Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC09-139 Solid Waste Management Grant Agreement�
. .^
~~ ~
�
.......
'
`
SOLID WASTE MANAGEMENT GRANT
GRANT AGREEMENT
between
Eagle County Government
and
UNITED STATES DEPARTMENT OF AGRICULTURE
RURAL DEVELOPMENT
RU8 Guide 1775'1
Page 1
N
^`
^'
RU8 Guide 1775-1
Page 2
Table of-Contents
Section Page
1 Terms ........................
' =="==o ---------------------------..._----8
'
' 2. Allbwci'be Costs' ............ ................................ _^---..—..------._—__1—..�,`_..___5'
`
' 3..` 'Use ofFunda--'_^^..�-~----..---------.-----.../--^�,.--.,--5
'- -
4^ Travel ` - ' ' `
-----'--^^-----'----'------`-----------------.---.5
5. `
,mxnm,nuo-----------_------.-----------------.--.."'...--..5
6. Pe' nnanoeRaoortReouireme ! ----------------------.`---`—.....~—^'6
7. Financial Management ................................................................................................................
7
8. Retention and, access of records ...................................................................................................
7
' 9. Audits ..................................................................
10 Program |noon�o
' ` -" ----------------------------------------..
8
11' Prior Approval Requirements --------_-----------------------._.S
12. No Cost Extensions --_---------~---------------------_---..8
13. Property Standards ................... ...................................................................................................
g
14. Equipment ...................................................................................................................................
1O
15. Supplies and Expendable ----------_---^--_----_--------
10
18 Intangible proparty — '
10
17. Cost sharing ................................................................................................................................
11
18. Suspension or Termination ........................................................................................... ..............
12
19. Appeal ..........................................................................................................................................
12
20. Publications .................................................................................................................................
12
21 ��i| Rights Requirements � '. , n�---------.-------_--------------.----13
RUS Guide 1775 -1
Page 3
Solid Waste Management
Grant Agreement
United-States Department of Agriculture
Utilities Programs
This Agreement is between Eagle County Government, (grantee)_and the
United, of America acting through the Utilities Programs (Grantor or Agency). The
Grantee shall provide technical assistance, training, services and /or funding for a project,
or activity under the Solid Waste Management Grant Program at an estimated cost of
The Grantee shall finance $ of these costs through
cash and in -kind contributions. The Grantor agrees to award a grant in a sum not to
exceed $100,000 to the Grantee. The grant period will be for 12 months, beginning date,
year, and ending date, year. The Agreement shall be effective on the date of grant
approval.
The Grantor shall make the grant to the Grantee under authority of Section 306(a)(14)(A)
of the Consolidated Farm and Rural Development Act, 7 USC 1926(a), as amended, for the
purpose of defraying technical assistance and training costs as permitted by applicable Agency
regulations.
1. General Terms
(a) The Grantee has full responsibility for the conduct of the project or activity supported
under this grant and for adherence to the grant conditions. The Grantee shall provide technical
assistance, training, and services set out in the Scope of Work (Scope).
(b) The Grantee is responsible for managing and monitoring each project, program,
subaward, function, or activity supported by the grant.
(c) The purpose and Scope for which this grant is made shall not duplicate programs for
which monies have been received, are committed, or are applied for from other sources, public
and private.
(d) Grant funds shall not be used to replace any financial support previously provided or
assured from any other source. The Grantee agrees that the general level of expenditure by the
Grantee for the benefit of the program area or the program covered by this Agreement shall be
maintained and not reduced as a result of the Federal -share funds received under this grant.
(e) The following items are incorporated in the Grant Agreement:
(1) The grant approval letter,
(2) The Scope of Work for the project. (Attachment .1)
(3) The budget, which indicates the amounts, by categories of expense, on which
the Grantor has based its support; (Attachment 2)
(f) This award is based on an application submitted to, and approved by, the RUS and is
subject to the terms and conditions incorporated either directly or by reference in the following:
RUS Guide 1775 -1
Page 4
(1) Grant.-program legislation cited above.
(2) Grant program regulation in Title 7, Code of Federal Regulations, Part 1775
(7 CFR 1(75).:
(.3) Grant Agreement.
(4) OMB Circular A -110, "Uniform Administrative Requirements for Grants and
Agreements with Institutions of Higher Education, Hospitals, and Other Non - Profit Organizations,"
as applicable, and implemented by USDA in 7 CFR Part, 3019.
(5) 7 CFR Part 3016, (the USDA Common Rule implementing OMB Circular A -102)
for State and local governments, as applicable.
In the event there are conflicting or otherwise inconsistent policies applicable to the grant,
the above order of precedence shall prevail.
(g) This Agreement is subject to current Grantor regulations and any future regulations
not inconsistent with the express terms contained in this agreement.
(h) By accepting this grant, the Grantee agrees to:
(1) Comply with the applicable Federal requirements for grants, all applicable laws,
regulations, Executive Orders, and other generally applicable requirements, which are
incorporated in this Agreement by reference, and specifically set forth in statutory provisions.
(2) Manage prudently all expenditures and actions affecting the grant.
Documentation for each expenditure must reflect appropriate organizational reviews or approvals
which should be made in advance of the action.
(i) The Grantor, will assist Grantee, within available appropriations, with any assistance
the Grantor deems appropriate in planning the project.
(j) The grantee's submission of fraudulent information or failure to comply with
applicable requirements- of the grant may cause the Grantor to take one or more enforcement
actions. The Grantor will undertake any such action in accordance with applicable statutes,
regulations, and policies, and will generally afford the Grantee an opportunity to correct the
deficiencies before taking enforcement action. The Grantor may exercise options available to it,
including, but not limited to:
(1) Collection of funds the Grantor has paid the Grantee, considered as debt. Debts
may esult from disallowances, recovery of funds, unobligated balances, or other circumstances.
The rantee will repay the principal amount of the debt with interest accruing on any delinquent
amount, computed from the original notification date to the Grantee of the indebtedness. The
interest rate will be at the market rate for Water and Waste Disposal Program loans in effect on
that date.
(2) Temporary withholding of payment or other actions specified at 7 CFR Part 3016
or OMB Circular A -110, as applicable,
(3) Suspension or debarment under 7 CFR Part 3017, and
(4) Other available legal remedies, including civil action under 7 CFR Part 1,
Subp6rt L.
RUS Guide 1775 -1
Page 5
2. . Allowable Costs
(a) Allowability of costs and cost allocation methods for work performed under this grant
will be determined in accordance- with the applicable Federal cost principles in effect*on the
effective date of this grant. The Federal cost principles, as applicable, are contained in:
(1) OMB Circular A-21 "Cost Principles for Educational Institutions," for both public
and private institutions of higher education;
(2) OMB Circular.A -87, "Cost Principles for State, Local and Indian Tribal
Governments;
(3) OMB Circular A -122, Cost Principles for Non - Profit Organizations," for other non-
profit organizations, except those organizations specifically exempted by the
Circular.
(b) Compensation for employees engaged in work under this grant will be considered
reasonable to the extent that such compensation:
(1) is consistent with that paid for similar work in the organization's other activities.
(2) Is comparable to that paid for similar work in the labor markets in which the
organization competes for the kind employees involved but not found in other
activities of the organization.
3. Restricted Use of Funds
(a) Grant funds may not be used to pay any expenses prohibited under RUS Instruction
1775, subpart A. Examples of restricted uses are costs of matching funds for other Federal
grants; construction, personal gifts (e.g., t- shirts, buttons, and hats), entertainment, advertising
and public relations for fund - raising or promoting the organization, litigation, lobbying, intervention
in Federal regulatory or adjudicatory proceedings, suing the Federal Government or any
government entities.
4. Travel
(a) Travel costs incurred by employees and officers must be attributed directly to specific
work under the grant or in the normal course of administration of the organization. Such costs will
be subject to the travel policies of the Grantee's organization. If the Grantee organization does
not have a written policy for travel costs, the Federal Travel Regulation (FTR) will apply in
determining the rates and amounts charged to the grant. The FTR contains the rates and
amounts for travel expenses, subsistence expenses, and mileage allowances. It is contained in
41 Code of Federal Regulations (CFR), Chapters 300 through 304.
5. Payments
(a) The Grantee should use the reimbursement method for requesting and receiving
payments under the grant. The Standard Form (SF) 270, "Request for Advance or
Reimbursement," will be submitted to the Agency to request payments. The Grantee will receive
payments under this grant through electronic fund transfers (EFT) by the Automated Clearing
House Payment System. The Agency will make payments within 30 days after receipt of the
billing, unless the billing is improper.
(b) Payment for proper charges will not be withheld during the project period unless:
RUS Guide 1775 -1
Page 6
-(1) The Grantee has failed to comply with project objectives, terms and conditions of
the Agreement or Federal reporting requirements, or
(2) The Grantee is delinquent on a debt to the United States as defined in OMB
Circular A -129, "Managing Federal Credit Programs." The Grantee will be
informed that payments shall not be made for obligations incurred after a
specified date until the conditions are corrected or indebtedness to the Federal
Government is liquidated.
(c) Interest earned on grant funds deposited in interest bearing accounts will be subject
to the following conditions as applicable:
(1) State and local governments. The Grantee may retain interest amounts up to
$100 for administrative expenses. All other interest amounts must be remitted at least quarterly
to the U.S. Department of Agriculture, Utilities Programs, Attention: Assistant Administrator,
Water and Environmental Programs, Washington, DC 20250 -1548. American Indian tribes are
exempt from this requirement under the Indian Self- Determination Act (23 U.S.C. 450).
(2) -Institutions
may retain interest amount
must be remitted annually 1
Management System, Roc'
transfer (EFT).
6. Performance Rep
(a) The Grantee %
become known. Significan
the aictivities supported un(
(1) Problems,
to meet the objective of the
contemplated, and any asc.
(2) Favorable
goals sooner or at less cos
planned.
tions. The Grantee
er interest amounts
;, Payment
electronic fund
c
ents as soon as they
iificant impact upon
iy affect the ability to
of the action taken or
me schedules and
;suits than originally
(b) The Grantee will submit to the Agency a narrative project performance report and
Standard Form 269A, Financial Status Report, within 30 days after each quarter ends.
Period Date Due
(c) The Grantee will submit a Final Project Report, which may serve as the last quarterly
report. Final performance reports are due 90 calendar days after the expiration or
termination of the grant.
Due Date
RUS Guide 1775 -1
Page 7
(d) The Agency may. make site, visits as needed.
7. Financial Management
(a) The Grantee will establish and maintain financial management and recordkeeping
systems in accordance with applicable Federal regulations. The financial management systems
will include:
(1) Accurate, current, and complete disclosure of the financial results of each project
or program. Financial reporting will be on an accrual basis.
(2) Records which identify adequately the source and application of funds for grant -
supported activities.
(3) Comparison of outlays with budget amounts for the grant award. The inability to
process information in accordance with Federal requirements could result in a requirement to
return funds that have not been accounted for properly.
(4) Accounting records supported by source documentation.
(5) Effective control over and accountability for all funds, property, and other assets.
Grantees shall adequately safeguard all such assets and shall assure that they are used solely
for authorized purposes.
(6) Adequate fidelity bond coverage to protect the Federal Government's interest,
where applicable.
8. Retention and access of records
(a) To retain financial records, supporting documents, and all other records pertinent to
the grant for a period of three years from the date of submission of the final project and
expenditure reports. The only exceptions are as follows:
(1) If any litigation, claim, or audit is started before the expiration of the three years,
the records will be retained until all litigation, claims, or audit findings have been resolved.
(2) Records for equipment acquired with grant funds shall be retained for three years
after final disposition.
(b) The Agency has the right of timely and unrestricted access to any books, documents,
papers, or other records pertinent to the grant in order to make audit, examination, excerpts, and
transcripts. The right of access will last as long as the records are retained.
9. Audits
(a) The Grantee shall provide an audit report or financial management report in
accordance with RUS Instruction 1775, Section.21, subject to the audit requirements under the
Single Audit Act Amendments of 1996 and OMB Circular A -133. "Audits of States, Local
Governments, and Non - Profit Organizations."
RUS Guide 1775 -1
Page 8
10. i Program Income
(a).,-Program income earned during the project period will be retained by the Grantee'and
deducted'. from th,e..total `allowable costs to determine the net allowable costs on which the. Federa`
shar of -costs ibased. Program income which the Grantee did not anticipate at the time of the
gran will ber used to reduce the Agency and Grantee contributions rather than to increase the
fund committed to the project.
(1) Costs incident to the generation of program income may be deducted from gross
income to determine program income, provided these costs have not been charged to the grant.
(2) Proceeds from the sale of property shall be handled in accordance with the
requirements of the Property Standards in OMB Circular A -102 or A -110.
(3) Grantee will have no obligation to the Federal Government regarding program
income earned after the end of the project period or from license fees and royalties for
copyrighted material produced under the grant.
11. Prior Approval Requirements
(a) The grantee will report changes in budget and program plans and request prior
approvals for budget and program plan revisions.
(b) The grantee will requestWritten prior.approval from the Agency approval official for
one or more of the following program or budget related reasons:
delivered.
(1) Change in the project or program's scope, objective, or proposed service to be
(2) Change of key project personnel overseeing the project or program.
(3) Absence of more than three months or a 25 percent reduction in time devoted to
the project by the project director, manager, coordinator, or key personnel.
(4) Transfer of funds between direct and indirect budgeted costs.
(5) Transfer of funds among direct cost categories for grants exceeding $100,000
and the cumulative amount of such transfers exceeds or is expected to exceed 10 percent of the
total budget as last approved by the Agency. Transfers for purposes other than those consistent
with the approved Scope will not be authorized.
(6) Transfer of funds for training to other cost categories.
(7) Inclusion of costs requiring prior approval in accordance with OMB Circular A -21,
"Cost Principles for Educational Institutions;" OMB Circular A -87, "Cost Principles for State and
Local Governments and Indian Tribal Government;" and OMB Circular A -122, "Cost Principles for
Non - Profit Organizations," as applicable.
(8) The subaward, transfer, or contracting out of any work under the grant, which
has not been approved in the initial budget. This provision does not apply to the purchase of
suppli�s, material, equipment or general support services.
(9) Any change in the project period to accomplish the stated objectives of the
project.
0
RUS Guide 1775 -1
Page 9
(c) Requests for prior approval maybe,- submitted electronically to the Agency.
(d) -Grantee will request written -prior .approval from the Agency approval official before
implementing any significant project changes or expending grant funds relating to the changes.
(e) Grantee may incur- pre-award.-costs within .the 90 calendar days preceding the
approval date of the grant with prior approval -from the .Agency. The grantee makes pre -award
expenditures at its own risk. The Agency ins under no. obligation to reimburse such-costs if; for
any reason, the grantee does not receive a grant, the grant is less than anticipated, or the grant is
inadequate to cover such pre -award costs.
(f) Grantee will notify the Agency promptly in. writing whenever grant funds are expected
to exceed Grantee's needs for the project period by more than $5,000 or five percent of the grant,
whichever is greater. m
(g) Grantee may use the budget forms that were used in the application or a letter when
requesting approval for budget revisions.
(h) Grantee may _submit requests electronically (facsimile or electronic mail) or in writing.
(i) Grantee will normally be notified within 30 calendar days of receipt of the request for
revision whether the request is approved. If the request is still under consideration at the end of
the 30 days, the Agency will inform the Grantee in writing of the date the decision may be
expected.
12. No Cost Extensions
(a) The Grantee may initiate a one -time extension of the expiration date of the grant up
to 12 months if additional time beyond the established expiration date is required to assure
completion of the Scope or objectives within the-funds already made available. The Agency will
not approve an extension if the following conditions apply:
(1) The extension requires additional Federal funds.
(2) The extension involves any change in the approved objectives or scope of the
project.
(b) For one -time extensions, the grantee may notify the Agency electronically by
facsimile or electronic mail or in writing. The notification must provide supporting reasons for the
extension and the revised extension date at least 10 days before the expiration date specified in
the grant.
(c) This one -time extension may. not be exercised merely for the purpose of using
unobligated balances.
13. Property Standards
(a) The Grantee is responsible for compliance with property standards identified in OMB
Circular A -110, Section .34 or 7 CFR 3016, section .30, as applicable. The Grantee will maintain
a property management system which, at a minimum, meets the requirements of OMB Circular A-
110 , as applicable. The Grantee also will establish written procedures for procurement of
supplies and other expendable property, equipment and other services with grant funds in
accordance with OMB Circular A -102 or A -110.
RUS Guide 1775 -1
Page 10
14. Equipment
(a) Title to equipment purchased with grant funds will vest in the Grantee, subject to
conditions set out in OMB Circular A -102 or,A =1 X10. 'E quipmnt means an article of non-
expendable, tangible personal property having 'a useful ~life of more than one year and an
acquisition cost which equals or exceeds''$5',000:
(b) Grantee may purchase furniture and office equipment only if specifically approved in
the Scope. Approval will be given only when Grantee demonstrates that purchase is necessary
to complete the program for which the grant is established. Commercial purchase under these
circumstances will be approved only after consideration of Federal supply sources.''
(c) The recipient will use the equipment in the project or program for which it was
acquired as long as needed, whether or not the*project or program continues to be supported by
Agency funds. The property may not be encumbered without the Agency's approval.
(d) When the equipment is no longer needed for the original project, the equipment may
be used for other activities sponsored by the Agency and if no such activities exist, then
equipment may be used for activities sponsored by other Federal agencies. The- use and
dispolition of equipment will be handled in accordance with OMB Circulars A -102 or A -110, as
applicable.
(e) For Equipment with a current per unit fair market value less than $5,000, the Grantee
may retain the equipment for other uses, sell it, or dispose of it without compensation to the
Agency. For items having an acquisition cost of $5,000 or more, the standards identified in OMB
Circular A -110, Section .34(g), or 7 CFR 3016.32(e) will be used. [Disposition]
(f) The Agency may reserve the right to transfer title to the Federal Government or a
third party named by the Agency. In cases where the Agency elects to transfer the title, it will
issue disposition instructions within 120 calendar days after receipt of a final inventory, listing all
equipment acquired with grant funds and federally -owned equipment.
15. Supplies and Expendable Property
(a) Title to supplies and other expendable property will vest in the Grantee upon
acquisition. At the project completion or grant expiration, the Grantee may retain or sell an
inventory of unused supplies:
(1) If the inventory is less than $5,000, without further obligation to the Agency.
.(2) if the inventory is $5,000 or greater and is not needed for any other federally -
spons red project or program, the Grantee will compensate the Federal Government for its
share.!
16. Intangible Property
(a) Title to intangible property acquired under the grant will vest in the Grantee upon
acquisition.
(b) Copyrights. The Grantee may copyright any work that is subject to copyright and is
produd.,ed in the performance of work under this grant. The Agency reserves a royalty -free,
nonex lusive, and irrevocable right to:
RUS Guide 1775 -1
Page 11
(1)� Obtain, reproduce, publish, or otherwise use the work for Federal purposes and
(2) Authorize others to receive, reproduce, publish, or otherwise use such data for
Federal purposes.
.(c) Grantee shall use intangible property for the originally authorized purpose an-d shall
not encumber it without approval from the Agency. When no longer needed for the originally-
authorized purpose, disposition will occur as outlined in OMB Circular A -102 or A -110.
17. Cost sharing
(a) The Grantee must maintain records of all project costs that are claimed by the
Grantee as cost - sharing.
(b) All contributions, including cash and third party in -kind, shall be accepted as part of
the Grantee's cost sharing or matching when such contributions meet the following criteria:
(1) Are verifiable from the Grantee's records.
(2) Are not included as contributions for any other federally- assisted project or
program.
(3) Are necessary and reasonable for proper and efficient accomplishment of project
or program objectives.
(4) Are allowable under the applicable cost principles.
(5) Are not paid by the Federal Government under another award, except where
authorized by Federal statute to be used for cost sharing or matching.
(6) Are provided for in the approved budget when required by the Agency.
(7) Conform to other provisions of OMB Circular A -110 and 7 CFR 3016.24, as
applicable.
(c) Third -party in -kind contributions mean property or services which benefit the project
or program under this grant and which are contributed by non - Federal third parties without charge
to the Grantee.
(d) The Grantee must document the basis for determining the valuation for in -kind
contributions from third parties. These records are subject to audit by the Agency. If the Agency
determines that the valuation is deficient, the Grantee must secure replacement contributions as
a condition for further disbursements of Agency grant funds.
(e) If the grantee becomes aware that it may be unable to provide the contributions of at
least the amount identified in the approved budget for the grant it should:
(1) Provide written notice to the Agency of the situation;
(2) Indicate steps it plans to take to secure replacement contributions, and
RUS Guide 1775 -1
Page 12
(3) Indicate the plans it has to either continue :or phase out the project in the
abs nce of contributions.
18. Suspension or.Termination
(a) The grant may be terminated in whole or in part in any of the following situations:
(1) By the Agency if Grantee materially fails to comply with the terms and conditions
of this Agreement. The Agency shall promptly notify the Grantee in writing of the determination
and .the reasons for the termination, together with the effective date. Grants can, be terminated
for cause, such as: failure to use funds for authorized purposes, poor or no progress, untimely
reports, and failure to properly account for expenditures or property.
(2) By the Agency and the Grantee by mutual agreement, in which case, the two
parties will agree upon termination conditions, including the effective date and, in the case of
partial terminations, the portion to be terminated.
(3) By the Grantee upon written notification to the grant approval official setting forth
the reasons for such action, the effective date, and in the case of partial termination, the portion
to be suspended or terminated. If the Agency determines that the reduced or modified portion of
the grant will not accomplish the purposes for which the grant was made, it may terminate the
entire grant
(b) The Grantee will not incur new obligations after the effective date of a suspension or
termination unless the Agency expressly authorizes the costs. The Agency will allow costs for the
Federal share of obligations incurred, if the costs were properly incurred by the Grantee before
the effective date of the suspension or termination and the Grantee could not reasonably avoid or
eliminate them. Disposition of expendable and non - expendable property will be in accordance
with the standards of Sections 14(d), (e) and (f) of this Agreement.
19. Appeal
(a) The Grantee may appeal certain adverse post -award administrative decisions made
by the Grantor. Any appeal shall be made under 7 CFR Part 11.
20. Publications
(a) The Grantee shall place an acknowledgment of RUS support and a disclaimer:
(1) In any publication (including World Wide Web pages) of any material based on or
developed under this project.
(2) During all news media interviews, including popular media such as radio,
television, and news magazines.
(b) The acknowledgement shall be in the following terms: "This material is based upon
work supported under a grant by the Utilities Programs, United States Department of Agriculture."
The di sclaimer shall be "Any opinions, findings, and conclusions or recommendations expressed
in this material are solely the responsibility of the authors and do not necessarily represent the
officia views of the Utilities Programs."
Attesting Signature:
Revised 08 -22 -07
Grantee
Eagle County Government
r
By
vY`,Xl�
(Title)
Grantor
UNITED STATES OF AMERICA
UTILITIES PROGRAMS
By
RUS Guide 1775 -1
Page 14
Director, Business and Community Programs
(Title)
RUS Guide 1775 -1
Page 13
(c) The Grantee shall place the following non - discrimination clause on the front cover of
publ cations: "(Name of Grantee) is an equal opportunity provider and employer" in print. no
sma ler than the text.
(d) The Grantee shall submit one copies of every publication of material written or
published under this grant to the Grantor.
21. Civil Rights Requirements
(a) The grant and any program assisted by the grant are subject to the provisions of:
(1) Title VI of the Civil Rights Act of 1964,
(2) Title IX of the Education Amendments of 1972,
(3) Section 504 of the Rehabilitation Act of 1973, as amended,
(4) the Age Discrimination Act of 1975, and
(5) Form RD 400 -1, "Equal Opportunity Agreement," and Form RD 400 -41
"Assurance Agreement," which the Grantee has filed with the Agency.
22. Availability of Information
(a) The Grantee shall release to the public all non - confidential information resulting from
grant activities.
Grantee on
U N00
A (-) I - , has caused this agreement to be
executed by its duly authorized and attested and its
corporate seal affixed by its duly authorized... ,
�USDA
�� Rurai '
Development
United States Department of Agriculture
Rural Development
April 24, 2009
Eagle County Government
Solid Waste & Recycling Manager
P.O. Box 250
Eagle, Colorado 81631
Dear Mr. Rasnic:
Your application for the fiscal year `09 Solid Waste Management Program in the amount
of $100,000 is complete and eligible for funding.
We are enclosing the Grant Agreement and other forms that must be completed and
returned so we can proceed with our recommendations for grant approval. Please refer to
the checklist of items that must be returned. Before signing and dating the Grant
Agreement we suggest that you: 4
• Check the Federal dollar amount awarded.
0 Check your share of project costs.
• Check the project and budget periods.
0 Check the approved budget category amounts.
Sign and date the Grant Agreement and the "Request for Obligation of
Funds." Return the two originals to us.
Please note that the Grant Agreement contains the terms and conditions for your Solid
Waste Management Grant. Certain applicable Federal administrative standards are
incorporated either directly or by reference in the Grant Agreement. In accepting this
grant, you agree to comply with all provisions and requirements contained in the Grant
Agreement and the following:
0 OMB Circular A -110, "Uniform Administrative Requirements for Grants and
Agreements with Institutions of Higher Education, Hospitals, and Other Non -
Profit Organizations." (OMB is the abbreviation for the Office of
Management and Budget.)
655 Parfet Street, Room E100 - Lakewood, CO 80215 - (720) 544 -2929 - (720) 544 -2972 FAX
Colorado Relay (800) 659 -3656 - www .rurdev.usda.gov /co /index.html
Committed to the future of 'rural communities
USDA is an equal opportunity provider, employer and lender.
To file a complaint of discrimination write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W.,
Washington, DC 20250 -9410 or call (800)795 -3272 (voice) or (202) 720 -6382 (TDD).
• 7 CFR Part 3019 - -the USDA implementation of OMB Circular A -110. (CFR
is the abbreviation for the Code of Federal Regulations.
• OMB Circular A -122, "Cost Principles for Non - Profit Organizations."
Return the agreement and forms to us by May 8, 2009. Processing of your grant will be
delayed if all items are not fully completed and returned by this date. If you have any
questions about the requirements of the Grant Agreement, or the forms, please contact me
at (720) 544 -2929 or robin.pulkkinen @co.usda.gov.
Sincerel
f.
Robin Pulkkined
Loan Specialist
Business and Community Programs
Attachments
REGIONAL WASTE DIVERSION STUDY
Eagle /Garfield /Pitkin Countv
.4 Technical Scope of Work
,ask I - Regional Diversion Collaboration This task will support a face -to -face meeting to be held
very other month in Glenwood Springs with staff and leaders from each association served by, and
corking towards, the grant project (i.e., the regional waste diversion partners). These meetings will be
rganlzed to:
Direct project tasks to best provide needed results
Review results of completed tasks
Identify which regionalized management efforts have the greatest benefits
Develop strategies for implementing new /expanded recyclable, yard /wood waste, special waste,
and problem waste diversion programs
'ask 1 will include six regional meetings throughout the study with community staff and other interested
arties. These will be facilitated by the project consultant and will include all necessary meeting
Banning and follow -up materials.
'ask 2 - Waste Composition Studies This task will include a single- season waste composition study
Y
XCS) at each of the four landfills in the region. The purpose of the WCSs will be to:
Evaluate the success of existing diversion programs by observing recyclables, organics, and
special wastes that are still being placed in the waste stream
Identifying those recyclables, organics, ands special wastes that should be targeted for
p g
new /improved diversion programs
Provide hands -on waste sort training to 20 workers so they can lead future sorting efforts
The WCSs will be conducted at the on -set of the Regional Waste Diversion Study, as the information
g6c.,nerated will drive subsequent tasks. Each WCS will measure approximately 20 materials from about
1 samples taken from in- coming waste loads at each landfill. These loads will be selected to represent
tl e relative quantities of residential, commercial, and industrial waste received at each landfill. The
samples will be about 200 pounds in size, and will be sorted according to an established sorting protocol
t at generally follows ASTM D 5231 -92 (reapproved 2003).
Each landfill WCS will take approximately two days to conduct worker trainin g complete lete the sort
p
pus some set -up and break -down time. Specific sort logistics will include collaboration with. each
landfill manager to isolate a safe location for sorting and management of sorted materials , plus
coordination with local haulers to select and tip targeted waste loads at the sort area.
T sk 2 will be supervised by the project consultant team and will utilize a combination of community
staff and local labor to complete the sort activities. The grant request includes funding for the laborers
've laborers for two days at each of four landfills, sort equipment that will be -used for all four sorts (a
p ecision scale, emergency eyewash and fast -aid kit); sort supplies (baskets, hand tools, shovels, rakes,
Dtcember 2008 ���� / Page 15
REGIONAL WASTE DIVERSION STUDY
Eagle /Garfield /Pitkin County
loves) and the rental of a protective tent and sorting tables. Appendix C includes a list of WCS
quipment.
he WCS will be analyzed in terms of materials composition, statistical significance, landfill - specific
►mpvsition, and aggregated regional results. A short memo report will summarize the results and
clude recommendations for future waste diversion activities in all three counties.
,ask 3 - Track Regional Recyclables Flow & Measure Waste Diversion There are numerous
urbside and drop -site programs for collecting recyclables throughout the three counties. � The first part
f this task will allow each program to be inventoried in terms of materials collected, collection
iechanism (i.e., type of program, infrastructure, and containers), haulers , and disposition of collected
laterials. Results will be illustrated to demonstrate the flow of recyclables throughout the region.
aseline quantities of diverted materials (recyclables, yard /wood waste, special waste, and construction/
a.1,molition debris) will subsequently be estimated for the 2008 calendar year. Based on this information
id the planning discussions conducted in Task 1, a region -wide ten -year waste diversion goal will be
weloped.
Task 3 will be completed by staff and the project consultant. It will include a tabulation and map of
current recyclables flow, calculations of current diverted quantities, and establishment of a ten -year
aste diversion goals) for the region.
ask 4 - Public Survey on Recycling This task will build on 'a general public survey recently
)mpleted by Garfield County that identified a strong desire for more recycling. The survey to be
)nducted in the Regional Waste Diversion Study will encompass all three counties and will focus on
.e public's desire and willingness to. recycle (possibly even a for new services). The purpose of this
pay ) p p
sk will be to both educate the public and assess the socio - political feasibility of additional diversion
id the alternative management of problem materials.
good example of information from the survey is whether the public might support new ways of
ndling glass (a material with high collection and transportation costs and a limited Colorado market).
ternatives the survey data might support include:
♦ Collection of glass separate from other containers so processing is not required
♦
Development, of local markets (such as crushing for roadway aggregate substitute)
♦ Elimination of glass from the recycling ltocrether
gp program b
Task 4 will be led and largely completed by the Town of Vail, an affiliated organization of Eagle
C unty. The task will include development of survey questions, random targeting of registered voters in
e ch of the three counties, letter notification of an on -line survey, and data analysis. An on -line survey
service will be used. Approximately 30,000 residents will be targeted and the goal is a 5% response
r c4 'te. Survey results will be summarized in a presentation to the regional waste diversion partners and
community leaders, and posted on the website (to be developed in Task 7).
cember 2008 Page 16
51
r
rN
REGIONAL WASTE DIVERSION STUDY
Eagle /Garfield /Pitkin County
.ask 5 - Ptoblem Materials Research This task will include a separate analysis to assess management
ptions for four separate problem materials in this region. All four materials are generated in notable
uantities, create nuisances at the landfills and /or can potentially be diverted to save landfill space. Each
nalysis wi�l be unique as a function of the material:
Construction and Demolition waste C &D
( ) - This analysis well focus on a survey of policies that
have been implemented throughout the U.S. to encourage the diversion of key C &D materials.
Those policies that could potentially be implemented in the re ion are likely to include a
requirement for recycling plans and /or deposits tied to construction and demolition permits.
Likely policies will be assessed in terms of political feasibility and implementation requirements.
p q
Scrap Tires - Per state regulations, residentially generated scrap tires are banned from landfill
disposal. This creates the problem of managing this material in an environmentally, cost-
effective manner. Few, if any, markets exist on the West Slope for scrap tires. Some landfill
facilities pay outside vendors to haul the tires to recycling or shredding facilities on the Front
Range. At least one other facility employs g y em p y manual labor to quarter the tires after which they are
landfilled. Quantities of scrap tires accumulated by in the service area resent a management
p g
problem. This task will evaluate scrap tire quantities collected at the four landfills, as well as
assess alternative management methods that may be feasible if the communities work together,
rather than separately. Reasonable options are expected to include community partnering to hire
. g
a mobile shredding/chipping/splitting service and possible new local markets.
Textiles -The size of the textile issue will be quantified from the WCSs. Reuse and recycling
options for managing these materials will be evaluated. Markets will be limited to Colorado (e.g.
rag outlets and reuse outlets) to minimize transportation costs. They will be assessed in terms of
collection, processing and hauling requirements.
Plastic bags - Options for reducing and recycling bags generated at local groceries will be
evaluated in terms of both ways to encourage the use of re- useable bags by the public and plastic
bag recycling by groceries (most large grocers currently accept used plastic bags, but the
awareness of - and incentives to - the public are small enough that these programs do not
stimulate significant diversion). Research will be tied to education activities in Task 7 and will
consider the value of a specific outreach campaign, as well as potential policy to encourage more
reuse and recycling.
Oil and gas (O &G) industry waste -The size of O &G waste within the regional waste stream and
diversion opportunities will be assessed during the WCSs. This data will be used in two to three
mee�ings with local O &G stakeholders (e.g., Encana and Exxon Mobile) that will focus on
strat gizing options for reducing and recycling key materials. Research will be limited to local
pote tial markets. No assessment of hazardous or special waste materials will be conducted.
!sk S will be conducted by staff and the project consultant. It will include tabulation a short memo
port summarizing findings, tabulating management options, and recommendations for future diversion
tions.
D�cember 2008 Page 17
REGIONAL WASTE DIVERSION STUDY
Eagle /Garfield /Pitkin County
ask 6 — Recycling, Composting & E -Waste Facility Tours As the governments in the region
contemplate which waste diversion facility improvements are needed and /or what type of new facilities
to build over the term, it is important for staff and decision- makers to have first -hand knowledge of
e emplary operations that are located in Colorado. In addition, operators of existing facilities have
hard-earned technical knowledge that they are eager to share with Eagle, Garfield and Pitkin Counties.
This task will include the coordination of site visits by key staff and leaders to the following facilities:
Composting facilities -Mesa County (Grand Junction) and Al Organics (Eaton)
Material recovery facilities - Boulder County (Boulder) and Altogether Recycling (Commerce
City)
Electronic waste facilities - GRX (Denver) and Lifespan Technologies (Grand Junction)
sk 6 will include tours coordinated over two to three separate days (one to two to the Front Range
and one to western Colorado). The grant request includes van rental, gas and lunches for participants.
Task 7 - Waste Diversion Education Currently, education programs are decentralized through the
counties and various municipalities - materials diverted vary widely and messages educating the public
a out the importance of diversion provide mixed messages to residents and businesses. This task will
a low the associations to develop a regional waste diversion education program that will work towards
r aching a broader, regional audience and providing consistent messages about the benefits of diversion,
t rgeted materials, and recycling/composting guidance.
N
ecific activities are expected to include:
Develop.a Regional Website - The website will establish waste diversion as a key responsibility
for all citizens and businesses in all three counties and provides user - friendly, direct access to
critical information:
♦ The website will be developed with a logo and initial content including diversion contacts
in every community and guidance /directions for local diversion activities
♦ It is expected to have a static home page, 3 dynamic pages (which can be updated
regularly), a resource page and a contact form where users can request info but spam
activity is minimize
Information posted to the website will include:
♦ The what, where and how of diverting waste in the service area
♦ Key contact information
♦ Regional Waste Diversion project results - including the Task 4 Public Survey results
♦ Links to the other associations
Develop a School Outreach Program -This program is needed to educate grades 3 through 5 in
each of the 27 elementary schools within the region (research indicates that these grades are the
most effective targets for this type of awareness and training). Education materials will be
developed so that hands -on teacher training can be conducted by local government staff (i.e.,
D4ember 2008 Page 18
REGIONAL WASTE DIVERSION STUDY
Eagle /Garfield /Pitkin County
i
public works employees , recycling coordinators or environmental health specialists) and
subsequently teachers can use the materials to interactively teach their students. The materials
will include:
♦ Interactive video on reducing, reusing, recycling and rethinking environmental
conservations - such as "011ie Saves the Planet" which is available through SWANA
♦ Lesson plan handbook with teacher /trainer guidance, instruction material and student
projects tailored to each of the three grades - it is expected that this material will not be
generated from scratch, but will instead utilize existing resources such as the "Chaffee,
Lake & Custer Counties, Colorado Lessons in Sustainable Waste Management"
developed in 2006 under an earlier USDA grant
♦ A poster describing the benefits of recycling tailored for each grade
ask 7 will be implemented primarily by local recycling education coordinators from throughout the
�gion. Expenses include purchasing one video for each school, printing a handbook for each teacher
Fthese grades in each school and producing a poster for each grade in each school.
ask 8 - St4dy Wrap -Up This task will specifically address the commitment to continue the work of
aste diversion long after the project grant is completed. It will include up to three presentations by
aff and the project consultant to the commissions, councils and trustees that represent the associations
;rved by the grant project. These presentations will summarize the findings from all seven tasks but
ill focus obi specific strategies for implementing recommendations from the Waste Diversion Study.
y
hese recommendations are expected to include:
Expanded diversion programs to target materials identified in the WCSs as not being recycled or
diverted efficiently (Task 2)
Implementation of publicly- supported recycling suggestions (Task 4)
Region-wide alternatives to managing problem wastes (Task 5)
Region -wide waste diversion outreach and education (Task 7)
Other activities to meet the 10 -year diversion goals (Task 3)
sk 8 will include up to three presentations at the end of the project to disseminate information and
tc, ke action to leverage the grant project results over the long -term.
4�5 Grant Project Schedule
T e tasks of the Waste Diversion Study will generally be completed in accordance with the schedule
b low. This schedule assumes a grant project start date in October 2009.
B sed on a 12-month grant schedule, all work will be conducted no later than September 2010. This
timing will b critical to the communities in the grant project service area, as they intend to develop their
T n -Year Regional Waste Diversion Strategy for implementation in 2011.
Dfcember 200$ Page 19
IMM
W
0
cc
a
F—
z
a
cc
a
z
0
CIO
M
W
d'
0 >
W 0)
� o
aN
CL
L
.J
a
a
Z
oW
oa
w�
oC --
C/) W cn
W
z Cn
�o
oL)
z
.J
w
LL
a
0
W
J
W
0- _
'U
6091
601
69-
601
C)
�(DN0
0
0
IICD
0
0
0 0
00
0000
O
0 -ok
oOf�M
0
O
N
MC
Y/ w
cOON
(0
C0
t o
>
r
N
O
U
t_
cn
ca
0 O
c
q:f
�-- N N
p
cu
a-
601 6%
N.
C)
0
of
a)
cC)
0
�
NW
N
C
'O
�-
_..J
—
o
Q
�oow
�
cc:
��
>�
dw
U)
N
0000
0000C
C>
0000
000
-Q
.LZ
c
000000
D
cn
0000
^>`
>. c c
O
0:
y
tp
■
W C
=
N
1
�
p
LID
Los
X000
vi0000
:n
00000
000
000000
00
0000
O
rp,
ui r
tU
NO
o
(0
�C)
0
(0
t4
6S.
64
6p
cl,
r
C
a�
06
a.
,*AO
0
.00,
o00
00000
0000
00la
co
(0
D
co
w
00
0000
�
0
ID
M
Q
0
(0
NO
C0
(0
O
c0
00
_O
U.
OOOO
O
C0
(0
14
OOO
CO
00
000000
00
d'
00
N
OO
00
d
OOOO
603 (79. NOI
O
(0
Q-
tt
(y
Cn
W
Cn
C)
(0
Cn
C�
00
N
(/�
Q1
N
C3)
O
N
O
Nt
d-
N
d-
w
d•
�t
O
M
N,
CO 44
06
bol),
�-
O
C)
M
i
r
O
.�.
0
�
co
C.
CO
oO
�
00
11111111
c
00
N
V
N
00
ilia
N
1101111
O
d'
'c7
N
O
d'
CO
d
N
CD
CO O O
Los
O
O
�
cc
i
>4
. .v. Vie_ r ,.r r ..,. �5� _ _.., - ., ..
�- .- ,_.... �._... .. >.. ..... -..- _
.. .... _ .. . .,. , - .. t...
._.,..
... ., t 4.
...,. ... .• �e .,. F..�:. t:v .��..
�. "'
x _. w "� .
�
e 2 p:
�:: -:., -`.
>..z, •_- �t
�. -,.. �._„ ::!. _. r. v ice.. w. , .. ,,t ... ;.. ._ _a_ .. _ _ .._.
✓.t. .i.. w .,_ ,..... '•.,r ,n.. Y 1 �
J, _ -,P:. : . __:- ...y: ��. . ..tea -r. - -.c -v_.. Yk' ..1w:�,. -.t wuwteeh-
1 ..........s- ^`ta. -.F .r 4 �rJ'.� _ �.�, .. h .. Ja . _...:�rw. . , - ,. _ ."- ,
..
,. K.? �!`'d : r. �1?".. ...r _ - .. 4-
,.>. a.. .. -•. ^._ _
y_ _ r..cgir
.a..xa e.. .::'S..,✓'. s. :.wy:..wr:«A�n �ir.
;_ ._ . -.. ,- ,:A_... .- ..
., _ ...
�
.rr .n > a3.. _. .�. ...
_. _ Y
. -:.w� .. -+Y. �
-
♦.- ...nom. - 9. _z. -rs.
....:. ..v ..2._ - - t
-�Y
t «_ :,� _:...._.. ,.._, - i •1c'
•+y-_.
�.. ...P,
it''.
..ls !S„' L -• .,�' -
F
yM��w
Vic. '
". .. ..
w _ .t x. .:- . , .. _ s _
...,
_.'S.. .- ':ir3l.r -r 5� d --a x�'r�r` -
...4ii _ ". _1 4- a
S
�x ,s x
F3
F
(�:a ,'.'4S'it:, :�•_ S'h a!:ice -
�-
_ .i� ..
_1 " cam_.
♦f.- C'S'u'%�.'4. -�Z'A
ti.
•Y;'; � -it
s + -
d y., r
Y ?'£�-"<i-
?I M yr. -.�
�:r. •`Sic�">.'-
, _ :'t ,. - r
_ �- _ ,,. . __,
- t ..t,y: ai-: . .2= r '1'- 4 t
'l. _ __ r _ _
3 tii�, _ _ _ _
r'aS ���
''Lb - ^' • 1 _
.:_'i _,+ .. . -__s � fit r.: d r_K 'n C , � n� r
,. ": -�. ...... .. tea. , y.. .: T i..r .-. ., - ," _.. �. ✓ -«.
i - 1 �a°: .. ��"'� �p�s
�` �°.�°i<
3
,:: _:4,.
t {• `"3t _
'- � , - _
<Eh
J�
�: ,3 "� -. - ys
it - :Yv�- i r� S ��%. s. �'-Y_
�L>�
S -
-.�'e
g3:att- .,-•9A ., - - -.r7 .'.i - -' .. r:. ..r.._ -. , -.:�f
.� .t. ,. -.t __ -.... . - - ,-..r .. _, _. -... ,: -.-a v, a '- "#n .�' �7
-��"' y;e _ � f. - � ._�•c.. : .R
_. .,. 3 . "..hd ... .. ,." 'b4tipCi9� - _
3. ✓.7,...z _..:: : +. >.. �».i?�.,. ♦ ..: .r .. ,.F - s-
�. -..- _ 7 _ :. •."..:. sa- _.r w. _ _ .k�._i : .i .... -'z+ .. '. ... -.
,- .� 'i'tir L :, ����♦�° �A,. w-. ;- . -, ���a - -ry : r I, a. t ,v,. ..
,-..� . - - - � .,, �
- �,. _ '�_
aaF:
_ e� ....6.�...
� >.. -N., -.
-_- r.
_ _ ,... ;... - _
.,.,. :
'gam
_ _ ,e -.3-.,
.Z: ..!2.�.w
." : _.:
T..
� • -a.. h-:
._ s •,1 .�i';E .. �.' - -Y1
T>,r� _ ai.�C _ _J♦S
N<, -e n.. .Zti:.. C -t. ..6'i -: i. :arx..
,__ _._?i. .bY:" �.. 3•`,�
T1 -rt. � .O ,. �'.~
-!�. {3 ; T _`E:-„ <-. -.- �[ -:.e -.
..f � :1:.. �.: - - `- T"'r:_
s
� � rte.... s r -.
�� � '.ui
3..m - -'
_. _ _
��.:� -
�_
>, -
.�J
-
. , , ,.- . _ „t.
'+ d. �-Y i.. �'- --
- - .. �- '.:.. -; < � ._ - �.., ;�'... ,, �. .sue'. -- '"°✓
_ro
K' -5'a s
� - � -
�-. - -.
� 3z
t
C - !� - '•;.,es :.s : 3Y
g - -
S..s' ^�-
-
.,.:��+1�i - -
.E �.�at. _ i. .:. 0' .- .. �:_ _.
�,^ H� �Y - - �.
1 �
'T°
'1.
- �
s
1 •. �.J
? . ; �.�
f ... <}..ttf
[nT d j�'+ �. ? 1p.
E 't1 Y':':5t � "yy �� 4-i " �?5t
.l- yi.� Y. r^p ✓,.c '[' '�'r• 2aar
.�"�T +IYI `!_i t�';L.:- _ -_ ! #._
. S '� � _ :Y _.• _ -R . �� ,.' � �.,_
'a
�-
3
='}T
�� +�- - - - _ - -
_.. i ..... . yf_ " [ ., ..r � . 3 !:: _
-
X, Y r
- !..°'mss
%Y ka _ -4 :. Y V.
�.±1c.t .cr• ��,�nn.x�.ryb".a
r �• y �Ya� ?`>xiY? � , M' Y r
-�' r• - ice: "ass.:
� i ,s��:$`I f .. �.
- -
EON
Task 1- Regional
Collaboration $21,070 $25880
$0
$0
$10,080
$23,700
$129780
Task 2 - Waste
Composition Studies $41055 $13320
$45180
$10,240
$15,360
$1,600
$319380
Task 3 - Track
Recyclables/Measure $2,165 $480
$830
$0
$49560
$0
$5,390
Diversion
Task 4 - Public
Survey $2,905 $19440
$14,100
$7,600
$12440
$0
$23,140
Task 5 - Problem
Materials Research $39785 $0
$0
$0
$6,290
$450
$69740
Task 6 - Diversion
Facility Tours $19,440 $240
$29770
$0
$17920
$0
$4,690
Task 7 - Diversion
Education $97720 $960
$113020
$0
$0
$0
$11,020
Task 8 - Study
Wrap-Up $3,115 $15080 $0
$0 $37960
$900
$4,860
t 1
re((
1 �/
_ y
wing
4@4r22/2009 15:14 7205442972
PAGE 08
nt
0
'� VO O M O Y �
(y)
co e C)
A&.J
CL
LL
cc
4s
QV
LL
LL 43
0
q
low
Q3
CD
rl i
0
0 0 co
OM
0
z
z
0
ch
Ai
Itt--
-0 tp.-
0
a)
(D PRIM
z 52-
M� (i)
L.0 LLJ LL
m MCI 4!,%
APR-22+2009 15:17 From :7205442972
ID: Ea,--.i le Co u ri t.H La n d f i 1 Page :008 R:--96-"-
LL 0
C/)
U n
Ilk
16
CD
C:
co
z
.0
o
to
0
E
CL
0
cry ,
E
o
0
C: c
C: <
LL
0
tj
C; U
m 0
CL
C�
(6
APR-22+2009 15:17 From :7205442972
ID: Ea,--.i le Co u ri t.H La n d f i 1 Page :008 R:--96-"-
04/22/2009 15: 14
7205442972
PAGE 09
•
RPR-22 12 000 15:17 From:7205442972
ID: Ea,Lile County Landfil Page :009 R=96%
fd
OC
FieC�
Qn
V)
C:
0
V
:3
CL
m
0
C)
D1
%IVA
Ix,
N
y
6W
k
tv
4, A,
UZI
4a DtiR
)vs.
3
lAlf
E-WA
�XaI
ib
A;+f
let,
SI
RZ,
•
♦
fir: i S
�f
i
�:a
a
:�i�:�t'
�
"ii
:
.7 %tv4
;41
04,
!%a
17
two:
55
-.a r
Gov
"iyoo, ot
set
31
We
, z
wT.a%
S�
if
(to
A. J
.—N
Or
•
RPR-22 12 000 15:17 From:7205442972
ID: Ea,Lile County Landfil Page :009 R=96%
fd
OC
FieC�
Qn
V)
C:
0
V
:3
CL
m
0
C)
D1
F
U
w
O
a
z
Q
CC
0
z
0
cic
w
o >
LLI o
C/) o
Q N
Qa
Z
0 L
c� ~
wa
wW
zC/)
= 0
o V
Z- — -i
LL
J 11
J
U L U
(l�
L- 0
O
O Cl�
O N
N
O N
C
69-
co
O. N �
O'=7
CY)
O O
O"0
O
C
° �
�
�Q
o
c� 69
C 0
%_ � a)
o_ 4, C
'- p 0
to cz co
U) U) c
rs °�' �
0 a) Cn
o
C L Cn � 'Q
Q
O 06
Y o o
a o) o
U) CL
W °� COO
C
C
�- CO
0
U) N
L Q Q)
0
O r
o
O
�--
C M
CS
O
co L
Cn
7 0
O
�
O O L
6Fi
-Y p C
O
cn U) ,._, O- LO
0 70 (n
cd �? >.
C C CD
C m m w N
L
U) CD
O O
Q- LL W
N T
Q
T O LO N
0)
C)
C
a)
C
E a) '-
(l
.0- j N
�
c 0
cz
o
O
U a)
ca
w
�—
>
_
co
-0
a)
CD
cz
co
0
U
C
U
cz
cz
L-
t
a)
0
0"
O O 0 0
0
O
O
O O
L
O O O O
CO
O
N
O O
Cl-
C
'~
O Co U-) O
co
O
(3)
00 T—
69. 69 6>
Efl
6F3
69-
C
co
O
^
U)
CO
00� LO
�
CD
U
U
CO
O COO
>
C
6�
.0
CL
cCS Cn
v,
C Cn
_
>
0) p
a)
>
CIO
O 0
C
U
�- �
N N
a)
>
a) C
co
C �
c� >
U
N
C Q-
N o co
N
LL
p
i
C
QCn
C
E v)
a) p
a) E X
U
�
�
o
9 p
> C
c
Q
6F O
C0 O
a) .
0
0 Q
.-
�
Cil
fl
Cn
b
6 C N
O
N >
U
%+--
a)
U
O L
7 U CLQaL
{
�
M !)
O
cCS
i C C
cZ M
a)
U) �
>.
RS n
> Q t
L
O
Q
Q
iL _
7 o a) (1)
Cn O
V—
�
" a
O O
.
T
@ C
" O
C I U U
U)
a)
Q- U)
>
w
O N
-C O
00 U
C
>
Z) "
a)
a U-
O
_
c6 —O
�
U U U 0
o
0
C
n CO
O Cn O O
�
N +�
U) p
C'U
O
N
O (n
a O
G1 0 O U
LO
Cc
n O
>� •
O
v 5 )
H a)
E N
c p
O N
cz
U O )
-I--
C C a)
x
O -0 c
c$
O Q co
U) 66-
a)
0 -n
Z N T— 00
C:L
O
O �
co c� >
CL
O
C
O �-
Q
N
-C
C 0
O O O (a
CD T— �.1 N J CD
lt) It Q
(a
(� �
COD
T m CL
ap
fR
ch
6cj
U)
d
O to
D
N
U)
c[1 C
.0 RS
-
C
C13 C
c,n c
�
O
U
O
co
L
>.
Cn
N
E
O
U)
C
a) 'O
U
O
�
p
N
>
C
C
O cti
0-
O
J
L
_0)
-0 CO
Q
-0
X
70
ca
C
'U
C
0)
O
U)
J
0-
cz
-j
cn
O
C
v
(a O
U)
U)
co
Q
O
+-j
X-
U
>•
�
O
Q J
`'S
~S
U)
CC
E—
W
CC
Z- — -i
For All Farmers Programs
44.
CERTIFICATION APPROVAL
EM, OL, F0, and SW Loans
This loan is approved subject to the availability of funds. If this loan does not close for any reason° within; 90_ days from the date
of approval o in this document, the approval official'wll'request updated eligibility information. Theundersigned loan appli--
cant agrees that the approval official will have 14 working days to review any updated information priof:to submitting this
documentfor obligation of funds. If there have been significant changes that may affect eligibility, a decision as to. eligibility
and feasibility will be made within 30 days from the time the applicant provides the necessary information.
If this is a loan approval for which a lien and /or title search is necessary, the undersigned applicant agrees that the 15-- working-
day .loan closing requirement may be exceeded for the purposes of the applicant's legal representative completing title work
and completing loan closing.
COMMENTS AND REQUIREMENTS OF CERTIFYING OFFICIAL
Refer to requiernents as outlined in the Grant Agreement dated
. (RD regulation 1775)
45. 1 HEREBY CERTIFY that I am unable to obtain sufficient credit elsewhere to finance my actual needs at reasonable rates and
terms, taking into consideration prevailing private and cooperative rates and terms in or near. my community for loans for
similar purposes and periods of time. I agree to use the sum specified herein, subject to an-d in accordance with regulations
applicable to the type of assistance indicated above, and request payment of such sum. I agree to report to USDA any material
adverse changes, financial or otherwise, that occur prior to loan closing. I certify that no part of the sum specified-herein has
been received. I have reviewed the loan approval requirements and comments associated with this loan request and agree to
comply with these provisions.
(For SFH & FP loans at eligible terms only) If this loan is approved, I elect the interest rate to be charged on my loan to be the
lower of the interest rate in effect at the time of loan approval or loan closing. If I check "NO ", the interest rate charged on my
loan will be the rate specified in Item 29 of this form. YES NO
WARNING: Whoever, in any matter within the jurisdiction of any department or agency of the United States
knowingly and willfully falsifies, conceals or covers up by any trick, scheme, or device a material
fact, or makes any false, fictitious or fraudulent statements or representations, or makes or
uses any false writing or document knowing the same to contain any false, fictitious or fraudulent
statement or entry, shall be fined under this title or imprisoned not more than five years, or
both."
Date k N 6 ne.
Date
JW1zX..,0
(Signature of Applicant)
(Signature of Co- Applicant)
46. I HEREBY CERTIFY that all of the committee and administrative determinations and certifications required by regulations
prerequisite to providing assistance of the type indicated above have been made and that evidence thereof is in the docket, and
that all requirements of pertinent regulations have been complied with. I hereby approve the above - described assistance in the
amount set forth above, and by this document, subject to the availability of funds, the Government agrees to advance such
amount to the applicant for the purpose of and subject to the availability prescribed by regulations applicable to this type of
assistance.
Date Approved:
(Signature of Approving Official)
Title: Director, Business and Colru-nunity Programs
47. TO THE APPLICANT: As of this date , this is notice that your application for financial .assistance
from the USDA has been approved, as indicated above, subject to the availability of funds and other conditions required by the
USDA. If you have any questions contact the County Supervisor or District Director. - U.S. Government Printing Office: 1996 - 697 -410
UJV/-i -MClrV
Form FmHA 1940 -1 REQUEST FOR OBLIGATION OF FUNDS
(Rev. 3 -95)
If the decision contained above in this form results in denial, reduction or cancellation of USDA assistance, you may appeal this decision and have a hearing or you nay request a
review in lieu of a hearing. Please use the fibrin we have included for This purpose.
Position 2
ORIGINAL - Borrower's Case Folder COPY 1 - Finance Office COPY 2 - Applicant/Lender COPY 3 - State Office
INSTRUCTIONS -TYPE IN CAPITALIZED ELITE TYPE IN SPACES MARKED (I I 1 1)
Complete Items 1 through 30 and applicable Items 31 through 43. See FMI.
1. CASE NUMBER
LOAN NUMBER
FISCAL YEAR
S T CO
BORROWER ID
015101119
0-181416101010171612
09
2. BORROWE
NAME
3. NUMBER NAME FIELDS
(1, 2, or 3 from Item 2)
E a g l e
l lClo*lulnitlyl I I I 1
2
4. STATE NAME
G o v e r
u m e n t
C 1 o I l o I r I a 1 d 1 o
5. COUNTY NAME
..
E a l e
GENERAL BORROWER /LOAN INFORMATION
6. RACE /ETHNIC
7. TYPE OF' 4- PUBLIC BODY
8. COLLATERAL CODE
9.,EMPLOYEE
CLASSIFICATION
APPLICANT 5 -ASSOC OF
1 -REAL ESTATE 4- MACHINERY ONLY
RELATIONSHIP' CODE
1 - VIA -flTE 4 - HISPANIC
FARMERS
6 - ORG OF
1 - INDIVIDUAL FARMERS
SECURED • 5 - LIVESTOCK ONLY
2 -REAL ESTATE 6 - CROPS ONLY
1 - EMPLOYEE
2 -BLACK 5 - A/PI �
3 - AI /AN
2 - PARTNERSHIP WORKERS 3 - CORPORATION 7 -OTHER
4,
AND CHATTEL 7 - SECURED BY
3 -NOTE ONLY OR BONDS
2 - MEMBER OF FAMILY
3 -CLOSE RELATIVE
CHATTEL ONLY
4 - ASSOC.
10. SEX CODE' 4 -o GAN MALE IOWNED
11. MARITAL STATUS
12. VETERAN CODE
13. CREDIT REPORT
61 1 - MALE 5 -ORGAN FEMALE OWNED
1 - MARRIED 3 - UNMARRIED (INCLUDES
1'-YES
1 -YES
2-FEMALE 6 -PUBLIC BODY
2 - SEPARATED WIDOWED /DIVORCED)
2-NO
2 2-NO
14. DIRECT PAYMENT
15. TYPE OF PAYMENT
16. FEE INSPECTION
17. INTEREST CREDIT
(See FMI)
1 - MONTHLY' 3-SEMI-ANNUALLY
1-YES
1 - YES (FOR SFH ONLY)
2-ANN UALLY 4 - QUARTERLY
2 2-NO
2 - NO
18. COMMUNITY SIZE
19. DWELLING TYPE /USE OF FUNDS CODE
1 - 10 000 OR 4ESS (FOR SFH AND
(See FMI)
2 - OVER 10,000 HPG ONLY)
COMPLETE FOR OBLIGATION OF FUNDS
20. TYPE OF
21. PURPOSE CODE
22. SOURCE OF FUNDS
23. TYPE OF ACTION
ASSISTANOE
1 - OBLIGATION ONLY
1 2 O (See FMI}
1 2 - OBLIGATION/CHECK REQUEST
1
2
1 3 - CORRECTION OF OBLIGATION
24. TYPE OF SUBMISSION
25. AMOUNT OF LOAN
26. AMOUNT OF GRANT
1 - INITIAL
2- SUBSEQUENT
1
1 1 1 1 1 1 101010
1 0 0 0 10 10 1 0 101
27. AMOUNT OF IMMEDIATE
28. DATE OF
29. INTEREST RATE 30. REPAYMENT TERMS
ADVANCE
APPROVAL
MO DA YR
010101 1.
1 1 - 1 1 1 -
COMPLETE FOR SINGLE FAMILY HOUSING ONLY
31. INCOME CATEGORY CODES
32. LOW INCOME
33. ADJUSTED FAMILY INCOME
LIMIT -MAX.
1 -VERY LOW 3- MODERATE
2- LOW 4- ABOVE MODERATE
O O
O O O
34. R.E. INSURANCE
35. R.E. TAXES
36. R.E. TAXES
37. NOTE INSTALLMENT INELIGIBLE
1st year
2nd year
10101
10101
10101
10101
38. TYPE OF UNIT
1 - FARM TRACK
2 - NON -FARM TRACT
COMPLETE FOR COMMUNITY PR -
PROGRAM AND CERTAIN MULTIPLE FAMILY HOUSING LOANS
39. PROFIT TYPE
2 •LIMITED PROFIT
1 - FULL PROFIT 3 - NONPROFIT
COMPLETE FOR EM LOANS ONLY
COMPLETE FOR CREDIT SALE - ASSUMPTION
40. DISASTER DESIGNATION NUMBER
41. TYPE OF SALE
(See 1
2 - ASSUMPTION ONLY 4 - ASSUMPTION WITH
1 - CREDIT SALE ONLY 3 - CREDIT SALE WITH SUBSEQUENT LOAN SUBSEQUENT LOAN
FINANCE OFFICE USE ONLY
COMPLETE FOR FP LOANS ONLY
42. OBLIGATION
DATE
43. BEGINNING FARMER /RANCHER
MO DA
YR
-
(see rMr)
If the decision contained above in this form results in denial, reduction or cancellation of USDA assistance, you may appeal this decision and have a hearing or you nay request a
review in lieu of a hearing. Please use the fibrin we have included for This purpose.
Position 2
ORIGINAL - Borrower's Case Folder COPY 1 - Finance Office COPY 2 - Applicant/Lender COPY 3 - State Office
04/22/2009 15:14 7205442 72
INSTRUCTIONS FOR THE SF -424A
PAGE 10
Public reporting burden for this collection of information is estimated to average 180 minutes per response, including time for reviewing
ihatrtictions, 'searching existing data sources, gathering and rftntaining the data needed, and completing and reviewing the collection of
information. Bend comments regarding the burden estimate or any other aspect of this collection of Information, including suggestions :for
reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (034&0044), Wgshingt6n, DO 20503.
PLEASE .DO NIOT-RETURN YOUR Ct' MPLETED ,FORM TO THE OFFICE OF-MMAGEMENT AND:Bi 0GET:*,' '
SEND IT -TO THE ADMESS PROVIDED "BY THE: SPONSORING AGENCY.
Generai Instructions
This form is 'designed so that application, can be -made far .funds
from one, .or more grant programs. In preparing the -budget*,.
adhere to any. existing Federal grantor agency guidelines* which
prasoribe how and whether budgeted amounts . should' be
separately shown for different functions or activities within. the
.program. For some programs, grantor agenoles may require
budgets to be 'separately shown by function or.ectIvI y, For other
programs, grantor agencies may require a breakdown by function
or activity. Sections A, B, C, and d should Include budget
estimates for the whole project except when applying for
assistance which requires Federal authorization in annual or
other funding period Increments. In the latter case; Sections A, B,
0, and D should provide the budget. for the first budget period
(usually a year) and Section E should present the need for
Federal assistance in the subsequent budget periods. All
applications should contain a breakdown by the object class
categories shown in Lines a -k of Section S.
Section A. Budget Summary Lines 1 -4 Columns (a) and (b)
For applications pertaining to a sIngle Federal grant program
(Federal Domestic Assistance Catalog number) and not ragviring
a functional or activity breakdown, enter on Llne 1 under Column
(a,) the Catalog program title and the Catalog number In Column
(b)
For applications pertaining to a single program requiring budget
amounts by multiple functions or activities, enter the name of
each activity or function on each fine in Column (a), and enter the
Catalog ' number in Column (b). For applications pertaining to
multiple programs where none of 'the programs require aA
breakdown by function or activity, eater the Catalog program title
on each line in Column (a) and the respective Oataiog number on
each line In W umn (b) .
For applications pertaining to multiple programs where one or
more programs require a breakdown by function ar activityr,
prepare a separate sheet for each program requiring the
breakdown. Additional sheets should be used when one form
does not provide adequate space for all breakdown of data
required, However, when more than one sheet Is used, the fiat
page should provide the summary totals t)y programs.
Lines 1 -4, Columns (c) through (g)
For new applications, leave QQlumn (c) and (d) blank. For each
line entry In Columns (a) and (b), enter in Columns (e), (f), and
(g) the appropriate amounts of funds needed to support the
project for the first funding period (usually a year),
APP -EE -2009 15:18
From:7885448978
Fir cominuing - granf - program appll lio s, submit these forms
before the end of each funding oLariod' as required by the grantor
agency, Enter In Columns .(c). and. ('d) the estimatod amounts' af,
funds which will remain unoblipated - at the end of thia grant
funding period only if the. Federal granter agency '1htftrdti0rtS
provide for this. Otherwise, leave these column$ blank. Enter- In
columns (e) and (f) -the amounts of funds needed for the
upcoming period. The amount(s) in Column (g) should be-the
gum of amounts In Columns. (e) and (f).
For supplerneonAW orants -and changes to existing grants, do 'hot
use Columns (c) and (d). Enter in Column (e) the amount of the
increase or decrease of Fedehal funds and enter in Column (f) the
amount of the Increase or decrease of non - Federal funds. In
Column (g) enter the new total- budgeted amount (Federal and
non - Federal) whIch includes the total previous authorized
budgeted amounts plus or minus, as appropriate, the amounts
shown In Columns (e) and (f), The amount(s) in Column (g)
should not equal the sum of amounts in Columns (e) and (f).
Line 5 , Show the totals for all columns used.
Section B Budget Categories
In the column headings (1) through (4), enter the titles of the
same programs, functions, and activities shown on Lines 1-4,
Column (a), Section A, when 'additional sheets are prepared for
Section A, provide similar column headings on each sheet. For
esch program, function of aotivity, fill In the total requirements for
funds (both Federal and nor- Federal) by object Glass categories.
Line Sa -i - Show tha totals of Lines 8a to Bh In each column.
Lire 6j - Show the amount of Indirect cost.
Line Sk - Eater the total of accounts on Lines 61 and 61. For all
applications for new grants and contlnuabon grants the total
amount In column (5), Line 8k, should be the same as the total
amount shown in Section A, Column (g), tine 5. For
supplemental grants and changes to grants, the total -amount of
the increase or decrease as shown In Columns (1) -(4), Line 8k
should be the same as the Burn of the amounts in Section A,
Oolumns (e) and (f) on Une 5.
Line 7 - Enter the estimated amount of Income, If arty, expected
to be generated from this project. Do not add or .subtract this
amount from the total project amount, Show under the progre.m
SF-424A (Rev. 7 -97) Page 3
ICS: Ea g le Go u n to La n d f i 1 Page : 010 P =96%
% 04/22/2009 15:14 7205442972
INSTRUCTIONS FOR THE SF-424A (continued)
PAGE 11
-naftffve st'sterrient the nature and soura6. of in-come'. The i Line IS - Enter the totals-of amoorits on.. Lines 13 and 14.,
amount of program income May be-.considered by the
Federal- gnint►r agency in -determining., the wtal amount of the ,Sectjon - E. Budget 'estimates of F-aderal Funds Needed for
grant. Balance of tine Project
-19- -Enter Oblumn (a)- the,,tame'grant program titles
C. Non.-,Federal Resources (Lines 16 1
shown in Column (a), Section A. A breaKdown by function or
Lines 8-11. Enter amounts of non-Federal resources that will be activity , is, not necessary.., For'M�w,�appllcafions and,confinuation
I - n -.
used on the grant. If in-kind contributions are included, provide a, grant-appficatlons, enterin,.th ' e proper columns amounts t
s of Federal
brief explanation on a separate sheet, funds - 'which wl 11 be needed to complete the program or project over
the succeeding funding periods (usually In years). This section
need not be completed for revisions (amendments, changes, or
Column (a) - Enter the program titles identical to supplements) to funds for the current year of existing grants.
Column (a), Section A. A breakdown by function or
activity is not necessary.
Column (b) - Enter the contribution to be made by the
applicant.
Column (c) - Enter the amount of the State's cash and
in-kInd =ntfitwtlon If the applicant is not a State or
State agency. Applica'nta which are a State or $tate
agencies should leave this column blank,
Column (d) - Enter the amount of cash and In-kind
contributions to be made from all other soumeS.
Column (e) - Enter totals of Columns (b), (c), and (d).
Line 12 - Enter the total for each of Columns (b)-(e). The amount
in Column (e) should be equal to the amount on Line 5, Column
(1), �ectlon A.
Section D. Forecasted Cash Needs
Line 13 - Enter the amount of cash needed by quarter from the
grantor aganoy during the first year.
Line 14 - Enter the amount of cash from all other sources needed
by quarter during the first year.
If more than four lines are needed to list the program titles, submit
additional schedules as necessary.
Line 20 - Enter the total ter each of the Columns (b)-(e), When
additional sQhedules are prepared for this Section, annotate
accordingly and show the overall totals on this line.
Section F. Other' Budget Information
Line 21 - Use this space - to explain amounts for individual d1rect
object class cost categories that may appear to be out of the
ordinary or to explain the details as re(4dirad by the Federal grantor
agency.
Line 22 - Enter the type of Indirect rate (provisional, predetermined,
final or fixed) that will be In effect during the funding period, the
estimated amount of the base to which the rate Is applied, and the
total indirect expense.
Line 23 - Provide any other explanations or comments deemed
necessary.
SF-424A (Rev, 7-97) Page 4
APR-22-2009 15:19 From :7205442972 ICS :Ea-91e Count!d Landfil Pa9e:011 R=97%
TERM SHEET
Requested Hearing Date: May 5, 2009 (First choice)
R a+r x
(Second choice)
For County Manager Signature: (If contract /agreement is under $25,000)
Requesting Department: Solid Waste & Recycling
Title: Solid Waste Management Grant Agreement between Eagle County Government
(Grantee) and United States Department of Agriculture Rural Development (Grantor)
Check One: Consent . x On the Record
Staff Submitting: Ron Rasnic, Solid Waste Manager
Purpose: The purpose of this grant, through a regional partnership comprised of Eagle,
Garfield and Pitkin Counties and various municipalities, is to document waste stream
characteristics; assess the flow of recyclable materials throughout the region; conduct a
public survey on glass recycling; research and make recommendations for certain
problem wastes; gain available knowledge regarding composting and e -waste recycling
through facility tours; create educational tools; and, conduct follow -up presentations with
regional leaders with recommended strategies for implementing diversion programs
following the completion of this study.
Schedule: The Regional Waste Diversion Study — Eagle /Garfield / Pitkin Counties being
funded by this grant will commence work in August 2009 and will be completed in July
Y
2010.
Financial Considerations: The total estimated cost of the project is $174,658. In -kind
contributions from partnership participants represent a total of $74,658. The grant award
represents a total of $100,000. The Grantor (USDA) uses the reimbursement method for
requesting and receiving payments under the grant. Eagle County is the lead agency for
this grant project and will be processing and submitting requests for reimbursement
through the Solid Waste & Recycling Department. Sufficient funding is available in the
Departments Fund Balance for this purpose and, if Finance prefers, funds will be
transferred to a specific account for this purpose at the next supplemental.
Other: There are three (3) federal documents that require signatures in this packet:
Grant Agreement (signature,, title, attested and sealed); Form SF -424A (signature &title);
and, Form FmHA 1940 -1 (signature &date).
qpp ('D AS TO FORM
By: �
Eagle County Attorney's office
By'
missioners' Of
Eagle County Comfice