Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC12-168 SHC Nursery & Landscape First Amendment FIRST AMENDMENT TO AGREEMENT
BETWEEN
EAGLE COUNTY AND
EAGLE COUNTY AND SHC LANDSCAPING
THIS FIRST AMENDMENT ( "Amendment ") is made and entered into this 2 ay
of I,�.(�( , 2012, between Eagle County, Colorado (hereinafter referred to as "County")
and SHC N rsery & Landscape Co. a Colorado corporation with its principal place of business at
"Contractor").
Chambers Street (hereinafter referred to as Contractor ).
WHEREAS, County and Contractor entered into an Agreement dated April 5, 2012
( "Original Agreement "); and
WHEREAS, County and Contractor wish to expand the scope work and correspondingly
increase the compensation amount gOriginal Justce r Center t and Justice Center sAnexdamage to
existing landscaped areas at Eag le County
NOW, THEREFORE, County and Contractor agree that the Original Agreement is
hereby amended as provided herein:
1. Article 1 — Work, Paragraph 1.1 shall be amended by the addition of the
following language at the end of the Paragraph 1.1:
No later than June 30, 2012, the Contractor shall provide all labor, materials and
equipment necessary to perform and complete the additional services set forth in
Contractor's bid dated April 25, 2012, attached hereto as Exhibit "C" and
incorporated herein by this reference at the Justice Center and Justice Center
Annex Buildings in Eagle, Colorado, as shown on the site map attached hereto as
Exhibit A. Except for as provided in Article 4 — Remuneration, the provision of
the additional services and materials described in Exhibit C shall be incorporated
into the term "Work" throughout this Agreement.
2. Article 4- Remuneration shall be amended by the addition of the following
language as Paragraph 4.4:
For the work to be provided under Exhibit C, County shall pay to the Contractor
two thousand four hundred sixty eight dollars and seventy one cents ($2, 468
upon execution of this First Amendment and an additional five thousand seven
hundred sixty dollars and thirty one cents ($5,760.31) within thirty days of receipt
of a complete and accurate invoice from Contractor for satisfactory completed in
accordance with Exhibit C. The invoice shall include a description of and date for
which the work was performed and upon request, Contractor shall provide County
with such other supporting information as County may request. In the event
Contractor fails to complete the work under Exhibit C by June 30, 2012, County
shall be entitled to a refund of a prorata portion of the amount prepaid under this
G: \MAINTENANCE \Service Agreements \Landscape ng\Justice Center \First Amendment 2012\SHC Landscaping First Amendment 05.9.12.docx
CAVUPg-
J
First Amendment that represents the services that were not performed and/or
materials not provided in accordance with the requirements of Exhibit C and the
terms of the amended Original Agreement. .
3. All terms and provisions of the Original Agreement shall remain in full force and
effect during the modified term.
4. This Amendment shall be binding on the parties hereto, their heirs, executors,
successors, and assigns.
IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to
Agreement the day and year first above written.
COUNTY OF EAGLE, STATE OF COLORADO
By and through its County Manager
By: \-•// All Keith Montag, Eagle County anager
SHC NURSERY & LANDSCAPE
By:
t
- < J '
Mike Stevens, President
STATE OF 0 O \CYQ'i 0 )
) ss.
COUNTY OF F ll 1-e..._ )
The foregoing instrument was acknowledged before me by VA, Y 5.10k) e-nS as
. es e41k , this ID day of i�� ,2012.
My com ion expire : 1 Z t t S 1 1 3
i t.-"/ C E. LEAL
Notary Public NOTAR PUBLIC `
STATE OF COLORADO t
My Commission Expires 12/15/2015
G: \MAINTENANCE \Service Agreements \Landscaping\Justice Center \First Amendment 2012\SHC Landscaping First Amendment 05.9.12.docx
•
Project - .Cagle County Justice Center
Location Chambers Avenue
date bid - April 25, 2012
add tax Vail, Avon, Eagle is 8.4%
other towns is 4.4%
rk,lt Uo -4 V. -
Plant Material- Shrubs //
Juniper Shrubs - Tammy - 5 gallon 20 N s fd' k ea
Plant Material- Perennials /��
Decorative grass plants -1 gallon 10 i�t.J Si
Plant Material -Sod & Seed S D •
Bluegrass seed mix - pounds 8
Hard Goods Taw
Ce..cCJ - - C cJ
Red sandstone caps 4 (�. �,�Q 30 ► Y
Red sandstone rock �"0 C 20 3 wQ is S S f' 7P
Shredded cedar mulch - bags 8gY� ��5
Large red .rock boulders - 2 -3 feet 6 —Coll in eArS �J-�'v e- LL) 51 rx.e...
Landscape fabric for cobble areas - square feet 260
Landscape pins for fabric 80 c ol b
Compost topsoil mix- 1.5 cubic foot bags 60
Soil Pep 30 � � ' ��"'�-
Roundup Herbicide 1 () .e roc t yr 1 I Sp Yea�
Installation
Plant Junipers 3
Prepare cobble areas in Juniper beds with fabric 8
Cobble import and place 4
Spread mulch and Soil Pep 18 C�Z
Place boulders 4
Remove old fabric and dig wall areas 5
Build rock walls 15
Prepare and seed bluegrass lawn in the back 5
Plant decorative grass plants 1
Spray Roundup in Juniper beds and garden beds 1
Equipment
Excavator 2
Skidsteer 4
Delivery Truck 6
Mobilization /General Conditions
Cleanup 4
Delivery Labor 6
Equipment delivery 1
Operator 6
$8,229.02
Plcase v our web sift For more Sletailedinformation. Page 1