SUBDIVISION AND OFF-SITE IMPROVEMENTS
AGREEMENT
THE POINTE AT EDWARDS
File No. SMA-00025
THIS SUBDIVISION AND OFF-SITE IMPROVEMENTS AGREEMENT
("Agreement") made and entered into this 6)~ day of June, 2006, by and between the
COUNTY OF EAGLE, STATE OF COLORADO, a body corporate and politic, by and through
its Board of County Commissioners (hereinafter "County") and The Pointe at Edwards LLC
(hereinafter "Subdivider").
WITNESSETH
WHEREAS, the Subdivider, as a condition of approval of the Final Plat of The Pointe at
Edwards (hereinafter referred to as "Subdivision"), desires an Agreement as provided for by the
Land Use Regulations of Eagle County, Colorado, 1999, as amended (hereinafter referred to as
"Land Use Regulations") Chapter II, Section 5-280.B.5.e. and C.R.S. ~30-28-137; and
WHEREAS, pursuant to the same authority, the Subdivider is obligated to provide
security or collateral sufficient in the judgment of the County to make reasonable provisions for
completion of certain public improvements hereinafter described ("Subdivision Improvements");
and
WHEREAS, pursuant to Chapter II, Section 4-620 of the Land Use Regulations, when a
proposed subdivision is located in an area serviced by an existing County road and the County
determines that the traffic generated by such development will result in safety hazards for vehicle
drivers, pedestrians and/or adjacent residents, or will result in substantially increased
maintenance costs to the County, the County is empowered to determine the amount of work
necessary to bring the affected County road to acceptable standards to provide adequate safe
service to present owners, to the proposed subdivision and to other probable subdivisions, and to
require the Subdivider to improve its equitable portion of such road to an acceptably safe
condition; and
WHEREAS, the County has determined that the traffic which will be generated by the
Subdivision, along with other potential subdivisions in the area, will result in safety hazards and
substantially increased maintenance costs relative to the off-site roads; and
WHEREAS, the Subdivider has agreed to improve the roads to an acceptably safe
condition and to accommodate the incremental increase in traffic burden to the said roads
resulting from the development of this Subdivision, by the engineering, construction and
completion of physical improvements to the said road as set forth in this Agreement; and
WHEREAS, as a further condition of approval ofthe [mal plat of this Subdivision, the
Subdivider is obligated to provide security and collateral sufficient in the judgment of the County
to make reasonable provision for completion of the Subdivision Improvements, including but not
limited to off-site road improvements, referred to herein; and
1
WHEREAS, pursuant to Chapter II, Section 4-620.9 of the Land Use Regulations and
C.R.S. 43-2-147, the Subdivider shall provide access for all lots and parcels it creates to the state
highway system in conformance with the State Highway Access Code.
NOW, THEREFORE, in consideration of the premises and the covenants and agreements
herein contained to be kept and performed by the parties hereto, it is hereby understood and
agreed as follows:
1. SUBDIVISION IMPROVEMENTS.
1.1 Subdivision Improvements. Subdivision Improvements are deemed to include all
public improvements, including but not limited to off-site improvements as set forth in all
documents, construction drawings, designs, maps, specifications, sketches, cost estimates, and
other materials submitted by the Subdivider prior to or at final plat approval and acceptance by
the County. Such Subdivision Improvements shall include roads, utilities and other similar
public improvements as specified by the County Engineer.
1.2 Scope of Work. The Subdivider hereby agrees, at its sole cost and expense, to
furnish all necessary equipment and material, and to complete all Subdivision Improvements as
referenced in the attached Exhibit "A," and as set forth in all documents, construction drawings,
designs, maps, specifications, sketches, and other materials submitted by the Subdivider prior to
or at fmal plat approval and accepted by the County, and in accordance with all laws ofthe
United States of America, State of Colorado, County of Eagle, and their respective agencies and
affected governmental entities. Such performance shall include acquisition of all necessary
rights-of-way.
1.3 Duties of Subdivider. For those Subdivision Improvements required herein,
including but not limited to the reconstruction and physical improvement of that portion of any
road subject to this Agreement, the Subdivider shall retain an engineer whose duties shall include
construction staking, observation of construction for conformance to the approved plans and
specifications, and materials sampling, testing and inspection using the Colorado Department of
Highways 2001 Field Materials Manual as a guide for frequency of sampling and testing. In
addition, the Subdivider is required to pave Bull Run Road and the lower north eastern portion of
Lariat Loop as part of the Off-Ste Improvements.
1.3.1 Construction Staking. Where applicable and by way of example only, the
following is a highlighting of the construction staking that will be required of the Subdivider:
a. Roadway - horizontal and vertical control every 50 feet or every 25 feet
in critical areas, specifically including:
-slope staking
-points of curvature
-points of tangency
- fillet radius points
-culverts
2
-transition points for super-elevation
-finished sub-grade
- finished gravel
b. Water, Sewer, and Other Utilities - horizontal and vertical control
every 100 feet, or every 50 feet in critical areas.
1.3.2 Testing. Where applicable and by way of example only, the following is a
highlighting of the acceptance testing that will be required ofthe Subdivider:
a. Utility and drainage culvert trench backfill under roadway prisms - one
density test per 200 C. Y. ofbackfill or a minimum of one test per roadway
crossing. This will require daily visits to the site by a testing laboratory
when utilities or drainage culverts are being backfilled within the roadway
pnsm.
b. Embankments for roadways - one density test per 2,000 C.Y. of any
additional embankment(s); and one density test per 500 C.Y. when within
100 feet ofbridge approaches."
c. Finished sub-grade - one density test per 250 lineal feet of roadway.
d. Aggregate base course - one in-place density per 250 lineal feet of
roadway, and gradation and Atterberg Limits test per 2000 tons of
aggregate base course.
e. Hot Bituminous Pavement - two asphalt content, gradation and in-place
density tests per day's production.
f Concrete - Curb and Gutter, Sidewalks and Bikepaths - tests for air
content, slump and compressive strength per 50 C.Y. of concrete placed or
minimum of one set of tests per day.
1.3.3 Notification/Road Construction. Subdivider or his Engineer shall notifY the
Eagle County Engineer for the purpose of arranging an on-site inspection no less than forty-eight
(48) hours in advance ofthe following stages of road construction:
1) Finished subgrade
2) Finished Aggregate Base Course
3) Asphalt Placement.
4) Concrete - Curb and Gutter, Sidewalks and Bikepaths
The County Engineer shall make an on-site visit within the forty-eight (48) hours notification
period or as shortly thereafter as reasonably possible for the purpose of observing proof rolls on
items I) and 2) above and for general observation of construction methods being employed at
these stages. Said on-site inspection by the Eagle County Engineer shall in no way abrogate the
duties of the Subdivider outlined elsewhere in this Agreement. The Subdivider shall provide the
proof rolling by arranging for a loaded single unit truck carrying 18,000 pounds per rear axle.
3
1.3.4 Witnessing of Water and Sewer Laterals. It is essential that the ends of
these laterals be witnessed by the Subdivider's engineer to a minimum of three divergent points
and a permanent record made of the same. Copies ofthese records are required to be furnished
to the Eagle County Engineer prior to commencement ofthe two year warranty period. In
addition to witnessing of the horizontal location of these laterals, a vertical witness shall be
required. Horizontal witnessing shall be to property comers, fire hydrants, manholes, and other
"permanent" features. Vertical witnessing shall be based on depth below ground and elevation
based on a datum used for the subdivision. Bench marks shall be shown on witness records.
1.3.5 Test Reports. All test reports shall be consecutively numbered, with copies
furnished directly to the Eagle County Engineer from the laboratory as they are reported to the
Subdivider or its engineer.
1.3.6 As-Built Drawings of Subdivision Improvements. As-Built drawings,
sealed, signed and dated by a Registered Professional Engineer showing the as-constructed
horizontal and vertical locations of Subdivision Improvements shall be submitted to the Eagle
County Engineer prior to commencement of the two year warranty period. This shall include as-
built drawings in an electronic format acceptable to the County Engineer.
1.3.7 Affidavit of Monument at ion. An Affidavit of Monument at ion sealed,
signed and dated by a Registered Professional Land Surveyor stating that the subdivision has
been monumented in accordance with ~38-51-105, C.R.S., shall be provided to the Eagle County
Engineer prior to the acceptance ofthe Subdivision Improvements by the County.
1.4 Compliance with Colorado Department of Highways Access Code. Subdivider shall
provide the County with designs in compliance with the Colorado Department of Highways
Access Code for all road improvements.
1.5 Date of Completion. All Subdivision Improvements shall be completed prior to
December 31, 2008.
1.6 Approval and Acceptance of Work.
1.6.1 Copies of all test results corresponding to work which is being inspected
and any other information which may be necessary to establish the satisfactory completion ofthe
work for which inspection is requested must be submitted prior to said inspection. All such
information shall be accompanied by a letter from the Subdivider's engineer verifying the
satisfactory completion ofthe work performed to date.
1.6.2 Notwithstanding Section 1.3.3 above, promptly after receiving a request for
inspection and the required documentation, the County Engineer shall review the information
presented and, if necessary, make an on-site inspection ofthe work completed.
1.6.3 All said work shall be done to the reasonable satisfaction of the County
Engineer and/or the County Department of Community Development, and shall not be deemed
complete until approved and accepted as complete by the County.
4
1.7 Estimated Costs of Subdivision Improvements. The estimated cost of the
Subdivision Improvements is the sum of$ 1,322,289.00, as summarized in Exhibit "A." To
secure and guarantee performance of its obligations as set forth in this Section 1, including the
completion of the required off-site improvements, the Subdivider hereby agrees to provide
security and collateral in the form and as set forth in Section 2, below.
1.8 Common Park and Recreation Areas. Subdivider agrees to submit a Common Open
Space, Park and Recreation Area Plan to be approved by the County Department of Community
Development prior to approval of final plat.
1.9 Landscape Guarantee. Subdivider agrees to submit a landscaping plan, prior to
approval of final plat, for the subdivision which will comply with Section 4-240, Installation and
Maintenance Requirements. The Subdivider agrees to abide by the Landscape Plan approved by
the County Department of Community Development.
2. SECURITY and COLLATERAL.
2.1 Collateral. Security and Collateral required in Section 1.7 herein, as security for the
performance by Subdivider of its obligations under this Agreement, shall be in the total amount
of$ 1,322,289.00. The Subdivider shall obtain collateral in the form of an irrevocable
LETTER OF CREDIT prior to signing of the final plat, and attached hereto as Exhibit "B".
2.2 Partial Release of Collateral. Subdivider may apply to the County for the release of
portions of the Collateral based upon work completed in accordance with this Agreement. To
make such releases, Subdivider shall request the County Engineer to inspect the work in order to
verify satisfactory completion in accordance with plans and specifications in accordance with
Section 1.6.
2.3 Final Release of Collateral/Warranty. Within thirty (30) days after Subdivider has
completed all ofthe work required by this Agreement and the work has been approved and
accepted by the County, the entire remaining amount ofthe Collateral, less an amount equal to
ten percent (10%) ofthe original Collateral, shall be released. Subdivider shall be responsible
for the condition ofthe Subdivision Improvements for a period of two (2) years after completion;
this shall be guaranteed either through the retention of Collateral, as set forth above, or
Subdivider may provide a substitute form of Collateral as set forth in Section 2.4 hereunder.
2.4 Substitution of Collateral. The Subdivider may at any time substitute the Collateral
originally deposited with the County herein, for another form of collateral acceptable to the
County, to guarantee the faithful completion of the Subdivision Improvements referred to herein
and the performance of the terms of this Agreement. At the time of substitution of collateral, an
inflationary and/or deflationary factor based upon the Denver-Boulder, Colorado Consumer
Price Index for All Urban Consumers, All Items (1967=100) published by the U.S. Bureau of
Labor Statistics, 303-837-2467, or, alternatively, an approved construction cost index, shall be
used to determine an adjusted estimated cost for all Subdivision Improvements as described
herein, and collateral shall be submitted by the Subdivider in accordance therewith.
5
2.5 Draws. Draws against the Collateral shall only be made as directed by written
Resolution ofthe County, stating that there has been an event of default under this Agreement
and that a sum certain is required to remedy the default. Any amount drawn on the Collateral
must be applied for the purpose of completing the work required by this Agreement and related
expenses and costs.
2.6 Events of Default. The following events shall be deemed "Events of Default, "
entitling the County to draw on the Collateral:
2.6.1 If Subdivider has not completed the work required by this Agreement
within thirty (30) days prior to the Date of Completion set forth herein, the County may, after ten
(10) working days written Notice to Subdivider, draw upon the Collateral an amount sufficient to
complete said work and compensate the County for its reasonable costs and expenses related to
said draw.
2.6.2 If the original collateral presented to the County (or any extension thereof)
is due to expire and the work is not yet completed, and Subdivider has not provided substitute
collateral or the bank's written extension to the original collateral (as it may have been previously
extended), the County shall draw on the Collateral according to the provisions set forth in this
Section 2. It is Subdivider's responsibility, with or without notice, to ensure that the
Collateral is extended, or that substitute collateral is provided in a form acceptable to the
County, at least ten (10) days prior to its expiration. If Collateral is neither extended nor
substitute collateral provided, in a form acceptable to the County, at least ten (10) days
prior to its expiration, the developer shall pay the County an additional $500 (Five hundred
dollars) for the additional administrative work required because of the failure to extend or
substitute collateral in a timely manner as required by this agreement.
2.6.3 Ifthe Collateral is substituted, as otherwise provided herein, this Agreement
may be amended or modified in order to set forth specific Events of Default deemed necessary,
in the County's sole discretion, commensurate with the type of collateral substituted.
2.7 Costs and Expenses. Subdivider agrees to pay any costs and expenses, including but
not limited to legal fees, which the County may incur in determining to accept collateral, in
drawing upon the Collateral, or in accomplishing an extension of its expiration.
2.8 Landscape Plan Collateral.
2.8.1 Subdivider agrees to provide collateral in a form acceptable to the County
Attorney to ensure landscaping will be installed. Subdivider agrees to provide collateral for no
less than one hundred and twenty-five percent (125%) of the estimated cost ofthe landscaping
improvements listed in the Landscape Plan.
2.8.2 As portions of the landscape improvements are completed, the Community
Development Director shall inspect them, and upon approval and acceptance, shall authorize the
release of the agreed estimated cost for that portion of the improvements, except that the ten
percent (10%) shall be withheld until all proposed improvements are completed and approved,
and an additional twenty-five percent (25%) be retained until the improvements have been
maintained in a satisfactory condition for two (2) years.
6
3. INSURANCE and INDEMNIFICATION.
3.1 Indemnification. Subdivider shall indemnifY and hold the County harmless from any
and all claims made against the County by any contractor, subcontractor, materialmen,
employee, independent contractor, agent or representative involved in the work necessary to
comply with this Agreement, or on account of any other claims against the County because of
the activities conducted in furtherance of the terms of this Agreement. This indemnification and
hold harmless provision shall include any legal expenses or costs incurred by the County.
3.2 Certificates ofInsurance. The Subdivider shall secure from any contractor or
subcontractor engaged in the work necessary to comply with this Agreement a Certificate of
Insurance providing for liability protection in the minimum amount of$150,000 per individual
and $600,000 per occurrence, naming the County as an additionally named insured. The
Subdivider, if it serves as the contractor for the Subdivision Improvements, shall provide
insurance in the same form and amounts as required of the general contractor. Said limits shall
be adjusted to comply with any changed limits in the Colorado Governmental Immunity Act,
Title 24, Article 10, Colorado Revised Statutes.
3.3 County Incurs No Liability. The County shall not, nor shall any officer or employee
thereof, be liable or responsible for any accident, loss or damage happening or occurring to the
Subdivision and/or Subdivision Improvements specified in this Agreement prior to the
completion and acceptance ofthe same; nor shall the County, nor any officer or employee
thereof, be liable for any persons or property injured or damaged by reasons of the nature of said
work on the Subdivision Improvements, but all of said liabilities shall be and are hereby assumed
by the Subdivider. The Subdivider hereby agrees to indemnifY and hold harmless the County
and any of its officers, agents and employees against any losses, claims, damages or liabilities for
which the County or any of its officers, agents, or employees may become subject to, insofar as
any such losses, claims, damages or liabilities (or actions in respect thereof) arise out of or are
based upon any performance by the Subdivider hereunder; and the Subdivider shall reimburse
the County for any and all legal and other expenses incurred by the County in connection with
investigating or defending any such loss, claim, damage, liability or action. This indemnity
provision shall be in addition to any other liability which the Subdivider may have.
4. GENERAL PROVISIONS.
The following shall apply to all Subdivision Improvements, including off-site
improvements, set forth in this Agreement:
4.1 Compliance with Land Use Regulations. The Subdivider shall be required to obtain
all necessary permits and comply with the provisions ofthe Land Use Regulations, including but
not limited to the Regulations for Construction within the Public Ways of Eagle County (Chapter
V), as the same are in effect at the time of commencement of construction ofthe Subdivision
Improvements referred to herein.
4.2 Subdivision Improvement Agreement Controls. In the event of any inconsistency or
incongruity between the provisions of this Agreement and the Land Use Regulations, the
provisions of this Agreement shall in all respect govern and control.
7
4.3 Warranties and Guarantees. There shall be a two-year correction period, or such
longer period as may be prescribed by law, from the time of completion of the Subdivision
Improvements during which time the Subdivider shall promptly correct or remove and replace, in
accordance with the County's written instructions, defective work or materials and consequences
thereof Repair or replacement made under the two-year correction period shall bear an
additional one-year correction period from the acceptance ofthe repair or the replacement by the
Eagle County Engineer. The work shall be collateralized during the correction period in an
amount and type of collateral as shall be reasonably determined by the County. The work shall
be inspected, at the request of the Subdivider; no less than sixty (60) days prior to expiration of
the one-year additional correction period, and any deficiencies shall be noted to the Subdivider.
4.4 Approval of Final Plat. The County agrees to the approval of the final plat of this
Subdivision, subject to the terms and conditions ofthis Agreement.
4.5 Final Plat Amendments. Where field changes or other circumstances have caused the
road, utilities, or other subdivision improvements to be constructed in locations different from
those shown on the approved plans, the locations ofrights-of-way, easements, lot lines, building
envelopes, setback lines, or other attributes shown on the Final Plat shall be amended as
necessary to comply with Final Plat requirements of the Eagle County Land Use Regulations.
4.6 Amendment and Modification. The parties hereto mutually agree that this
Agreement may be amended or modified from time to time, provided that such amendment or
modification be in writing and signed by all parties hereto.
4.7 Assignability. This Agreement shall be enforceable against the Subdivider,
provided, however, that in the event the Subdivider sells, transfers or assigns all or part of the
subject Subdivision, the obligations of the Subdivider under this Agreement as to that portion of
the subject Subdivision may be assumed in writing by the purchaser ofthe parcel, and the
Subdivider shall have no further obligations hereunder. It is agreed, however, that no such
assumption of these obligations shall be effective unless the County gives its prior written
approval to such assumption following an investigation of the fmancial condition of the
purchaser. The Subdivider shall not otherwise assign, transfer, convey, pledge or otherwise
dispose of this Agreement without prior written consent of the County, which consent shall not
be unreasonably withheld.
4.8 Binding upon Successors. This Agreement shall inure to the benefit of and be
binding upon the parties hereto, their respective successors, and assigns.
4.9 Sole Responsibility of Subdivider Prior to County Acceptance. It is further agreed
and understood that at all times prior to the completion and acceptance of the off-site
Subdivision Improvements set forth herein by the County, each of said improvements not
accepted as complete shall be under the sole responsibility and charge of the Subdivider. When
it is necessary to allow the general public to utilize the roadways under construction by the
Subdivider, traffic control and warning devices shall be placed upon such roadways by the
Subdivider in accordance with the Manual on Uniform Traffic Control Devices for Streets and
Highways as prepared by the U.S. Department of Transportation, Federal Highway
Administration.
8
4.10 No Rights to Third Parties. This Agreement does not and shall not be deemed to
confer upon or grant to any third party any right to claim damages or to bring any lawsuit, action
or other proceedings against either the County or its officers, employees or agents because of any
breach hereof or because of any terms, covenants, agreements or conditions contained herein.
4.11 Notice. Notice required pursuant to the terms of this Agreement shall be deemed
given on the day that the same is placed in the United States Mail, postage prepaid, certified or
registered mail, return receipt requested.
4.12 Enforcement and Attorney Fees. The County may enforce the provisions of this
Agreement in the same manner and with the same remedies applicable to the enforcement of
land use regulations pursuant to the Eagle County Land Use Regulations, as they may be
amended from time to time, or as otherwise provided by law. Alternatively, the terms ofthis
Agreement may be enforceable by the Board or its designee by any appropriate equitable or legal
action, including but not limited to specific perfonnance, mandamus, abatement, or injunction.
The remedies explicitly provided herein are cumulative, and not exclusive, of all other remedies
provided by law. The prevailing party in any action brought pertaining to this Agreement shall
be entitled to an award of costs and reasonable attorney's fees.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the
day and year first above written.
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
ATTEST: BOARD OF COUNTY COM IS
/
.
Teak 1. Simonton, Clerk to the
County Commissioners
Address for giving notice:
P.O. Box 850
Eagle, CO 81631
Phone: (970) 328-8685
9
Name: Sanford M. Treat III
Title: President, Treat Development, Inc.,
Managing Member of The Pointe at Edwards LLC
STATE OF COLORADO )
) ss:
County of )
was acknowledged before me this 2006,
by as n&l~l~
WITNESS my hand and official seal.
My commission expires
r
~qf<'<ft.!i~~Li1J
II
10
POIIl Ie itS
THE at1JFf:$.AT EDWARDS
Summary of Public Improvement Cost Estimates
12/5/2005
On-Site Infrastructure Improvements $868,632
Off-Site Infrastructure Improvements $210,040
Infrastructure Contingency (1001<,) $107.867
Landscape Improvements $108,600
Landscaping Contingency (25%) $27.150
Total Infrastructure and Landscaping $1,322.289
Infrastructure Cost Estimates by Peak Civil Engineering, Inc dated 12-5-05
Landscape Cost Estimates by SonesMac Landscape, dated 12-5-05
\\\\\\\lWIJf1I/111
~\\\\\ DO RE G!;II/;';"
#" ~ ....... ~ ;.z
# 0 ..~CAS ;q~....~~
!~,'V ~\~%.
~():~ "1'.0;:;
- .&: (j)" :::
::: 36668 0: ::
~ r1JJ.. ~. ~
s"O. t .tJ:~
~ . . ii,,/, "
~.. .. ..... .. .. .;,,:.;$
~ . . .. rz.#1#b~._,~~:
~ is: ........... ~0. i-~"
~//II 8;ONAL 't:.'. ;..,;,;;'
IIIIJ \1\"\
't^y S~~tl6i~ ~e*()fJ<;'l{Hllry
15> t..\M lTED 10 c ,VI L. I I
E;;NbINE:€.,e.\f'J(q f>Lf\N~ .PPff€O 11 Ig t6
fo/~ it, Peak Civil Engineering, Inc.
fS PLC Job No. 1344
12-5-05
THE -.;.urn~.AT EDWARDS- SITE
PUBLIC IMPROVEMENTS COST ESTIMATE
Approx. Unit Total
Item Description Quantity Unit Cost Cost
,--
SITE WORK
1 Site Grading-Excess Ex_cavation 16591 CY $10 $165,910
2 Site Grading- Cut/Fill 2966 CY $5 $14,089
3 Site Walls (Stacked Boulders) 6896 SF $25 $172,400
4 Erosion Control 1 LS $8,000 $8,000
5 Revegetati()..I'1.___ 1 LS $3,000 $3,000
ROADS
6 3" Asphalt Pavement 234 TON $47 $10,998
7 8" Aggregate Base Course (Class 6) 858 TON $20 $17,160
8 Concrete Sidewalk (4') 2444 SF $10 $24,440
9 Curb and Gutter Type 2 (Section 11M) 1269 LF $20 $25,380
10 Curb Ramp 1 EA $500 $500
11 Signage per MUTCD and COOT Specifications 2 EA $500 $1 ,000
12 Pavement Marking per MUTCD and COOT Specifications 1 LS $250 $250
DRIVEWAYS
13 Asphalt Pavement (Assumed 3" Depth) 431 TON $47 $20,257
14 Aggregate Base Course (Class 6) (Assumed 4" Depth) 560 TON $20 $11,200
15 Concrete Apron 399 SF $15 $5,985
16 Gutter Type 2 (W=3') 545 LF $20 $10,900
STORM DRAINAGE SYSTEMS
17 12" CMP 140.1 LF $14 $1,961
18 18" CMP 125.1 LF $20 $2,502
19 24" CMP 287.9 LF $28 $8,061
20 30" CMP 54 LF $32 $1,728
21 12" FES wi Toewall 2 EA $250 $500
- 24" FES wi Toewall 1 EA $300 $300
22
23 30" FES wi Toewall 1 EA $500 $500
24 Type 13 inlet and grate 4 EA $2,000 $8,000
25 Detention Pond Water Quality Outlet Structure 1 LS $3,000 $3,000
26 Manhole (4') 2 EA $3,000 $6,000
Page 1 Engineers Estimate
Po I~ ie prs Peak Civil Engineering, Inc.
PLC Job No. 1344
12-5-05
THE _""" ....... AT EDWARDS- SITE I
- -_.~ ---. -- -----_.~
PUBLIC IMPROVEMENTS COST ESTIMATE
-- - -- -------
Approx. Unit Total
--~-~-~~-'~-'
Item Description Quantity Unit Cost Cost
- --
27 Riprap D50=9" (Includes bedding) 29 CY $150 $4,350
~- -.- -~
28 Grouted Riprap D50=18" (Includes grouting) 60 CY $250 $15,000
-~-- --
SANITARY SEWER SYSTEMS
29 8" PVC SDR 26 Sewer Main 866 LF $32 $27,712
~- $3,000 --~
4' Dia. Sewer Manhole 8 EA $24,000
-- Raise Rim of Manhole #0800 1 LS $500 $560
31
----
32 4" Sanitary Services Connections (8"x4" Factory Wyes) & 4" Cleanout 11 EA $150 $1,650
33 4" Sanitary Service Line PVC-SDR-35 484 LF $16 $7,744
34 Remove/Dispose or Abandon in place Existing Sewer Mains & Manholes 1 LS $1,500 $1,500
35 ERWSD Testing & Televising 1 LS $500 $500
36 ERWSD As-builts 1 LS $1,000 $1,000
DOMESTIC WATER DISTRIBUTION SYSTEMS ----
37 8" DIP AWWA C151, CL 52, Pressure Class 350 1919 LF $45 $86,355
38 8" Main-line Gate Valve & Box 13 EA $1,300 $16,900
39 Air ValveNac Manhole 1 EA $3,000 $3,000
40 Fire Hydrant Assemblies 3 EA $2,800 $8,400
41 Connect to Existing Water Mains 1 EA $500 $500
42 1" Service tap and Curb Stop 11 EA $500 $5]00
43 1" Service Line 500 LF $21 $10,500
44 ERWSD Testing 1 LS $500 $500
45 Drain 577 LF of 8" Water Main after Testing 1 LS $500 $500
46 ERWSD As-builts 1 LS $1 ,000 $1 ,000
1--- --
-- !----~
SHALLOW UTILITIES
$10 ----~-
47 Electric Main Line (materials furnished by others) 1100 LF $11,000
-----
48 Shallows Main (3-4" PVC & 1-2" PVC) 1100 LF $17 $18,700
49 Gas Line (Trench & Backfill) 1100 LF $8 $8,800
50 Transformer 3 EA $5,000 $15,060
---- I---------.__._~
------ $794,632
SUBTOTAL
--- -'--------.
Page 2 Engineers Estimate
, Peak Gjvll Engineering, Inc.
POI~+e P& PLC Job N~2_~~~~
~n~R5~-~~€tT~I?~6-sfl}~TIMATE -------------- . \ ---+----- .-- --
------1..- -----..--- ------.. ---...--------- -----.-.- -.------.------.- . ------ --.- ------.,. .----....-.--...,--.... ...........--
Aporox. I UnH I Total
b,....._.~..........,.. ...c........ ......,.... .. ~.. .,,-.~ c~."...~..._w.~ A" ~^_,,-.................__..~..._...c.~..._._.~. "~""_'_""""'>"_ ..... _ "__'''_.<-<_' UM..'" ---::-..__._....._;k""._~-~.__._"._t..M._._._.~-,_..-,.-....'.'~'.'M._
It~~1~-=. .. ..- ---~~~SR~~~:~'~~~T~i~~~~$pli~e~~ .QlIanlil~.I!l-~ostt........ ...=~it~~~~
=_j-:._n_ - . -- .n==A~i~~~~~~~~~~~~~~~~g~~~=l_n~nl -~ ......if~~~g]
ON-SlTE TOTAL $868,632
_.__u.._. _.___,_ ._._~_,_.__'U'_ ________,_'u _,_~_~.___ ._______"_ _'_'___ ..~~____'_.M_~~__..._,.,_~___ ._ ,__~.___ _u__
~\\\\\\lllllllltl#i.fll,
~~ r,.pO REG/'%
~ !p:.,,-r... ~>t~
i1 O...~\V'\S AA~. .~. ~
~O~.'nJ -.,.v". ~~
;;: -.' V V..i!\" 'A\ ~
~r'....... \'.::.\;;j;;;.
~ vR,:l\v:
""' ."(" (fJ. -
5 : lXi.56 O.:~
~fJ.-l! , ......
_. I ...
~. I"" V .- t.(i ~
~. . ..(* . ... . ..~
~ l't_c-07.. k/~,
"1: ',^".." -; .. ~ ~
~ '~.."",..::'~0 ~
1'/'1> 'tONAL t-- ,\\~\;.
IIII' . '\\'"
'~l!tlllll 11\\\\\\'
Page 3 Engineers Estimate
A . Peak CivH Engineering, Inc.
0, (-- p~ PLC Job No 1344
~'1e 12f5/05
~Z~~~ifR~~i~~tT~D~b~ii~~i'i~ADS) 1-...- ..1.----1 ...
!t~mL-pe~~~jQ~~-- . ---'-~-r~~~~i~~lUQI :~-=~g~~=-+~-~~~i- --- ~.
~~OADS __'_'_P~------------~~-=~=----. ---=:l~-:=:::_---!-=:-=: -~--~--=:j-----'-- ---. ~
-.- i~ii!~?a~i1~~ui1~ITS-~~~Cl~Clti()!1-------~.--~-.--~--. ~--l"-~~~1-2}- ----- $ ~~I----------$t~~~ Ii
1 --- ---g- -- . - -------.-----.---- ..-------. --i-------------+----.---- ----------------...--,- ----
---1~e~~~~~i~ti~~!'O'.- -- . - ---- --- !--------ilt~.~~:~6~t---~~~6~6
I .'_ "'._ .- ._ ._....' _. _.......____. ___'-____..,..___._________.
____]6" AsEh~.lJ;)~vl3.f11.~'!.L..___~__________~____ -~------L!"'-~' TQ.t! _.____J~!l~_ . _~82. ?..fF
V'99regate Ba~eCour.se(Class?) .._.______ . __._ _ 658 TON __~?Ol_ $13,~60
_jA~2!~f:lI~I:)Clt~f:1~'\f!{:rDe.Pt/.11._;_----~------..---.--- ____ _1. 9 TQ.t'>J________J~Qt--. _ $720
-1~~&~~~~?J~~JyP:r\~5ft6'!a~dB~ooys.ecirications...-- . __'_1__150~ -t~-----..$2:~5~i -- S~~:6~~
l::::~~~:iW;:L ~........_.-~ ....~u. .... _ I~ _Q2-LFI:__$20!-$=,240
IAsphalt Pavef!lEJfll (Assull1(')d 3" Depth) ... _ J3~? Tg~L_.._$.8~g .._1680
I I
.~_l____~,,_.__.~~__..____________~____________..___ _ ____.._...____________. ~._.1.___~___~_.....____...__._
_tB~~~~uf.!}~~-J\~E SYSTE:~S__H__.._ ...... .. -.- ~-=1t-cCS-Jc"..-:$t60+- "~---]700
iRiprap D5O"'6" I 21- CY i $150 $300 ~\\\\\\lIl1l1lliJI"f,
-i......--. ....... --- .... ...--.--- .... ---...--~.: ......-.-.---.-----....-----.~-r.. -~-.r~-~--.j~~..~..--~--.- .-..- - . ...- ~~~.~~?::;,
.~.--._. ------~------..----._...--..-...-----..--------"......- ---.. SUBT()!J\.Lf---___l__ _ ..,,__~_._____.. $14~,040 I~~(.~CAS ~d'.~~
"--J -.-- ---- --- _. ~-- -- -- -~ -- - -- - 'TRAFFIC CONTRoi:f --- r' ------..... $22,000 ~ 0 [l . 1:,\ 0 !
\...... ... .... . CONSRUCnoN ENGI~E"Rli!G~O~:~~~ ~g~t _ --i-... . ......... . ... ..... . nt~~~ \ ~fI j;3aiJ.!j $}
._~_. ____.____...____99!'{!?~Y(;_T._'_Q}'.J?ygyEyINGf-.-..-J.- ...... T__..__~~~QOO ~;{;j:z. - 5-D ....~it
-.---i-.-......-~- .-------------..--..-~~~~~~~~'f1~~~-~~t~~~~g~l. .......~..i-- ~..-_..--t_.....-......- ~.~:~@g ~/",~iONAl.~~#
I. _ .m . ....... _ .. .... ... ... ...... .......~. .. . .... - . .... - ..J-.-rOFF-SiTE f~TAd. .;;1 O~~4~ ..."..11'....
This estimate b?~~.Q.()npl~n!>Aat~(jJ1:.:!~:'9~:..____. ..,,_____._H__ t----~i - -- f. -- --. ----1 .--- .....----
I I '
~~i~~~~ne~IT:~~'~;n~-~~~--.---u ... ...r-=~:I . ..1- t -
Page 1 Ell9ineers Estimate
sane 5 ma C
Landscape: A.rch CIure Site Plann n9
Urban Design
The Dluffs Th(. Po/~.{.e 01.+ Glwa.rols
Edwards, Colorado f~.
Landscape and Irrigation Construction
Preliminary Budget/Estimate
NOTE: Estimate includes all trees as shown on plan. Estimate does not include additional
landscaping/irrigation of individual units (i.e. shrubs, perennials, lawn, mulch etc.).
November 3, 2005
Revised December 2, 2005
Earthwork...................................................................................................................... .. .$20,000
. Boulder groupings (tree planting benches on steep slope at entry)
. Soil preparation
. Fine grading
Note: Soil preparation and fine grading associated with landscaping of individual
units is not included in this estimate.
Plant Materials............. ......... ..................... .......... ........... ....................... ........... ............. ..$30,700
. Trees
22-4' Spruce
11-6' Spruce
11-8' Spruce
65-1-1/2" cal. Aspen
65-2" cal. Aspen
Note: Shrubs shown on plan are associated with the landscaping of individual
units.
Grasses....................................................................................................................... .... .$12,900
. Native revegetation of disturbed areas
Note: All lawn areas (sod) shown on plan are associated with the landscaping of
individual units.
Irrigation..................................................................................................................... ..... .$36,900
. Temporary irrigation of revegetated (native) areas
. Drip irrigation of trees
Note: All irrigation of lawn areas and plant materials associated with landscaping
of individual units is not included in this estimate.
P.O. Box 115 Avon, CO 81620 970.949.6490 fax 970.262.2167 mie@sonesmac.com
P.O. Box 281 Silvelthorne, CO 80498 970.468.4717 ott@5oneSmac.com
Miscellaneous Materials... .......... .............. ................. ............... ..... ..... ....... ............. .... $8, 100
. Mulch (tree wells in native)
. Soft trail/overlook (assumes some stone slab stairs along trail where
necessary)
. Seating boulders at overlook
Note: Edging, mulch, and or other landscaping materials associated with
landscaping of individual units is not included in this estimate.
TOT AL ................................................................. $1 08,600
Note: Preliminary budgeVestimate is based on preliminary landscape submittal documents
prepared by Sones Mac, September, 2005. A more detailed and accurate cost estimate may be
prepared pending final design. Preliminary budgeVestimate does not include
landscaping/irrigation of individual units, rough grading, hardscape, retaining walls or boulders
other than identified, site lighting, or irrigation tap fees.
-
o COLORADO ""
BUSINESS BANK
IRREVOCABLE STANDBY LETTER OF CREDIT
Letter oi'Credit Number: 1253
Expiration Date: June 14,2008
Date: June 16, 2006
Beneficiary Name: Eagle County
Address: P.O. Box 850
City, State, Zip Code: Eagle, CO 81631
Applicant Name: Treat Development, Inc.
Address: P.O. Box 1829
City, State, Zip Code: Edwards, CO 81632
We hereby issue our lrrevocable Standby Letter of Credit No. t 253 in your favor in the
amount of One Million Three Hundred Twenty Two Ihousand Two Hundred Eighty Nine
and 001100 U.S. Dollars (USD $1,322,289.00) and expiring at the close of business (3:00
p.m. MOlmtain Time) on June 14,2008 a1 our counters at Colorado Business Bank, Loan
Operation!> Department 3rU floor, 821 17th Street, Denver, CO 80202.
This let1,~r of credit is available by presentation of your draft at sight, drawn on Colorado
Busines~, Bank, accompanied by the original letter of credit and amendment(s), if any. In
the evel1 t of a partial draw, this letter of credit is available by presentation of your draft at
sight, drawn on Colorado Business Bank and certified copies of the original letter of
credit and amendment(s), if any.
Special Conditions:
. Partial drawings are allowed.
. This Letter of Credit shall expire on June 14, 2008 unless extended as
provided herein.
We hereby agree with you that drafts drawn under and in accordance with the terms of
this lette:r of credit will be duly honored upon presentation of drafts(s) and required
docwnenr(s) at our office no later than the close of busincss (3:00 p.m. Mountain Time)
at 821 17th St., Loan Operations Department 3rd floor, Denver, Colorado 80202, U.S.A.
on or before the expiry date of this Letter of Credit.
0056 Edwards Village Blvd., Suite 130. Edward~ Colorado 81632
P.O. Box 2826. Edwards, Colorado 8163:2
Tel; 970.926.6801 . Fax: 970.926.6806
www.cobizbank.com
,.., ....-.-~
Letter of Credit No. 1253
Page 2
Unless olherwise expressly stated, this letter of credit and all negotiations hereunder shall
be govemed by and construed in accordance with the International Standby Practices
ISP98, as published by the International Chamber of Commerce Publication No. 590,
and, to the extent not inconsistent therewith, the laws of the State of Colorado.
This letter of credit is not transferable unless Colorado Business Bank agrees 10 the
transfer in writing.
Please direct any inquiries with regard to this Letter of Credit to Colorado Business Bank,
Loan Operations Department, 821 17th Street, Denver, CO 80202 (303)293-2265.
Colorado Business Bank,
~~ ,~~ ~
~- ~.
James Thomason
Presiden t