Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC06-294
l<.
SOPRIS ARCHITECTURE
CONTRACT
For The:
EAGLE COUNTY ROAD & BRIDGE FACILITY
EL JEBEL, COLORADO VACINITY
Submitted To:
EAGLE COUNTY
Rick Ullom-Construction Manager,
Eagle County Facilities Management Department
p. 0. Box 850
500 Broadway
Eagle, CO 81631-0850
By:
SOPRIS ARCHITECTURE
David Uoyd Koenck, AlA, NCARB
1579 Gateway Road
Snowmass, Colorado 81654
Ph: (970) 927-3313
Fax: (970) 927-0507
soparch@sopris.net
www.soprisarchitecture.com
Date:
September 21, 2006
SOPRIS ARCHITECTURE
Eagle County Road & Bridge Facility-EI Jebel, Colorado Vacinity
Table of Contents
CONTRACT:
Section 1
Section 2
Section 3
Agreement Regarding Provisions of Architectural
Services for the EI Jebel Road and Bridge Facility
Attachment "A" - Worl<' Outline
Attachment "B" - Payment Schedule
AGREEMENT REGARDING PROVISION OF
ARCHITECTURAL SERVICES FOR THE EL JEBEL ROAD AND BRIDGE FACILITY
This Agreement Regarding Provision of Architectural Services for Eagle County for the Eagle
County Road and Bridge Facility, EI Jebel Vicinity ("Agreement") dated this 19th day of
September, 2006, is between the County of Eagle, State of Colorado, a body corporate and
politic, by and through its Board of County Commissioners (hereinafter "County"), and Sopris
Architecture, with a business address of with a business address of 1579 Gateway Road,
Snowmass, Colorado 81631-0850 (hereinafter "Architect").
Recitals
A. County desires to construct a Road and Bridge Facility (hereinafter "Facility") in the EI
Jebel, Colorado vicinity. The County desires, in connection therewith, architectural services for
the design and construction of this facility.
B. Architect is a corporation authorized to do business in the State of Colorado, the principal
of which is David Koenck, whose expertise is in architecture and who is a professional Architect
authorized to act as such in the State of Colorado.
C. Architect has submitted to County a proposal for performing the Work (defined below)
and represented that it has the expertise and personnel necessary to properly and timely perform
the Work.
D. Architect and County intend by this Agreement to set forth the scope of the
responsibilities of the Architect, in connection with the Work, and related terms and conditions
to govern the relationship between Architect and County.
Agreement
Therefore, based upon the representations by Architect set forth in the foregoing recitals
incorporated herein, for good and valuable consideration, including the promises set forth herein,
the parties agree to the following:
1. Scope of Work: The Scope of Work are more particularly described in Exhibit "A"
attached hereto and incorporated herein by this reference ("Work"). To the extent that any
provision in this Agreement conflicts with a term or condition of the proposal, this Agreement
shall control. The Architect's Work consists of those services performed by the Architect,
Architect's employees and Architect's sub-consultants. No other Work shall be performed prior
to the direction of County to proceed following the execution of a written amendment to this
Agreement.
The Work is generally described as preparing design and construction services to complete
construction ready-documents, to assist in bidding/contractor negotiations and to perform
construction contract administration for the Facility.
Architect shall design an approximately 10,000 square foot building to include storage for four or
five large pieces of heavy equipment, miscellaneous services parts, maintenance materials, a
wash bay, equipment and office space.
The parties hereto recognize that the scope of the Work may be changed. County may, without
invalidating this Agreement, order additions, deletions, or revisions in the Work. All such
additions or revisions to the Work that cause an increase in the contract price shall be reflected in
an equitable adjustment as agreed to by the parties. All such deletions or revisions to the Work
that cause a decrease shall be reflected in an equitable adjustment as agreed to by the parties. If
additions, deletions, or revisions in the Work result in partially completed work, the County shall
be liable only for Work completed in a satisfactory manner.
When the Architect believes that the Work has been changed, or by reason of a decision of the
County, it will be required to redo properly completed Work, the Architect shall immediately
advise the County of such belief and shall also provide a statement of the maximum additional
charges for such services. Architect shall not be entitled to be paid for any such services unless
and until County agrees in writing that the Work has changed and accepts the statement of the
maximum additional charges.
Nothing herein is intended to or constitutes a representation by County that it will construct the
proposed improvements or that it will do so at a particular time.
Architect shall be responsible for having taken steps reasonably necessary to ascertain the nature
and location of the Work, and the general and local conditions which can affect the Work or the
cost thereof. Any failure by Architect to do so will not relieve him from responsibility for
successfully performing the Work without additional expense to the County.
2. Architect's Professional Level of Care: Architect shall be responsible for the
completeness and accuracy of the Work, including all supporting data and other documents
prepared or compiled in performance of the Work by Architect's sub-consultants, and shall
correct, at his sole expense, all significant errors and omissions therein. Architect shall be
responsible for and shall coordinate the efforts of the engineers and other sub-consultants relative
to the Work. The fact that the County has accepted or approved Architect's Work shall not
relieve Architect of any of his responsibilities. Architect shall perform the Work in a skillful,
professional, and competent manner and in accordance with the highest standards of care, skill,
and diligence applicable to Architects with respect to similar services. Architect shall not be
responsible for the content or accuracy of any reports or studies provided by the County or its
representatives.
3. Time of Performance and Termination:
Architect shall commence the Work no later than five (5) business days after the date of this
Agreement. Architect shall complete the individual task of the Work in conformity with the
2
completion dates set forth in a finalized design schedule to be provided by Architect upon the
execution of this Agreement, provided that completion dates for anyone or more of the tasks
identified in the proposed schedule may be extended by the County in its sole discretion.
This Agreement may be terminated by either party for any reason at any time, with or without
cause, and without penalty whatsoever therefore, on at least seven (7) days prior written notice to
that effect to the other party. Notwithstanding the foregoing, if Architect defaults or neglects to
carry out the Work in accordance with this Agreement, the County may terminate this Agreement
immediately. Upon any termination, the County shall be liable only for Work satisfactorily
completed prior to the notice. At its sole option, the County may require that the Architect
complete particular portions of the Work on an hourly rate consistent with the Architect's
standard fees. Upon termination, the Architect shall deliver to County all data and other
documents entirely or partially completed, together with all material supplied to the Architect by
the County. Payment will be due within thirty (30) days after Architect has delivered the last of
the partially or wholly completed documents, together with any records that may be required to
determine the amount due.
4. Com{>Cnsation and Payment: In consideration of its performance of the Work, County
shall pay Architect for its time and expenses actually and directly spent on or incurred in
performing the Work, provide that the total payment for each service item shall not exceed the
amount set forth in the fee proposal in the attached Exhibit "B." For the purposes of this
Agreement, the term "expenses" shall include all out-of-pocket expenses reasonably incurred by
Architect in connection with the Work. Expenses shall include telephone, postal charges, air
freight charges, blueprint/plan printing (sufficient copies as directed by County for bid package
preparation and distribution, County use, building inspection use, and the General Contractors
use), fax charges, photo-reproduction costs, travel costs, as well as any other expenses identified
in Exhibit "B." Expenses are specifically included in the fee proposal in the attached Exhibit
"B."
The funds currently appropriated for this project are equal to or in excess of the contract amount.
Notwithstanding anything to the contrary contained in this Agreement, no charges shall be made
to County nor shall any payment be made to Architect in excess of the above amounts for any
work done without the written approval of the County in accordance with a budget adopted by
the Board of County Commissioners in accordance with the provisions of the Colorado Revised
Statutes. The parties recognize that the County is a governmental entity and that all financial
obligations beyond the current fiscal year are subject to funds being budgeted and appropriated.
Payment shall be made in accordance with the following:
a. Architect shall submit to the County progress invoices for payment not more than once a
month regarding one or more of the tasks identified in the Work. Such invoices shall describe
the Work performed and shall segregate the charges for work done by task, including the
percentage of completion Architect contends was accomplished during the month. Upon request,
the Architect shall provide the County with such other supporting information as the County may
3
request. County shall review and pay proper and documented invoices based on the percentage
of work accomplished during the month.
b. Architect shall maintain comprehensive, complete and accurate records and accounts of
his performance relating to this Agreement for a period of three (3) years following final payment
hereunder, which period shall be extended at County's reasonable request. County shall have the
right within such period to inspect such books, records and documents upon demand, with
reasonable notice and at a reasonable time, for the purpose of determining, in accordance with
acceptable accounting and auditing standards, compliance with the requirements of this
Agreement and the law.
5. Independent Contractor: It is expressly acknowledged and understood by the parties
hereto that nothing contained in this Agreement shall result in, or be construed as establishing, an
employment relationship. Architect shall be, and shall perform as, an independent contractor.
No agent, subconsultant, subcontractor, employee, or servant of Architect shall be, or shall be
deemed to be, the employee, agent or servant of County. Architect shall be solely and entirely
responsible for its acts and for the acts of Architect's agents, employees, servants and
subcontractors during the performance of this Agreement.
6. Personnel: Architect understands and hereby acknowledges that County is relying
primarily upon the Architect's expertise and professional abilities. Architect may not subcontract
or delegate any part of the Work or substitute subcontractors without County's written consent,
which consent County may exercise in its sole discretion.
7. Ownership of Documents: All documents (including electronic files) which are obtained
during or prepared, partially or wholly, in the performance of the Work shall remain the property
of the County and are to be delivered to County before final payment is made to Architect or
upon earlier termination of this Agreement. Use of the documents is limited to this project only.
Reuse or modification of any such documents by the County, without the Architect's written
permission, shall be at County's sole risk.
Copies of documents that may be relied upon by the County are limited to the printed copies
(also known as hard copies) that are signed or sealed by the Architect. Files in electronic media
format or test, data, graphic or other types that are furnished by the Architect to the County are
only for convenience ofthe County. Any conclusions or information obtained or derived from
such electronic files will be at the user's sole risk. When transferring documents in electronic
media format, the Architect makes no representations as to precision, long term compatibility,
usability, or readability of the documents.
8. No Assignment: The parties to this Agreement recognize that the Work to be provided
pursuant to this Agreement are professional in nature and that in entering into this Agreement
County is relying upon the professional services and reputation of Architect. Therefore,
Architect may not assign its interest in the Agreement, including the assignment of any rights or
delegation of any obligations provided therein, without the prior written consent of County,
4
which consent County may withhold in its sole discretion. Except as so provided, this
Agreement shall be binding on and inure to the benefit of the parties hereto, and their respective
successors and assigns, and shall not be deemed to be for the benefit of or enforceable by any
third party. Unless specifically stated to the contrary in any written consent to an assignment, no
assignment will release or discharge the assignor from any duty or responsibility under the
Agreement.
9. Conflicting Emplovment: The Architect agrees that Architect will not enter into any
employment arrangements with third parties that will conflict in any manner with the Work
herein.
10. Insurance: At all times during the term of this Agreement, Architect shall maintain the
following insurance:
T e of Insurance
rofessional Liability
orkers' Compensation
Cover e Limits
$1,000,000 minimum
Statutory limits
All insurance required hereby shall be issued by an insurance company or companies authorized
to do business in the State of Colorado. Architect shall deliver certificates of required insurance
to the County within fifteen (15) calendar days of execution of this Agreement by the Board.
11. Indemnification: Architect shall indemnifY County for, and hold and defend the County
and its officials, boards, officers and employees, harmless from, all costs, claims and expenses,
including reasonable attorney's fees, arising from claims of any nature whatsoever made by any
person to the extent caused by the negligent acts, errors or omissions of Sopris Architecture, its
employees, agents, and assigns in the performance of this Agreement. This indemnification shall
not apply to claims by third parties against the County to the extent that the County is liable to
such third party for such claim without regard to the involvement of the Architect.
12. Notices: Any notice and all written communications required under this Agreement shall
be given in writing by personal delivery, facsimile or mail to the other party at the following
addresses:
Architect:
Sopris Architecture
attn: David Koenck
1579 Gateway Road
Snowmass, Colorado 81654
tel. 970-927-3313
fax. 970-927-0507
County:
Facilities Manager
P.O. Box 850
500 Broadway
5
Eagle, CO 81631
tel. 970-328-8880
fax.970-328-8899
With a copy to:
Eagle County Attorney's Office
P.O. Box 850
500 Broadway
Eagle, Colorado 81631
tel. 970-328-8685
fax. 970-328-8699
Notices shall be deemed given on the date of delivery; on the date a fax is transmitted and
confirmed received or, if transmitted after normal business hours, on the next business day after
transmission, provided that a paper copy is mailed the same date; or three days after the date of
deposit, first class postage prepaid, in an official depositary of the U.S. Postal Service.
13. Miscellaneous:
Architect shall not discriminate against any employee or applicant for employment to be
employed in the performance of this Agreement on the basis of race, color, religion, national
origin, sex, ancestry, physical handicap, age, political affiliation or family responsibility.
The making, execution and delivery of this Agreement by the parties hereto has not been induced
by any prior or contemporaneous representation, statement, warranty or agreement as to any
matter other than those herein expressed. This Agreement embodies the entire understanding and
agreement of the parties, and there are no further or other agreements or understandings, written
or oral, in effect between them relating to the subject matter hereof. This Agreement may not be
amended, including by any modification of, deletion from or addition to the scope of the Work,
except by a written document of equal formality executed by both parties hereto.
This Agreement shall be governed by and construed in accordance with the internal laws of the
State of Colorado, without reference to choice of law rules. The parties agree that venue in any
action to enforce or interpret this Agreement shall be in the District Court in the 5th Judicial
District for the State of Colorado.
This Agreement does not and shall not be deemed to confer upon or grant to any third party any
right enforceable at law or equity arising out of any term, covenant, or condition herein or the
breach thereof.
6
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first
above written.
ATTEST:
COUNTY OF EAGLE, STATE OF COLORADO,
By and Through Its
BOARD OF COUNTY COMMISSIONERS
Clerk to the B d of
County Commissioners
i~~
Peter F. Runyon, Ch an
SOPRIS ARCHITECTURE
STATE OF COLORADO )
) ss:
County )
7.u
On this I t:l~day of ~pJe~,~, came before me, a notary public, David Koenck,
known to me to be an officer of Sopris Architecture who acknowledged to me that he executed
the foregoing document, that he executed it in that capacity, and that the same was the act of the
corporation.
7
work outline
primary phases of services
and percentage of service
pre-design .. 5%
site analysis.. 5%
schematic design.. 15%
design development.. 20%
construction documentation .. 40%
bidding/contractor negotiation - 5%
construction contract administration - 10%
post-construction extended services (optional)
supplemental services (opti.onal)
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 1 of 32
SOPRIS ARCHITECTURE (SA)
work outline
This work outline has been developed for the Eagle County Road and Bridge Facility EI Jebel, Colorado
Vicinity which shall indude storage for four or five large pieces of heavy equipment (to be
determined), (trucks, motor graders, etc.) miscellaneous services parts, maintenance materials, a
wash bay and equipment and some offices space. A future needs assessment will be taken into
consideration for determining the overall size of the facility and the fadlity shall be approximately
10,000 square feet (to be determined though the AlE fees are based on a 10,000 square foOt facility).
ThiS outline is general in nature. It shows a general outline of the work on a typal project similar type and
as anticipated on at thiS moment in prior to actualy doing the project. Some
items called for in the outline may not be necessary in the final development of the project and others
not shown may be required by the final project and adjusted accordingly. Other items may be
required that are outside our control.
pre-clesign services
Description in detail of the contents of a typical conceptual design package submitted by Sopris
Architecture is as follows:
project planning
Create a job calendar of estimated phase starts, completions, and phase payments
Pre.design and Programming
Site Analysis
Land Use Process (part of Pr&<iesign, Site Analysis and Schematic Design)
Schematic Design
Design Development
construction Documentation
BiddingINegotiation
contract Administration
Post..construction
Create a for budget and schedule progress reviews
project administration
Prepare project records:
Start format and list of contents for job project record book specific to Project
Establish dates for preparation of monthly expense records
Distribute copies of the job calendar to appropriate job participants
Establish dates for submittal of statements to client
Establish dates for preparation of monthly reimbursable expense statements
Start categories for the project filing system to Project
Prepare file folders and/or binders for project records
Create the Project directory
Acquire from dient the name(s), addressees), and phone number(s) and authority of the
client representative(s)
Eagle County Road & Bridge Facility - EI Jebel, Colorado VICinity
2006
Page 2 of 32
SOPRIS ARCHITECTURE (SA)
work outline
consultant selection and coordination
Choose and hire consultants
Evaluate, interview, and select project consultants
Notify client of all consultant choices and confirm client's approval
Review and reach agreement with the consultants on the Scope of Work.
Complete contractual agreements with consultants
codes/approvals for conceptual design/schematic/design development
package
IDENTIFY MISCELLANEOUS APPLICABLE AGENCIES AND CODES:
City or County Building Codes
City or COunty Zoning Office
Health Deparbnent
Environmental Agency
Design Control
Sign Control
Roads and traffic
Grading and drainage control
Utilities
Fire Deparbnent
IDENTIFY OCCUPANCY AND CONSTRUCTION TYPE ZONING REQUIREMENTS FOR:
Zone restrictions
Exceptions
Property line setbacks
Street and driveway requirements and others
HEIGHT LIMITATIONS FOR:
Building height..to-land area ratio
Exception trades for dedicated public Space
Air rights
View entitlements
Sun and shade entitlements
Net upper story buildable areas, floor by floor and others
IDENTIFY MISCELlANEOUS ZONING REQUIREMENTS FOR:
Fencing--aflowable types, heights and distance from property and building lines
Yard walls- allowable types, heights and distance from property and building lines
Exterior building display lighting
Exterior yard lighting
Building Yard Security
Required landscaping or open areas
Required pavement drainage
Eagle County Road & Bridge Facility - EI .lebel, Colorado Vicinity
2006
Page 3 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Restrictions on trash collection area
Zoning restrictions regarding handicapped access
Neighborhood Meetings
Blue Lake Homeowners
Town of Basalt
Pitkin County
Garfield County
EI Jebel and Vicinity
LAND USE APPLICATIONS FOR:
Variance (?)
Special Use Permit
Location and Extent
ZONING AND PLANNING PERMIT HEARINGS FOR:
Variance
Exceptions
Use Permit
Conditional Permit
Other Permits
PLANNING AND ZONING BOOKLET AND DRAWINGS
Application Letter
Project Narrative
Planning Application
Project Rendering
Warranty Deed and Proof of Property Ownership
Parking Analysis
Site Plan and Dimensions
Grading Plan
Site Pictures
Floor Plan and Elevations
Snow storage Diagram
Drainage Calculations
Grading Plan
Erosion Control
Landscape Plan
Utility Plan
Details
Site Survey
Wildlife Analysis
ROARING FORK VAlLEY REQUIRED PLANNING COMMISSION PUBLIC HEARING
EAGLE COUNTY BOARD Of COUNTY COMMISSIONER HEARING
IDENTIFY MISCELLANEOUS DETAILED FIRE CODE REQUIREMENTS:
Eagle County Road & Bridge Facility - EI Jebel, Colorado VICinity
2006
Page 4 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Fire-rated construction for walls, floors, and ceilings (developed during CD's)
Fire doors and hardware (developed during CD's)
Automatic Sprinklers (type and coverage) (developed during CD's)
Smoke detectors (type and location) (developed during CD's)
Fire extinguishers (type and locatiOn) (developed during CD's)
Fire hose cabinets (type and locatiOn) (developed. during CD's)
Fire alarms (type and location) (developed during CD's)
Above ceiling smoke and fire barriers (type and location) (developed during CD's)
IDENTIFY THE FOLLOWING CODE-RELATED ASPECTS OF THE PROJECT DESIGN:
Occupancy and Construction Type classifications
Building locatiOn set backs and exterior wall requirements
Height limits and allowable number of stories
Fire exit requirements
Ventilation, energy and health requirements
Construction systems, materiatS, and engineering requirements
Handicapped access
Local regulations
State regulations
Federal regulations
Client agency regulations
Identify sequential requirements such as approvals required prior to obtaining other approvals
Request information on any special code requirements known to the client
pre-design and programming
services shall include:
Obtaining or creating interior space needs
Conduct client user needs survey
Estimate room and create diagrammatic or schematic building plans
Identify overall OCCUpancy and specific departmental and room occupancies
Obtain lists of client needs for special equipment builHn fumishing
Obtain the client's list of equipment and furnishings
Verify site zoning or other restrictiOns on building and height
Review and confirm restrictions,sel~ and limits on height and parking
Develop preliminary building code and fire code search
Check and verify types. and space size requirements for mechanical/utility systems and
area(s)
Conduct detailed client and user needs survey and create spatial interaction diagrams if
necessary
Identify options within existing space for utiliZation and configurations based on functions,
occupancies, etc.
Identify options of building configuration based on functions, occupancies, site, etc.
Create two or three optional diagrammatic/schematic building plans based on owner needs
Estimate construction and site development costs
Eagle County Road & Bridge Facility - EI...bel, Colorado Vicinity
2006
Page 5 of 32
SOPRIS ARCHITECTURE (SA)
work outline
site analysis
Services shall include:
Site review may include some or most of the following:
Assist client in obtaining an up-to-date survey (included in Civil Engineering Services)
Visit site to observe and verify major site features
Confirm accuracy of major features of the land survey by observation
Obtain photographs of major site features and surroundings
Assist client in obtaining necessary soil and related site tests and investigations
COnsultant coordination/document checking
Assist client in obtaining Agency consulting/review/approvals by providing appropriate documentation
(Sopris Architecture and John Tauter & Associates shall lead this process for the Owner during the
Design and Documentation Phases)
Building department review
Fire Marshall review
Sign control review
Public roads department review
Health department review
Planning departmentlzoning commission
Zoning and permit consultation
Public utilities
Coordination of c1ient-provided data
Title papers
Utility maps
Property covenants and easements
Site Analysis
Site survey consultation and coordination
Site survey check of major site features
Soil testing/geophysical survey coordination/consultation
Building and parking location
General Handicap access audit of site
Preliminary Site Development Plan
Building siting and alternatiVes
Traffic and parking planning and alternatives
Utilities pfanning and a1tematives
Geophysical review consultation
legal and zoning analysis
landscaping and alternatives
Detailed Site Development Plan
Building siting and alternatives
Traffic and parking pfanning and alternatives
Utilities planning and a1tematives
Geophysical review consultation
legal and zoning analysis
landscaping and alternatives
On..site Utility Study
Gas
Eagle County Road & Bridge Facility - EI Jebel, Colorado YlCinity
2006
Page 6 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Electrical
Water
Drainage
Sewerage
Waste water
Fire protection
Eme~en~ands~riwsy&ems
Exterior lighting
Communications: TV, Radio, CCTV
Off-Site Utility Study (as required)
Project Development Schedule
Project Budgeting
Project Presentations
schematic design package
design process and discipline coordination
Description in detail of the contents of a typical schematic design package by 80priS Architecture is as
follows:
Services shall include:
Confirm and up..date the building program's stated functional, occupancy and spatial
requirements
Prepare architectUrat Schematic Design Drawings that include:
Preliminary Floor Plan(s)
Preliminary Site Plan
Reconfirm budget, program, and legal requirements and restrictions
Prepare architecturaf Schematic Design drawing if required in addition to those above:
Site Plan/Circulation diagrams
Floor Plans
Cro5$-Sections if required
Exterior Elevation(s) (primary view)
Sketch perspectives if necessary
Compare SChematic Design Drawings to the program, probable cost estimate and codes
Prepare and mount schematic drawingS for formal presentation if necessary
Schematic Design Development drawings may include additional data. as required for:
Building department preliminary review
Planning department preliminary review
Preliminary oonstrootion estimates (if oontractor on-board)
schematic design package ~ structural design and documentation
Consult with specialist structural engineer if anticipating any exceptionat problems regarding soil,
construction, adjacent site conditions, etc.
Eagle County Road & Bridge Facility -- EI Jebet. Colorado VICinity
2006
Page 7 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Review and reach agreement with the structural engineer on the scope of Work (prior to contract
signing)
Obtain preliminary description of possible structural systems
Assist Owner with engaging a Geotechnical Engineering company to prepare soil report.
schematic design package .. mechanical design and documentation
Acquire preliminary evaluations of possible appropriate types of mechanical systems including
potential a1temative energy conservation options.
schematic design package .. electrical design and documentation
Review and reach agreement with the engineer on the Scope of Work (prior to contract signing)
Consult with electrical engineers for advanced electronic and communications systems
Acquire preliminary evaluations of possible appropriate types of electrical systems
Determine ability of electric three phase power, single phase power, phone cable.
schematic design package .. ciVl design and documentation
Review required soils testing, regulations, and resultS of previous site tests
Review and reach agreement with the engineer on the Scope of Work (prior to contract &tgning)
Obtain preliminary probable for civi engineering related construction costs
Consult and coordinate design for exceptional foundation, site, and/or soil conditions
schematic design package .. landscape design and documentation
Review and reach agreement with engineer on the Scope of Work (prior to contract signing)
Identify optional landscape features
Obtain preliminary probable cost for landscaping and irrigation related construction costs
Evafuateland$Cape features to remain, modify, remove for storage, or eliminate
landscape and Irrigation design
schematic design package .. fumitu... design and documentation (optional)
Identify optional InteriOr Design or Office Planning services
Provide coordination and review of space planning
Preliminary furniture layout (optional)
materials research and 8peCificatfon$
Start project outline specifications or contents list
Investigate unusuall'l'l8terials and material combinations required for the project
Green Build Product Alternatives
estimating opinion of probable construction costs
Provide information on current costs of comparable projects
presentations
Present SChematic Design and cost data
Prepare for the client, presentations of one to two optional design features and variations per
department
Eagle County Road & Bridge Facility - 1:1 Jebal, Colorado VICinity
2006
Page 8 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Prepare preliminary building floor area calculations, usable area ratios, etc.
design development package
general information sheets
Description in detail of the contents of a typical design development package submitted by Sopris
Architecture is as follows:
Content:
User needs survey data and chart review
Regulations and codes data
Project scheduling and budget
site plans
Survey drawings
Soil and geological data
DD landscaping ptan with plant selection and existing plants to remain or be relocated
Easements and rights of way locations
Building outline or footprint with exterior wall dimensions to property boundary lines
Street access, Driveway dimensions
Parking space required
Handicap parking, ramp and access
Zoning check and confirmed setback limits
Existing and new contours
Retaining walls, fences and grates
Locations for signs, kiosks, and other site appurtenances
Material Storage
Lighting (Exterior)
Fuel Farm
Utility Locations
design development package - floor plans
Content
Room identifications with square footage
Walls and partitions with keyed materials indications
Stairs, other vertical transportation, utility and mechanicaf spaces
Overall square footage and net to gross usable space ratios
Datum references to show relative floor heights of balconies, landings, mezzanines, etc.
Walls and partitions with keyed materials indications
Fumiture and equipment plans and inventory (optional)
Datum references to show relative floor heights of balconies, landings main floors, mezzanines, etc.
Structural grid coordinates and primary dimensions
Outline finish schedule
Eagle County Road & Bridge facility - EI Jebel, Colorado VICinity
2006
Page 9 of 32
SOPRfS ARCHITECTURE (SA)
work outline
design development package - roof plans
Roof layout, finish material, overhangs and slopes
Preliminary coordination of plan with structural frame, openings and skylights, etc.
design development package - exterior elevations
Exterior elevations of primary sides of building
Exterior material notes or pattem indications
Doors and windows shown in general location
Finish grades
Below grade construction
Retaining walls, paving, planters, etc. adjacent to structure
design development package - cross sections and waR sections
Overall building cross sections showing major design and construction features
Sections of exterior bearing walls showing outline construction detailing
design development package - sched....: finish
Interior materials description
Exterior materials description
Fumishings location and type
Cabinet location in plan and iflustrated literature
Door and window component illustrated literature
design development package - construction details
Design or construction details as required by regulatory agencies
Design details of major building features
design development package - design process and disciplines coordination
Confirm and update the building program's functional, occupancy and spatial requirements
Obtain or update lists of special building equipment and fixtures required by the client
Review structural, I1'leChanical, eIecfricaI and other building systems
Provide .project schedule time estimate in cooperation with all disciplines
Hold crOS&-COOrdination meetings to aIow consultants to compare their drawings
design development package - architectural design and documentation
Review the program's functional, occupancy and spatial requirements with the client
Prepare architectural Design Development drawings:
Site Plan
Floor Plans
Roof Plan
Exterior Elevations
Primary Building Sections
Some Wall Sections
Design Details as necessary
Design Development drawings may include additional data as required for.
Eagle County Road & Bridge Facility -II Jebel, Colorado VICinity
2006
Page 10 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Building department preliminary review
Planning department preliminary review
Preliminary contractor construction estimates (if contractor on-board)
Prepare and coordinate Outline Specifications
Review architectural design, Development drawings in progress and compare them with the
structural, mechanical, electrical, and other consultants' drawings
Prepare building floor area calculations, building volume if required, usable area ratios, etc.
Provide "Statement of Probable Construction Costs" by square footage cost comparison with
other comparable projects
Prepare data on costs and availability of special equipment and fumishings
design devGlopment package - atructufat design and documentation
Conductstru:etural, mechanical, electrical and architectural cross checking by
Coordinate phas&<:heCking of stru:etural drawings by Structural Engineer
Review the structural systems approach with the client (Owner and Architect)
Prepare Structural Design Development drawings:
Structural Foundation Plan
Structural Framing Floor Plans
Structural Roof Framing Plan
DetailS and Sections of typical details
design devGlopment package ~ mechanical design and documentation
Conduct mechanical, structural, electrical and architectural cross checking
Coordinate phase-checking of mechanical drawings
Review the mechanical systems approach with the client
Prepare Mechanical Design Devetopment drawings:
HVAC Floor Plans
Plumbing cut sheets
cut sheets and descriptions
Details and sections of typical details
Prepare and coordinate Outline Specifications for mechanical issues
Review mechanical design development drawings in progress and compare them with the, electrical
and other COO$Ultants' drawings
ProvidEt "Statement of Probable Construction Costs" on systemIcomponent cost comparison with
other comparable projects
Fuel Farm & Washbay
design devGlopment package - etectriCat design and documentation
Conduct electrical, mechanical, structural and architectural crosschecking
Coordinate phas&-checking of electrical drawings
Create electrical lighting diagramlfloor plans as necessary to clarify electrical lighting layout and
proper lighting levels
Review the electrical systems and quality approach with the client
Prepare Electrical Design Development drawings:
Lighting Floor Plans
lighting fixture cut sheets
Develop Preliminary Power and Communications Plans
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 11 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Equipment cut sheets and descriptions
Details and Sections of typical details
Prepare and coordinate Outline Specifications for electrical issues
Review electrical design devetopment drawings in progress and compare them with the
architectural, structural, mechanical, and other consultants' drawings
Provide "Statement of Probable Construction Costs" on system/component cost comparison with
other comparable projects
design development package .. eivil design and documentation
Confirm that site soils tests conform to requirements of local building authorities
Review engineer's site observation and soil test report with the structural engineer
Conduct eMf, mechanicat. structural, landscape and architectural coordination meetings
Schedule and monitor completion dates for civil design development dOcumentation
Prepare CMI Design Development drawings:
Site Plan with Roof Plan. new and old contours. parking. drives and sidewalks
Develop Preliminary utiIly locations plan
Equi.pment cut sheets and descriptions
Details and Sections of typical details
Provide "Statement of Probable Construction Costs" on system/component cost comparison with
other comparable projects
design development package -landscape and irrigation design and documentatiott
Provide schematic landscape plan and schematic irrigation plan
Review plan proposed by or nursery company
Review and coordinate landscape, architectural, civil, mechanical and work
Prepare Landscape Design Development drawings:
Site Plan with Roof Plan, new and old contours, parking, drives and sidewalks and
p1antscaping
Equipment cut sheets and descriptions
Details and Sections of typical detais
Provide "Statement of Probable Construction Costs" on system/component cost comparison with
other comparable projects
design development package .. fumitUre design and documentatiott (optional)
Provide verification of space layout for desks, etc. so that they will work adequately.
Conduct furniture, electrical, mechanical, and architectural cross checking
Coordinate pttase..checking of furniture drawings
Create fumiture plans as necessary to clarify fumiture location. layout, quantities, quality,
systems, built-ins, ete.
design development package .. materials ....rcl't and specifications
Develop outline specifications describe in outline form major parts, components. etc. for
building
Start project outline specifications in coordination with design development drawings
Devetop finish schedule for interiOr and exterior finishes
Review finish schedule for interior finishes with client
Eagle County Road & Bridge Facility - 1St JebeJ, Colorado Vicinity
2006
Page 12 of 32
SOPRIS ARCHITECTURE (SA)
work outline
design development - estimating probable costs
Provide "Opinion of Probable Construction Costs.. by square footage cost comparison with other
comparable projects
design development - presentations
Participation in staff department meetings
Review and negotiation meetings
Finalize building floor area calculations, usable area ratios, and other numerical
comparisons with program requirements
construction documents package
Description in detail of the contents of a typical construction document package submitted by Sopris
Arebitecture is as foIows:
construction documents - general information sheets
Symbol and nomenclature keys
Vicinity map if necessary
Consultant contact names, addresses, phone and fax number
Project name and address
Owners name and address
General notes explaining special drawing features such as keynotes
Sample symbols and their meaning for Architectural
Abbreviations used on drawings
Square Footage and Vofume tor each floor
Type of construction
COMtruction documents - floor plans
Rooms dimensioned with room name
Doors and windows with siZesltypeS noted at each unit
Watls and partitions with centenine or surface dimenSions
Dotted-line indications for openings, soffits, etc. at all ceiling with notes, dimension, and detail
references
Door and windOw symbols keyed to door and window schedule
Detail keys at junctures of different floor material, saddles, and thresholds
Door and window symbols keyed to door and windOw frame or rough opening schedules
Door and window frame schedules keyed to details
Notes of depressed slabs or framing to accommodate divergent thickness of finish floor
SOund isolation walls
Cabinet work keyed to cabinet elevations
Dimensions and detail keys of chases, shafts and furred waUs
Fixtures such as drinking fountains, fire extinguisher cabinets, etc.
Finish flooring pattern or reference to enlarged pattern drawings or specifications
Eagle County Road & 8rk1ge Facility - let Jebel, Colorado ViCinity
2006
Page 13 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Datum reference to show relative floor heights of floors, landings, mezzanines, etc.
Walls and partitions with dimensions to framing and substructure
Cumulative dimensions across entire plan
Walls and partitions with keyed materials indications
Furniture reference overlay (optional)
Anchor detail keys at walls and floors for mounted equipment and fixtures
Interior wall construction keyed to enlarged wall plan
Floor and ceiling plans keyed to floor and ceiling detail sections showing framing, detail keys,
acoustic and fire-rated treatments
construction documents. reflected ceiling plans
Cotumns, posts, walls, ceiling-high partitions
suspended ceiling or integrated ceiling grid
Ceiling construction, slopes, and finish
Furred ceiling and soffits
Ceiling-mounted fixtures
Recessed, valances and detail keys
Overhead door and folding partition tracks and detail keys
Ceiling noise barriers above tow partitions
Access panels, chases, chutes, future shafts and detail keys and details
Ceiling heating systems
Exposed ductwork
Exit device location
registers, diffusers and light fixtures
construction documents. scheduleS: finis", door and window, ..
Notes on plan identifying finishes, door types and sizes, and window types. and sizes
Schedules as _identify finishes , with reference to specifications
Door and window symbols referenced to door and window frame schedule which are referenced
in turn to detail keys showing siR jamb, and head conditions
General note explaining that schedule and details are in the specificatioo booklet.
Hardware schedule with door schedule
construction documents. constructiOn details
Details provided primarily as required by building depat'tment
Special condition details required for building safety and solidity of connections
Standard details as oed to illustrate typical construction
Plan and/or vertical cros&-sections of:
Openings and penetrations
Connections between different types of construction
Joint connections between the same materials and construction
Profiles of ready--made products or fabrications connected to construction
Details with assembly note as needed for clarification
construction documents - discipline coordination and document checking
Eagle County Road" Bridge Facility - lEI Jebel, Colorado Vicinity
2006
Page 14 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Coordination shall include:
Review update information on building occupancies and design changes with consultants
Update previous decisions on structural, mechanical, electrical, construction techniques, and
other systems
Obtain or update lists of special building equipment and fixtures required by the client
Conduct meetings to allow consultants to compare their drawings with one another
construction dOCuments package - architectural design and dOCumentation
Confirm and update the program's functional, occupancy, and spatial requirements
FinaliZe the code search
Review with client the necessary applications for approvals and permits
Check the finat construction dOCuments for conflicts with the program or budget
Plan and schedule specification writing
Determine and note reasons for changes in deSign and construction
Plan and schedule submittal of atl construction dOCuments (drawings, calculations, contracts,
specifications, and update on construction cost estimates
Identify possible bid alternativeS and plan content and organiZation of dOCuments accordingly
Prepare data on costs and availability of special equipment and fumishing
construction docu...... package - mecIlanical design and dOCumentation
Conduct mechanical, eleCtrical and architectural cross checking
Coordinate phase-dlecking of mechanical drawings
Review with the mechanical consultant the necessary approvalS and permits from the fire
department, health department, etc.
Create final mechanical drawings necessary to clarify mechanical HV AC system and
construction methods
Prepare final Mechanical Drawings:
HV AC FlOor Plans
Plumbing FlOor Plans
Details and Sections of typical details
All other necessary detail per engineer's best judgment for comprehensive documentation
Provide statement of probable construction cost based on recent comparable project bids
Prepare coordinate final Spedfications for mechanical issues
Review and finat check mechanical deSign development drawings and compare them with the
architectural, electrical, and other consultants' drawings
Provide "Statement of Probable Construction Costs" on system/component cost compariSOn with
other comparable projects
construction dOCument package - electrical design and dOCumentation
Conduct electrical, mechanical, and architectural cross checking
Coordinate ~ing of electrical drawings
Coordinate specialiZed communic::ation systems such as for computer, etc.
Create electriCal lighting floor plans as necessary to clarify electricat lighting layout and
proper lighting levels
Prepare Finat ElectriCal Drawings:
Lighting FlOor Plans
Power and Communications Plans
Eagle County Road " Bridge FacUity - EI Jebel, Colorado Vicinity
2006
Page 15 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Details and Sections of typical details
All other necessary detail per engineer's best judgment for comprehensive documentation
Provide statement of probable construction cost based on recent comparable project bids
Prepare and coordinate final Specifications for electrical issues
Review and check final electrical design development drawings and compare them with the
architectural, mechanical, and other consultants' drawings
construction document package - furniture design and documentation (optional)
Conduct furniture, electricaf, mechanical and architectural cross checking
Coordinate phase-checking of furniture drawings
Create furniture plans as necessary to clarify fumiture location, layout, quantities, quality,
systems, buiJt-ins, etc.
Prepare Furniture construction documents drawings:
Floor Plan(s) including furniture Iocation,layout, quantities, quality, bujJt-ins, etc.
EquipmentiFurniture description and specifications
All other n~ dais per consultanfs best Judgment for comprehensive documentation
Provide probable cost based on recent comparable project bids
Prepare and coordinate final Specifications for furniture issues
Review furniture construction document drawings and compare them with the architectural,
mechanical, electrical and other consultants' drawings
Obtain final estimates for probable furniture costs
construction document package -la~ and irrigation
Prepare landscape Plan including identification and location of plant material; plant schedule and
details.
Prepare Irrigation Plan including location of irrigation heads, piping, vaNe and irrigation zones;
irrigation schedule and details.
Prepare statement of landscape and irrigation probable costs.
COI1Struction docu........ - .pmject devetopment scheduling
Review with client the Scope of Work for possible revisions and additions to design services
prior to completion of documents
COI1Struction document package - estimating probable construction costs
Provide "statement of Probable Construction Costs" by square footage cost comparison with
other comparable projeCts
Obtain and review all consultants' probable construction cost estimates if provided by consultant
construction document package - presentations
Finalize building floor area caJculations, building voJumeif required, usable area ratios, and other
numerical comparisons with program requirements
Provide and review construction document presentation with client
COI1Struction documents - specifICations
Review the follOwing decisions and options with the client
Type of construction contract
Eagle County Road & Bridge Facility - EI Jebel, ColoradO Vicinity
2006
Page 16 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Decide with client the contractor for types
Develop and finalize project specifications based on the drawings and coordinate with the
drawings
Conduct review meeting and drawing check to coordinate decisions and alternatives on
and construction systems and finishes
Provide completely detailed specification divisions and sections specific to the job
Review "Scope of Work" and Work not included" articles in each section
assumed drawings
Assumed drawings for the Eagle County Road and Bridge Facility - EI Jebel, Colorado Vicinity
(Generaf Outline only, tailored to the specific needs of the Project)
ARCHITECTURAl DRAWINGS:
PLANS:
A-Q01 Cover Sheet
A-1oo First Floor Plan & Plan Details
A-102 Second Floor Plan & Plan Details (if necessary)
A-103 Roof Plan and Details
EXTERIOR ELEVATIONS & BUILDING SECTIONS:
A-201 Exterior Elevations
A.202 Exterior Elevations & Building Sections
A-203 Building Sections
ENLARGED PLANS AND INTERIOR ELEVATIONS
A-301 Enlarged Plans & Interior Elevations
A.302 Enlarged Plan & Interior Elevations
(Include Door, Window and Finish Schedules on Drawings)
REFLECTED CEILING PLANS:
A-401 First Floor Reflected Ceiling Plan & Details
A402 Second Floor Reflected Ceiling Plan & Details (if necessary)
A403 Interior Wall Details
VERTICAL CIRCULATION:
A-501 Vertical Circulation Plans, Elevations and Sections
(Elevator, Stairs and Ramps) (if necessary)
A-502 Sections, Details and Rail Details (if necessary)
WALL SECTIONS
A-601 Wall Sections & Details
A-602 Wall Sections & Details
A-603 Wall Sections & Details
Eagle County Road & Bridge Facility .... II Jebel, Colorado VICinity
2006
Page 17 of 32
SOPRIS ARCHITECTURE (SA)
work outline
(These drawings shall include bollard typical detail at building comers and garage door
sides. )
CIVIL DRAWINGS:
C1 Dimension Plan
C2 Dimension Plan
C3 Grading & Drainage Plan
C4 Grading & Drainage Plan
C5 Utility Plan
C6 Site Details
C7 Utility Details
(These drawing shall include exterior sidewalks, driveways, bollard and fuel farm)
STRUCTURAL DRAWINGS:
S1 General Notes & Std. Details
S2 Foundation & Lower Level Framing Plan
S3 Upper Level Framing Plan (if necessary)
S4 Roof Framing Plan
S5 Sections & Details
S6 Sections & Details
S7 Sections & Details
S8 Braced Frames & Details
MECHANICAL DRAWINGS:
M-1 Site Plan
M-2 First Floor Mechanical Plan
M-3 Second Floor Mechanical Plan (if necessary)
M-4 First Floor Plumbing Plan (Washbay, Air Lines for Air Compressor)
M-5 Second Floor Plumbing Plan (if necessary)
M-6 First Floor Piping Plan
M-7 Second Floor Piping Plan
M-8 Mechanical ROOf Plan
M~9 Waste & Vent & Water Riser Diagrams
Plumbing Fixture SChedule
ELECTRICAL DRAWINGS:
E~ 1 Site Plan & Symbol Legend
E-2 First Floor Lighting Plan (Light Fixture Schedule)
E-3 Second Floor Lighting Plan (if necessary)
E-4 First Floor Power Plan
E-5 Second Floor Power Plan (if necessary)
E-6 First Floor Systems Plan
E~7 Second Floor Systems Plan (if necessary)
LANDSCAPE DRAWINGS:
LA~ 1 Site Plan - Dimension Plan - Buildings, Walks and Drives
LA-2 Site Plan - Plantscaping and Details
Eagle County Road & Bridge Facility - EI .lebel, Colorado Vicinity
2006
Page 18 of 32
SOPRIS ARCHITECTURE (SA)
work outline
LA-3 Irrigation and Details
Outline specification
Outline specification are as follows and are general in nature at this time:
Assumed Index For Specification For The Eagle County Road And Bridge Facility - EI Jebel,
Colorado And VICinity
BIDDING REQUIREMENTS, FORMS AND CONDITIONS OF THE CONTRACT
BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
00000 - Project Directory
00100 - Instructions to Bidders
00200 - Information Available to Contractor
00300 - Proposal Form
00500 - Agreement Forms
00600 - Bonds and Certificates
00700 - General Conditions
00810 - Amendments to General Conditions
00820 - Supplementary General Conditions
00860 - list of Drawings
00900 - Addenda
DIVISION 1 . GENERAL REQUIREMENTS
01000 . General
01010 - Summary of Work
01020 - Allowances
01030 - Alternates
01035 - Modification Procedures
01041 . Project COordination
01042 - Mechanical and Electrical COordination
01050 . Field Engineering
01060 . Codes, Standards, Reports, Permits
01200 - Project Meetings
01340 - Shop Drawings and Samples
01360 - Quality Control Submittals
01400 - Quality Control and Contractor's Quality Control
01410 - Testing
01500 - Temporary FacilitieS
01560 . Cleaning Up
01700 . Contract and Project Closeout
DIVISION 2 - SITE WORK
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 19 of 32
SOPRIS ARCHITECTURE (SA)
work outline
02000 - General
02100 - Site Preparation
02140 - Dewatering
02200 - Excavation and Embankment
02201 - Excavation and Backfill of Structure
02221 - Trenching, Backfilling and Compaction
02230 - Embedment and Base Course Aggregate
02510 - Hot Bituminous Paving
02626 - Concrete Curb and Gutter, Sidewalk, Curbwalk and Driveway
02665 - Water Transpiration and Distribution lines
02720 - Drainage Pipe
02730 - Sanitary Sewer lines
02810 -Irrigation
02830 - Trees, Shrubs and Seeding
DIVISION 3 - CONCRETE
03000 - General
03100 - Concrete Forrnwork
03200 - Concrete Reinforcement
03250 - Concrete Accessories
03300 - cast in Place Concrete
DIVISION 4 -MASONRY (AS NECESSARY)
04000 - General
04100 - Mortar
04210 - Hollow Clay Masonry Units (as applicable)
04220 - Concrete Masonry Units (as applicable)
04400 - Stone (as applicable)
DIVISION 5 - METALS (AS NECESSARY)
05000 - General
05120 - Structural Steel (as applicable)
05400 - Cold Formed Metal Framing
05800 - Expansion Control (as applicable)
05990 - Miscellaneous Metals
DIVISION 6 - CARPENTRY
06000 - General
06100 - Rough carpentry
06180 - GJue..laminated Construction (As Necessary)
06200 - Finish Carpentry
06220 - Millwork
06400 - Architectural Woodwork
DIVISION 7 - MOISTURE PROTECTION
07000 - General
07110 - Membrane Waterproofing
Eagle County Road & Bridge Facility - EI JebeI, Colorado VICinity
2006
Page 20 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Attachment "An
07150 - Damproofinglvapor Barrier
07210 - Building Insulation
07240 - Exterior Finish Systems (As Necessary)
07300 - Shingles and Roof Systems (As Necessary)
07500 - Roofing and Roofing Insulation
07600 - Flashing and Sheet Metal Work
07700 - Roof Specialties and Roof Accessories
07250 - Fireproofing and Firestopping
07800 - Skylights (As Necessary)
07900 - Caulking and Sealant
DIVISION 8 - DOORS, WINDOWS AND GLASS
08000 - General
08100 - Hollow Metal Doors and Frames
08200 - Wood Doors
08330 - Coiling Doors and Grilles
08350 - Folding Doors and Grilles
08360 - Sectional Overhead Doors
08610 - Aluminum Clad Wood Windows
08710 - Finish Hardware
088OQ. - Glass and Glazing
08900 - Glazed Curtainwall System (As Necessary)
DIVISION 9 - FINISHES
09000 - General
09250 - Gypsum Drywall
09310 - Ceramic Tile
09510 - Acoustical Tile
09650 - Resilient Flooring
09678 - Stair Treads and Risers (As Necessary)
09680 - Carpet
09986 - Specialty Ceiling and Soffit Panels
09900 - Painting and Staining
09950 - Wall Coverings (As Necessary)
DIVISION 10 - SPECIALTIES
10000-General
10160 - Toilet Partitions
10350 - Flagpole (As Necessary)
10400 - Identifying Devices
10500 - Lockers
10522 - Firefighting Devices and Cabinets
10652 - Folding Panel Partitions
10800 - Toilet and Bath Accessories
10900 - Wardrobe and Closet Specialties
DIVISION 11 - EQUIPMENT
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 21 of 32
SOPRIS ARCHITECTURE (SA)
work outline
11000 - General
11140 - Vehicle Service Equipment (Fleet Maintenance Equipment Optional as Necessary including
Air Compressors, Special Wash Bay Equipment, etc.)
11165 - Dock Bumpers
11450 - Residential Appliances
11681 - Landscape Partitions (Optional As Necessary)
DIVISION 12 - FURNISHINGS
12000 - General
12300 - Manufactured Casework
12690 - Floor Mats
DIVISION 14 - CONVEYING SYSTEMS
14000 - General
14200 - Elevators (As Necessary)
DIVISION 15 - MECHANICAL (As Necessary)
15060 - Hangers and Supports for Plumbing and Equipment
15061 - Hangers and Supports for HVAC Piping and Equipment
15075 - Identification for Plumbing Piping and Equipment
15076 - Identification for HVAC Piping and Equipment
15080 - Plumbing Insulation
15801- HVAC Insulation
15120 - Hydronic Piping Specialties
15103 - Hydronic Pumps
15140 - Domestic Water Piping
15150 - Sanitary Waste and Vent Piping
15160 - Storm Drainage Piping
15180 - Hydronic Piping
15182 -Imernal-Combustion Engine Exhaust Piping
15184 - Refrigerant Piping
15195 - Facility Nawral--Gas Piping
15214 - Compressed Air Systems
15410 - Plumbing Fixtures
15460 - Domestic Water Conditioning Equipment
15480 - Electric Domestic water Heaters
15481- Fuel-Fired Domestic Water Heaters
15512 - Cast-Iron Baiters
15514 - Finned Water-Tube Boilers
15530 - Furnaces
15540 - Fuel-Fired Heaters
15550 - Breeching, Chimneys, and Stacks
15621 - Package Water Chillers - Reciprocating, Scroll, and Screw
15622 - Package Water Chillers - Centrifugal and Screw
15670 - Refrigerant Condensing Units
15720 - Indoor Central-Station Air-Handling Units
15721 - Package Outdoor Central-Station Air-Handling Units
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 22 of 32
SOPRIS ARCHITECTURE (SA)
work outline
15731 - Self COntained Air Conditioners
15733 - Packaged Terminal Air Conditioning Units
15735 - Computer - Room Air Conditioning Units
15736 - Package Rooftop Air COnditioning Units - Small Capacity
15737 - Package Rooftop Air COnditioning Units - Medium Capacity
15739 - Split System Air Conditioning Units
15740 - Heat Pumps
15745 - Water Source Heat Pumps
15760 - Terminal Heating and Coofing Units
15770 - Floor-Heating and Snow--Melting Equipment
15810 - Ducts
15820 - Duct Accessories
15830 - Fans
15840 - Air Terminal Units
15850 - Air Outlets and Inlets
15905 - HVAC Instrumentation
15940 - Sequence Of Operation
15950 - Testing, Adjusting, and Balancing
15992 - HVAC COmmissioning
DIVISION 16 ELECTRICAL
16010 - General Electrical Requirements
16011 - Submittal Requirements
16012 - Bid Breakdown
16020 - Work Included
16025 - Codes and Fees
16030 - Tests
16040 - Identification
16100 - Basic Materials and Methods
16111 - Conduit Systems
16120 - Wire and Cables
16130 - Outlets
16140 - Wiring Devices
16141- Contractors
16155 - Magnetic Motor Starters
16160 - Main Distribution Fusible Panelboard
16164 - Branch Circuit Panels
16170 - Fusible and Non-Fusible Safety Switches
16171 - COmmunication/COmputer Equipment
16180 - Fuses
16400 - Service and Distribution
16450 - Grounding
16500 -Lighting Systems
16503 - Poles, Standards and Bases
16721 - Fire Alarm Systems and Specification
16740 - Telephone & TV Raceway Distribution System
16851 - MechanicallElectrical Coordination
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 23 of 32
SOPRIS ARCHITECTURE (SA)
work outline
16859 - Roof Drain Freeze Protection System
bid administration
Description in detail of the contents of a typical bid administration service complete by Sopris Architecture is
as follows:
ADMINISTRATION - PRE-BID
Prepare and assemble bid documentation such as Bid Notice, Invitation, Instructions deposits, bonds,
General and Supplementary Conditions, etc.
Review and confirm that all required government permits and approvals have been obtained
Review and confirm that all permits and approvals from public utijities have been obtained
FOR OPEN BIDDING
Administrative (includes but not limited to all advertising for bidders
Assist Owner in Providing Instruction to Bidders and/or advertising for bidders
Write the criteria: for acceptable bidder quajifications, and confirm criteria: with the client
Write the Invitation to Bid, and obtain client's approval
Identify the surety or bid bond to be required of bidders
Assist Owner in Publishing and distribute the Invitation to Bid
When responding to any bidder's request for cIa:rification or additional data, develop copies of the
clarification data as an addendum.
BIDDING AND NEGOIA TIONS
Owner in H.Qlding pre-.bidmeeting(s) with prospective bidders and client if necessary
Prepare a report on the pre..bid meeting(s) and send copies to Owner
Prepare a Bid Tabulation Form
Assist Owner in receiving bids according to procedures in the Instructions to bidders
Check aU bids to confirm the validity of the contractors' and major subcontractors' qualifications
Confirm that the rules regarding bid security are enforced
ANALYSIS OF ALTERNATES AND SUBSTITUTION
Create a "Conformation Form" memo to set in writing aU verbal interpretations, instructions, and
confirmations
Establish a record of notifications to the eontractor(s) of approved and not approved alternates
Notify all bidders of accepted substitutes
Identify attema:tes that concern the work of consultants
Ask consultants for list of favored prospective subContractors
Identify and confirm the design form and client's separate responsibilities in advertising for bids,
receiving bids, negotiation and acceptance
Assist Owner in identifying insurance coverage the Contractor should have prior to the execution
of the contract
Identify insurance and bonds the client will require the contractor to have
Eagle County Road & Bridge Facility - el Jebel, Colorado Vicinity
2006
Page 24 of 32
SOPRIS ARCHITECTURE (SA)
work outline
BID EVALUATION
Analyze the bids; check for errors or omissions
Write a comparison of bid tabulation with the latest design firm construction cost estimates as
necessary
Review significant discrepancies between the bid tabulations and the last previous construction
cost estimate
Administration (includes all or most of the following):
Review bids with the client and advise on bid acceptance and rejection
Obtain the c1ienfs acceptance of a bid or rejection of all bids
Record reasons for acceptance/rejections in the project manual
Advise the client how to draft a notice of acceptance
Notify all bidders of acceptance or rejection
Retum received documents and refund the bid deposits/security to unsuccessful bidders
CONSTRUCTION CONTRACT AGREEMENTS
Advise the client on construction contract format and content if requested
COnsult with and assist the client in negotiating and executing the final contract if requested
Administration (includes all or most of the following):
Advise client and contractor of their insurance responsibilities
Advise the G.C. to turn in performance and labor and materilaI payment bonds to the Owner
Advise the contractor's to tum in certificate of insurance to Owner
Obtain the post~bid information from the accepted contractor as required in the Instruction to
Bidders
Review the construction pfan and time schedule with the client and contractor for inclusion in
the contract
POST~BIDDING
Administration (includes all or most of the following):
Create a log for recording all change orders and modifications to the contract
Identify bid tabulation data, special agreements addenda, and memos, reports, minutes, and
correspondence that should be included in the final Project Manual as part of construction
contracts or construction documents
If all bids are rejected, confer with the client to establish the next step of bidding invitations or
negotiations
If the client wants to proceed with limited interim construction prior to awarding the final
contract, advise the client on the form and content of this type of letter of intent
construction administration
Description in detail of the contents of a general and typical construction administration service complete by
Sopris Architecture is as folfows:
PROJECT ADMINISTRATION - PRECONSTRUCTION
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 25 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Provide site observation visits as required by the contract
Create a Construction Contract Administration Manual to include schedules, photo surveys, tests,
shop drawings, change orders, certificates of payment, etc.
Provide Bi-monthly project representation for Observation. The General Contractor shall take notes
at these bi-monthly meetings.
Provide Staff or Client Team project walk..through
SHOP DRAWING CHECKING AND COORDINATION
Follow the General and Supplementary Conditions describing the relative responsibilities of the
contractor and design firm in regard to shop drawings
Create Shop Drawing and Sample Record to note shop drawings received from the contractor
Gall for General Contractor to create list of anticipated shop drawings and a preliminary calendar
schedule of when they should be received by the contractor and when submitted to the deSign firm
Administration:
Establish a transmittal form and procedure for conveying reasons for disapproval of a
sample or shop drawing
Confirm that copies of al approved items are being kept by the contractor for the client
Review shop drawings according to compliance with drawings and specifications, testing criteria,
other documentation, etc.
Coordinate with consultants their responsibilities in checking shop drawings
CONSTRUCTION CONTRACT ADMINISTRATION - ACTIONS REGARDING CONTRACTOR
Assist Owner in confirming that all contracts with the contractor are complete as required by Owner
Confirm that contractor's Performance Bond and Labor and Material Bonds have been sent into the
Owner
Send the contractor a copy of the clienfs directions regarding required insurance unless OWner does
this.
Acquire and review the list of proposed SUbcontractors from the prime contractor if supplied by the
General Contractor
Make recommendations regarding acceptable, unacceptable, or questionable subcontractors
Assist the client in evaluating substitute contractors
Write Change Orders when necessary to modify contract terms
Review and approve. or have corrected, the contractor's Schedute of Values before the first
scheduled application for payment if supplied by the G.C.
Review and mOdify as necessary the contractor's schedule of required shop drawings. samples, and
colors as supplied by the G.C.
Review and approve, or have corrected, the contractor's estimated job construction progress
schedule as supplied by the G.C.
Establish a site visit and job observation schedule based on the construction schedule
CONSULTANT COORDINATION AND DOCUMENT CHECKING
Notify consultants ofchangea in construction contract that effect their work
Coordinate consultant drawings, scheduling, checking and change orders
Notify consultant of selected prime contractors
Coordinate consultants' review of shop drawings
Assist Owner in conducting detailed preconstruction coordination meeting with consultants,
contractor, owner and subcontractors if required by the Owner
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 26 of 32
SOPRIS ARCHITECTURE (SA)
work outline
AGENCY CONSULTING, REVIEWING AND APPROVALS
Provide ongoing liaison and coordination with inspection agencies in addition to job inspection
reviews
OWNER-SUPPLlED DATA COORDINATION
Administration
Review and advise contractor of client-supplied materials, equipment and fumishing
IN-OFFICE CONSTRUCTION ADMINISTRATION
Establish a shop drawing and samples review procedure if required by the contract
Review the plan and schedule for construction, and update the overall date of substantial completion
Confirm start date, estimated days of construction, and estimated date of substantial completion
Send the Notice to Proceed to the contractor if supplied by the Owner
Call for cross-coordination to all parties regarding interpretations, special instructions, modifications,
and clarifications
Participate in a detailed preconstruction meeting with all concerned parties, including the client,
prime contractor(s), subcontractors, appropriate design firm staff members and management, and
consultants if requested by Owner
FIELD OBSERVATION AND REPORTS
Provide field observation at specified intervals as per agreement with client
Establish schedule and record log for periodic field observation of the construction site
Provide periodic field observation reports
Review all Project Field Observation Reports and submit a copy of each to the General Contractor
Submit copies of Field Observation Reports, modifications, and construction schedule changes to
the client
File Field Observation Reports in Construction Contract Administration Manual
In addition to regular periodic field observations, including extended field observation visits at starting
points and important coordination junctures in:
Grading and Excavation
Foundation Formwork and pours
Concrete Pours and Finishing
Framing
Masonry
Closing in
Roofing
MechanicallPlumbing
Mechanical HVAC
Electrical
Finishes
Landscaping and Irrigation
Create a Field Observation Report format for consultants as needed
FIELD ORDERS AND CHANGE ORDERS
Eagle County Road & Bridge Facility - EI .lebel, ColOrado Vicinity
2006
Page 27 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Provide Field Orders, and Change Orders as required to meet basic construction standards and
compliance with construction documentation
Start and administer a Field and Change Order Log
Note all supplemental drawings required for clarifications, interpretation s, and revisions
Monitor field order translation to change orders for approval by the client
Monitor and confirm that negotiated change orders are reviewed, approved, and signed by the client
Record extra design and/or drawings service required due to client..jnitiated changes
Administration:
Monitor field orders that affect the construction cost and time
Monitor and record all extra design and/or drawing services required due to changes
Review and report to client on contractor Proposal Requests for changes, with price quotations
TESTS
Review all. test results for general compliance with specifications
Review and notify client of alt extra or special tests known and as required by regulatory agencies
Administration:
Start a test log in the Project Construction Administration Manual
List all test required for the job, and note dates according to the construction schedule
Confirm that required tests are being requested by the contractor
Review all test results
Have the General Contractor distribute test results to the appropriate design/consultants so they can
review test results that pertain to their work
CERTIFICATE FOR PAYMENT
Review applications for payment and compare each against observation reports, fiefd review and
other reports
Administration:
Notify the contractor of disapproval's or requests for further information to validate any application for
payment
Send Certificate of Payment to the client
CONSTRUCTION ADMINISTRATION
Work with Owner to create a schedule of construction site visits
Review the inspection results of regulatory agencies, and write punch list of required corrective
actions
Administration:
Prepare a Supplemental Drawing Log to record all new documents prepared for interpretation and
clarification, and for recording project changes during. construction
Prepare a log to confirm reproduction and delivery of all drawings and specifications that show
design and schedule changes
Schedule check times for confirming that supplemental drawings and other documents that show
changes and clarifications have replaCed obsolete documents
Establish a file or log to verify that all approved change orders are distributed to the contractor,
accounting department, and concerned consultants and departments
File copies of change orders and relevant drawings and phOtos in the change order section of the
Construction Contract Administration Manual
Note changes in schedule and any anticipated changes in the final occupancy date
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 28 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Schedule site visits specifically for determining the contractor's time schedule performance if
necessary
Assist in negotiations in disagreements involving contractors or regulatory agencies
Assist in negotiate with the contractor to expedite construction when evidence appears that
liquidated damages may be required for slow performance
SUBSTANTIAL COMPLETION
Do field visit of the project to confirm substantial completion
Administration:
Review the Notification of Substantial Completion and the contractor's list of remaining work to be
corrected or finished
Review the inspection results, if requested, of regulatory agencies in their inspection
Prepare a punch list of remaining work to be repaired or completed (assumes that the General
Contractor is truly finished with the project prior to punch list request and that multiple punch list
reviews are not necessary.
When the project is judged to be substantially complete, prepare a Certificate of SUbstantial
Completion
Review a possible final reduction of the contractor's retainage
Have the contractor submit construction records and documents:
Certificate of Inspection and approvals
Bonds
Project record drawings ('as-built')
Guarantees and warranties for installed equipment and materials
Supplies and equipment provided for maintenance of installed equipment and materials
Project maintenance manuals as specified
Equipment operating instruction
Keying schedule and master keys
SEMIFINAL AND FINAL OBSERVATION
Provide a field observation to confirm completion and confirm that clean up is satisfactory if
necessary
Deduct the cost of required Observations from the final payment to the contractor
FINAL CERTIFICATE OF PAYMENT
Review the contractor's application for final payment and assist Owner in acquiring affidavits,
vouchers, releases, and waivers of lien as necessary to verify the contractor's payments to
subcontractors and suppliers as required.
Administration:
Verify that the correct retainage is noted, to deduct from the payment to contractor
Review the Owner..contractor Agreement, and confirm that all conditions have been met
Issue a semifinaf Certificate for payment, if necessary, prior to issuing a final Certificate
IN-OFFICE CLOSE-OUT
Assist the client in obtaining final regulatory agency approvals, certificate of Occupancy, etc. if
necessary
Assist client in obtaining all building materials and equipment maintenance information
Obtain record drawings of final construction and send to client
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 29 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Attachment "A"
post construction administration
Administration:
list known corrective work required of the contractor
list known corrections, repair, or replacement required of equipment and materials manufacturers
Confirm completion of corrective work and OK final payments
Assist the client in obtaining any delayed final permits or certificates
Coordinate consultanfs observations of the contractor's remedial work on HVAC, etc. (if necessary)
Assemble record drawings and building operations data
Assist the client in assembling and building operations and maintenance manual( s)
Review with general contractor to confirm that all notable changes made during construction have
been recorded on the record drawings.
send record drawings and reJated data to the client
Schedule inspection of materials and equipment prior to the expiration of warranties if called for by the
Owner
supplemental services
SPECIAL STUDIES
Master Planning of future facilities
RENDERINGS
Hand or computer generated elevation and/or perspective graphics
Extended interior and/or exterior studies
Alternative design proposals
MODEL CONSTRUCTION
Site model
Building model (exterior and interior)
Build.ing components. model
VALUE ANALYSIS
Overall building analysis of alternatives for cost savings
Altemative design analysis
Systerns and components analysis
DETAilED CONSTRUCTION COST ESTIMATES
Final cost estimates at 90% completion of Construction Documents
Eagle County Road & Bridge Facility - EI Jeber, Colorado VICinity
2006
Page 30 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Ongoing construction cost estimating throughout all design and documentation phases of the
project
ENERGY STUDIES
Analysis of energy-conservation options, cost, and benefits
TENANT RELATED SERVICES
Interior Space Planning
Materials and color palettes
GRAPHIC DESIGN
Signage
Graphic system and logo design
Cooperation, collaboration of work with graphics design firm
SPECIAL FURNISHING DESIGN
Specifications
Design
Bidding
Value comparison
NON-BUILDING EQUIPMENT SELECTION
Specifications
Design
PROJECT PROMOTION/PUBLIC RELATIONS
Coordination of press relations and publicists services
Graphics
MATERIALS AND SYSTEMS TESTING
Requirement and criteria
Procurement and coordination of testing services
Monitoring of tests
Review, analysis, and reports
DEMOLITION SERVICES
Requirement and Planning
Drawings and Specifications
Contract consulting
Bidding administration
Field observation and/or administration
MOCK-UP SERVICES
Design and working drawings for full size component mock-up
Administration of mock-up assembly or construction
Procurement and coordination of testing services
Monitoring of tests
Eagle County Road & Bridge Facility - EI Jebel, Colorado Vicinity
2006
Page 31 of 32
SOPRIS ARCHITECTURE (SA)
work outline
Attachment "An
Review, analysis, and reports
STill PHOTOGRAPHY
Existing conditions survey
Site
Vicinity
Coordination/purchase of aerial photography
Presentation photos/model photos/photo renderings
Systematic construction record photos
Post construction photo survey
Finished building marketing photography
COORDINATION WITH NON-DESIGN PROFESSIONALS
Economic survey
Sociological survey
Marketing survey
SPECIAL TV CONSULTATION
Fleet maintenance consultant
CIVil ENGINEERING EXCLUSIONS (ADD SERVICES)
Engineering work for sketch plan maps, preliminary/final plats, amended final plats, retaining wall
design, fOundation design, structural design, water tank design, lift station design, 404 permit work
(wetlands), phasing plan, debris ftow studies, water rightEI research, soils and geological
investigations, level-1 environmental studies. subsurface drainage stud.ies, detailed floodplain
studies, lot sprinkler systems, landscaping. plans. lighting. plans or other special or unusual
requirementEl, non..potable irrigation design, COOT Access PermitEl, COOT NotiCe to Proceed,
Traffic Impact Studies, bidding, construction management or adminiStration, construction
observation (except for two observations), review of contractor pay applications, verification of
contractor's quantities, preparation of letter of Credit Reduction certifications.
LANDSCAPE AND PLANNING EXClUStONS (ADO SERVICES)
Pubtic Meetings beyond base contract meeting of 20 hours of pubtic meetings and preparation
time.
Proposal Base on CrawfOrd Family Site. Changes in site location, during the design process, will
require a re-lissessment of estimated fees.
Scope changes charged on an hourly basis.
Eagle County Road & Bridge facility - EI Jebel, Colorado Vicinity
2006
Page 32 of 32
SOPRIS ARCHITECTURE (SA)
Attachment UB"
Payment Schedule for the Eagle Road and Bridge Facility, EI Jebel Vicinity
Sopris Architecture
Proposal Contract Amount:
Architectural, Structural, Mechanical and Electrical =
Civil Engineering =
Landscaping (with revision requested)
Total AlE Contract
Services Percentage of Contract:
Pre-clesign 05%
Site Analysis 05%
Schematic Design 15%
Design Development 20%
Construction Documentation 40%
Bidding and Negotiation 05%
Construction Administration 10%
Schedule of Payments (Monthly Payments)
10/02106
11/01/06
12/01/06
01/02/07
02101/07
03/01/07
04/01/07 - 02101/08*
$1,442.00/month
"Assumes Contractor can completes project in 1 0 months
$93,750.00
$28,000.00
$22,450.00
$144,200.00
$7,210.00
$7,210.00
$21,630.00
$28,840.00
$57,680.00
$7,210.00
$14,420.00
$21,635.00
$24,065.00
$33,630.00
$19,220.00
$25,462.00
$5,768.00
$14,420.00