HomeMy WebLinkAboutC12-243 Cooperative Forest Road Agreement u S USDA, Forest Service OMB 0596 -0217
FS- 1500 -9
FS Agreement No. 12- RO- 11021500 -017
Cooperator Agreement No.
COOPERATIVE FOREST ROAD AGREEMENT
Between
EAGLE COUNTY, COLORADO
And The
USDA, FOREST SERVICE
WHITE RIVER NATIONAL FOREST
PARTIES TO AGREEMENT: This agreement, made and entered into this the day of
June, 2012, by and between Eagle County, Colorado, hereinafter referred to as "County," and the
USDA, Forest Service White River National Forest, hereinafter referred to as the "U.S. Forest
Service."
PURPOSE OF AGREEMENT: The purpose of this agreement is to set forth the general terms
and conditions, acceptable to the parties hereto, for the cooperative planning, survey, design,
construction, reconstruction, improvement, and maintenance of certain Forest Roads in Eagle
County, State of Colorado, pursuant to the provisions of 16 U.S.C. 532 -538, 23 U.S.C. 205, and
the regulations issued by the Secretary of Agriculture.
The Congress has, from time to time, authorized and appropriated funds for "Forest Roads,"
which are defined as "those Forest roads of primary importance for the protection,
administration, and utilization of the National Forests, or where necessary, for the use and
development of the resources upon which communities within or adjacent to the National Forests
are dependent." Recognizing that substantial benefits will accrue to the Nation and to the State
from the construction, reconstruction, improvement, maintenance, and use of certain Forest roads
and roads on the State or local road system over which the County has/have jurisdiction, and
further that such roads carry substantial volumes of public service traffic as well as National
Forest traffic, and further that the County has/have road construction, reconstruction,
improvement, maintenance, and right -of -way acquisition facilities available to assist in the
accomplishment of the work, it is accordingly deemed fitting and desirable to the parties hereto
to express by this agreement the general terms of their mutual cooperation in that regard to
achieve the maximum benefits therefrom in the public interest.
1. INTENT TO COOPERATE. It is the intention of the parties under this agreement to
cooperate as follows:
a. Agree that certain roads under the jurisdiction of the County or the U.S. Forest
Service which serve the National Forest and also carry traffic which is properly the
responsibility of the County should be maintained and, if necessary, improved to a
standard adequate to accommodate safely and economically all traffic which uses
such roads.
Page 1 of 7
115 USDA, Forest Service OMB 0596 -0217
FS- 1500 -9
b. Agree on the identification of roads or road segments which meet the criteria in item
a by a listing and appropriate maps.
c. Provide for formal meetings and informal consultation on a regular basis to discuss
and agree on action with respect to the roads identified pursuant to item b.
d. Provide for regular and adequate maintenance of the roads identified in item b,
including the assignment of maintenance responsibilities.
e. Provide for entering into project agreements when improvements of a road under the
jurisdiction of one party is to be financed in whole or in part from funds or resources
provided by the other party.
f. Provide for appropriate jurisdictional status of roads through transfer of easements
and acquisition of easements by the appropriate party.
2. IDENTIFICATION OF ROADS. A list of roads and segments of roads which meet the
criteria set forth in item la is agreed upon and is marked "Schedule A" and attached as
part of this agreement. Schedule A may be modified from time to time by agreement
between the County and U.S. Forest Service, by adding or removing roads or road
segments, or by altering the description of a road or road segments, to give it proper
identity. Each such modification shall be indicated by a revised Schedule A bearing the
signatures of the parties or their authorized representatives and the effective date of the
revision.
3. MAINTENANCE PLANS. At the annual meeting provided for in item 6, plans for
maintaining the roads listed in Schedule A shall be agreed upon. Such plans shall include
assignment of responsibility for maintenance or particular elements of maintenance to the
County or U.S. Forest Service for each road or segment of road listed in Schedule A. To
the extent practical, and subject to availability of funds, responsibility for maintenance
shall be assigned in proportion to use for which each party is properly responsible.
Maintenance shall include preserving and keeping the roads, including structures and
related facilities as nearly as possible in their original condition as constructed or
reconstructed to provide satisfactory and safe road service.
Maintenance plans shall provide for prompt changes in maintenance assignments during
g g
the period of the plan upon agreement by the parties or their designated representatives.
4. PROJECT AGREEMENTS. When improvement of a road listed in Schedule A is to be
financed in whole or in part from funds or resources provided by the party not having
jurisdiction, the parties shall enter into a project agreement providing for performing the
improvement work and its financing. A project agreement is not required for
improvement of a road or a road segment over which the party performing and financing
such improvement has jurisdiction. Project agreements shall be supplements to this
Page 2 of 7
USDA, Forest Service OMB 0596 -0217
FS- 1500 -9
general agreement and subject to the agreements, provisions, and conditions herein
contained.
a. A project agreement shall be entered into prior to beginning of improvement or
construction work for which a project agreement is required.
b. The project agreement shall include the following elements:
1. Identification of road or road segment to be improved or constructed.
2. Plans and specifications for the project or provision for their development and
subsequent agreement thereon.
3. Schedule of construction or improvement work and designation of the party or
parties to perform the work.
4. Estimates of cost of improvement or construction.
5. Agreement as to how cost of work is to be borne including arrangements to
share in the work or to deposit funds with the performing party for a share of
the costs.
c. If funds are provided by the County on an advance basis for work to be performed by
the U.S. Forest Service, they shall be deposited in the Treasury of the United States to
the credit of cooperative work, U.S. Forest Service. Any unused balance of
cooperative funds for the purposes outlined in the project agreement shall be returned
to the County after completion of the work performed or upon agreement of the U.S.
Forest Service. If the cooperative funds are made available on a reimbursement basis
as the work progresses or upon its completion, the U.S. Forest Service shall submit to
the County periodic billings, but not more often than monthly, or a final billing as the
case may be.
The amount of cooperative funds as set forth in the project agreement shall be the
maximum commitment of the County to the project unless changed by a modification
of the project agreement.
If funds are provided by the U.S. Forest Service for work to be performed by the
County the arrangements shall be set forth in the project agreement. Payments to the
County shall be made as provided for in the project agreement.
If it appears that the project cost may exceed the estimate and additional funds may
be needed, no obligation shall arise against the Federal government with respect to
the increased cost except by modification of the project agreement prior to incurring
any commitment.
Page 3 of 7
�ls USDA, Forest Service OMB 0596 - 0217
FS- 1500 -9
5. RIGHTS -OF -WAY. Easements or other interests in land acquired by either party shall
be adequate to serve the road needs of both parties. The party having jurisdiction of an
existing road or intended to have jurisdiction of a road to be constructed shall obtain the
needed rights -of -way in its name. There shall be no provisions in any easement
document that will prevent the U.S. Forest Service from using or authorizing the use of
roads for which Federal funds were expended. The County must be in a position to
assure the U.S. Forest Service the continuance of such uses for the period needed. The
party acquiring the easement or other interest in land shall obtain such title evidence and
title approval as required in its acquisitions for roads of comparable standards.
The costs of such easements or other interests in land are to be at the expense of the
acquiring party.
The U.S. Forest Service shall cooperate in the procurement of rights -of -way over land
administered by other agencies of the United States required for any project included
under this agreement and shall furnish the County copies of survey notes, maps, and other
records.
To the extent possible under available authority, each party agrees to convey easements
over lands or interests in lands it owns or administers to the other party in order to
provide jurisdiction by the appropriate party as may be agreed to for any road or road
segment listed on Schedule A.
6. ANNUAL MEETING AND CONTINUING CONSULTATION. The County and U.S.
Forest Service shall meet at least once each year to review matters covered by this
agreement and to agree on actions to implement this agreement including, but not limited
to, (1) approval of changes in the listing of roads on Schedule A; (2) approval of the
annual maintenance plan; (3) approval of project agreements for construction or
reconstruction; and (4) approval of transfer of jurisdiction of particular roads by easement
conveyance. It is also the intent of the parties to arrange for continuing consultation
between their representatives with the objective of reaching prompt agreement by the
parties on all matters of mutual concern which are covered by this agreement. The Forest
Supervisor of the White River National Forest for the U.S. Forest Service, and Eagle
County for the County shall be responsible for making the arrangements for formal
meetings and continuing consultation.
7. TEXT MESSAGING WHILE DRIVING. In accordance with Executive Order (EO)
13513, "Federal Leadership on Reducing Text Messaging While Driving," any and all
text messaging by Federal employees is banned: a) while driving a Government owned
vehicle (GOV) or driving a privately owned vehicle (POV) while on official Government
business; or b) using any electronic equipment supplied by the Government when driving
any vehicle at any time. All cooperators, their employees, volunteers, and contractors are
encouraged to adopt and enforce policies that ban text messaging when driving company
owned, leased or rented vehicles, POVs or GOVs when driving while on official
Government business or when performing any work for or on behalf of the Government.
Page 4 of 7
USDA, Forest Service OMB 0596 - 0217
FS- 1500 -9
8. MODIFICATION AND TERMINATION.
a. This agreement may be modified by mutual consent.
b. This agreement may be terminated by either party upon at least 90 days prior written
notice, except that such termination shall in no way affect or change any commitment
made authorizing the use of roads or rights -of -way for purposes for which Federal
funds were expended, or any operation in progress at time of notice, and provided that
such termination shall in no way affect the agreement of the parties hereto with
respect to any obligations incurred under the agreement until a full settlement has
been made.
9. MISCELLANEOUS.
a. It is understood that any default by a permittee or other authorized road user creates
no liability on the part of the U.S. Forest Service.
b. Nothing herein contained shall be construed to obligate the U.S. Forest Service or the
County beyond the extent of available funds allocated or programmed for this work,
or contrary to applicable laws, rules, and regulations.
c. No Member of, or Delegate to, the Congress, or Resident Commissioner, shall be
admitted to any share or part of this agreement or to any benefits that may arise
therefrom, unless it is made with a corporation for its general benefit.
d. Where applicable, any contract, agreement, or understanding entered into pursuant to
this agreement providing for work to be performed shall include the requirements of
Federal laws, Executive orders, and Regulations.
10. PRINCIPAL CONTACTS. Individuals listed below are authorized to act in their
respective areas for matters related to this agreement.
Principal Cooperator Contacts:
Cooperator Program Contact Cooperator Administrative Contact
Name: Gordon Adams Name: Nicole Trujillo
Address: PO Box 250 Address: PO Box 250
City, State, Zip: Eagle, CO 81631 City, State, Zip: Eagle, CO 81631
Telephone: 970 - 328 -3540 Telephone: 970 - 328 -3540
FAX: 970 - 328 -3546 FAX: 970 - 328 -3546
Email: Gordon.Adams @EagleCounty.us Email: Nicole.Trujillo @EagleCounty.us
Principal U.S. Forest Service Contacts:
U.S. Forest Service Program Manager U.S. Forest Service Administrative
Contact Contact
Page 5 of 7
C3 USDA, Forest Service OMB 0596 - 0217
FS- 1500 -9
Name: Mark Buchanan Name: Elaine Langstaff
Address: 900 Grand Avenue Address: 900 Grand Avenue
City, State, Zip: Glenwood Springs CO City, State, Zip: Glenwood Springs CO
81601 81601
Telephone: 970 - 945 -3222 Telephone: 970 -945 -3224
FAX: 970 - 945 -3288 FAX: 970 - 945 -3211
Email: jmbuchanan@fs.fed.us Email: elangstaff @fs.fed.us
11. COMMENCEMENT/EXPIRATION DATE. This agreement is executed as of the date
of last signature and is effective through five years at which time it will expire unless
extended.
12. AUTHORIZED REPRESENTATIVES. By signature below, the parties certify that the
individuals listed in this document as representatives of each party are authorized to act in
their respective areas for matters related to this agreement.
This agreement shall be effective as of the date herein written and shall supersede all prior
existing agreements, if any, for the same roads.
SCOTT G. FITZWILLIAMS, Date
FOREST SUPERVISOR
U.S. Forest Service, White River National Forest
PETER RUNYON, Date
CHAIR, COUNTY COMMISSION
Eagle County, Colorado
SARA FISH /0144.12 •/Q ./
Date
COUNTY COMMISSIONER
Eagle County, Colorado
.4
JOHN ST VNEY, Date
COU TV COMMISSIONER
Eagle .o nty, Colorado
Page 6 of 7
1 I CS USDA, Forest Service OMB 0596 -0217
FS- 1500 -9 I
The authority and format of this agreement have been reviewed and approved for
signature.
ELAINE LAN S A F r Da
U.S. Forest Service Grants & Agreements
Specialist
Burden Statement
According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information
unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0596 -0217. The time required to complete this
information collection is estimated to average 4 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and
where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or
part of an individual's income is derived from any public assistance. (Not all prohibited bases apply to all programs.) Persons with disabilities who require
alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at 202 - 720 -2600 (voice
and TDD).
To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250 -9410 or call toll free
(866) 632 -9992 (voice). TDD users can contact USDA through local relay or the Federal relay at (800) 877 -8339 (TDD) or (866) 377 -8642 (relay voice). USDA
is an equal opportunity provider and employer.
Page 7 of 7
Us .
White River National Forest, Sopris, Eagle and
Holy Cross Ranger Districts and Eagle County, Schedule A - Road Summary: Exhibit A
State of Colorado Agreement #: 12 -RO. 11021500 -017
USFS Road L aw Road Maint & Sianina
Road Number County ROW USFS ROW Restncdon Enforcement Resoonsibility
"1/ '2/ "3/ '4/
'0
��pp 2 1. m
6 9 J m •2 r C ta J
Length e N E u S E a S LL L ) m e e
A W
Sheet # Road Name FS CO Termini (Mites) O w o '8 w 8 K v Q a :Si f
2 Basalt Mountain 524 42 Cattle Creek #509 - M.P. 5.31 5.31 X X X X 3
3 Brush - Gypsum 414 44 E -T #400 - Gypsum Crk. Rd. 6.84 X X X X 3,2
4 Burnt Mountain 506 506 Woods Lake Rd 507 - Pitkin County Line 5.98 X X X X 3
5 Cattle Creek 509 42 Eagle Cty Rd 13 - Basalt Mtn Rd 524 2.16 X X X X 3
6 Coffee Pot 600 17 Colo River Rd. 301 - GarCo Line 7.39 X X X X 4
7 Derby Guard Station 609 - County Road 39 -Guard Station 0.60 X X X X 2
8 Eagle - Thomasville 400 307 FS Bndry A MP 8.90 - PitCo Line 21.86 X X X X 4,3
9 East Brush Creek 415 15 E -T Rd #400 - Fulford CG 7.52 X X X X 3
10 Fulford CG 415.1F - FS 415 - Loop 0.50 X X X X 2
11 Gold Park CG 703.1 D - FS 703 (CR 1) - Campground 0.50 X X X _ X 3
12 Gypsum Creek 412 101 FS Bndry - LEDE Resvr 12.88 X X U X X X 3
13 Hardscrabble 413 110 CR #307 (Brush Cr.) - FS #414 19.56 X X X X 3
14 Hat Creek 416 81 E -T Rd #400 - E. Brush Cr. #415 12.60 X X X X 2
15 Homestake 703 1 Hwy 24 - Lonesome Lake TH 10.35 X U X X X 4
16 Lime Creek 728 103A Shrine Pass Rd -End 5.20 X X X X 3
17 Nolan Creek 418 80 E. Brush Creek # 415 - Porphry Rd # 435 5.38 X X X X 3
18 No Name 705 705 Hwy 24 - Surface Change 5.95 X X X X 3
19 Pearl Creek 715 715 Resolution Cr #702 - End 4.10 X X X X 3
20 Red Sandstone - Muddy Pass 700 6, 701, 95 Vail Town Limit - Colo Hwy 131 31.37 X X X X 3
21 Red Table 514 79 CR 10A (Ctnwd Pass) - FAA Beacon 12.73 X X X X 3
22 Resolution Creek 702 702 Hwy 24 - Summit County Line 6.58 X X X X 3
23 Sawmill Spur (7 Hermits) 451 110B Hardscrabble #413 - FDR # 461 2.20 X X X X 3
24 Sheephorn 401 Gate na, Piney Peak Ranch to Lone Lick Lakes 7.00 X X X X 3
25 Shrine Pass 709 293 Redcliff - County Line 9.53 X X X X 3
26 South Fork Piney 701 410 FS 700 - Gate 2.50 X X X X 3
27 Squaw Creek 422 - Squaw Creek Rd #23, Private Land MP 0.32 0.32 X X X X 3
28 Tiqiwon 707 100 Hwy 24 - Half Moon CG TH 8.43 X X X X 3
29 Woods Lake 507 83 E -T Rd #400 - Trailhead Parking 1.57 X X X X 3
30 Yeoman CG 416.1A, - Hat Creek #416 - Campground 0.50 X X X X 3
31 Taylor Gulch 731.1 - US24 - Switchback @, MP 1.67 1.67 X X X X X 2
Total Mileage 219.08
* 1/ County has jurisdiction for law enforcement and authority to control and regulate use.
* 2/ USFS has jurisdiciton to control and regulate use. Both County and USFS have law enforcement jurisdicitions.
* 3/ Applicable only to roads or road segments with USFS ROW or ownership. Includes seasonal closures.
* 4/ County enforces on all joint system roads. USFS alone enforces rules in addition to State laws.
A "U" designation indicates an undetermined status for the item in question.
A "P" designation indicates a pending status for the item in question. Ongoing research and /or dialogue is
being conducted with regards to the affected item.
Above items and those listed in Exhibit B that are not designated have not been verified as of the date of signing, I
therefore, no formal agreement will exist for the execution of these duties beyond the date of signing.
All activity frequencies not specificied in Exhibit B shall be performed on an "as needed" basis.
AD "as needed" items (including ditch maintenance and culvert cleaning) shall be performed in accordance
with USFS coordination or USFS Project Agreement.
o' itzwilliams, F st upervisor Date
7-(0'4 z-
Jo i County Co issioner Date
.�--
P r nyon,Coun my11,�iene�� Date
1 I
Sara Fisher, County mmissioner Date
Page 1 of 31
, \
U S
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 2
Road Name: Basalt Mountain Maintenance Level: 13
Termini Length (Mi.): 5.31
Termini: Cattle Creek #509 - M.P. 5.31
Forest Name: White River NF State: CO
Ranger District(s): Sopris County: Eagle
NFSR #: 524 CR #: 42
County ROW: Owned 0 Easement El Claimed 0
USFS ROW : USFS Land Ed Easement Li
USFS Road Restriction: Unrestricted .J Restricted Li
Law Enforcement: County Li USFS a
Road Maintenance & Signing
Responsibility: All County LI All USFS 0 Joint El
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading Li 0 1
Surfacing Repair 0 Ei As Needed
Surface Replacement Ld 0 As Needed
Dust Abatement LJ 0
Slide Removal 1
Li
Roadside Vegetation g-1
, .e
t_,..., 0 As Needed
Clean and Reshape Ditches ; 1
, 1
12 As Needed
Culvert Cleaning J E As Needed
Culvert Replacement r-J;1
L-4 E As Needed
Major Drainage Structures I 1
_, 0
Miscellaneous Structures ' 4 '
1 i 0 As Needed
E E
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of rA 0
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection 0 Li
Posting 0 0
Snow Plowing 0 0
Maintain Closure Facility Ld ti As Needed
REMARKS: This road is subject to seasonal closure, MP0.0-5.31. Road is closed to vehicular traffic
beyond MP 5.31.
Page 2 of 31
,
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 3
Road Name: Brush - Gypsum Maintenance Level: 13,2
Termini Length (Mi.): 6.84
Termini: E -T #400 - Gypsum Crk. Rd.
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 414 CR #: 44
County ROW: Owned ❑ Easement ❑ Claimed
USFS ROW : USFS Land 5 Easement •
USFS Road Restriction: Unrestricted • Restricted
Law Enforcement: Count ❑ USFS 5
- oa. raintenance : igning
Responsibility: All County a .API USFS ❑ Joint is
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ® As Needed
Dust Abatement ❑ ❑
Slide Removal ❑ U
Roadside Vegetation E1 ❑ As Needed
Clean and Reshape Ditches Li 5 As Needed
Culvert Cleaning ❑ 5 As Needed
Culvert Replacement 5 ❑ As Needed
LJ
Major Drainage Structures ❑
Miscellaneous Structures Li ❑ As Needed
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of rj
Directional & Guide Signs F5 ROW CO ROW As Needed
Bridge: Inspection El U
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility U ❑ As Needed
REMARKS: MPO -5.67 ML = 2 MP 5.67 -6.84 ML = 3
Page 3 of 31
Y
1
i
I
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 4
Road Name: Burnt Mountain Maintenance Level: 13
Termini Length (Mi.): 5.98
Termini: Woods Lake Rd 507 - Pitkin County Line
Forest Name: White River NF State: CO
Ranger District(s): Sopris County: Eagle
NFSR #: 506 CR #: 506
County ROW: Owned ❑ Easement ❑ Claimed ❑
USFS ROW : USFS Land 5 Easement ■
USFS Road Restriction: Unrestricted ■ Restricted
Law Enforcement: County ❑ USFS IS
Road Maintenance & Signing
Responsibility: All County ❑ All USFS El Joint
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement u ❑
Slide Removal ❑ U
Roadside Vegetation A ❑ As Needed
Clean and Reshape Ditches u 5 As Needed
Culvert Cleaning u 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures [J ❑
Miscellaneous Structures Li ❑ As Needed
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p ❑
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ U
Posting ❑
Snow Plowing ❑ ❑
Maintain Closure Facility U u As Needed
REMARKS:
Page 4 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 5
Road Name: Cattle Creek Maintenance Level: 13
Termini Length (Mi.): 2.16
Termini: Eagle Cty Rd 13 - Basalt Mtn Rd 524
Forest Name: White River NF State: CO
Ranger District(s): Sopris County: Eagle
NFSR #: 509 CR #: 42
County ROW: Owned ❑ Easement ❑ Claimed ■
USFS ROW : USFS Land p Easement ■
USFS Road Restriction: Unrestricted ■ Restricted
Law Enforcement: County ❑ USFS
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ® Joint
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ IS 1
Surfacing Repair ❑ 1 As Needed
Surface Replacement 1 ❑ As Needed
Dust Abatement Li
1 Slide Removal ❑ Li
Roadside Vegetation 1 ❑ As Needed
Clean and Reshape Ditches Li 1 As Needed
Culvert Cleaning ❑ 1 As Needed
Culvert Replacement a 1 As Needed
Major Drainage Structures Li
Miscellaneous Structures Li] ❑ As Needed
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of 1 ❑
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection 0 Li
Posting ❑ 0
Snow Plowing ❑ ❑
Maintain Closure Facility Li Li As Needed
REMARKS: This road is subject to seasonal closure.
Page 5 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 6
Road Name: Coffee Pot Maintenance Level: 14
Termini Length (Mi.): 7.39
Termini: Colo River Rd. 301 - GarCo Line
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 600 CR #: 17
County ROW: Owned ❑ Easement ❑ Claimed fl
USFS ROW : USFS Land 5 Easement IL
USFS Road Restriction: Unrestricted IS Restricted Ul
Law Enforcement: County ❑ USFS 5
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint a
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ® As Needed
Dust Abatement Li ® As Needed Contact USFS prior.
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches f I a As Needed
Culvert Cleaning [J 5 As Needed
Culvert Replacement El 5 As Needed
Major Drainage Structures u ❑
Miscellaneous Structures Li, ❑ As Needed
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of ® 0
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ ❑
Posting ❑ ❑
Snow Plowing ❑ a As Needed
Maintain Closure Facility J U
REMARKS:
Page 6 of 31
s,
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 7
Road Name: Derby Guard Station Maintenance Level: 12
Termini Length (Mi.): 0.60
Termini: County Road 39 -Guard Station
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 609 CR #: -
County ROW: Owned ❑ Easement ❑ Claimed •
USFS ROW : USFS Land • Easement •
USFS Road Restriction: Unrestricted • Restricted
Law Enforcement: County ❑ USFS IS
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint d
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Wading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement Li ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches U 5 As Needed
Culvert Cleaning U 5 As Needed
Culvert Replacement a ❑ As Needed
Major Drainage Structures U ❑
Miscellaneous Structures L] ❑ As Needed
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p 0
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ U
Posting ❑
Snow Plowing ❑
Maintain Closure Facility U U As Needed
REMARKS: This road provides private access.
Page 7 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 8
Road Name: Eagle - Thomasville Maintenance Level: 14,3
Termini Length (ML): 21.86
Termini: FS Bndry @ MP 8.90 - PitCo Line
Forest Name: White River NF State: CO
Ranger District(s): Eagle /Sopris County: Eagle
NFSR #: 400 CR #: 307
County ROW: Owned ❑ Easement ❑ Claimed ❑
USFS ROW : USFS Land 5 Easement ■
USFS Road Restriction: Unrestricted ■ Restricted ei
Law Enforcement: County ❑ USFS ig
Road Maintenance & Signing
Responsibility: All County ❑ All USFS El Joint n
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ p 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement U ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches Li 5 As Needed
Culvert Cleaning U 5 As Needed
Culvert Replacement 5 © As Needed
Major Drainage Structures U ❑
Miscellaneous Structures U ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of E
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ® U As Needed
Posting ® ❑ As Needed
Snow Plowing g ❑ ❑
Maintain Closure Facili ty U U As Needed
REMARKS: MilePost 8.90 is measured south from Eagle, CO.
MP 8.90 -15.80 ML = 4. MP 15.80 -30.76 ML = 3.
Page 8 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 9
Road Name: East Brush Creek Maintenance Level: 13
Termini Length (Mi.): 7.52
Termini: E -T Rd #400 - Fulford CG
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 415 CR #: 15
County ROW: Owned ❑ Easement ® Claimed
USFS ROW: USFS Land 5 Easement
USFS Road Restriction: Unrestricted is Restricted
Law Enforcement: County ❑ USFS
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint )!
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement el ❑ As Needed
Dust Abatement U 5 As Needed Contact USFS prior.
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches L] 5 As Needed
Culvert Cleaning (J 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures Li, ❑
Miscellaneous Structures ❑ ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of 5 Ell
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ Ll
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility U L As Needed
REMARKS:
Page 9 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 10
Road Name: Fulford CG Maintenance Level: 12
Termini Length (Mi.): 0.50
Termini: FS 415 - Loop
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 415.1F CR #: -
County ROW :: Owned ❑ Easement ❑ Claimed ❑
USFS ROW : USFS Land 5 Easement
USFS Road Restriction: Unrestricted ■ Restricted
Law Enforcement: Count ❑ USFS 0
- oa. 'amtenance : ignmg
Responsibility: All County ❑ _All USFS ❑ Joint
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ Eli 1
Surfacing Repair 5 ❑ As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement u ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches ❑ 5 As Needed
Culvert Cleaning ❑ 5 As Needed
Culvert Replacement 5 ❑ As Needed
Major Drainage Structures ❑ ❑
Miscellaneous Structures [ ] ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of i
Directional & Guide Signs F5 ROW CO ROW As Needed
Bridge: Inspection ❑ L
Posting ❑
Snow Plowing ❑ ❑
Maintain Closure Facility U LJ As Needed
REMARKS:
Page 10 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 11
Road Name: Gold Park CG Maintenance Level: 13
Termini Length (Mi.): 0.50
Termini: FS 703 (CR 1) - Campground
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 703.1D CR #: -
County ROW: Owned ❑ Easement ❑ Claimed 1
USFS ROW : USFS Land a Easement
USFS Road Restriction: Unrestricted ® Restricted al
Law Enforcement: County El USFS El
Road Maintenance & Signing .
Responsibility: All County ❑ .AII USFS ❑ Joint a
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ in 1
Surfacing Repair n Q As Needed
Surface Replacement n ❑ As Needed
Dust Abatement U ❑
Slide Removal ❑ U
Roadside Vegetation in ❑ As Needed
Clean and Reshape Ditches U Si As Needed
Culvert Cleaning U Ig As Needed
Culvert Replacement Q ❑ As Needed
Major Drainage Structures U ❑
Miscellaneous Structures U ❑ As Needed
Repair and Installation of Li
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of IR 10
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ Li
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility U U As Needed
REMARKS:
Page 11 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 12
Road Name: Gypsum Creek Maintenance Level: 13
Termini Length (ML): 12.88
Termini: FS Bndry - LEDE Resvr
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 412 CR #: 101
County ROW. Owned ❑ Easement ❑ Claimed
USFS ROW : USFS Land 5 Easement
USFS Road Restriction: Unrestricted 5 Restricted DI
Law Enforcement: County ❑ USFS III
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint 5
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement L] ❑
Slide Removal ❑ LJ
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches L] 5 As Needed
Culvert Cleaning L] 5 As Needed
Culvert Replacement ❑ 5 As Needed
Major Drainage Structures Li ❑
Miscellaneous Structures ❑ ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of a p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection El U
Posting ❑
Snow Plowing 0 ❑
Maintain Closure Facility U J As Needed
REMARKS:
Page 12 of 31
us{
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 13
Road Name: Hardscrabble Maintenance Level: 13
Termini Length (Mi.): 19.56
Termini: CR #307 (Brush Cr.) - FS #414
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 413 CR #: 110
County ROW: Owned ❑ Easement ❑ Claimed
USFS ROW : USFS Land 5 Easement 5
USFS Road Restriction: Unrestricted it Restricted
Law Enforcement: County ❑ USFS 5
Road Maintenance & Signing
Responsibility.: All County ❑ All USFS ❑ Joint d
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ p 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement U ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches Li El As Needed
Culvert Cleaning LJ 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures Li ❑
Miscellaneous Structures Lii ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of is p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ Li
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility U LJ As Needed
REMARKS:
Page 13 of 31
�
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 14
Road Name: Hat Creek Maintenance Level: 12
Termini Length (Mi.): 12.60
Termini: E -T Rd #400 - E. Brush Cr. #415
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 416 CR #: 81
County ROW: Owned ❑ Easement 111 Claimed
USFS ROW : USFS Land 5 Easement
USFS Road Restriction: Unrestricted 5 Restricted DI
Law Enforcement: County ❑ USFS Q
Road Maintenance & Signing
Responsibility: All County ❑ All USFS El Joint a
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement Li ❑
Slide Removal ❑ U
Roadside Vegetation NI ❑ As Needed
Clean and Reshape Ditches L] 5 As Needed
Culvert Cleaning U 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures IA ❑
Miscellaneous Structures [J ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of 113 p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection 5 U As Needed
Posting 5 ❑ As Needed
Snow Plowing ❑ ❑
Maintain Closure Facility U L As Needed
REMARKS:
Page 14 of 31
i
a
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 15
Road Name: Homestake Maintenance Level: 14
Termini Length (Mi.): 10.35
Termini: Hwy 24 - Lonesome Lake TH
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 703 CR #: 1
County ROW: Owned ❑ Easement ❑ ClaimedET
USFS ROW : USFS Land 5 Easement •
USFS Road Restriction: Unrestricted • Restricted
Law Enforcement: County ❑ USFS lel
Road Maintenance & Signing
Responsibility: All County n All USFS ® Joint Q
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ a 1
Surfacing Repair ❑ CI As Needed
Surface Replacement a ❑ As Needed
Dust Abatement U ❑
Slide Removal ❑ U
Roadside Vegetation a ❑ As Needed
Clean and Reshape Ditches U 5 As Needed
Culvert Cleaning U 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures U ❑
Miscellaneous Structures L.] ❑ As Needed
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of ® B
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ® U As Needed
Posting 5 0 As Needed
Snow Plowing 0 ❑
Maintain Closure Facility U J As Needed
REMARKS: Commercial cooperators may perform maintenance. County should notify USFS prior
to scheduling maintenance.
Page 15 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 16
Road Name: Lime Creek Maintenance Level: 13
Termini Length (Mi.): 5.20
Termini: Shrine Pass Rd -End
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 728 CR #: 103A
County ROW: Owned ❑ Easement ❑ Claimed L
USFS ROW : USFS Land ® Easement
USFS Road Restriction: Unrestricted 5 Restricted DI
Law Enforcement: County ❑ USFS El
Road Maintenance & Signing
Responsibility: All County ❑ All USFS El Joint ei
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ SI As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement U El
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches U 5 As Needed
Culvert Cleaning U a As Needed
Culvert Replacement Q a As Needed
Major Drainage Structures U ❑
Miscellaneous Structures [[ , ] ❑ As Needed
a Ell
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection El U
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility Li L As Needed
REMARKS:
Page 16 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 17
Road Name: Nolan Creek Maintenance Level: 13
Termini Length (Mi.): 5.38
Termini: E. Brush Creek # 415 - Porphry Rd # 435
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 418 CR #: 80
County ROW: Owned ❑ Easement ❑ Claimed
USFS ROW : USFS Land IN Easement '5
USFS Road Restriction: Unrestricted ■ Restricted li
Law Enforcement: County ❑ USFS
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint Q
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement U ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches U 5 As Needed
Culvert Cleaning U 5 As Needed
Culvert Replacement © 5 As Needed
Major Drainage Structures 0 ❑
Miscellaneous Structures U ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ U
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility LJ U As Needed
REMARKS:
Page 17 of 31
ii4S',
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 18
Road Name: No Name Maintenance Level: 13
Termini Length (Mi.): 5.95
Termini: Hwy 24 - Surface Change
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 705 CR #: 705
County ROW: Owned ❑ Easement ❑ Claimed D
USFS ROW : USFS Land Q Easement •
USFS Road Restriction: Unrestricted • Restricted
Law Enforcement: County ❑ USFS 5
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint is
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ p 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement Li ❑
Slide Removal ❑ Li
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches Li 5 As Needed
Culvert Cleaning L.I Q As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures Li ❑
Miscellaneous Structures LJ ❑ As Needed
5
Repair and Installation of Q
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of as p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ Li
Posting ❑ ❑
Snow Plowing 0 ❑
Maintain Closure Facility U Li As Needed
REMARKS:
Page 18 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 19
Road Name: Pearl Creek Maintenance Level: 13
Termini Length (Mi.): 4.10
Termini: Resolution Cr #702 - End
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 715 CR #: 715
County ROW: Owned ❑ Easement ❑ Claimed ■
USFS ROW : USFS Land 5 Easement ■
USFS Road Restriction: Unrestricted ■ Restricted p
Law Enforcement: County ❑ USFS 5
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint p
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement U ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches U 5 As Needed
Culvert Cleaning L I 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures U ❑
Miscellaneous Structures fJ ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p p
Directional & Guide Signs F5 ROW CO ROW As Needed
Bridge: Inspection ❑ U
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility Li U As Needed
REMARKS:
Page 19 of 31
u.
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 20
Road Name: Red Sandstone - Muddy Pass Maintenance Level: 13
Termini Length (ML): 31.37
Termini: Vail Town Limit - Colo Hwy 131
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 700 CR #: 6, 701, 95
County ROW: Owned ❑ Easement ❑ Claimedr
USFS ROW : USFS Land ® Easement •
USFS Road Restriction: Unrestricted ■ Restricted El
Law Enforcement: County ❑ USFS II
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint 6
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ © 1
Surfacing Repair g p ❑ Si As Needed
Surface Replacement B ❑ As Needed
Dust Abatement Li p As Needed Contact USFS prior.
Slide Removal ❑ [J
Roadside Vegetation p ❑ As Needed
Clean and Reshape Ditches LI B As Needed
Culvert Cleaning Li p As Needed
Culvert Replacement p el As Needed
Major Drainage Structures Li ❑
Miscellaneous Structures [!J ❑ As Needed
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ LJ
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility Li L] As Needed
REMARKS: This combines two former Schedule A roads; Muddy Pass #405 and Red Standstone #700.
Commercial cooperators may be in area. Contact USFS pior to maintenance.
Page 20 of 31
k
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 21
-- Road Name: Red Table Maintenance Level: 13
Termini Length (Mi.): 12.73
Termini: CR 10A (Ctnwd Pass) - FAA Beacon
Forest Name: White River NF State: CO
Ranger District(s): Sopris County: Eagle
NFSR #: 514 CR #: 79
County ROW: Owned ❑ Easement ❑ Claimed
USFS ROW : USFS Land 5 Easement ❑ •
USFS Road Restriction: Unrestricted ■ Restricted Lili
Law Enforcement: County ❑ USFS
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ _Joint
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Wading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement {,,,,,,I ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches [J El As Needed
Culvert Cleaning L„] 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures LJ ❑
Miscellaneous Structures [J 0 As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ Li
Posting 0 ❑
Snow Plowing ❑ ❑
Maintain Closure Facility U U As Needed
REMARKS:
Page 21 of 31
u E, E'
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 22
Road Name: Resolution Creek Maintenance Level: 13
Termini Length (Mi.): 6.58
Termini: Hwy 24 - Summit County Line
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 702 CR #: 702
County ROW: Owned ❑ Easement ❑ Claimed ❑
USFS ROW : USFS Land 5 Easement lill
USFS Road Restriction: Unrestricted 5 Restricted ❑
Law Enforcement: County ❑ USFS
Road Maintenance & Signing
Responsibility: All County ® _All USFS ❑ Joint ei
,
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement LI ❑
Slide Removal ❑ U
Roadside Vegetation ® ❑ As Needed
Clean and Reshape Ditches {_„,J B As Needed
Culvert Cleaning U 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures U ❑
Miscellaneous Structures U ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of ® p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ U
Posting 0 ❑
Snow Plowing 0 ❑
Maintain Closure Facility U U As Needed
REMARKS:
Page 22 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 23
Road Name: Sawmill Spur (7 Hermits) Maintenance Level: 13
Termini Length (Mi.): 2.20
Termini: Hardscrabble #413 - FDR # 461
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 451 CR #: 110B
County ROW :: Owned ❑ Easement ❑ Claimed_EE
USFS ROW: USFS Land • Easement •
USFS Road Restriction: Unrestricted • Restricted
Law Enforcement: County ❑ USFS p
Road Maintenance & Signing
Responsibility: All County ❑ All USFS El Joint p
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement ® ❑ As Needed
Dust Abatement U ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches U 5 As Needed
Culvert Cleaning U 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures U ❑
Miscellaneous Structures U ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ U
Posting ❑ ❑
Snow Plowing 0 ❑
Maintain Closure Facility (J U As Needed
REMARKS:
Page 23 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 24
Road Name: Sheephorn Maintenance Level: 13
Termini Length (Mi.): 7.00
Termini: Gate @ Piney Peak Ranch to Lone Lick Lake
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 401 CR #: -
County ROW. Owned 0 Easement ❑ Claimed - 0 —
USFS ROW : USFS Land • Easement •
USFS Road Restriction: Unrestricted ■ Restricted •
Law Enforcement: County ❑ USFS •
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint •
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ El As Needed
Surface Replacement ® ❑ As Needed
Dust Abatement ❑ ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches ❑ El As Needed
Culvert Cleaning LI 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures LJ ❑
Miscellaneous Structures ❑ ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ U
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility U LJ As Needed
REMARKS:
Page 24 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 25
Road Name: Shrine Pass Maintenance Level: 13
Termini Length (Mi.): 9.53
Termini: Redcliff - County Line
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 709 CR #: 293
County ROW. Owned ❑ Easement ❑ Claimed ■
USFS ROW : USFS Land p Easement
USFS Road Restriction: Unrestricted 5 Restricted
Law Enforcement: Count ❑ USFS
- oa. r aintenance : igning
Responsibility: All County ❑ All USFS El Joint m
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ is 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement U ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches U 5 As Needed
Culvert Cleaning U 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures [,j 5
Miscellaneous Structures L] ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection 5 U As Needed
Posting 5 ❑ As Needed
Snow Plowing ❑ ❑
Maintain Closure Facility U U As Needed
REMARKS:
Page 25 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 26
Road Name: South Fork Piney Maintenance Level: 13
Termini Length (ML): 2.50
Termini: FS 700 - Gate
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 701 CR #: 410
County ROW: Owned ❑ Easement ❑ Claimed ❑
USFS ROW : USFS Land 5 Easement •
USFS Road Restriction: Unrestricted ■ Restricted
Law Enforcement: County ❑ USFS
Road Maintenance & Signing
Responsibility: All County ❑ All USFS El Joint 5
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement U ❑
Slide Removal ❑ [ J
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches Li Q As Needed
Culvert Cleaning U Q As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures L ❑
Miscellaneous Structures Li l ❑ As Needed
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ® [J As Needed
Posting ®' ❑ As Needed
Snow Plowing ❑ ❑
Maintain Closure Facility Li 1J As Needed
REMARKS:
Page 26 of 31
I 4 e lS
•
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 27
Road Name: Squaw Creek Maintenance Level: 13
Termini Length (Mi.): 0.32
Termini: Squaw Creek Rd #23, Private Land MP 0.32
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 422 CR #: -
County ROW: Owned ❑ Easement ❑ Claimed ❑
USFS ROW : USFS Land 5 Easement •
USFS Road Restriction: Unrestricted ■ Restricted
Law Enforcement: County ❑ USFS 5
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement Li 7
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches L] 5 As Needed
Culvert Cleaning L] 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures Ll El
Miscellaneous Structures [J ❑ As Needed
5 El
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ L1
Posting 0 ❑
Snow Plowing 0 0
Maintain Closure Facility L i U As Needed
REMARKS: This road is subject to seasonal closure, MP 0.0 -5.31. Road accesses private land
beyond MP 0.32.
Page 27 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 28
Road Name: Tigiwon Maintenance Level: 13
Termini Length (Mi.): 8.43
Termini: Hwy 24 - Half Moon CG TH
Forest Name: White River NF State: CO
Ranger District(s): Holy Cross County: Eagle
NFSR #: 707 CR #: 100
County ROW: Owned ❑ Easement ❑ Claimed D
USFS ROW : USFS Land 5 Easement •
USFS Road Restriction: Unrestricted • Restricted •
Law Enforcement: County ❑ USFS
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint a
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement LJ ❑
Slide Removal ❑ u
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches U 5 As Needed
Culvert Cleaning LJ 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures LJ ❑
Miscellaneous Structures Ld ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ LJ
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility LJ U As Needed
REMARKS:
Page 28 of 31
ekre
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 29
Road Name: Woods Lake Maintenance Level: 13
Termini Length (Mi.): 1.57
Termini: E -T Rd #400 - Trailhead Parking
Forest Name: White River NF State: CO
Ranger District(s): Sopris County: Eagle
NFSR #: 507 CR #: 83
County ROW.: Owned ❑ Easement ❑ Claimed ❑
USFS ROW : USFS Land 5 Easement ■
USFS Road Restriction: Unrestricted ■ Restricted
Law Enforcement: Count ❑ USFS p
- oa. Maintenance : igning
Responsibility: All County ❑ All USFS El Joint il
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement U ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches U 5 As Needed
Culvert Cleaning U 5 As Needed
Culvert Replacement © 5 As Needed
Major Drainage Structures U El
Miscellaneous Structures [J ❑ As Needed
5 5
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection 0 U
Posting ❑ ❑
Snow Plowing 0 ❑
Maintain Closure Facility U U As Needed
REMARKS:
Page 29 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 30
Road Name: Yeoman CG Maintenance Level: 13
Termini Length (Mi.): 0.50
Termini: Hat Creek #416 - Campground
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 416.1A, B CR #: -
County ROW: Owned ❑ Easement ❑ Claimed ❑
USFS ROW : USFS Land 5 Easement
USFS Road Restriction: Unrestricted 5 Restricted f
Law Enforcement: County ❑ USFS 5
Road Maintenance & Signing
Responsibility: All County ❑ All USFS ❑ Joint
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement 5 ❑ As Needed
Dust Abatement [J ❑
Slide Removal ❑ U
Roadside Vegetation 5 ❑ As Needed
Clean and Reshape Ditches [J 5 As Needed
Culvert Cleaning [J 5 As Needed
Culvert Replacement 5 5 As Needed
Major Drainage Structures Li ❑
Miscellaneous Structures L] ❑ As Needed
Repair and Installation of
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ U
Posting ❑ ❑
Snow Plowing ❑ ❑
Maintain Closure Facility Li [J As Needed
REMARKS:
,
Page 30 of 31
Schedule A - Joint Road
Maintenance Plan: Exhibit B Sheet 31
Road Name: Taylor Gulch Maintenance Level: 12
Termini Length (Mi.): 1.67
Termini: US24 - Switchback @ MP 1.67
Forest Name: White River NF State: CO
Ranger District(s): Eagle County: Eagle
NFSR #: 731.1 CR #: -
County ROW: Owned ❑ Easement ❑ Claimed
USFS ROW : USFS Land 5 Easement l
USFS Road Restriction: Unrestricted 5 Restricted
Law Enforcement: Count ❑ USFS
- oa• raintenance : igning
Responsibility.: All County ❑ ,All USFS El Joint a
Frequency
Activity Standard Maintenance Responsibility Per Year Notes
USFS County
Surface Blading ❑ 5 1
Surfacing Repair ❑ 5 As Needed
Surface Replacement ❑ 5 As Needed
Dust Abatement U ❑
Slide Removal ❑ U
Roadside Vegetation ❑ 5 As Needed
Clean and Reshape Ditches U ❑
Culvert Cleaning U ❑
Culvert Replacement ❑ ❑
Major Drainage Structures U ❑
Miscellaneous Structures U 5 As Needed
Repair and Installation of ❑ 5
Warning & Regulatory Signs FS ROW CO ROW As Needed
Repair and Installation of p
Directional & Guide Signs FS ROW CO ROW As Needed
Bridge: Inspection ❑ U
Posting ❑ ❑
Snow Plowing ❑ 5 As Needed
Maintain Closure Facility U U
REMARKS: Consists of forest owned sections and easements. Primitive road; no roadside ditches or
culverts. Drainage accomplished via water bars.
Page 31 of 31