Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC05-360 American Civil Constructors_skate park
LRD-
CHANGE ORDER NUMBER ~
--------------------------------------------------
--------------------------------------------------
CONTRACTOR American Civil Constructors
Contract for Skate Park - Sanitary Sewer Line
Contract Date October 12, 2004
--------------------------------------------------
--------------------------------------------------
TO: American Civil Constructors
4901 South Windermere Street
Littleton, CO 80120
You are directed to make the changes noted below in the Subject Contract. Appropriations to
cover the costs of additional work have been made.
TY BOARD OF COUNTY COMMISSIONERS
By:
DATE:
--------------------------------------------------
--------------------------------------------------
Nature of Changes: In accordance with the contract drawings dated October 18, 2005, by Peak
Land Consultants, Inc. Sheets S 1.1, S 1.2 and S 1.3, American Civil Constructors, Inc. would like
to submit, for approval, the following proposal to provide a new 8" sanitary sewer line at Berry
Creek.
Item QTY Unit Unit Total
No. Description Price
001 8" SDR35 PVC 922 LF $45.00 $41,490.000
002 8" C900 Class 150 314 LF $50.00 $15,700.00
003 4" SDR35 PVC IO LF $40.00 $400.00
004 4' -0" Diameter Sanitary Manhole 5 EACH $6,250.00 $31,250.00
005 Reclamation / Restoration I LS $25,650.00 $25,650.00
006 Existing Utility Protection I LS $22,590.00 $22,590.00
007 Mobilization I LS $31,000.00 $31,000.00
008 Remove and Replace Asphalt Path 1 LS $36,000.00 $36,000.00
009 Silt Fence 1260 LF $2.00 $2,520.00
010 Temporary Path (lnc/. Removal) 1 LS $15,625.00 $15,625.00
Total: $222,225.00
SKATE PARK - SANITARY SEWER LINE TERM SHEET
1) Purpose: To approve Change Order #4 for American Civil Constructors to install
a 1250' long, 8" diameter sewer line for Berry Creek to provide sewer service for
future restrooms to be located between the playground and skate park. The new
sewer line will be installed along the south side of the pond and volleyball courts.
This will also reconcile three previously approved changes to the original
contract.
2) MethodoJo2V:
The sewer line was designed by Peak Land Consultants with approval from Eagle
River Water & Sanitation District.
3) Schedule:
Skate Park and playground completed in August 2005.
Attorney Review of Change Order.
Approval by BOCC on December 13, 2005
Begin work as soon as Change Order is approved, contractor needs ninety (90)
days to complete this project.
Completion date: April 3, 2006.
4) Financial Considerations:
The original scope of the project included construction of the skate park and
playground for $943,552.50
Total construction cost to the County is $222,225.00 for the new sewer line.
Three previously approved changes to the original contract are included:
$7,903.20.
These items are budgeted.
5) Other:
Nearby bike path will be removed for new sewer line. A temporary bike path will
be installed to maintain paths continuity (350').
G: iCapila{ PrOjects (CPROJECT)lBerry Creek:Skate Park\Sewer Line Term Sheet. doc
Change Order No. ~
American Civil Constructors
Page 3
Nature of Changes: To include Previous ACC Change Order #5 dated September 7, 2005,
reading as follows:
Item Install Plan Delete Unit
No. Description QTY QTY QTY Unit Price Delete Total
B04 Quaking Aspen (8-10' drops) 0 12.00 -12.00 Each 220.00 -2,640.00
B05 Quakinq Aspen (2.5 cal) 0 7.00 -7.00 Each 220.00 -1,540.00
B06 Narrowleaf Cottonwood (2.5 cal) 14 14.00 0.00 Each 350.00 0.00
B07 Shubert Chokecherry (2.5 cal) 18 18.00 0.00 Each 415.00 0.00
B08 Ponderosa Pine (6-7') 5 5.00 0.00 Each 270.00 0.00
B09 Colorado Spruce (6-7') 0 8.00 -8.00 Each 340.00 -2,720.00
009 Lanceleaf Cottonwood (4" cal) 0 10.00 -10.00 Each 575.00 -5,750.00
010 Patimore Ash (4" cal) 13 16.00 -3.00 Each 825.00 -2,475.00
011 Colorado Spruce (6-7') 11 16.00 -5.00 Each 340.00 -1,700.00
012 Quaking Aspen (2.5 cal) 23 36.00 -13.00 Each 220.00 -2,860.00
B10 Add Shibori Spirea (115 EA) 0 115 -115.00 Each 20.00 -2,300.00
Total: -$21,985.00
Nature of Changes: To include Previous ACC Change Order #6 dated September 28, 2005,
reading as follows:
Scheduled % Total
Item No. Description of Work Value Complete
001 Pothole Crew $3,570.00 100% 3570.00
002 Credit Skate Park Picnic -250.00 100% -250.00
Total $3,320.00
These changes result in the following adjustment of Contract Price and Contract Time:
Contract Price Prior to this Change Order $1,130,135.50
Net Increase Resulting from Change Order No.4 230,128.20
Current Contract Price Including this Change Order $1,360,263.70
Change Order No. ~
American Civil Constructors
Page 3
--------------------------------------------------
--------------------------------------------------
Contract Date Prior to this Change Order AU2ust 12. 2005
Net Increase Resulting from Change Order No.3 166 Working Days
Current Contract Time Including this Change Order April 3. 2006
The above changes are recommended:
Peter Fralick
Senior Facilities Engineer
Date:
--------------------------------------------------
--------------------------------------------------
The above changes are accepted: American Civil Constructors
By:
Nick Po1ce
Title:
Date:
G:ICapital Projects (CPROJECT)\Berry Creek\Skate ParklSewer line change order.DOC