal spending limits? Explain.
Yes. See the answer to Question#1 above.
5. Are there any limitations to the voter approved revenues? (e.g., Can revenues only be spent on law enforcement or
roads?)
No. The ballot question described in Question#1 above was general and did not include any limitation on expenditure of
the voter approved revenues. A copy of the resolution approving the ballot question is attached to this grant application.
6. If the applicant jurisdiction is classified as an enterprise under TABOR,will acceptance of a state grant affect this
status? Explain.
No.The Eagle County Regional Transportation Authority is organized and operated by Eagle County and neither are
classified as an enterprise under TABOR.
G. ENVIRONMENTAL REVIEW.
Indicate below whether any of the proposed project activities:
1. Will be undertaken in flood hazard areas. Yes No X
List flood plain maps/studies reviewed in reaching this conclusion. Describe alternatives considered and mitigation
proposed.
N/A
2. Will affect historical, archeological or cultural resources, or be undertaken in geological
hazard area? Yes No X
Describe alternatives considered and mitigation proposed.
N/A
3. Address any other related public health or safety concerns? Describe. Yes No X
N/A
Page 9 of 10
Revised 2.20.15
APPLICATION SUBMISSION INSTRUCTIONS
AND
OFFICIAL BOARD ACTION DATE (REQUIRED)
Application and attachments must be submitted electronically in
WORD .DOC (Preferred) or .PDF Format (Unsecured) to:
ImpactGrantsCa�state.co.us
Please Cc your Regional Field Manager all documents as well to ensure receipt.
In email subject line include: Applicant Local Government name and Tier for which you are applying
-example-Subject: Springfield County EIAF Grant Request, Tier 1
NOTE: Please do not submit a scanned application(scanned attachments ok).
(If you are unable to submit electronically please contact your DOLA regional manager)
For any questions related to the electronic submittal please call Bret Hillberry @ 303.864.7730
Attachments List(Check and submit the following documents, if applicable):
■ Preliminary Engineering Reports
■ Architectural Drawings
■ Cost Estimates
■ Detailed Budget
■ Map showing location of the project
■ Attorney's TABOR decision
■ HPCP Registration, modification
Or Waiver Form
Official Board Action taken on
4/21/2015
Date
Submission of this form indicates official action by the applicant's governing board
authorizing application for these funds.
Page 10 of 10
CMPC-14-BOC-RFP Order Form - Glaval Entourage
Agency Name Eagle County RTA Contact Person Kelley Collier
Date 27-Feb-15 Phone Number 970-328-3533
Base Pricing +Class E(Seating 16 22!2)Glaval Ford
Unit Cost Quantity Total Cost
Base Floorplan XL-6.8L V10 Gas - Standard
Floor=31' Ford F550 228"WB 19,500 77,472.00
Front Lift GVWR
Base Floorplan XL-6.8L V10 Gas-Standard
Floor=27' Ford F550 201"W B 19,500 75,470.00
Rear Lift GVWR
Bas± Pricing Class F(Seating 20 30 12)Glaval Ford
Unit Cost Quantity Total Cost
Base Floorplan XL-6.8L V10 Gas - Standard
Floor=31' Ford F550 228"WB 19,500 76,945.00
Front Lift GVWR
Base Floorplan XL-6.8L V10 Gas - Standard
Floor=31' Ford F550 228"WB 19,500 78,545.00 1 78,545.00
Rear Lift GVWR
Bass Pricing-Mass G(Seating 24-34I )Glaval Ford i
Entourage .: i.` ,. Unit Cost Quantity Total Cost
Base Floorplan XL 6.8L V10 Gas Standard
Floor=33'Ford F550 252"WB 19,500 79,900.00 -
Front Lift GVWR
Base Floorplan XL-6.8L V10 Gas-Standard
Floor=33' Ford F550 252"WB 19,500 79,400.00 -
Rear Lift GVWR
Body Qptions
S5;Structure Op. FRP Fiberglass Skin 1,350.00
1: Exterior Skin -
S5; Body Op. 1 Undercoating 400.00 1 400.00
Engine-Trarwstrilss - el:Options
S7; 7A. Op. 1 Combined High Idle/Lift Interlock(Intermotive
HighLock) 100.00 1 100.00
S7; 7E. Op. 1 Diesel Engine in lieu of Gasoline Engine 6,900.00 1 6,900.00
S7; 7E. Op. 2 Compressed Natural Gas (CNG) Dedicated
-
Fuel System:42 GGE 27,000.00
S7;7E. Op.2 Compressed Natural Gas (CNG) Dedicated
-
Fuel System:53 GGE 29,500.00
S7; 7E. Op. 2 Compressed Natural Gas (CNG) Dedicated
-
Fuel System:62 GGE 32,800.00
Liquefied Petroleum Gas (LPG) Propane
S7; 7E. Op. 3 Dedicated Fuel System, Roush or Al 18,500.00
Alternatives. 42 GGE
Liquefied Petroleum Gas(LPG) Propane
S7;7E. Op. 3 Dedicated Fuel System Roush or Al 22,800.00
Alternative.65 GGE
1
4/1/2015
CMPC-14-BOC-RFP Order Form - Glaval Entourage
Suspension System Opt ons <..
S9;9D. Op. 1 MOR/ryde RL Suspension System 800.00 1 800.00
S9;9D. Op. 2 Non-slip Axle 280.00 1 280.00
Tires and Wheels Options s
S10; 1 OA. Op. 1 Mud and Snow Tires -Goodyear Wrangler 3,400.00
DuraTrac
S10; 10A. Op. 1 Mud and Snow Tires-Goodyear G622 2,240.00 -
Commercial Grade
S10; 10A. Op. 2 Spare Tire Carrier 240.00 -
Electrioal System.Options ,
S12; B2. Op. 1 Alternate Battery Location-OEM Engine (300.00) -
Compartment
S12; D13. Op. 1 Ignition Switch Controls-Route MBC -
through Ignition
Interior:Climate Control.Options ..
S13;A3/516 Op. Air Conditioning Deletion Credit (3,550.00)
1
S13;A3/516 Op. Thermo King Roof Top HVAC Unit:65 7,850.00
2
S13;A31516 Op. Thermo King Roof Top HVAC Unit:75 8,200.00
2 -
S13;A18 Op. 1 Vacuum Operated Heater Control Valve 85.00 -
interior Trim Option .. . , ` .,'' .0 .
S14; 14A. Op 1 !Upholstered Interior I 855.00 I 11 855.00
Seam ? #ions SIN LE SEAT CRED T DOES NOT 1PPL TO OitiSeat,3PT Scat or Oo feat
Upgrades;±hosts are In.Addit of to Bass
S16; 16A. Op. 1 Additional Mobility Aid Positions 345.00 -
S16; 16A. Op. 2 Single Seat Credit (150.00) -
S16; 16B. Op. 1 Freedman CitiSeat:Single Seat 280.00 -
S16; 16B. Op. 1 Freedman CitiSeat: Double Seat 480.00 10 4,800.00
S16; 16B.Op. 1 Freedman 3PT Seat:Single Seat 210.00 -
S16; 16B. Op. 1 Freedman 3PT Seat: Double Seat 290.00 -
S16; 16B. Op. 1 Freedman Go Seat:Single Seat 125.00 -
S16; 16B. Op. 1 Freedman Go Seat: Double Seat 225.00 -
Freedman Level 4:cost per seat
S16; B8. Op. 1 SPECIFY SEAT COLOR AND FABRIC 40.00 -
TYPE:
Freedman Level 5:cost per seat
S16; B8. Op. 1 SPECIFY SEAT COLOR AND FABRIC 53.00
TYPE:
Freedman Level 6:cost per seat
S16; B8. Op. 1 SPECIFY SEAT COLOR AND FABRIC 57.00 24 1,368.00
TYPE: La France Mills 398 Twilight
2 4/1/2015
CMPC-14-BOC-RFP Order Form - Glaval Entourage
Freedman Repel:cost per seat
S16; B8. Op. 1 SPECIFY SEAT COLOR AND FABRIC 38.00 -
TYPE:
S16; B12;Op. 1 Passenger Restraint System Deletion Credit (95.00) -
S16; B14;Op. 1 Single-Freedman BV Foldaway 400.00 -
S16; B14;Op. 1 Single-Freedman AM Foldaway 370.00 -
S16; B14;Op. 1 Stele-Freedman CitiSeat Foldaway 220.00 -
S16; B14;Op. 1 Single-Freedman GoSeat Foldaway 450.00 -
S16; B14. Op.2 Double: Freedman BV Foldaway 565.00 -
S16; B14. Op. 2 Double: Freedman AM Foldaway 520.00 -
S16; B14. Op. 2 Double: Freedman Citiseat Foldaway 610.00 2 1,220.00
S16; B14. Op. 2 Double: Freedman GoSeat Foldaway 525.00 -
Ford OEM 6-Way Power Driver's Seat with
S16; 16C. Op. 1 power seat base-cannot be used with 1,680.00 -
USSC seat
USSC Evolution G2E Driver Seat with
S16; 16C. Op. 1 manual seat base only-cannot be used 1,325.00 -
with Ford OEM power seat and base
Ftoor.arnd FloorCovettng`:Options ` K
S17; 17B. Op. 1 Floor Underbelly 250.00 -
S17; 17F. Op. 1 Altro Transflor Meta 405.00 -
SPECIFY COLOR:
S17; 17G. Op. 1 Contrast White Step Edging and Standee 35.00 -
Line
Passenger;;Door Option .
S19; 19D. Op. 1 1Rear Emergency Exit Door I 645.00 I I -
Lighting Options :t , 4 .
S22;A. Op. 1 Fog Lights 120.00 -
S22; B. Op. 1 Underhood Light 150.00 -
Finish and Color Options r # r, a. ,` .
S23;23B. Op. 1 City of Greeley Paint Scheme 4,200.00 -
S23;23B. Op. 1 Eagle County Paint Scheme 1,200.00 1 1,200.00
S23;23B. Op. 1 Mesa County Paint Scheme 1,600.00 -
S23;23B. Op. 1 Town of Snowmass Paint Scheme 3,885.00 -
S23;23B. Op. 1 All Points Transit Paint Scheme 3,250.00 -
S23;23B. Op. 1 City of Durango Paint Scheme 4,600.00 -
S23;23B. Op. 1 DSI-Amblicab Paint Scheme 3,250.00 -
S23;23B. Op. 1 Seniors' Resource Center Paint Scheme 2,300.00 -
3 4/1/2015
CMPC-14-BOC-RFP Order Form - Glaval Entourage
S23;23B. Op. 1 City of Farmington Paint Scheme 4,525.00 -
S23;23D. Op. 1 Wheel Powder Coating 730.00 -
Mirror;.Options 4-,.
S25;A;Op. 1 Velvac Mirrors No Camera Model 2020 250.00 1 250.00
S25;A;Op.2 Velvac Mirrors With Camera Model 2020XG 1,100.00 -
Mobifity.Lift Options IT: . .,i...,
u
BASE LIFT` ;Ricoh tanium 1,0001bs S-Series t, NO CHARGE. .t- -;
S26;26A. Op. 1 Braun Vista 2 Mobility Lift (260.00)
S26;26A. Op. 1 Braun Century 2 Mobility Lift 34"X51" (500.00) -
S26;26A. Op. 1 Braun Century 2 Mobility Lift 1,000Ibs;
34"x54" 50.00 1 50.00
S26;26A. Op. 1 Braun Millennium 2 Mobility Lift (100.00) -
S26;26A. Op. 1 Ricon K-Series KlearVue Mobility Lift (500.00)
S26;26A. Op. 1 Ricon Titanium 1,000 lbs. K-Series - -
S26 26A. Op. 2 Access-Arize Safety Lift Belt 45.00 1 45.00
Wheelchair cerement System Options,TRACK ANA SECUREMENT SYSTEM MUST BIB CHOSEN
NOT INC UDED AL COSTS.LISTEb,.AREaFOR A sS1NGLE,'WHEELCHAIR POSITION, .
S27;27A. Op. 1 Sure-Lok FF600 Retractor Series 625.00
S27;27A. Op. 1 Sure-Lok AL 700 Titan Series 375.00
S27;27A. Op. 1 Q-Straint QRT Deluxe Series 580.00 -
S27;27A. Op. 1 Q-Straint QRT Max Series 375.00 2 750.00
S27;27A. Op. 1 Q-Straint Q'UBE Series 1,700.00 -
S27;27C. Op. 1 Sure-Lok Series L Track; model#AL712S-4C 350.00
S27;27C. Op. 1 Sure-Lok Slide'N Click 525.00 -
S27;27C. Op. 1 Q'Straint L Track;model#0-8300-Al-L 375.00 2 750.00
S27;27C. Op. 1 Q'Straint Slide"N Click 510.00
S27;27C. Op. 2 Full Length Track:per foot 8.00
S27;27C. Op. 3 Scooter Securement System 155.00 2 310.00
S27;27G. Op. 1 Storage Pouch 35.00
S27;27G. Op. 2 Freedman Seating Tie Down Storage System
(TDSS) cost per seat 50.00 2 100.00
Miscellaneous Otton .` _
S28;28D. Op. 2 Rear Help Bumpers 625.00 1 625.00
S28;280. Op. 1 Bluetooth Enabled Radio 205.00 1 205.00
S28;280. Op.2 Paratransit Scheduling Hardware (Tablets,
etc.) Power Source 400.00 1 400.00
Manual Option
S29;29A. Op. 1 lAs Built Parts Manual I 50.00 1 11 50.00
4
4/1/2015
CMPC-14-BOC-RFP Order Form - Glaval Entourage
Additional Bus`Options
S32;A. 1. HawkEye Plus Reverse Assistance System 500.00 -
S32;A. 2. Closed circuit rearview monitoring/reverse
asst.system 900.00 -
S32;A. 3. Dash mounted monitor and camera mounted
-vehicle rear 600.00 -
S32;A. 4. Rearview Mirror with Built In Screen and
Backup Camera 750.00 1 750.00
S32; B. 1. REI Model R8001 Camera System 3,400.00
S32; B. 2. Apollo Roadrunner 4 Camera System 4,940.00
S32; B. 2. Apollo Roadrunner 8 Camera System 7,200.00 1 7,200.00
S32; B. 3. Seon vMax 4 Camera System 3,700.00 -
S32; B. 4. MobileView Penta 4 Camera System 5,950.00 -
S32; B.4. MobileView Penta 8 Camera System 7,500.00
S32; C. Brake Retarder 7,505.00
S32; D. 4x4 Capability: Ford OEM 5,000.00 -
S32; E. 1. OnSpot Automatic Drop Down Tire Chains
Ford F550 12V Comp. 2,870.00 -
S32; E. 2.
compressor RUD-ROTOGRIP Light Truck with air
3,700.00 -
S32; F. 1. Sportworks DL2 Bike Rack 1,710.00
S32; F. 2. Sportworks DL2 NP Bike Rack 1,950.00
S32; F. 3. Sportworks Apex 3 Bike Rack 2,245.00 1 2,245.00
S32; F.4. Byk-Rak Solo Bike Rack 1,475.00 _
S32;G. Ski Rack 945.00 -
Passenger Stop Request
S32; H. (if chosen;must choose Passenger Stop 425.00 1 425.00
Request 0 W/C positions as well)
S32; H. Passenger Stop Request at Wheelchair
positions: cost per position 110.00 1 110.00
S32; I. Public Address System 90.00 -
S32;J. 1. Luminator Twin Vision Mobilite Sign System:
Front& Side 6,900.00 -
S32;J. 2. Luminator Horizon SMT Sign System: Front&
Side 9,300.00 1 9,300.00
S32;J. 3. Hanover Monochrome LED Automatic Sign
System: Front& Side 7,800.00 -
S32; K. Yield to Bus Sign 365.00 1 365.00
S32; L. 1. GFI Odyssey Farebox 15,800.00
S32; L. 3. Diamond Model XV Farebox 1,380.00
S32; L. 4. Diamond Model SV Farebox 1,310.00
S32; M. Keyed Alike:per bus 450.00 -
Total Cost Base + Options Per Contract Pricing 120,398.00
Total BASE/OPTION Cost x # of Buses Ordered I 1 120,398 00
Additional:Bus Options:Not Covered In Contract,At Agency's Own:Expense
Item Description Unit Cost Quantity Total Cost
Apollo IP System Upgrade 2,517.00 1 2,517.00
Clever pre-wire for ITS equipment. Add$200 to S28;280. Op. 2 200.00 1 200.00
Total Cost Additional Bus Options _ 2,717.00
5
4/1/2015
CMPC-14-BOC-RFP Order Form - Glaval Entourage
Additional Bus Deletions Not covered In Contract ,r
Item Description Unit Deletion Quantity Total Deletion
As built parts manual 50.00 1 50.00
Total Cost Additional Bus Deletions 50.00
Total Cost Contract Pr ue+ Addfl• Options/Deletions 123,065.00
Total BASE/OPTION + Addtl. Options/Deletions Cost x I 1 123,065.00
ADDITIONAL INSTRUCTIONS TO VENDOR
Rear Heater Location:
Specify 1) Floor or 2) Ceiling
Master Battery Control Switch Location:
Specify 1) Stepwell; 2) Under Driver's Seat; 3) Between
Driver's Seat Mount and Driver Door; or 4) Driver's Dash
Specify Location to Mount Safety Items
(i.e Fire Extinguisher; First Aid Kit, etc.)
Specify Seat Color and Fabric Type (Freedman Level 1- Upgrade to Level 6
3) Freedman Order Form will be attached by La France Mills 398
vendor to confirm seat choice Twilight
ADDITIONAL CONFIGURATION OR OPTION NOTES:
• Upholstered interior: solid grey
• Modified floorplan: 9 rows fixed seats; 3 rows foldaway flip seats; 2 in rear near w/c and
1 row behind the driver.
• Clever pre-wire obtain schematic from Clever; quoted at $600 by NBS
6
4/1/2015