HomeMy WebLinkAboutC07-307 American Civil Engineers_Eagle River PreserveCHANGE ORDER PROJECT : EAf;L)~ V I`JE R PRESERVE CONTRACTOR: AMERIC',,',N i:1 VIL (,'ONS'FR[iCTOIZS Distribution to: [XI OWNER JXi ARC ]1't1:CT CHANCE C U INITIA.'IION DATE : CONTRACT DATE: You are direcicd to make the following changes in this Contract: [XI CONTRACTORZ [ ] F,"?I,D [ 7 OrUIER 1 7/23/2007 Reduce landscape trees/shrubs quantity per revised Planting Plan ($16,110.75) Added 2007 Irrigation Systems Elements $36,454.33 Added Dry Fire Hydrant $4,438.00 Added pond lining with sediment fines $8,770.44 Added wet well for Irrigation System $12,610.78 TOTAL T4-6,162.30 The Eagle County Project Manager hereby makes assurance that lawful appropriations to cover the costs of the additional work have been made, The original Contrac $398,610.00 _ Net change by previously authorized Change Orders $0.00 The Contract Sum prior to this Change Order was $398,610.00 _ The Contract Sum will be increased by this change order $46,162.80 The new Contract Sum including this Change Order will be $444,772.80 The Contract Time will be increased. . The Date of Substantial Completion as of the date of this Change Order therefore is 10-Jun-08 It is further agreed that pricing presented for the balance of irrigation systems, including the pump house building and filter, to occure in 2008 but not yet included in a change in the contract scope, shall not exceed that pricing presented 10/03/07, attached hereto. CONTRACTOR: American Civil Constructors By: i�y t✓ Date: OWNER: Eagle County Government -Y J Date i J wa m f -y 1r>i< 3ij- - rtqr r qt'a' 1 �i L< t , . d rA z Dw sicn 201 Bad Address' Litileto�, CO 1 Gora4 z t: k�a"iA it"t Gic C•`iaE _.... Fat ,z phone: .o , na1 rar ,max E�a�eri to {�u��� �� ��ll���r�r� �t��r�� c�r� ����e re �r � _..__ .—� — >ivil Col-strd,&Orl Is i3 _._...,_. L - L7 t at unit Price Total Price _ Estimat'd O�ap t — $211.99 $47,061.78 Line Na. ite'n A1ca, 64ern Desrrtp ac ----- 222.t)0 EACH , 28,622.52 ------- 774.00 EACH 1 2" DECIDUOUS TREES 11,692.99 4 UPLAND, RIPARIAN AND EACH 0.53 WETLAND SHRUBS 45 383.00 v $i 35.00 5 UPLAND RIPARIAN AND A00.00 �,1.35 EACH $5,6,28.70 W E-i-LAND SHRUBS #1 EACH 402.05 6 WILLOW CUTTINGS14.00 LARGE UPLAND EVERGREEN S,248.123,969.02 7 16.00 EACH TREES 6' $5,025.84 8 LARGE UPLAND EVERGREEN EACH $837.64 "TREES 4' 6.00 ERG .5 LARGE UPLAND EVREEN $2,48 �8,200.00 8 TREES 10' 2500.00 EACH 10 WETLAND HERBACEOUS108 336.75 PLANTS Total Price for the above ite�t�s: Total Bid Price: $1138,336.75 ACCEPTED: The are atisfactary und>reithereby accde,Ft conditions Buyer -- - 1 Signature `'"''�'�`� Da10 of Acceptance F Pacer; 1 of 1 Cie .._ E — 1 -.. . Tacky Pfjourttain Light i Authorized Signature: --- Estimator: Chad Anema Submit ted To: ACC Design Build Address, Littleton, CO 80120 Contact: Phone: Fax: 16DI West Belleview Littkton, Colcraao, gal'-'o Phone (30) 795-2582 Fax C303)797-0-798 Date: 9/25/2 &�d T' Me: Eagle River Preserve Dry Hydrant, Sediment Install, And Wet Well Bid Number: Project Location: Project City, State: Eagle, CO Engineer/Architect: American Civil Constructors Is pleased to quote the following items on the above referenced project. Item No- Item Description Total Price I Dry Hydrant $4,438.00 2 Lining Pond WY Sediment $8,770.44 3 Wet Well $12,610.78 Total Bid Price: $25,819.22 Notes: ' This proposal is a change order that will extend the contract beyond the Oct. 21, 2007 date. Prices firm for 30 days. --------- - --- ACCEPTED: CONFIRMED: The above prices, ecifications conditions are satisfactory td'arereby Rocky Mountain Light Civil Buyer -=,- i Authorized Signature Signature; Date of Acceptanre Estimator: Amy 1-44rd L-ffli eri, L g- Ors 164JI v, ""Olorad""' f! }13 Submitted TO: `X ----------- y [Wer h .. .. .. Addrc-.>s: Li ttletoin, CC) 30 i 2-,) Bid Nurnii;of: Pro;,,�ct Location: Contact: "30 f Project Ci',-- CO Phone: Fax: EngineGr)Arch American Civil Constructors iS pleased to cl"of-0 the following items on the above referenced project. Item No. .......... Item Description — - -------------- - E"stimated Quantitv Unit Unit Price Total Price I Pump And Associated Electrical 1.00 LS ................ . . . $65,253.27 -- $65,263.27 5 Controiler 1.00 EACH $7,069.96 $7,069.96 6 Lateral Line 2,000.00 LE $5.76 $11,520.00 12 Heads 35,00 EACH $175.70 $6,149.50 13 Drip Tubing 11,140.00 LF $3.41 $37,987.40 Notes: This proposal is a change order that will extend the contract to June 10, 2008. Prices firrn for 30 days. ACCEPTED: The above prices, specifications and conditions aro satisfactory and are hereby accepted. Buyer Signature Date of Acceptanco Page 1 of I Total Bd Price: $127,980,13 CONFIPIVIED: Rocky Mountain Light Civil Authorized Signature: Estimator: Amy Levine s�- YON { S EA WX I N u rig z s \ � f su.b tAc ., i... �. 7 f. !ild (-Ont,rr::... ....... I Z . -ty _J-1 .. ..... ...... t a American C' i _'s! A onsiratcors is p" }a..:-e d i:3 -loote "Thee following items on the ezbove: Safe-3"wnCis,d project. Item No. etcm Oc8cr pti€9n Estimated Quprtsiy Unit Unit Price TC?i'iil Price Alt. 1 Pump House Building 1.00 L S $,23,916.00 $23,916.00 Total Bid Prim $23,916.00 Notes: Fhis proposal is a change order that will extend the contract to June 10, 2008, Prices firm 'or 30 days. ACCEPTED: The above: priccs, sp ciiicati ns ar_ con,"Nic"Is are- satisfactory aid sarE h£are-Ly accE pt d. Buyer 5ictnafure �_ Dr,te of Accepia)-,cEe Page 1 of 1 Rocky iv4ouir`tnin Light Civil Authorized Signature: Estimator: Amy Lavine tqq AWN, Subrjnitt-Irl To- AGI I'D - "Gi 80120 ContFGt: Phone: Fa x ;j 0,ai-� 101-1 to T x"< e: r s e Sid be. Project 1'7r0je,t clty; stag":: Enghne,,r/Arcl-d t0c'., F-OW0, CO A 4 mucl erican Civil Constrors is Pleased to quote the fiollowing Itc-Ins on MW VbOvc- referevic d r,- ..... ..... .. - ------ -- -------- ------ -- ---------- Ite-m-, No. Item Description Estimated Quantibi Unit Unit Price Total Prk;e - ----------- --,- --.- . . ........ --- - - -------- — - -- - ----------------- Alt. 2 Automatic Self Cleaning Filter 1.00 LS $8,249.41 $8,249.41 Total Bid Price: $8,2,".41 Notes: This proposal is a change order that will extend the contract to June 10, 2008. Prices firm for 30 days. ACCEPTED: The abo-,,,(,, prices, specificafie.nF and conditicinf, are ,atisfactory and are, Nereby accepted. Buyer Gianature Date of Acceptance CONFIRMED* Rocky Mountain Light Civil Authorized Signature: Estimator: Amy Levine