CHANGE ORDER NUMBER 1
---------------------------------------------------
---------------------------------------------------
CONTRACTOR Vaughan Construction Company
Contract for Multi-Use Events Center at the Eagle County Fairgrounds
Contract Date September 6, 2006
--------------------------------------------------
--------------------------------------------------
TO: Vaughan Construction Company
You are directed to make the changes noted below in the Subject Contract. Appropriations to
cover the costs of additional work have been made.
DAT~~""\""'Q~\ I, ::loc:.\...Q.
\
--------------------------------------------------
--------------------------------------------------
Nature of Changes:
Provide labor and materials to add men's & women's restrooms, wash bay, passage, and storage
room to the Multi-Use Events Center at the Eagle County Fairgrounds. This addition is per
Kenney Associates Architects LLC's drawings dated October 4, 2005. The changes are itemized
in Vaughn Construction Company's proposal dated February 1,2006, attached as Exhibit "A".
--------------------------------------------------
--------------------------------------------------
These changes result in the following adjustment of Contract Price and Contract Time:
Contract Price Prior to this Change Order $2,100,000.00
Net Increase Resulting from this Change Order $ 508,110.00
Current Contract Price Including this Change Order $2,608,110.00
--------------------------------------------------
--------------------------------------------------
Change Order No. 1
Page 2
Contract Time Prior to this Change Order March 31, 2006
Net Increase Resulting from this Change Order (76) Calendar Days
Current Contract Time Including this Change Order June 15, 2006
--------------------------------------------------
--------------------------------------------------
The above changes are recommended:
~,~
Helen Migchelbrink
County Engineer
Date: ,J/ J I Or.,
--------------------------------------------------
--------------------------------------------------
The above changes are accepted: Vaughan Construction Company
By:
Title:
Date:
Job Cost Estimate Compared to Actual or Projected Page 1
-" .." II.... Addition I .., "..uuu I
.. -- .
Total Cost Code % of Completion
.... --
----- ...
------()fVISION1- PHASE 1 -..-.
=--:;------------------- ...-..
~o!_~nce Bo~~_________ 4,850.00 01-061. ...__ ....
~i~~-------------- 2,500.00 01-062_ Ii
~n~~teTestir!~L-------- 1,000.00 01-101 1_ -.---........-.. ............... .~...<t:
~onbl1_gel1~_______ ____~O.OO 01-106:><
Field Personnel (Job Superintendent) 10,000.00 01-108 W
----------------------- r-----
Builders Risk Insurance 1,850.00 01-121
Admin~-FeesTProj.Mtgs./S-lJbmittais 3,500.00 01-124
'Field Office----------------------850.00 01-501 ...-.--.....-.... .S<!lqqm
1=------------------------
Toilet Rental 750.00 01-506
-------------------- ------------- ------
Trash Dump Fees 1,000.00 01-513
-------------------------------- ------ ....-
Clean-Up; Final 1,000.00 01-702
---------------------.--- ----------- -..-
TOTAL DIVISION 1 COST_____~,80~00 0.00 0.00
------------------------- ---
Site Preparation 02-100 -
~----------- -------- ........ -- .-
Excavation-site and footer ;nn 02-101
---------------------- . -- - --
Finish Grading nn 02-102
-=-:--------------- --
Slab on grade prep. 3/4 SR DO. 02-810
---l'OTALDIVisION icos-,..- ~. nn 0.00 0.00 10500 .-
----- --------..------.- .'
- . DIVISION 3 .- PHASE 3--
Concrete ..11': 7l;n nn 03-000
TOTAL . ,) \#U;) I At: '7J::n nn 0.00 0.00
4 PHASE 4_
72 n1 n nn 04-000
~^~I~~' ':l <;nn nn'
'V'''''V'''Y'''''''''''"
TnT.Il.1 4 COST 75,510.00 0.00 0.00 75510
------------Oi\lISION5------ Metals
1V1etaIV\,--elding-.---- C 5-020
fnterToiwa~6baiiailings=~=_=~ <;nn nn C 5-206_
Bollards/8" Steel/conc fill 250.00 C 5-910
=-=IQTl\J...I>I.",~2J1i]gOST _ rJ::n nn 0.00 0.00 . .........
Cost Code ..._............
-----------.oIVfsION 6-.----- Wood & PI",..ti.... PHASE 6 ._ f-
--_._..
- - ---OIVISioN7------- lerrllal PHASE 7 .. ..-
Roof InsulatTon/9" Vin~i( Faced- 'v..u vv 07-246_
~-- TO.!~I::DIVI~'-ON 7_COS"[: 0.00 0.00 c c. -c------.
ost ode
Job Cost Estimate Compared to Actual or Projected Page 2
""'Mu,a. Invoice Total v.
" ......._-"
--.-'--""'"'--'"' DIVISION 8 - Doors & "
PHASE 8
----""""--""-------"""-_.- ._"-
Metal Doors & Frames 10,550.00 08-100
"-_._-_."-----""-"--"----""_.- -----" """
Overhead doors 4,500.00 08-305
-" -"-"
Aluminum clad windows 1----__ 5,500.90 08-600
=-_._-"
B~~.rg~!!'lJ:1~rd\\l~~_L&M 20,155.00 08-700
TOTAL DIVISION 8 COST 40,705.00 0.00 0.00
~ "'-""'-~"',."--"----,,
--'-"~'~"--'---" --"-
DIVISION 9 Finishes PHASE 9
"""---'--- "
QYR.J?~~<:!~eilings/pail1ted ____ 3,150.00 09-100
~_l1fi.!llshed ceill~gJ)~int ________ 4,200.00 I 09-250
Floor Treatment -- 4,600.00 09-780
--- TOTAL.DTVISION-9CO~- 11,950.00 0.00 0.00 0
" -,'_."---"~-,,._""-------'-,.,--~--,-~ "--
Cost Code
--"'-'~'-"-- Specialties "-,-
DIVISION 10 PHASE 10
" ---"'-'---"'"'-''''''~-''''---''----''' -""----
DIVISION 11 ________ Equipment PHASE 11
~---'''''''-~''----''''----'--'--''-
DIVISION 12 Furnishings PHASE 12
--""------------ f-""----===-=- . I
-""--""-"--""_.._- ---
DIVISION 13 Special Construction _ PHASE 13
=---"""-"--"-""-----
f're-Engll1~~red Roof ~yste~ 17,175.00 13-050
Dektites/ snowfence L&M _~" 4.500.00 13-133
"""--"_._---"-"--""------ 13-140
~~IB~9-~~:~on~actLabor ""_~ 43,600.00.."
13_~eck,~r~of, tri~ardw(lre 20,850.00 13-145
TOTAL DIVISION 13 COST 86,125.00 0.00 0.00 0
""-"''''''--"--,----~"-----
Cost Code
PHASE 14
15 PHASE 15
Ar. 17,143.' 15-000
.-
and ex. pipe 15-250
15-400 ._-"-".._""
TOTAL 15 COST ;,911 0.00 0.00
16 PHASE 16
:::In 7nCl nn 16-000
TnTAI IUVU~ "to 700 00 0.00 0.00
-""--"" --"--- ..--
.--
JOB COST 463,110.00 0.00 0.00 -
CONTRACTORS FEE" ,,~-- -- 45,000.00
==-:------------"-""--" "____~8,110.00 0.00 0.00
TOTAL JOB COSTS c-..
--"-----"-----"------------"- ---
----
ESTIMATED BY- TED -LVAUGHAN~-VAITGHANCONSTRUCTION CO ,-- " ..""."...... I- .-