HomeMy WebLinkAboutC09-114 Shaw ConstructionSECOND AMENDMENT APPROVING THE GUARANTEED MAXIMUM PRICE,
BUDGET, AND CONSTRUCTION SCHEDULE FOR THE EAGLE COUNTY
RECYCLING TRANSFER FACILITY
THIS Second Amendment is made and entered into this 7th day of April, 2009 between the
Board of County Commissioners, County of Eagle, State of Colorado, (hereinafter referred to as
"County") and Shaw Construction (hereinafter referred to as "Contractor"). Together all shall be
referred to as "Parties."
WHEREAS, County and Contractor entered into an Agreement dated September 30, 2008
("Original .Agreement") for Preconstruction and Construction of the Eagle County Recycling
Transfer Facility; and
WHEREAS, the Original Agreement called for the provision by Contractor of a proposed
Guaranteed Maximum Price (hereinafter referred to as "GMP"), detailed budget and construction
schedule to the County; and
WHEREAS, the GMP, budget and construction schedule must be approved by the Eagle County
Project Manager and the County before Contractor may be authorized to commence construction
services; and
WHEREAS, Contractor has presented to the County a GMP, detailed budget and construction
schedule attached hereto; and
WHERAS, the Eagle County Project Manager and the County wish to approve the GMP,
detailed budget and construction schedule as conditioned herein and authorize the issuance of a
Notice to Proceed with Construction Services.
In consideration of the terms and conditions of the Original Agreement, the sufficiency of which
is hereby acknowledged, County and Contractor hereby agree to the following:
THAT, the GMP, detailed budget and construction schedules attached hereto are hereby
accepted by the undersigried and incorporated into the Contract Documents as defined in
Article 2 of the Original Agreement.
THAT, Article 2 of the Original Agreement shall be modified with the addition of the
following Contract Documents:
"Article 2.1M GMP drawing set dated January 26, 2009 and the construction set dated
February, 18, 2009; GMP specifications dated January 26, 2009 and the construction set
dated February 20, 2009".
"Article 2.1N Second Amendment approving the Guaranteed Maximum Price, Schedule
A Rate Sheet and Construction Schedule, including attached exhibits, for the Eagle County
Recycling Transfer Facility dated Apri17, 2009".
THAT, the Original Agreement, General Conditions, and the Drawings and Specifications
shall control if there exists any conflicts with those documents and this Second Amendment,
including any attachments attached hereto, unless otherwise notified in writing by the Eagle
County Project Manager.
THAT, Contractor is hereby designated as the Construction Manager/General Contractor for
the construction of the Eagle County Recycling Transfer Facility.
THAT, the Eagle County Project Manager is authorized to issue a Notice to Proceed to
Contractor to perform those Construction Services set forth in the Original Agreement.
County and Contractor agree that, except as expressly altered, modified and changed in this
Second Amendment, all terms and provisions of the Original Agreement shall remain in full
force and effect, and are hereby ratified and confirmed in all respects as of the date hereof.
This Second Amendment shall be binding on the parties hereto, their heirs, executors,
successors, and assigns.
IN WITNESS WHEREOF, the parties have executed this Second Amendment on the day and
year first above written.
EAGLE COUNTY:
ATTEST:
Teak Simonton
Clerk to the Board of
County Commissioners
TY OF EAGLE, STATE OF COLORADO
d Through its BOARD OF COUNTY
MISSIONERS
r
Sara J. Fis er, Chairman
EAGLE CO TY PR JECT MANAGER:
By:
Rick Ullom
1
>0:~0 Y •. ~ y
• Name:
•
•
•
•
•
•~~ A `G : ~O Title: ~; ~JiS i e,n ,n4Ci tr-
~rgTF FB O~OQP
G:1Capital Projects - Ac[ive\Recycling Transfer FacilityVShaw Construction\Contract DocumentsWmendment #2 3-27-09 .DOC
2
Eagle County Material Recycling Facility
Eagle County, Colorado
GMP Budget based on ?/18/09 Drawings - W/Owner Edits
Prolaet name Eagls Count' MRF
Wolwtl
CO
Estlmatm PH
Labor rate fable - 1
Job ske 15050 sf
Duntlen 10 mo
Bid dab 3ISR009
RetwRlormat Sorted by'Group phase/Phase'
'Deist summary
Albcale eddona
Print soA level notes
Page 1
3/27/1008 8:19 AM
Eagle Cty CD GMP 2-27-09.pee
Eagle County Material Recycling Facility Page s
Eagle County, Colorado 3/27/T009 8:13 AM
GMP Budget based on ?/18/09 Drawings - W/Owner Edlts Eagle Cry CD GMP 2-Y7-09.pee
1
Group Phase DescrlpUon
001000 GENERAL CONDITIONS
001005 GENERAL CONDITIONS
Lurtp Sum GC's
GENERAL CONDITIONS
001320 CONSTRUCTION DOCUMENTS
Blue Panting for shop drawings
As-Buk Document Printing
CONSTRUCTION DOCUMENTS
001450 QUALITY CONTROL
Teatlng Allowance (B/OJ
001510 TEMPORARY UTILITIES
Temporary foal for hestlng
system
Monthy Fhdric Cosb
Monthy Water Costa - hauling ony
TEMPORARY UTILITIES
001530 TEMPORARY CONSTRUCTION
ConsWetion Fence
TEMPORARY CONSTRUCTION
001580 TEMP BARRICADES/ENCLOS.
Temporery Errclosures
TEMP BARRICADES/ENCLOS.
001570 TEMP CONTROLS
Sits Dra/nags Study
Takeoff Ouantlty Total CostlUnit Total Amount Previous BudgetlNotes
1.00 b 313,589.33 As 313,589
1.00 Is 313,589.33 ;Is 313,589
50.00 ea 07.23 lea 3,362
15.00 ea 263.99 lea 3.960
/sf 7,321
N/C /N/C Private lnspsctlons by Owner
NIC MIC
8.00 mo 510.78 /mo 1,086
8.00 mo 153.23 !rro 1.226 Water supplied and paid for by Eagle Count'
Isf 5.312
1,360.00 R 10.22 M 13.893
/sf 13,893
80.00 M 52.81 Tr 4,225
lsf 4,225
N!C M/C By Owner
GENERAL CONDITIONS
002000 SITEWORK
002050 SITEWORK SUPPORT
Cones Blankets for grcund protection
Initlal Snow Removal - By County
Snow Rartaval
SITEWORK SUPPORT
002310 GRADING
Hand gredirp
Grade d ezuvetion phase 1
Grade d exuvatbn phase 2
Ragrade Under Paving •24" 8 8" base
GRADING
002320 BUILDING EXCAVATION
Rock Orll!!ng 6 Blastlng -Not
Included
002370 EROSION CONTROL
Emaion control
EROSION CONTROL
002505 SITE UTILITIES
Storm
Sanitary
Perrneter drain
Firo Tank
Water
eledrinl Service
SITE UTILITIES
002510 WA~iER DISTRIBUTION
1000 Galbn potable vwler knk
WATER DISTRIBUTION
002750 CONCRETE PAVING
BoNards
14,927.00 sf 23.07 /sf 344,340
2.00 mo 3,851.94 /rtq 7,704
0.00 mo 0.00 /mo 0 By Eag/s County
2.00 mo 2,775.91 /mo 5.552
!sf 13,256
73,098.00 cy 0.72 fry 9,428
13,098.00 et' 9.74 /ry 127,523 County to provide Strut. fip and haul oR spoAs
682.50 cY 9.74 /cy 8,644 County k provide Sbud. fill and haul oR spoils
5,874.00 et' 77.04 !q 100,084 Count' to provide Stnct. fig and haul oR apoAs
Isf 243,676
0.00 b 0.00 /la 0 Not /nclud'ed
9,768.00 et' 1.32 Icy 12,934 Vf P, silt fence, det pond, storm pmt, etc...
/sf 12,934
125,453.00 of 0.37 /al 48,743 Added manhok
125,453.00 sf 0.07 lest 9,343
625.00 R 11.35 M 7,091
2.00 earn 82,955.88 /each 125,912 25,000 gal. tanks w16" v~ater entry
125,453.00 sf 0.08 !af 10,258
310.00 R 38.68 M 11,984 Indudea vauka, fiber, Wdc auk, d acc.
Isf 211,330
1,000.00 gal 3,07 /gal 3.085
Isf 3,085
19.00 ea 459.66 lea 8,734
Eagle County Material Recycling Facility
Eagle County, Colorado
GMP Budget based on 1/18/09 Drawings - W/Owner Edits
Page 3
3/17/1008 8:13 AM
Eagle Cty CO GMP 2-27.09.pee
Group Phase Description Takeoff Quantity Total CosUUnit Total Amount Previous BudgeUNotes
CONCRETE PAVING !sf 8,134
002175 SIDEWALKS
/"SldewvW 500.00 al 8.13 !sf 3.065
SIDEWALKS !sf 3.0&5
002820 FENCES R GATES
Fencng - a CLF 258.00 K 43.00 AI 11,093 213 g of 8' 6 45 N of 4' b gates
DauWe swing entry gate 1.00 each 1,383.72 leach 1,364 Man double entry gale
FENCESB GATES !sf 12,~t56
002830 RETAINING WALLS
Stone Sborg 8bck 2,095.00 sf 49.10 Isf 102,858 W/ over excav. antl recompact
RETAINING WALLS Isf 102,856
002870 SITE FURNISHINGS
Site signaga 1.00 b 766.13 ~a 766
SITE FURNISHINGS /sf 766
002905. LANDSCAPE SUBCONTRACT
Landscap/ng - By Owner - /- Not included at th(s tlms.
SITEWORK 14,927.00 sf 41.01 Isf 612,137
003000 CONCRETE
003310 CAST-IN-PLACE CONCRETE
Concrete work 926.00 cy 422.20 /q 391,802 Irtc aN tat, fomr, exf, prts, and material
Fine grade ®sbtu 15,000.00 at 0.39 !sl 5,846
Phase 2 grade beams aro 0.00 cy 0.00 /cy 0 Phase 1 grade beams excluded
excluded
Grade beamhebining weM mor6na5on 1.00 Iwm 5,107.58 Asum 5,108 Phase 2 grade bearte exduded
Allowerroe
Temp. Heatd Weather Protee'n 8.00 vJc 5,987.07 ~Wk 47,737
Cban up, bash 8.00 vAc 495.22 MAc 3,962
Grout bass plates 1.00 Iwm 2,554.98 Asum 2.555
CAST-1N~PLACE CONCRETE !sf 457,009
003390 CURING 8 PROTECTING
Concrete slab construction jdnta 1.00 Iwm - 15,322.70 Asum 15,323 PJlowartte to eddresalprobd slab joinb
CURING & PROTECTING /sf 15,323
CONCRETE 14,927.00 sf 31.64 Isf 472,331
004000 MASONRY
004220 CONCRETE MASONRY UNITS
Masonry 0.00 Isum 0.00 plum 0 None
005000 METALS
005510 MISC. METALS
Anrhore tx~8s 1.00 b 6,180.16 Rs 8,160
MISC. METALS !sf 6,180
005715 i°ABRICATED STAIRS
Stair Fights, Railings, angb embeds, DS 1.00 Iwm 13,381.82 /lsum 13,382
angbs
Retaining wall ro11 0.00 0 0.00 /0 0 In chain Ilnk above
Stair end handrsi powder coating 1.00 Iwm 1,532.27 sum 1.532
FABRICATED STAIRS /sf 14,914
METALS Isf 21,094
006000 WOOD 8 PLASTICS
006105 ROUGH CARPENTRY
In Well Bbdung- Untroatd 200.00 M B.BB Rf 1 737 fndudes tab punch down
ROUGH CARPENTRY /sf 1,737
006410 CABINETS
Cabinets-install lowers 9.00 M 74.95 M 875 OwnerfumishadmaterbLShawtoinstaN
Cabinets-inata8uppers 12.00 M 82.45 Af 969 Owner/umishedmaterial•Shawroinafa8
Eagle County Material Recycling Facility
Eagle County, Colondo
GMP Budget based on 2/18/09 Drawings - W/Owner Edits
Page I
3/27/2009 8:13 AM
Eagle Cty CD GMP 2-27-09. pes
Group Phase Description Takeoff Quantity Total CosHUnlt Total Amount Previous BudgeUNotes
006510 CABINETS
Cadnets - P-lam munMr top W 4" splash 9.00 d 103.54 ,11 932 Shaw to suppq 8 inslaX -Std Nevamar s =
CABINETS Isf 2,598
WOOD 8 PLASTICS Isf 4,332
007000 THERMAUMOISTURE
PROTEC'N
007120 WATERPROOFING
Membrane NAterproofing 2,140.00 sf 3.84 /sl 8,220 Vapor retards at ofice and on qt walls
Foundation DP 8 H2O proofing 5,120.00 sf 4.23 /sf 22,897 Foundaton waterproofing b dreinage
Insulatlon d Poty undo-slab per 0.00 sf 0.00 /sf 0 Exc/uded:Can be added upon
Arch request
WATERPROOFING !sf 31,117
007210 BUILDING INSt1LAT10N
Pro-Eng Bb Insulation 74,000.00 sf 1.71 /sf 23,947 R-38 ®roof d RQS ®walls
Office bad insulation 7,050.00 sf 2.73 /st 2,885 R•19G ext weds and ceilings, R-ti dint.
web
Man lift 8 oppsats 1.50 mM 17,636.73 lnnM 17,455 R-19 ®ext walla and endings, R-11 ~ int.
wads
BUILDING INSULATION /sf 44,282
W7420 PLASTIC ROOFIWALL PANELS .
KaMad perrols 2,553.00 sf 48.09 Isf 122,782 Powers - 2-3/4" panels
KaMall panel-tinting 2,553.00 sf 0.69 Isf 1,770 Rose tint option
PLASTIC ROOFM/ALL PANELS !sf 124,552
007920 JOINT SEALANTS
Bidg. Sealants 15,000.00 sf 0.32 Isf 4,852
JOINT SEALANTS fsf 4,852
THERMAUMOISTURE 14,927.00 sf 13.72 Isf 204,783
PROTEC'N
008000 DOORS 8 WINDOWS
008005 DOOR BID
Doors, frames,6hardware 14.00 ea 1,108.11 lea 15,514
DOOR BID !sf 15,514
008380 OVERHEAD DOORS
Roping Overhsd Doors 7,300.00 sf 34.75 laf 45,172 Nan insulated
Roping Overhead Doors-upgrade to 1,300.00 sf 9.18 !sf 11,971
insulated spec
OVERHEAD DOORS /sf 57,083
008520 ALUMINUM WINDOWS
Alumnum Wrdows 156.00 sf 59.27 !af 9,247
ALUMINUM WINDOWS Isf 9,247
DOORS 8 WINDOWS
009000 FINISHES
009250 GYPSUM WALL BOARD
Melal Studs, Rodc, Taps, 8 ACT
GYPSUM WALLBOARD
009310 (:ERAMIC TILE
Ceramb Fbor 6 WaN TiN
CERAMIC TILE
009650 RESILIENT FLOORING
12x12 VCT Fboring 6 Baas
RESILIEN T FLOORING
009720 WALL COVERINGS
FRP
14,927.00 sf 5.48 /sf 81,843
1,050.00 of 50.58 Isf 53,104
!sf 53,104
650.00 sf 10.88 1st 7,059
/sf 7,059
SB5.00 sf 2.30 /sf 1.345
Isf 1,345
1.00 Is 418.78 Ae 417
Eagle County Material Recycling Facility
Eagle County, Colorado
GMP Budget based on ?/18/09 Drawings - W/Owner Edits
Page 6
3/27/2009 8:13 AM
Eagle Cty CD GMP 2-27-09.pee
Group Phase Description Takeoff Quantity Total CosUUnit Total Amount Previous BudgedNotes
WALL COVERINGS 'sf 417
J09910 PAINTING
Inlerior8 Ext Painting 4,488.00 st 1A9 /sf 6,840
Concrete lbor sealing 14,000.00 sf 0.62 laf 8,883
Interior 8 6kt. Paint touch up 4,488.00 sl 0.46 isf 2,043
PAINTING (sf 17,366
FINISHES 14,927.00 sf 5.31 !sf 79,290
010000 SPECIALTIES
010705 EX 7ERIOR Sl1N CONTROL
Solar Wall - Material d shipping 1,675.00 sf 15.38 /sf 25, 723 Solar Wall - 24 guage wall system
Solar Wall- Install 1,675.00 al 20.53 /sf 34,382 Solar Wall insist
E JCTERIOR SUN CONTROL Isf 60,105
010810 TOILET ACCESSORIES
Toilet Accessories 12.00 ea 69.97 !ea 840
TOILET ACCESSORIES /sf 1140
0113880 SCALES
Style-Subcontrad 1.00 b 34,623.39 /b 34,823 Per Blackford agreement
Guard rail 1.00 b 2,645.73 As 2,848 Per Bladkkrd agreement
Installation 1.00 Is 2,042.00 lls 2,042 Per Blackford agreement
Lifting crane 24.00 hrs 255.38 /hrs 8,129
Calibration 1.00 b 407.59 rb 408 Per BIaG(ord agreement
Trip charge 1.00 b 2,742.75 As 2,743 Per Bledkford agreement
Concrete work 1.00 b 10,266.22 As 10,266 Per Blackford agreement
Rubber T Grip 1.00 b 137.91 As 138 Per Blackford agreement
Shipping 8 handing 32,000.00 Iba 0.18 /ba 5.884
SCALES - Isf 65,079
SPECIALTIES 14,927.00 sf 8.44 Isf 126,023
011000 EQUIPMENT
011170 SOI..iD WASTE EQUIP
Mabrial Handling Equipment- Merhinex 14,000.00 s( 132.80 /at 1,859,187 Per Madrinex aggroemenl
Corrmtinent
SOLID WASTE EQUIP Isf 1,859,187
011450 RESIDENTIAL APPLIANCES
Appliance 1.00 Isum 868.63 Rsum 889
RESIDENTIAL APPLIANCES isf 889
EQUIPMENT 14,927.00 sf 124.61 /sf 1,860,076
013000 SPECIAL CONSTRUCTION
013121 PRE-ENGINEERED BUILDINGS
Metal Bldg. Materiel I al 14,000.00 of 19.98 /sf 279,420
Mebl BIk1g. Materbl / of - Otrxx -panels 16,395.00 of 2.04 /sl 33,495
Metal Bldg. Etettion / sf 14,958.00 sf 6.14 !sf 91,834
Added root snow puarda 100.00 M 20.43 M 2,043
Winter cond/dons, snow removal 0.00 mo 0.00 /mo 0 Doss not appty ro new schsdul~
PRE-ENGINEERED BUILDINGS /sf 406.792
SPECIAL CONSTRUCTION 14,927.00 sf 27.25 Isf 406,792
015000 MECHANICAL
015100 PLUMBING
Plumbing 15,050.00 al 1.63 /sf 24,465
PLUMBING isf 24,465
015300 FIRE PROTECTION
Fire Protection dry system 15,050.00 sf 6.49 /sl 97,625
FIRE PROTECTION Isf 97,625
015510 HVAC
HVAC 15,050.00 sf 2.91 !sf 43,748
Eagle County Material Recycling Facility
Eagle County, Colorado
GMP Budget based on 1/18/09 Drawings - W/Owner Edits
Page 8
3/27/2009 8:13 AM
Eagle Cty CD GMP 2-27-09.pee
Group Phase Description Takeoff Quantity Total CostlUnit Total Amount Previous BudgeUNotes
OI5510 FiVAC
Controb 15,050.00 sf 0.75 Isf 11,225
Temp heat 3.00 nnth 8,384.48 /mnh 19.153
NVAC isf 74,127
MECHANICAL 14,927.00 sf 13.15 Isf 198,217
016000 ELECTRICAL
61tr010 ELECTRICAL
Eleceical work 15,050.00 sf 11.89 !sf 179,010
Temp electrical service 81ighUng 8.00 rmth 1,532.27 /rmth 12,258
F LECTRICgL Isf 191,268
016740 CiJMMUNICATIONB & SECURIf'(
Security system Allowance 15,050.00 sf 1.38 Isf 20,430 Alowance for security system
COMh1lINICA !IONS R SECURITY %si 20,430
ELECTRICAL
019000 INSURANCE/PERMITS/MISC
019.700 PERMffS
8utlding PermH
019400 SERVICES
SD Cost EsUmats
06M Manuals
Video AS-Bull
SERVICES
14,927.00 sf 14.18 /sf 211,698
N/C MIC
N/C MIC
1.00 is 2,043.04 !Is 2,043
1.00 fa 2,553.78 As 2.554
ng d,ss7
INSURANCEIPERMITS/MISC
14,927.00 Is 0.31 /Is 4,597
Eagle County Material Recycling Facility Page 7a
Eagle County, Colorado 3/Z7/1009 8:1J AM
GMP Budget based on ZH9/09 Drawings - W/Owner Edits Eagle Cty CD GMP Z-27-09.pes
~ t
Estimate Totals
Deaeriptlon Amount Totals Peresnt of Total
Labor 74.909 1.50%
Material 394,157 7.87%
Subconlrad 4,156,489 82.95%
EQU4xnent
4.615.555 4,625,555 92.32 92.31 k
Bld Dol CoMlncenev 9.701 0.19%
CMlGC Conlingenq 150,317 3.00%
160.018 4.765,577 7.19 9551"6
Preconstrudion Servicea
49%
4
Construction Services Fee 225.000 .
Total 5,010,573
Eagle County
Material Recovery Facility
SCHEDULE A
Effective January 1, 2009
List of Standard Rates
The following list of standard ra`es apply to construction services and wilt be billed to the Owner on a monthly basis
upon execution of the work.
DESCRIPTION RATE
*Laborers $ 15/hr
*Labor Foremen $ 25/hr
*Carpenters $ 25/hr
Labor Burden, FICA, FUTA, SUTA 52% of labor
Diesel Powered Ground Heater (As Needed) $6,750/mo
Forklift (excluding maintenance and fuel) (As needed) $3,500/mo
Bobcat $3,000/mo
Concrete Blankets $32
Storage Trailer $150/mo
Labor Inflation (effective 1/1 of each year) 4% of all labor rates noted above
Change Orders cost of work plus 4.5%
Notes:
Labor Burden applies to.all items noted above with "
All rates are agreed upon in advance by Construction Manager and Owner and rates and percentages on this schedule
are not subject to audit.'
E'i ~ ~ ~ e ~ v ~ ~ ~ w n~i ~ `a ~ ~ pv 3+ ° ~ pw N ° g. ~ ~ ~'' w ~ uW~+ `S' u N ~ ~ ~ m o ^' C II
W 01
~ ~ ~
p ~
$
F T
$ ~
Cg
v }~
g
O to Co n N
_
~ e p c ~
~
iC~ M
pp q
n m q m
t _
S ~ v ~,
m~
~ H ~ T m d <~ P a w i ~ n '~ i
~
~
b
6 N _
- ~ T
m
~
s
0
qp NN s N e ~
p ~ W W W W gY O N > W N N A (P (.~ D N P N ~ gV W ~ • • A N ~ V Y gL gN + @O
T 11 T ~ < '~ ~ ~ ~ O ~ T ~ T ^~ 6 6 ~ S T C ~ ~ ~ S 3 ~ J ~ ~ ~ ~ 1 ~ •
N O~ ~ ~ v m P W r` C ~ m S P ~ L ~ N ~ V ~ P J O~ W Y N -W' •
L
~,
-~
~--, ~
Z
m
~~
~~
~ ~.
~~
~~
s~
A
VV ,J~ VV~~ pp >> VAS yy g yA1 ~yy1~
tT~. p ~ OG N p 4: r., ~ U ~ (S :T tT L A L m ~D O~
W
N O
N (~~
l 7
a~
1 -4
'~
;~ '
ICI ~~
n•
N y
'3
~a
3
I
U
C
n
n
m
~ 8 ~ m ~ O~ N A W N ~+ O tp ~ m, ~ U > ~ N m O ip m' V Ovf N • W N ~ O ~ m ~ ~ ~' ~. C ~
ydy
i
~
~ ~ O m 77 T T
~
~ O
] O
m T
g T
s _
~ ~ A ~ D ~ A n ~ n m ~ y m ~ C N Q ~ ~ '9 V A C m N ~ ~ g ~ f ~ o S
p3 ~ Q N T
T ]~ n ~ ~5N{ ~ _
~ e C m ~ SL T ~ ~ ~ ~ ~ ~ T ~ q
g s _ _
~ ~ ~ $ ~ ~ ~ ~ a N 8
A ~~ ~ ~ '~ O ~ N ~ V • N N ~ N N ~ N N N N l~ fJ A A ~ P tJ N 0 A A V
N
O ~ ~ ~ o o ~o ~ p ~ ~ ~ ~p pig ~o ~o ~ ~ ~ e ~''~ ~ ~ ~ r7 ~ ~ ~ g!~ r~ f° o ~ `6' s
N
? ry 1 C T 4 6 GGG+ ] ~ ~ T ~ ~0 T ~ ~ 6 • C T C T P 6 T ~ C ~ 4 O C ~ ~ C R~ S
ti
J+
.. A
~_' w u~ y ~ `~"
^_
r.
N
~ -c
~ ~
•- 1 ~'~'y f 'a
~ ~
N d
i
~~
~i
m
s
~~
0
a~
~~
o ~
N ~
p
~g
c.
s,~
y1 y. {,.+ W y{~t W. ~ ~y N v N N N N. NN j ~ r ~ r ~ r j ~ r p p G p p O O ~
m Q+ N A W N O~ m Q~ V~ A W N O b m V O~ N A W N + O 1p O V OI N !~ W.
W W o
r
~I
z
~ ~ ~ ~i
m _ q G
P R3 ~ '' -- i m~ E m
W
of
~~ I
~ _ R
~j ~ ~ ~ ~ s 4 ~ ~ ~ G' O ~ J p 7 ~ N.
~ r~ m m = ~_ p r
m ¢ ~
S
A W W N ~ N N N N • W A r O1 W N ~ O O ~
N ~~ E Q P P Q Q Q Q ' N. A. N N f ~ .~. + .'. .+ Y P Q Q
o~~ao~g~~~~~~$g~~~~~~~~~~g~~~~~~~~
T ~ ~ --1 -i ~ V -1 H ~ -i ti ~
T c ~c R ~ u nl q ~ ~ ~ ~ Q ~ ° ~ 7 N n~ ~ n~ ti ~ ~ N Q
WW W W ~ l N N V ~ ~ N N N ~ N O + -+. r ~ ~ r ~ c p p p 2 v m pl
A T W ~W.. N N tC m ~ N N N N p ~+ O~ W W N ~ N O Of • Ol
y~ N N N
N N y
E ~ g XY
N ~
yN
N
N
pd+ w N ~ I
T (c ~+ A O ~D 2 ~~ ONi it N ~~ m v O+ ~l+ N ~ -. .gyp tUC U
~I
~ O
n
~~
1
~~
C
l
f-1-1 f-1 -'1~1 1 ,I ,.I..f~ •_ 1 1 f, ~ V-_,~~.o~
a 1 f _1_1~ ~ ~~
1-- ~-= F==F-= 1 1 ~~ N W
m
s
~~
~a
~_~
n
~~
s~
A
TERM SHEET
1) Requested hearing date: Apri17, 2009. This date is important to
accommodate the construction schedule.
2) Requesting department: Project Management
3) .Title: Second Amendment to Agreement for Pre-Construction and Construe on
of the Eagle County Recycling Transfer Facility between Eagle County and Shaw
Construction. See #5 for purpose.
4) Staff submitting: Ron Siebert, x88 ~ ~~~ 1
~-~'~ 1
5) Purpose: Approve Shaw Construction's GMP Estimate and schedule for the
construction of the Recycling Transfer Facility.
6) Schedule: Start construction by April 18th and complete construction mid
January 2010.
7) Financial considerations: 5.8 million was budgeted. This will cover the
construction and design costs. Value Engineering will be actively pursued during
construction.
8) Other• None ,°~
s ~~ l ~'`~
~J"
._.,.
APP VE AS TO FO
By Ea~+le ^aunty Attorney's Office
~y' Eagls County Commissione