HomeMy WebLinkAboutC13-048 Oldcastle SW Group, Inc.Change Order CHANGE ORDER REQUEST #1 AVON TO EAGLE VAIL TRAIL PROJECT, PHASE II Contract dated June 12, 2012 CONTRACTOR: Oldcastle SW Group, Inc. d.b.a. B &B Excavating Contract for: Avon to Eagle Vail Trail, Phase II Contract Date: June 12, 2012 Oldcastle SW Group, Inc. d.b.a. B &B excavating ( "Contractor ") and Eagle County, Colorado, a body corporate and politic ( "County ") are parties to a contract dated June 12, 2012 ( "Contract ") for the Avon to Eagle Vail Trail Project, Phase II. Contractor and County, for good and valuable consideration as set forth herein agree to amend the Contract as follows and such amendment shall hereinafter be referred to as "Change Order Request #1 ": 1. Nature of Changes: DESCRIPTION INCREASE DECREASE Delete: Concrete sign post footers, installed by owner $413.92 Sign panels, installed by owner $670.69 Concrete Trail and Sidewalk (6 "), revised design $2,754.40 Bollard, install $486.98 Survey services, expanded scope $700.00 Silt fence, restore VE delete per owner $1,712.50 Erosion log, restore VE delete per owner $1,626.87 Soil retention blanket, expanded scope $420.00 Retaining walls Boulder, add per revised design $2,554.64 Retaining wall, amend per revised design at stop light $5,386.66 Additional removal Guardrail Type 7 $106.64 24" CMP, extend buried CDOT culvert $1,440.05 Traffic control, for striping work by owner $600.00 Electric box riser w /concrete rim, add per revised design $800.00 Railing, add rail, increase steel gauge, per owner $3,980.00 Demo /fill found abandoned culvert $632.00 Remove /replace additional asphalt, per owner $1,928.44 Labor /equip install for tree, per owner request $129.00 Pedestrian signal pole and base, add to bid schedule $3,475.00 Guardrail hand dig posts, per revised design $3,000.00 24" CMP bend, extend buried CDOT culvert $769.27 6" footing to Traffic Barrier, per revised design $2,660.00 Type 7 Barrier slab, per revised design $4,522.53 Totals $36,443.60 $4,325.99 e V-11 These changes result in the following adjustment of Contract Price and Contract Time: Contract Price Prior to this Change Order $1,551,576.60 Net Increase Resulting from this Change Order $32,117.61 Current Contract Price Including this Change Order $1,583,694.20 Contract Time Prior to this Change Order Nov. 1, 2012 Net Resulting from this Change Order May 1, 2013 Current Contract Time Including this Change Order May 1, 2013 2. All definitions set forth in the Contract shall apply to this Change Order Request #1 unless a different definition is expressly set forth herein. 3. In the event of a conflict between the Contract or this Change Order Request #1 the terms of this Change Order Request #1 shall control. 4. Except as expressly amended or modified herein, the Contract shall remain unmodified and in full force and effect. The above changes are recommended: Owner's Representative This Change Order #1 is executed on the I day of , 21013. COUNTY OF EAGLE, STATE OF COLORADO, By and rough Its BOARD OF C I NTY COMMISSIONERS 411116 104 Clerk to the Boa d of g a tA 90 on avne , Chairman County Commissioners � CONTRACTOR: Oldcastle SW Group, Inc. d /b /a B & B Excavating By: _ Title: Wz,3CQT M*V . . State of Colorado ) )ss. County of Eagle ) The foregoing instrument was acknowledged before me by Jeremy Carfi of OldCastle SW Group, Inc. d/b /a B & B Excavating, this 7th day of February , 2013. My Commission Expires: 3/29/15 Notary Public DEBBIE WEAVER NOTARY PUBLIC STATE OP COLORADO