Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC09-425 CDOT Eagle County Airport Interchange Project Contract Amend #2(Local $ CDOTWI) PROJECT IM 0702 -229 (13230) 09 HA3 00081
REGION 3 (DAW) ID 331000135
CONTRACT AMENDMENT #2
THIS AMENDMENT, is made this (
30' day ofA ¢ ( )� /�� , 2009, b and between the State fate of Colorado
for the use and benefit of the COLORADO DEPARTMENT OF TRANSPORTATION, hereinafter referred to as
"the State ", and EAGLE COUNTY 500 Broadway Box 850 Eagle, Colorado, 81631,
CDOT Vendor #: 2000124, hereinafter referred to as the "Contractor" or the "Local Agency."
FACTUAL RECITALS
1. Authority exists in the law and funds have been budgeted, appropriated and otherwise made available and a
sufficient unencumbered balance thereof remains available for this Project as set forth below; and,
2. Required approval, clearance, and coordination has been accomplished from and with appropriate agencies;
and,
3. The Parties entered into the original contract dated July 7 2008, Contract Routing Number
08 HA3 00073 and subsequently executed Amendment #1, Routing Number 09 HA3 00050 dated
April 27, 2009, collectively known hereafter as "the Basic Contract "; and,
4. The Basic Contract is an Intergovernmental Agreement between the State and the Local Agency
Project # IM 0702 -229 (13230) which shall consist of a contribution toward the cost of design for the I -70
Eagle County Airport Interchange project, referred to as the "Project' or the "Work." Such Work will be
performed on I -70 MP 141 — MP 144, in Eagle County, Colorado; and,
5. The Basic Contract is still in effect and provides for changes to its terms and conditions by written
supplement or contract amendment; and,
6. The Parties also now desire to amend the Basic Contract to add $350,000.00 of Local Contribution
Funding, in ROW Acquisition by replacing for a new encumbrance amount of $575,000.00, and, to amend
Recital 6, replacing Section 4. "Project Funding Provisions" Sub - Sections A, B & C (pages 2 of 11
and 3 of 11 of the Basic Contract), and, replacing Section 5. A, Project Payment Provisions (page 3 of
11); and,
The Right of Way Acquisition shall be performed by CDOT per Section 7 of the Basic Contract, via the
Fair Market Value process (FMV) as outlined in the CDOT Local Agency Manual; and,
The Parties enter into this Amendment pursuant to the provisions of Colorado Revised Statutes,
Sections 24 -30 -1401 et seq. Section 43 -1 -106, and Section 43 -1 -110, as amended.
Pagel of 3
��Z4 /- ��
NOW THEREFORE, it is hereby agreed that:
Consideration f r this Amendment consists of the payments that shall be made pursuant to this Amendment and the
promises and alTeements herein set forth.
1. This Air endment is supplemental to the Basic Contract, which is, by this reference, incorporated herein and
made a r art hereof, and all terms, conditions, and provisions thereof, unless specifically modified herein, are
to apply to this Amendment as though they were expressly rewritten, incorporated, and included herein.
2. The Basic Contract is and shall be modified, altered, and changed in the following respects only:
a. Recital Number 1 (Page 1 of 11 of the Basic Contract) shall be amended to read as follows:
Recital 1. Authority exists in the law and funds have been budgeted, appropriated and otherwise made available
and a sufficient uncommitted balance thereof remains available for payment of project and Local Agency
costs in Fund Number 400; Functions 3020, 3111; "S Elements 13230.10.30, 13230.10.10;
Org # R3120 -010; Program 2000; GL Acct: 4231200011 Contract Encumbrance Amount: $0.00
b. ftecital Number 6 (Page 1 of 11 of the Basic Contract) shall be amended to read as follows:
Recital 6. The Local Agency has funds available and desires to provide up to$575,000.00 in funding
for I he `Work".
c. $ection 4. Project Funding Provisions (Page 2 of 11 and 3 of 11 of the Basic Contract);
Sub- Sections A B and C shall be replaced in their entirety, and hereby amended to read as follows:
Section 4. Project Funding Provisions
A. CDOT has estimated the total cost of the work and the Local Agency is prepared to provide a portion of the
funding for the work, as evidenced by an appropriate ordinance or resolution duly passed and adopted by the
authorized rep esentatives of the Local Agency, which expressly authorizes the Local Agency to enter into this
contract and tc expend its funds for the project. A copy of this ordinance or resolution is attached hereto and
incorporated h rein as Exhibit B -2.
B. CDOT has estimated the total cost of the work to be $575,000.00 which is to be funded as follows:
a. Local Agency Funds $575.000.00
Total Funds: $575.000.00
C. The maxiriium amount payable by the Local Agency under this contract shall be $575,000.00, unless such
amount is increased by an appropriate written modification to this contract executed before any increased cost is
incurred. It is understood and agreed by the parties hereto that the total cost of the work stated hereinbefore is the
best estimate available, based on the design data as approved at the time of execution of this contract, and that such
cost is subject to revisions (in accord with the procedure in the previous sentence) agreeable to the parties prior to
bid and award.
d. Section 5. Project Payment Provisions
A. The Local Agency shall contribute a lump sum amount and shall not exceed the
amount of $575,000.00. The Amendment 2 amount of $350,000.00 shall be due within 60
days of execution of this agreement.
Page 2 of 3
SIGNATURE PAGE
THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT
LOCAL AGENCY:
Eagle County
Legal Name of Contracting Entity
20000124
CDOT Vendor Code
-1A -
Signature of Aut orized Officer
DATE: / - - -3� -
LOCAL AGENCY:
STATE OF COLORADO:
BILL RITTER, JR., GOVERNOR
By:
For the Executive Director
Colorado Department of Transportation
(A Local Agency Attestation is required.)ac:
Attest (Seal) By:
Town / City / County Clerk (Place Local Agency Seal here, if available.)
ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER
CRS 24 -30 -202 requires that the State Controller approve all state contracts. This contract is not valid until the
State Controller, or such assistant as he may delegate, has signed it. The contractor is not authorized to begin
performance until the contract is signed and dated below. If performance begins prior to the date below, the
State of Colorado may not be obligated to pay for the goods and/or services provided.
By:
Date:
STATE CONTROLLER:
DAVID J. MC DERMOTT, CPA
Page 3 of 3
OFFICE OF THE
BOARD OF COMMISSIONERS
(970) 328 -8605
FAX: (970) 328 -8629
Email: eagleadmin @eaglecounty.us
www.eaglecounty.us
OGLE COUNTY
June 1, 2009
Weldon Allen, Director
Transportation Region 3
Colorado Department of Transportation
222 South Sixth Street, #317
Grand Junction, CO 81501 -2769
Subject: Eagle County Airport Interchange ROW acquisition shortfall
Dear Director Allen:
SARA J. FISHER
PETER F RUNYON
JON STAVNEY
We thank you and your staff for your commitment to and support for the Eagle County
Airport Interchange Project. We're also committed to this project and stand ready to add local
funding of up to $350,000 in support the ROW acquisition shortfall.
If you have any questions, please feel free to contact us or our County Engineer, Eva
Wilson, at 920 - 328 -3560.
Sincerely,
Eagle County Board of Commissioners
W1.0-Q- . K,
Sara J. Fisher Peter F. Runyo
Chairman Commissioner
cc: Tammie Smith, CDOT R3
Mark Rogers, CDOT R3
Joe Eisen CDOT R3
Martha Miller, CDOT Eagle County Resident Engineer
Peter Kozinski, CDOT R3
Brian Killian, CDOT R3 Local Agency Coordinator
Jeff Schroll, Town of Gypsum Manager
J- ---
Jop Stavney
mmissioner
Eagle County Building, 500 Broadway, P.O. Box 850, Eagle, Colorado 8 163 1-0850