HomeMy WebLinkAboutC09-427 Amend SIA Arrowhead Valley DevelopersAGREEMENT TO AMEND SUBDIVISION AND OFF-SITE IMPROVEMENTS
AGREEMENT
Arrowhead Valley Developers, LLC
This Agreement (the "Agreement"}, is entered into this ~3'~iay of October, 2009
between the Board of County Commissioners of Eagle County, Colorado ("County") and
Arrowhead Valley Developers, LLC ("Subdivider"),
WITNESSETH:
WHEREAS, the County and John and Diane Donovan entered into a Subdivision and
Off-Site Improvements Agreement for Arrowhead Ranch Planned Unit Development, File No.
PDF-00074, on October 21, 2002, recorded October 29, 2002 at Reception No. 811892 (the
"Original Agreement"); and
WHEREAS, Subdivider is the successor in interest as subordination to John and Diane
Donovan under the Original Agreement; and
WHEREAS, the Original Agreement, in Section 1.5 thereof, requires that Subdivider
complete all Subdivision Improvements contemplated in the Original Agreement prior to
October 22, 2007; and
WHEREAS, the Original Agreement, in Section 4.3 thereof states there shall be a two-
yearcorrection period, or such longer period as may be prescribed by law, from the time of
completion of the Subdivision Improvements during which time the Subdivider shall promptly
correct or remove and replace, in accordance with the County's written instructions, defective
work or materials and consequences thereof. Repair or replacement made under the two-year
correction period shall bear an additional one-year correction period from the acceptance of the
repair or the replacement by the Eagle County Engineer. The work shall be collateralized during
the correction period in an amount and type of collateral as shall be reasonably determined by the
County; and
WHEREAS, the surety provided by Subdivider for improvements covered by the
Original Agreement does not expire until June 30, 20L0; and
WHEREAS, the County and the Subdivider agree that it is in their mutual interest to
amend the Original Agreement to extend the base correction period to June 30, 2010, and
correspondingly extend the additional correction period to one year from inspection and
acceptance of all the work detailed on Exhibit "A".
W`~-~~
NOW, THEREFORE, in consideration of the foregoing premises and following
promises, the County and the Subdivider agree as follows:
The date for completion of the base corrections to the Subdivision Improvements as
required by Section 1.5 of the Original Agreement, as amended, and as detailed on Exhibit "A"
hereto, is extended to June 30, 2010, and correspondingly to extend the additional correction
period to one year from inspection and acceptance of all the work detailed on Exhibit "A".
IN WTI'NESS WHEREOF, the parties hereto have executed this Agreement the day and
year first above written.
ATTEST:
Clerk to the Board of """"'_
County Corn e
13~-t' ~rd~z-~- -----~I~~ri ~-
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
BOARp OF COUNTY COMMISSIONERS
Y-
Chairman
Address for giving notice:
P.O. Box 850
Eagle, CO 81631
(970) 328-8685
Valley Developers, LLC
Y~
Names: ~ y~~. N ~m
Title: ~ ~~n~ q ev-
Address for giving Notice:
P O Box 2633
Edwards, CO 81632
STATE OF COLORADO
ss.
COUNTY OF ~~~
The foregoing instrument was acknowledged before me this 23~ day of
(~~~ , 2009 by ~iLC~ ~~/1Ll~S
Witness my hand and official seal.
Nota~ Public
My commission expires: 1 l 7 ~Q '~;;~~~~'~e~~"
,=~UBLiC
BID SCHEDULE PROPOSAL
Arrowhead River Ranch Infrastructure Improvements
BUI Project No: 09019
10!21!2009 -- Construction Plans (Shts 1-5, Qated 10-19.09)
ltem Est. unit
No. Qty. Unk Description and Unit Price in Words Price Total Price
t LS Mobiization, incuding but not limted to, any and a1 equlprnent
necessary to complete proJep, (this item amount can not
exceed 5 percent of total bld) , per Lump Sum.
Ten Thousand Ddlars and NO/100
(Lump Sum - Words )
2 LS Install 4' diameter new controls storm sewer manhole SDMH D-
I On existing 18" die. storm drain pips, indud'ng but not limited
to excavatlon, cut existing pipe, poured-in-place concrete base
with 24" sump, pretest risers & cone, HDPE snout with SS
brackets ~ bolts, adjuabrtem rings, cast Iron ring and cover,
compaged select backfill, misc. materials, camplate and in
place, per Lump Sum.
510,000.00
Seven Thousand Eight Hundred Ninety Dollars and NO/100 57,890.00
{ Lump Sum -Words )
3 30 LF IS" dia, ADS-N12 Pipe Replacement {from STA I+15 to STA
I+45) of exsting storm drain, including but not limited to,
excavation, cut Sr remove ex'sting pipe, new pipe and couplings,
eompaded pipe bedding & trench backfill, misc. materials,
complete end in place, per Lump Sum.
Sixteen Thousand Five Hundred Ten Dollars and NO/100 Stb,510.00
(Lump Sum - Words )
4 L3 InstaA t8" dia, deanout CO D-1(Sta 1+45) on existing IB"
die. (CPP) storm drain, Including cwt not limped to excavation,
cu[ & remove exbdnp pipe, 18" die. pipe & finings, iocking
metal ring and cover, compacted select backfill, misc. materials,
complete and in place, per Lump Sum.
Four Thousand Six Hundred Dollars and NO/100 54,600.00
( Lump Sum - Words )
5 LS Landscape replacement for all disturbed areas abng 18' Storm
Drain Improvement corridor between STA 1+15 to STA 1+45,
Including but not limited to salvaging and replacement of existng
vegetation, trees, boulders end ell other landscape features plus
repair of any disturbed lawn sprinkler systems, wireless dog
fence and other shallow utilities, excavation, complete and in
place, per Lump Sum.
Two Thousand Fight Hundred Fitty Dolars and NO/100
(Lump Sum -Words)
6 t EA 24` Nyloplast drain or 36"x36" basin a2 on 18" Nt2 Stonn
pipe including but not limited to, excavation, basin Installation,
lid, couplings, bedding, grout, bacldill, 90X compactbn in
landscape areas, complete and in place, per Each.
Two Thousand Two Hundred Fitt' Dollars and NO/F00
1
52,850.00
52,250.00
81D SCHEDULE PROPOSAL
Arrowhead River Ranch Infrastructure Improvements
BUI Project No: 09Q19
10/21/2009 -- Construction Plans (Shts 1.5, Dated 10-19.09)
Item Eat. Unit
No. Qty. Untt Description and Unit Price in Words Price Total Price
(Lump Sum - Words )
7 2 EA 12"x6" full body Wye for 6" existing PVC service drain (49 &
51 LF from curb inlet), inducting but not 6miled to exeavaton,
pipe removal, new wye, misc. pipe & couDNngs, bedding, misc.
materials, 90% compacted backfill, complete and In place, per
Lump Sum.
Two Thousand Five Hundred Ddlars and NO/l00 32.5~•~
(Lump Sum - Words )
8 LS Remove twin 6" PVC drain pipes (with twat tape) between
inlet 31A1 and N. edge of oortcrete crosspen, inducting but not
limited to excavation, pipe & wire removal, compacted class 6
ABC baekflll, misc. materials, complete end fn glace, per Lump
Sum.
Six Thousand Four Hundred Twenty Dollars and tJ0/100 36,420.00
( Lump Sum -Words )
9 2,600 SF Removal of All Asphabic and Concrete Surfaces, including, but
not Ilmlted ro, saw cutting (full depth), demallshing & removal
of sidewalks, curb & gutter, Curb cuts, ramps, driveway cross
pans, street pavement of any thickness and their dlsppsal off
site, complete and in place, per Square Foe.
Eleven Thousand Seven Hundred Ddltxs and NO/100 311,700.00
( Lump Sum -Words )
10 LS Install new concrete Inlet box Ai-1 (Ste 0.00) induding but
not limbed to excavation, box removal, salvage & replace
existing grate & kettle, new caxxete box 24" sung, snout,
grout pipe, compacted becldll 95X, complete and in place, per
Lump Sum.
Slx Thousand Nlne Hundred Seventy Dollars and NO/100
( Lump Sum - Words )
11 95 LF 18" diameter ADS N12-WT Storm Drain Plplnp, includng but
not Ilmited to, excavaton, new pipe insta~etion, couplings.
bends, bedding, backfill, 957: compaction in road areas end
9074 compaction in landscape areas, complete and in place, per
Lineal Foot.
36,970.00
Twenty-Six Thousand One Hundred Forty Dpllars and NO/100 326,140.00
( Lump Sum -Words )
12 2 EA 24" Nyloplast drain or 36"x36" bealn A2-2 & A2-3 on 18"
N12 Storm pipe including but not limited to, excavation, basin
installation, lid, ceuplings, bedding, grout, baddill, 9574
compacton In road areas and 90X compaction In landscape
areas, complete and In place, per Each.
BID SCHEDULE PROPOSAL
Arrowhead River Ranch Infrastructure Improvements
BUI Project No: 09019
10121!2009 -- Construction PEans (3hts 1-5, Dated 10.19-09}
Item Est. Unit
No. Qty. Unit Description and Unit Prise in Words Price Total Price
Four Thousand Five Hundred Dollars and NO/100
54,500.00
(Lump Sum -Words )
l3 LS Correct 18" N12 Storm pipe tnlo existing concrete inlet box
(STA 0+91) including but not united to excavaurxr, cut hole,
grout pipe, hackfitl, complete and in place, per Lump Sum.
Two Thousand Seven Hundred Fitry Dolars and NO/100 S2,TSOAO
( Lump Sum -Wards )
14 LS Landscape replacement for all disturbed areas along 18" Slam
Drain (Alternate B) rAnida, including but not Ilmited to
salvaging and replacement d existing vegetation, trees, boulders,
edging scrips, and all other existing landscape leaWres plus
repair of any disturbed lawn sprinkler systems, wireless dog
fence end other dlsturbed shetlow uttllties, exravaton, complete
end In place, per Lump Sum.
Two Thousand Three Hundred Sixty Dollars and NO/100 S2,3fi0.00
(Lump Sum - Words)
IS 38 LF 18" diameter ADS N12-Wl' Stone Drain Piping, including twl
rat limited to, excavation, new pipe installation, couplings,
bands, bedding, backflll, 95% tampaclbn in roads areas and
90% compaUlon In landscape arose, complete and in place
complete and in place, per Lineal Foot.
Eleven Thousand Five Hundred Dotlars and NO/100 SI1,500.00
(Lump Sum - Words )
16 LS Install 4' diameter new concrete storm sewer meNale SDMH-
2 (Ste 0+42) , InGuding but not united to excavation, cut
exisbng pipe, poured-In-place concrote base with 24" sump,
precast risers & lid, HDPE smut with SS brackets & bohe,
adjustment rings, cast iron ring and cover, compacted select
baekflll, misc. materials, complete and In place, per Lump Sum.
Seven Thousand Eight Hundred Ninety Ddlaro end NO/100
(Lump Sum - words )
17 36 LF 18" diameter ADS N12-WT Stone Drain Piping between (00083
& 0105 ), Including but nd limited to, excavation, new pipe
Installation, couplings, bends, bedding, beckfltl, 90% compaction,
complete and In place, per Lineal Foot.
E~,89o.00
Nineteen Thousand Eight Hundred Ten Dollars and NO/100 519,810.00
( Lump Sum - Words )
3
BID SCHEDULE PROPOSAL
Arrowhead River Ranch Infrastructure improvements
BUI Project No: 09019
10!21!2009 --- Construction Plans {Shts 1-5, Dated 10.19.09)
Item Est. Unit
No. Qty. Unit Description and Unit Price in Words Price Total Price
18 3 EA 24" Nybplast dreln or 36"x36" Conuete basin (B-3, 4 & 5)
on 18• ADS-Nt2 Stonn pipe Induding but not limited to,
excavation, basin installation, grout, Ud, couplings, bedding,
backfill, 95% compaction in road areas aM 90% compaction In
landscape areas
Eleven Thousand Five Hundred Sixty Dollars and NO/100
( Lump Sum - Words )
19 LS Landsapa replacement for all di:iwbsd eras along 18" Storm
Drain Improvement corridor between 0083 & 0105, including but
not limited to seNaging and replacement ar existitg vegetatbn,
trees, boulders and all other landscape features plus repair of
any disturbed lawn sprinkler systems, wireless dog fence and
other shallow utvities, excavaUOn, complete and in place, per
Lump Sum.
Two Thousand Four Hundred Fony Oolars end NO/ 100
( Lump Sum Words )
20 45 LF 18" diameter ADS N12-WT Storm Drain taping between (0181
& 0203), including but not limited to, excavation, new pipe
instdlaNon, couplings, bends, bedding, beckflll, 90% compedbn,
complete and in place, per Lineal Foot.
Ten Thousand One Hundred Twenty-Five Dollars end NO/100
( Lump Sum -Words )
21 LS Landscape replacement br all disturbed areas along 18" Storm
Drain improvement corNdor between OI81 & 203, Induding but
not limited to satveging and replacement of existing vagetatbn,
trees, boulders and e1 other landscape Teatures plus repair of
any drsturbed lawn sprinkler systems, wiekss dog fence and
other shallow utilitles, excavation, complete and in place, per
Lump Sum.
Et t, 560.00
5z,4ao.oo
Sto,125.00
Two Thousand Six Hundred Sevemy-Flue Oollers end NO/100 52,675.00
(Lump Sum - Words )
22 LS Replace existing corx~ele inlet box aM7 opposite of existing curb
cut between 0181 & 0203 ), Including but nd Ilmilsd to
excavation, removal of existing concrete box, selvage & replace
existing prate & creme, new Concrete box with 24" sump,
HDPE snout with SS bredtets & bolts, 95% compacted backfYl,
misc. materials, complete and in place, per Lump Sum.
Four Thousand One Hundred DGlars and NO/100
( Lump Sum -Wade )
b4,100.00
BID SCHEDULE PROPOSAL
Arrowhead River Ranch Infrastructure Improvements
BUI Protect No: 09019
10/21/2009 -- Construction Plans (Shts 1~, Dattad 10-19-09)
Item Est. UnK
No. Qty. Unit description and Unil Price In Words Price Total Price
23 3 EA 18" Plastic Flared End Sedtons FES Ct, C2, & 86 for new
18" ADS-N12 Storm Drain Pipe, Includirg but not Bmlted to,
excavation, coupling, baekfll, complete and In piece, per Each.
One Thousand Slx Hundred FIRy Dollars and NO/I00 11,650.00
( Lump Sum - Worck )
24 1 EA 12" Plastic Flared End Section FES 2 for existing 12" ADS
M12 Stortrt Draln Pipe (on river bank between OOlS & 0023) ,
Including but np[ Iimlt@d to, excavation, ootrpling, rock backfAl,
wmplete and In place, per Each.
Five Hundred Dollars and NO/100 5500.00
(Lump Sum -Words)
25 6 EA Grout pipes entering existing concrete box inlob, including but
not limited to, loose grout removal and repair grouting, fir~hed
surface, complete and in place, per t:ach.
Two Thousand One Hundred DoAara erd NO/100 12,100.00
( Lump Sum - Words )
26 400 SF Corwete Driveway Goss-Pan Replacement, includag but not
Ilmited to excavaton, compacted subgrade preparation, fumisNng
& compacdon of B" Class 6 ABC subbase, forming, hxnishing
& placement of 6" concrete wNh polypropylene Bbers, Bowls,
cdored, finisttirtg, Joints, cuNrtg, comDleta and In place, per
Square Foot.
Six Thousand Nine Hundred Seventy Dollart end NO/100 56,970.00
(Lump Sum -Words )
27 120 SF Concrete Vagey Pan, including but not limited to excavatbn,
compacted subgrade preparation, fumfshing & compaction of 8"
Class 6 ABC subbase, funning, famishing ~ placement o} 8"
concrete with polypropylene fibermesh, coloring, rebar, finishing,
joints, wring, eompkte and in place, per Square Foot.
Two Thousand One Hundred Forty-Two Ddars and NO/100 32,142.00
(Lump Sum - Words)
28 60 LF 18" or 24" Concrete Curb & Guner Replacement including, but
not limited to exwvaNon, compacted subgrade preparation,
furnishing d compaction or Clara 6 ABC eubbaisa, rorming,
furnishirtg & placement of concrete with polypropykne fibers,
coloring, finishing, jonts, and cuing, t»mplets and in place, per
Lineal Foot.
One Thousand Eight Hundred Dollars and NO/100
( L1xnp Sum - Words )
5
31,800.00
BID SCHEDULE PROPOSAL
Arrowhead River Ranch Infrastructure Improvements
BUI Protect No: 09019
10/2112009 - Construction Plana (Shts 1-5, Dated 10-19-09)
Item Est. Unit
No. Qty. Unit Description and Unit Price In Words Price Total Price
29 2,150 SF Asphaltk Pavement Replacement, irtdudng but not imFled to
excavaton, grading, compacted subgrade properatlon, min. 8" d
compacted Class 6 ABC, proof roling, min. 3" asphalt
pavement, inhered heal patch pints (except sown lines) ,
complete and in place, per Square Foot.
Eleven Thousand Four Hltrtdred Fitly Dollars aM NO/100 511,450.00
(Lump Sum -Words)
30 680 LF Jetflueh end clean existing 12" & 18" die storm drain pipes,
Including but nd fmiled to mud/gravel/debris & trash removal
( prevent wash water from entering inlUtretors) , complete end in
place, per ineal foot.
Four Thousand Twelve Ddlara end NO/100 54,012.00
(Lump Sun -Words )
31 7 EA Chan existing storm dram inlets, including but not imilad to
mud/gravel/debris & trash removal (prevent wash water hom
entering inalbators) , complete and b place, per Each.
Two 7ltarsand Four Hundred Fifty DoIWrs arW NO/100 52,450.00
(Lump Sum -Words )
32 LS Construct 12" Drainage Swale abng west side of 0015,
including but not united b salvage grass-sod & bpsdl,
excavate drainage swats, repair of any disturbed lawn sprinkler
systems, appurtenances, replace topso8 & grass-sod all
disturbed areas, complete and b piece, per Lump Sum.
Five Thousard Three Hundred Sbny-Four fbllars end NO/100 55,364.00
{ Lump Sum - Words )
33 LS Conswct 6" Drainage Swale abng east side of 0015, including
but not limited to selvage grass-sod S topsoil, exeevets
drainage 8wele, repair of any diswrbed lawn sprinkler systems,
wireiesa dog fence lines, appurtenances, replace topsdl & gtass-
sod all disturbed areas, complete and in plea, per Lump Sum.
One Thousand Six Hundred Seventy-Five Dollars end NO/100 51,675.00
( Lump Sum - Words )
34 LS Cut & Plug existktg two 4" PVC drain pipes at SW corner of
Eagle River ~Roed & Erttrettee Rosd intersection (East of
0050) draining low area, including but not limited to excavation,
cut & remore 2 feet d pipe, cep end of pipe, backflll, repair
landscape, complete & in place, per Lump Sum
Three Thousand Five Hundred Doiars and NO/100 53,500.00
(Lump Sum -Words )
BID SCHEDULE PROPOSAL
Arrowhead Rlver Ranch Infrastructure Improvements
BUI Project No: 09019
1012112009 -- Construction Plans (Shts 1-5, Dated 10-19-09)
Item Est. Unit
No. Qty. Unit Description and Unit Price in Worda Price Total Price
35 LS Erosan antl Sediment Control as required, inclutling, but not
Nmited to material (Inlet protection, silt fencing, fabric, erosion
logs, etc.) necessary to complete project, par Lump Sum.
Four Thousand Eight Hundred Odlars and NO/100 54,800.00
(Lump Sum - Wads )
36 LS Performance, Payment end i Year Warranty Bond, complete and
In place, per Lump Sum.
Twee Thousand Two Hundred DoNars and NO/100
53,200.00
(Lump Sum - Words)
3229,153.00
Engineering S 2 S ,000.00
3254,153.00
Warranty 525,415.30
3279,568.30