HomeMy WebLinkAboutC05-327 Rippy Contractors_change order CHANGE ORDER NUMBER -L -------------------------------------------------- -------------------------------------------------- CONTRACTOR Rippy Contractors Contract for Golden Eagle Senior Center Remodel Contract Date September 20, 2005 -------------------------------------------------- -------------------------------------------------- TO: Rippy Contractors P.O. Box 3610 Eagle, CO 81631 You are directed to make the changes noted below in the Subject Contract. Appropriations to cover the costs of additional work have been made. EAG TY BOARD OF COUNTY COMMISSIONERS By: DATE: -------------------------------------------------- -------------------------------------------------- Nature of Changes: See EXHIBIT "A" attached hereto, to add the kitchen expansion including but is not limited to the following: Item No. Description Add kitchen expansion per the plans dated 6/24/05 by Jeff Johnson Architects and specifications dated June 20, 2005 by Carol Vaughan Designs, and Rippy Contractors 001 proposal dated September 15,2005. $56,000.00 002 Kitchen cabinets (KraftMaid laminate, Ivory) $9,153.07 003 Hardware for cabinets (chrome wire pull) $150.00 004 Countertops (Deepstar Laminate, Glaze) $845.94 Dining Room Buffet (Silestone top, Diana Pearl $1,326.00 ! 005 1208) 006 Kitchen Island (Silestone top, Diana Pearl 1208) $5635.50 007 Cabinet installation $2,000.00 Grand Total $75,110.51 Ch~mge Order No. .l Rippy Contractors Page 2 Kitchen cabinet and countertop prices shown above per Rippy Contractors quote dated October 14, 2005. Confirm chrome wire pull style, laminate colors, VCT color, and Silestone color with Carol Vaughan Designs. These changes result in the following adjustment of Contract Price and Contract Time: Contract Price Prior to this Change Order $355.000.00 Net Increase Resulting from Change Order #1 $ 75.110.51 Cunent Contract Price Including this Change Order $430.110.51 -------------------------------------------------- -------------------------------------------------- Contract Time Prior to this Change Order Februarv 10. 2006 Net Increase Resulting from this Change Order (20) Workin2 Davs Cunent Contract Time Including this Change Order March 10.2006 -------------------------------------------------- -------------------------------------------------- The above changes are recommended: A1~ Peter Fralick Senior Facilities Engineer Date: -------------------------------------------------- -------------------------------------------------- The above changes are accepted: Rippy Contractors " "~~ Ik;hy/ By' (/)It . / . \c L/ Michael Rippy Title: Date: G\Capital Projects (CPROJECT)\Senior Center Remodel\Rippy CO# 1 IOO505.DOC - - -.. -- _ ___ WlV""""" , " _, _'-',-U_ P.O BOX 3610 EAGLE rippyinc@centurytel.com 970-328-3655 PHONE 328-8880 DATE Jounty Community Development fax 328-8899 15-$e 05 ICo'orodo JOB NAME/LOCATION Golden Eagle Senior Center Expansion #J EXHIBIT "A" 715 Broadway i? Page 1 of 4 :t j I JOB PHONE l "liE /-:t:~EBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: Goldc..1I E09I~ Senior Center Expansion as per Plans Dated 6/24/05 by Jeff Johnson Architectural and SpecificaTions Dated June 20th, 2005 by Carol N Vaughan Designs. P,lce reductions listed below 1 Delete Replace existing roof $15,000 2 Delete Replace existing fumaces $12,000 3 Delete brick, Replace with altemate veneer $20,000 $11,000 5 Delete kitchen expansion $56,000 Addtional owanc sted below Date 08-18.05 Allowance for landscape and inigation $5,000 II Allowance for two new parking places $7,000 EXCLUSIONS: work for Addendum No.1 Drawi~S: 1. a. & 1.b. (COrol N Vaughan Designs) kit'chen hood#cabinets, work tab es onser fire suppression system surveys site pinning ,Ilc, dc utility relocation (phone in park) Performance bond costs l:itc;hen expansion P '\so Utilities, Surveys, Engineering. As-Built Plans Ct.,..,\tGE .ORDER FEES: . Hourly Fee - Supervisior $50.00 Hourly Fee - Carpenter $40.00 Hourly Fee - Laborer $25.00 Hourly Fee - Administrator $30.00 SubcontracTors Cost Plus 20% Material Cost Plus 20% Rippy Contractor Equipment - Hourly Fee $40.00 Rippy Contractor Equipment Operator - Hourly Fee $40.00 Rental Equipment Cost Plus 10% Dum run er Tn 00.00 WE PROPOSE HEREBY TO FURNISH LABOR AND OR MATERfALS TO COMPLETE IN ACCOROIlNCE WtTH ABOVE SPECIF~T1ONS FOR THE SUM OF: Ori9ional $457,000.00 Revised $355,000.00 DEPOSIT WITH PROPOSAL I PROGRESS BILLING TO COMPlETION IF FULL PAYMENT IS NOT MADE WITHIN 30 DAYS OF INVOICING CUSTOMER AGREES TO PAY ONE AND ONE HALF PERCENT PER MONTH (18"1{, PER ANNUM) ON ANY UNPAID BALANCE. ANY ATTORNEYS FEES NEEDED FOR COLLECnON WILL BE PAID FOR BY CLIENT PROPOSAL MAY BE WITHDRAWN IF NOT ACCEPTED WITHIN 30 DAYS ALL MATERIAL IS GUARANTEED TO BE N3 SPECIFIED. ALL WORK TO BE COMPLETED IN A PROFESSIONAL MANNER ACCORDING TO STANDARD PRACTICES. ANY ALTERATION OR DEVIATION FROM ABOVE SPECIFICATIONS INVOLVING EXTRA COSTS WILL BECOME AN EXTRA CHARGE OVER AND ABOVE THIS PROPOSAL RESPECTFULLY SUBMITTED ACCEPTANCE OF PROPOSAL - SIGNATURE MJ' R.fr~ THE NJQVE PRICES AND SPECIFICATIONS AND CONDITIONS ARE SATISFACTORY AND HEREBY ACCEPTED. YOU ARE AUTHORIZED TO DO THE WORK AS SPECIFIED. PAYMENTS WILL BE MADE AS OUTLINED ABOVE. DATE OF ACCEPTANCE SIGNATURE r . d vS9E 82E 01.6 AddI~ l::Wf..JIl dL.S:20 SO sr das EXHIBIT "A" Page 2 of 4 Carol N V augban Designs Inttri.r Spin Planni"l & Duil" _ (Olllllllrdll & hsi'...ti.1 - N(lDa (tr,ifintl h. 14713 Date: October 20, 2005 Project: Golden Eagle Senior Center Remodel " Addition Eagle, Colorado Rc: Kitcben cabinets " countertops options The following quotes were provided by Rippy Contractors, Inc. for the kitchen expansion oftbe Senior Center. After consulting with Facilities Management, we have selected two (2) options for the kitchen cabinets and countertops. Please see the sample boardIplan for samples and colors. Option 1 ~, '\ \ Cabinets KraftMai~ laminate ~ laminate \ color - ivory color - ivory \ Hardware chrome wire puUa chrome wire puns \ Countertops kitcben. Deep Star laminate Deep Star laminate island Deep Star laminate Silcstmee buffet Deep Star laminate Silestooee i The following quotes do not include new appliances. The total price rL the construction pJam as __iU buildiag permit. I Option 1 Option 2 Cabinets $9,553.07 $9,553.07 riacludel~) (~.JtT;J) Countertops 4,648.75 7,807,44 Subtotal $14,201.82 $17,360.51 Installation 2,000.00 2,000.00 Total 516,.101.81 519,360.51 Kitchen Expansion $56,000.00 $56,000.00 i) r'lUlhldial cabinID A Kite". Total $72,201.82 575,360.51 "- t.' "11'''''' CI".. - ..".....t ...., c...,.... .IU5 ,If, 971.115.9111 . .: '71.S7'.71fl n, ........r ..... u. <~--- EXHIBIT "An Page 3 of 4 RIPPY CONTRACTORS, INC. P.O. BOX 3610 2756 SALT CREEK ROAD EAGLE, COLORADO 81631 970-328-3655 (0) 970-328-3654 (FAX) October 14, 2005 I COUNTER SILESTONE DEEP STAR OPTIONS: ALL ALL CABINETS KRAFTMAID LAMINA TE 9,153.07 9,153.07 COUNTERS 14320.80 4,648.75 D.R. BUFFET INCLUDED INCLUDED ISLAND INCLUDED INCLUDED APPLIANCES NOT INCLUDED NOT INCLUDED SUBTOTAL $23,473.87 $13,801.82 INST ALLA TION $ 2,000.00 $ 2,000.00 TOTALS $25,473.87 $15,801.82 KITCHEN EXPANSION $56,000.00 $56,000.00 TOTAL $81,473.87 $71,801.82 EXHIBIT "A" Page 4 of 4 COUNTER DEEP STAR DEEP STAR ALL ALL ISLAND & BUFFET BUFFET SILESTONE SILESTONE CABINETS 9,153.07 9,153.07 COUNTERS 845.94 4,218.31 D.R. BUFFET 1,326.00 1,326.00 ISLAND 5635.50 INCLUDED APPLIANCES NOT INCLUDED NOT INCLUDED "/"(),c;/ SUBTOTAL $~ $14,697.38 INST ALLA nON $ 2,000.00 $ 2,000.00 Ie q(,o. 'I TOTALS $~ $16,697.38 KITCHEN EXPANSION $56,000.00 $56,000.00 TOTAL $74,960.51 $72,697.38 CA~NE-T t \ So, co !1A~ W^FJ:- ?E:~ /,.JNl>,A RIr?Y 10/28/05 p:J toTAL $' 75) 110 , 5" I