CHANGE ORDER NUMBER -L
--------------------------------------------------
--------------------------------------------------
CONTRACTOR Rippy Contractors
Contract for Golden Eagle Senior Center Remodel
Contract Date September 20, 2005
--------------------------------------------------
--------------------------------------------------
TO: Rippy Contractors
P.O. Box 3610
Eagle, CO 81631
You are directed to make the changes noted below in the Subject Contract. Appropriations to
cover the costs of additional work have been made.
EAG TY BOARD OF COUNTY COMMISSIONERS
By:
DATE:
--------------------------------------------------
--------------------------------------------------
Nature of Changes: See EXHIBIT "A" attached hereto, to add the kitchen expansion including
but is not limited to the following:
Item
No. Description
Add kitchen expansion per the plans dated
6/24/05 by Jeff Johnson Architects and
specifications dated June 20, 2005 by Carol
Vaughan Designs, and Rippy Contractors
001 proposal dated September 15,2005. $56,000.00
002 Kitchen cabinets (KraftMaid laminate, Ivory) $9,153.07
003 Hardware for cabinets (chrome wire pull) $150.00
004 Countertops (Deepstar Laminate, Glaze) $845.94
Dining Room Buffet (Silestone top, Diana Pearl $1,326.00
! 005 1208)
006 Kitchen Island (Silestone top, Diana Pearl 1208) $5635.50
007 Cabinet installation $2,000.00
Grand Total $75,110.51
Ch~mge Order No. .l
Rippy Contractors
Page 2
Kitchen cabinet and countertop prices shown above per Rippy Contractors quote dated October 14,
2005. Confirm chrome wire pull style, laminate colors, VCT color, and Silestone color with Carol
Vaughan Designs.
These changes result in the following adjustment of Contract Price and Contract Time:
Contract Price Prior to this Change Order $355.000.00
Net Increase Resulting from Change Order #1 $ 75.110.51
Cunent Contract Price Including this Change Order $430.110.51
--------------------------------------------------
--------------------------------------------------
Contract Time Prior to this Change Order Februarv 10. 2006
Net Increase Resulting from this Change Order (20) Workin2 Davs
Cunent Contract Time Including this Change Order March 10.2006
--------------------------------------------------
--------------------------------------------------
The above changes are recommended:
A1~
Peter Fralick
Senior Facilities Engineer
Date:
--------------------------------------------------
--------------------------------------------------
The above changes are accepted: Rippy Contractors " "~~ Ik;hy/
By' (/)It . /
. \c L/
Michael Rippy
Title:
Date:
G\Capital Projects (CPROJECT)\Senior Center Remodel\Rippy CO# 1 IOO505.DOC
- - -.. -- _ ___ WlV""""" , " _, _'-',-U_
P.O BOX 3610 EAGLE rippyinc@centurytel.com
970-328-3655
PHONE 328-8880 DATE
Jounty Community Development fax 328-8899 15-$e 05
ICo'orodo JOB NAME/LOCATION
Golden Eagle Senior Center Expansion
#J EXHIBIT "A" 715 Broadway
i? Page 1 of 4
:t
j
I JOB PHONE
l
"liE /-:t:~EBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR:
Goldc..1I E09I~ Senior Center Expansion as per Plans Dated 6/24/05 by Jeff Johnson Architectural and
SpecificaTions Dated June 20th, 2005 by Carol N Vaughan Designs.
P,lce reductions listed below
1 Delete Replace existing roof $15,000
2 Delete Replace existing fumaces $12,000
3 Delete brick, Replace with altemate veneer $20,000
$11,000
5 Delete kitchen expansion $56,000
Addtional owanc sted below Date 08-18.05
Allowance for landscape and inigation $5,000 II
Allowance for two new parking places $7,000
EXCLUSIONS:
work for Addendum No.1 Drawi~S: 1. a. & 1.b. (COrol N Vaughan Designs)
kit'chen hood#cabinets, work tab es
onser fire suppression system
surveys site pinning ,Ilc, dc
utility relocation (phone in park)
Performance bond costs
l:itc;hen expansion
P '\so Utilities, Surveys, Engineering. As-Built Plans
Ct.,..,\tGE .ORDER FEES: .
Hourly Fee - Supervisior $50.00
Hourly Fee - Carpenter $40.00
Hourly Fee - Laborer $25.00
Hourly Fee - Administrator $30.00
SubcontracTors Cost Plus 20%
Material Cost Plus 20%
Rippy Contractor Equipment - Hourly Fee $40.00
Rippy Contractor Equipment Operator - Hourly Fee $40.00
Rental Equipment Cost Plus 10%
Dum run er Tn 00.00
WE PROPOSE HEREBY TO FURNISH LABOR AND OR MATERfALS TO COMPLETE IN ACCOROIlNCE WtTH ABOVE SPECIF~T1ONS FOR THE SUM OF: Ori9ional $457,000.00
Revised $355,000.00
DEPOSIT WITH PROPOSAL I PROGRESS BILLING TO COMPlETION
IF FULL PAYMENT IS NOT MADE WITHIN 30 DAYS OF INVOICING CUSTOMER AGREES TO PAY ONE AND ONE HALF PERCENT PER MONTH
(18"1{, PER ANNUM) ON ANY UNPAID BALANCE. ANY ATTORNEYS FEES NEEDED FOR COLLECnON WILL BE PAID FOR BY CLIENT
PROPOSAL MAY BE WITHDRAWN IF NOT ACCEPTED WITHIN 30 DAYS
ALL MATERIAL IS GUARANTEED TO BE N3 SPECIFIED. ALL WORK TO BE COMPLETED IN A PROFESSIONAL
MANNER ACCORDING TO STANDARD PRACTICES. ANY ALTERATION OR DEVIATION FROM ABOVE SPECIFICATIONS
INVOLVING EXTRA COSTS WILL BECOME AN EXTRA CHARGE OVER AND ABOVE THIS PROPOSAL
RESPECTFULLY SUBMITTED
ACCEPTANCE OF PROPOSAL - SIGNATURE MJ' R.fr~
THE NJQVE PRICES AND SPECIFICATIONS AND CONDITIONS ARE SATISFACTORY
AND HEREBY ACCEPTED. YOU ARE AUTHORIZED TO DO THE WORK AS SPECIFIED.
PAYMENTS WILL BE MADE AS OUTLINED ABOVE. DATE OF ACCEPTANCE SIGNATURE
r . d vS9E 82E 01.6 AddI~ l::Wf..JIl dL.S:20 SO sr das
EXHIBIT "A"
Page 2 of 4
Carol N V augban Designs
Inttri.r Spin Planni"l & Duil" _ (Olllllllrdll & hsi'...ti.1 - N(lDa (tr,ifintl h. 14713
Date: October 20, 2005
Project: Golden Eagle Senior Center Remodel " Addition
Eagle, Colorado
Rc: Kitcben cabinets " countertops options
The following quotes were provided by Rippy Contractors, Inc. for the kitchen expansion oftbe Senior
Center. After consulting with Facilities Management, we have selected two (2) options for the kitchen
cabinets and countertops. Please see the sample boardIplan for samples and colors.
Option 1 ~,
'\
\
Cabinets KraftMai~ laminate ~ laminate \
color - ivory color - ivory \
Hardware chrome wire puUa chrome wire puns \
Countertops
kitcben. Deep Star laminate Deep Star laminate
island Deep Star laminate Silcstmee
buffet Deep Star laminate Silestooee
i
The following quotes do not include new appliances. The total price rL the construction pJam as
__iU buildiag permit. I
Option 1 Option 2
Cabinets $9,553.07 $9,553.07
riacludel~) (~.JtT;J)
Countertops 4,648.75 7,807,44
Subtotal $14,201.82 $17,360.51
Installation 2,000.00 2,000.00
Total 516,.101.81 519,360.51
Kitchen Expansion $56,000.00 $56,000.00 i)
r'lUlhldial cabinID A
Kite". Total $72,201.82 575,360.51
"-
t.' "11'''''' CI".. - ..".....t ...., c...,.... .IU5
,If, 971.115.9111 . .: '71.S7'.71fl
n, ........r ..... u.
<~---
EXHIBIT "An
Page 3 of 4 RIPPY CONTRACTORS, INC.
P.O. BOX 3610
2756 SALT CREEK ROAD
EAGLE, COLORADO 81631
970-328-3655 (0)
970-328-3654 (FAX)
October 14, 2005
I
COUNTER SILESTONE DEEP STAR
OPTIONS: ALL ALL
CABINETS
KRAFTMAID
LAMINA TE 9,153.07 9,153.07
COUNTERS 14320.80 4,648.75
D.R. BUFFET INCLUDED INCLUDED
ISLAND INCLUDED INCLUDED
APPLIANCES NOT INCLUDED NOT INCLUDED
SUBTOTAL $23,473.87 $13,801.82
INST ALLA TION $ 2,000.00 $ 2,000.00
TOTALS $25,473.87 $15,801.82
KITCHEN
EXPANSION $56,000.00 $56,000.00
TOTAL $81,473.87 $71,801.82
EXHIBIT "A"
Page 4 of 4
COUNTER DEEP STAR DEEP STAR
ALL ALL
ISLAND & BUFFET
BUFFET SILESTONE
SILESTONE
CABINETS 9,153.07 9,153.07
COUNTERS 845.94 4,218.31
D.R. BUFFET 1,326.00 1,326.00
ISLAND 5635.50 INCLUDED
APPLIANCES NOT INCLUDED NOT INCLUDED
"/"(),c;/
SUBTOTAL $~ $14,697.38
INST ALLA nON $ 2,000.00 $ 2,000.00
Ie q(,o. 'I
TOTALS $~ $16,697.38
KITCHEN
EXPANSION $56,000.00 $56,000.00
TOTAL $74,960.51 $72,697.38
CA~NE-T t \ So, co
!1A~ W^FJ:-
?E:~ /,.JNl>,A RIr?Y 10/28/05 p:J
toTAL $' 75) 110 , 5" I