FIRST AMENDMENT TO
PUBLIC IMPROVEMENTS AGREEMENT
FOR
FROST CREEK PUD ROADWAY
GRADING PERMIT NO. MI-12007
File No. PDF-12007
THIS FIRST AMENDMENT to the Public Improvements Agreement for Prost
Creek PUD Roadway Gradi~t No. MI-12007 (hereinafter "Prost Creek") is
entered into this ~ day 0 , 05, by and between the Board of County
Commissioners of the County of Eagle, State of Colorado (hereinafter "County") and
Kummer Development Corporation (hereinafter "Developer").
WITNESSETH
WHEREAS, Developer and County entered into a Public Improvements
Agreement for Prost Creek PUD Roadway Grading Permit No. MI-12007 on May 31,
2005 to permit additional construction activities on the Prost Creek project site
(hereinafter "Agreement"); and
WHEREAS, Section 1.7 of the Agreement provided that the estimated cost of the
Public Improvements was the sum of$2,441,308.21; and
WHEREAS, Developer provided to the County WestStar Bank Letter of Credit
No. 838 in the amount of$2,441,308.21 as security for the performance by the Developer
of its obligations under the Agreement; and
WHEREAS, on June 30, 2005, the Grading Permit No. MI-12007 was amended
to permit additional construction activities on the Prost Creek project site. The Eagle
County Engineering Department has determined that with the amendment of the grading
permit, the scope of work has been increased as outlined in the Preliminary Engineer's
Estimates for the Town of Eagle Water Line, Prost Creek Water Line, and Prost Creek
Bike Path. The additional amount of collateral required and identified by the Eagle
County Engineering Department is $4,444,010.98 and as amended, the total amount of
collateral required for the Prost Creek project is now $6,885,319.19 (see Exhibit "A"
attached hereto and incorporated herein by this reference); and
WHEREAS, Developer has provided to the County WestStar Bank Letter of
Credit No. 841 in the amount of $4,444,010.98 as additional security in a form
acceptable to the County Attorney; and
WHEREAS, Section 4.5 of the Agreement provides that "this Agreement may be
amended or modified from time to time, provided that such amendment or modification
be in writing and signed by all parties hereto"; and
b>~ ):13 -
.
WHEREAS, the County and Developer desire to amend the Agreement to reflect
the additional amount of collateral required.
AGREEMENT
I. Section 1.7 of the Agreement is hereby amended to read as follows:
Estimated Cost of Public Improvements. The estimated cost of the Public
Improvements is the sum of$6,885,319.19, as summarized in Exhibit "A." To
secure and guarantee performance of its obligations as set forth in this Section I,
including the completion of the required Public Improvements, the Developer
hereby agrees to provide security and collateral in the form and as set forth in
Section 2, below."
2. Section 2.1 of the Agreement is hereby amended to read as follows:
Collateral. Security and Collateral required in Section 1.7 herein, as security for
the performance by Developer of its obligations under this Agreement, shall be in
the total amount of $6,885,319.19. The Developer shall obtain collateral in such
form acceptable to the county ("Collateral") prior to approval of the Frost Creek
PUD Roadway Grading Permit, File No. MI-12007 as specified in attached
Exhibit "B."
3. All other terms and conditions of the Public Improvements Agreement for
Frost Creek PUD Roadway Grading Permit File No. MI-12007 shall remain in full force
and effect.
IN WITNESS WHEREOF, the parties hereto have executed this First
Amendment the day and year first above written.
COUNTY:
~
~y~~
Teak J. Simonton
Clerk to the Board of
County Commissioners
2
DEVELOPER:
KUMMER DEVELOPMENT
:~~
//
/
/
/ By: __
\ D. ununer, President
State of Colorado )
) ss:
County of Eagle )
The foregoing was acknowledged before me day of
2005, by Fred D. Kummer as President of Kummer Development.
Witness my hand and official seal.
My commission expires
My ConIlI~1 ExpIres Feb.
G:VKS\FIRST AMENDMENT TO SIA.doc
3
MEMORANDUM
EAGLE COUNTY ENGINEERING
TO: Janice Scofield, Attorney's Office
FROM: Phillip M. Bowman, Engineering f~~- 7,!.t?r
DATE: July 1,2005
RE: Grading Permit MI-12007, Frost Creek
On June 30,2005, Grading Permit MI-12007 was amended to permit additional construction
activities on the Frost Creek project site. The original approval ofthe grading permit included a
Public Improvements Agreement recorded at Reception No. 917945, with collateral in the
amount of$2,441,308.21 received by Eagle County in a Letter of Credit.
With the amendment of the grading permit, the scope of work has been increased as outlined in
the Preliminary Engineer's Estimates for the Town of Eagle Water Line, Frost Creek Water Line,
and Frost Creek Bike Path as attached to this memo. The additional amount of collateral
identified in these estimates is $4,444,010.98. An original Letter of Credit in this amount is also
attached to this memo.
As amended, the total amount of collateral for this project is now $6,885,319.19. Please amend
the Public Improvements Agreement as necessary to include the additional scope of work and
collateral amount.
If you have any questions, please call me at 328-3560.
xc: Helen Migchelbrink, County Engineer
Chrono/file
EXHIBIT
~
.D
i
(
*WestStar Bank
EXPECT ACTION
IRREVOCABLE LETTER OF CREDIT
WestS tar Bank
0015 Benchmark Road, P. O. Box 3219
Avon, CO 81620
Irrevocable Letter of Credit Date 6/30/05
Number: 84 I
June 30, 2005
Board of County Commissioners
County of Eagle
State of Colorado
P. O. Box 850
Eagle, Colorado 81631
To Whom It May Concern:
We hereby open our Irrevocable Letter of Credit in your favor, available by draft at sight drawn on
WestS tar Bank for any sum or sums not exceeding in total the sum of $4,444,0 10.98
For account of Kummer Development Corporation, P.O. Box 659, Eagle Colorado 81631, in
reference to WestStar Bank Borrowers' HBE Corporation.
For the purpose of guaranteeing construction of public improvements required by the County of
Eagle, State of Colorado, pursuant to that certain Grading Permit #MI-12007 dated April 25, 2005, and the
Public Improvements Agreement between County of Eagle, Colorado, Kummer Development Corp,
relative to Frost Creek P.U.D. Subdivision. Each draft drawn on WestStar Bank sight shall be endorsed on
the reverse side or this Letter of Credit and bear upon its face "Drawn under Letter of Credit Number 841,
dated June 30, 2005, of WestS tar Bank." And shall be accompanied by a Resolution of the Board of County
Commissioners of Eagle County certifying: 1) that there has been a default under the Subdivision
Improvements Agreement and 2) that a sum certain is required to remedy the default.
WestStar Bank agrees with the drawers, endorsers and bonafide holders of drafts drawn and
negotiated in compliance with terms of this Letter of Credit that such drafts will be duly honored upon due
presentation at the counter of this bank.
WestStar Bank represents and warrants to the County of Eagle that it has the full authority and
power to issue this Letter of Credit to the County of Eagle, State of Colorado, in the total amount and for
the period of time stated herein; said authority being pursuant to the laws of the United States, or the State
or territory which governs the establishment and regulation of WestS tar Bank charter, by-laws and other
applicable rules and regulations adopted pursuant thereto. Should it be necessary for the County of Eagle to
file suit in an effort to enforce this irrevocable Letter of Credit, WestS tar Bank hereby waivers all venue
rights and submits to the jurisdiction of the District Court in and for the County of Eagle, State of Colorado.
All drafts hereunder must be drawn on or before June 30, 2006.
PO BOX 3119 0015 BENCHMARK ROAD AVON, CO 81620
Letter of Credit #841
Page 2
Suj~ UUr
WestStar Bank
Dan Godec
President
Avon I WestStar Bank
PRELIMINARY ENGINEER'S ESTIMATE
PROJECT NAME: AdamS..~!l?f~~~.C;~!;.<;t~, U .0.
~~~~'fi~agie'Wa~'l1iri~
JK Job# EA05009
DATE :6-24-2005
ITEM NO. DESCRIPTION EST QTY UNIT UNIT PRICE AMOUNT REMARKS
GENERAL
Bonds and Insurance 1.00 LS. $35,000.00 $35,OOa:00
Mobilization 1.00 LS. $25,000.00 $25,000.00 --
Site Cleanup 1.00 LS. $5,000.00 $5,000.00
Demobilization 1.00 LS. $5,000.00 $5,000.00
Traffic Control 1.00 LS. $5,000.00 $5,000.00
TOTAL - GENERAL $75,000.00
TREATED WATER CONSTRUCTION TOWN OF ,
EAGLE
Tap into existing Town Main Line at Water Plant 1.00 LS. $2,000.00 $2,000.00
Water Trench - Main 24" (6' - \0' depth) (Excavate,
Bedding, Backfill, Compact) 10,234.00 LF $54.36 $556,320.24
Water Main, DIP - 24"
(poly wrapped) 10,234.00 LF $47.26 $483,658.84 "-
Gate Valve, DIP - 24" (with barrel and lid) 8.00 EACH $3,019.23 $24,153.84 ,-
Bends, DIP 24".45 deg 6.00 EACH $837.33 $5,023.98
Bends, DIP 24" - 22-1/2 deg 5.00 EACH $872.88 $4,364.40
Bends, DIP 24" - 11-1/4 deg 1.00 EACH $775.46 $775.46
Reducer, DIP 24"x 14" 2.00 EACH $300.00 $600.00 ,-
Gate Valve, DIP -14" (with barrel and lid) 5.00 EACH $1,164.18 $5,820.90
Gate Valve, DIP -8" (with barrel and lid) 2.00 EACH $622.56 $1,245.12
Tap into existing Town Main Line North End 1.00 LS. $5,000.00 $5,000.00
--
Air Release / Vacuum (ARV) Vault, Precast Concrete _ 48"
diameter 3.00 EACH $1,360.00 $4,080.00
Air Release / Vacuum (ARV) Valve Assembly 3.00 EACH $436.04 $1,308.12
Clear and Grub 10' swath 2.34 ACRES $1,500.00 $3,510.00
Topsoil Removal & Stockpile I' depth 3,789.00 CY. $2.50 $9,472.50
Topsoil Placement 3,789.00 CY. $3.50 $13,261.50
Revegetation 2.34 ACRES $2,500.00 $5,850.00 . ",,1 t.,-, , ,:.' ~"""
Fire Hydrant Blow Off Assembly 1.00 EACH $1,500.00 $1,500.00 II ,..", 'il5~ I '- Sf 1""",
Fire Hydrant Assembly 12.00 EACH $1,500.00 $18,000.00 I / ..' . \,~~ 'II'"::' ' · ".. ~.........
", '" l1 ' ~ , Q ;;r
Fire Hydrant Guard Valve, DIP - 6" 12.00 EACH $450.00 $5,400.00 I / ~ l;;;j"" ."J10 /. :~.o..
... 1 Cl . ..I III, """
Tee, DIP 24" x 6" 12.00 EACH $936.53 $11,238.36 V_ - - i/J' / vv rl ~ 't
.... 0' ~ _
Tee, DIP 24" x 8" 2.00 EACH $900.00 $1,800.00 (~~-tij;;~5J.:j
FROST CREEK P.U.D. I
"" 1\)0. ..,A)- ~,'
Town ofEagleWatet.l.fue ,.'.... p -"0" WO'. \.,..... ,,'
, . ( tIl!'\\ '(. "
~ ;". ''(,i .."
ITEM NO. DESCRIPTION EST QTY UNIT UNIT PRlCE AMOUNT REMARKS
Tee, DIP 14"x 14" 2.00 EACH $700.00 SI,400.00
Fire Hydrant Lateral, DIP - 6" Trench/Pipe (polywrapped) 352.00 LF $21.74 S7,652.48
Mechanical Restrained Joint Crossings 200.00 LF S20.00 $4,000.00
DIP 8" Plug 1.00 EACH $400.00 $400.00
Water Trench - Main 8" (6' - 10' depth) (Excavate,
Bedding, Backfill, Compact) 40.00 LF $12.25 $490.00
Water Main, DIP - 8"
(poly wrapped) 40.00 LF $15.Q7 $602.80
Water Service Trench (6' - 10' depth) --
(Excavate, Bedding, Backfill, Compact) 2.00 EACH $915.00 $1,830.00
Water Service Line -I" copper 1.00 EACH $354.74 $354.74
Water Service Line -2" copper 1.00 EACH $400.00 $400.00
Water Service Curb Stop Valve
(with barrel and marker) 2.00 EACH $249.75 $499.50
Water Main, Pressure Testing 1.00 LS $5,000.00 $5,000.00
Culvert 24" RCP 30.00 LF. $40.00 SI,200.00
24" RCP End Sections 2.00 EACH $150.00 $300.00
Culvert 36" Extension 40.00 LF. $50.00 S2,OOO.00
36" End Section 1.00 EACH S300.00 $300.00
TOTAL - TREATED WATER CONSTRUCTION TOWN
OF EAGLE $1,190,8lZ.78
TOTAL GENERAL & WATER CONSTRUCTION
COSTS $1,265,8lZ.78
INDIRECT COSTS
Surveying-Engineering_ Testing-As-builts $151,897.53
TOTAL INDIRECT COSTS $151,897.53
TOTAL CONSTRUCTION & INDIRECT COSTS $1,417,710.31
10% CONTINGENCY $141,771.03
GRAND TOTAL $1,559,481.34
.,,\ ..
FROST CREEK P.U.D. 2
Town of Eagle Water Line
--
PRELIMINARY ENGINEER'S ESTIMATE
PROJECT NAME: Adams Rib Frost Creek P.U.D.
\'1l1~!i~~!t,~~~~!!t"
JK Job#EA05009
DATE :6-27-2005
ITEM NO. DESCRIPTION EST QTY UNIT UNIT PRICE AMOUNT REMARKS '!X[q)P1~lVI) ~l
GENERAL
Bonds and Insurance 1.00 LS. $63,000.00 $63,000.00 II
Mobilization 1.00 LS. $40,000.00 $40,000.00 JUN 2 9 2005
Site Cleanup 1.00 LS. $5,000.00 $5,000.00
Demobilization 1.00 LS. $5,000.00 $5,000.00 I
TOTAL - GENERAL $113,000.00 ENGINEERING
TREATED WATER CONSTRUCTION FROST CREEK
Water Trench - Main 10" (6' - 10' depth) (Excavate, Bedding,
Backfill, Compact) 8,000.00 LF. $13.35 $106,800.00
Trench Stabilization Material 1,600.00 CY. $30.00 $48,000.00
Water Main, DIP- 10" --
c- l(pOly wrapped) 8,000.00 LF. $18.91 $151,280.00
Bends, DIP 10" - 45 d~ 6.00 EACH $348.28 $2,089.68
Bends, DIP 10" - 22-1/2 deg 4.00 EACH $172.17 $688.68
Bends, DIP 10" - 11-1/4 deg 3.00 EACH $177.55 $532.65
Gale Valve, DIP. 10" (with barrel and lid) 14.00 EACH $900.81 $12,611.34
Gate Valve, DIP. 14" (with barrel and lid) 2.00 EACH $1,289.18 $2,578.36
TEE, DIP 14" x 14" x 8" 1.00 EACH $581.30 $581.30
TEE, DIP 10" x 10" x 8" 3.00 EACH $303.82 $911.46
Reducer, DIP 10"x 6" 1.00 EACH $86.20 $86.20
Reducer, DIP lO"x 14" 1.00 EACH $135.00 $135.00
Insulate water Main (4" riRid for 20 LF.) 2.00 EACH $239.80 $479.60
BACKLOT 10"
Clear and Grub 10' swath 0.51 ACRES $2,500.00 $1,275.00
T~soil Removal & Stockpile I' depth 819.00 CY. $3.50 $2,866.50
Backlot Water Trench - Main 10" (6' - 10' depth)
(Excavate, Bedding, Backfill, Compact) 2,210.00 LF. $14.45 $31,934.50 --
BackIot Water Main, DIP . 10"
[(poly wrapped) 2,210.00 LF. $18.91 $41,791.10
Topsoil Placement 819.00 CY. $5.00 $4,095.00
Revegetation 0.51 ACRES $2,000.00 $1.020.00
Wet Tap to Existing Main 14" 1.00 EACH $2,000.00 $2,000.00 1"1,.1' lit lr, hI f
"l~ RtGI 1'].:',
Water Trench - Main 8" (6' - 10' depth) (Excavate, ," ~ ~..eo. ~,,,
'~~ ceo:.
Beddi'!!k Backfill, Co~cl) 25,711.00 LF. $12.25 $314,959.75 S Q<<! S. "111<
Ii ;~ 0 .'.
Conunon Water Trench - Main 8" (6' - 10' depth) .. c::::. . <v
(Excavate, Bedding, Backfill, Compact) 460.00 LF. $16.75 $7,705.00 .. c:..:, :;'d I. .. c" ~,
9' .,
Water Main, DIP - 8" ~Z iU' .' 'J;
(poly wrapped) 26,171.00 LF. $15.62 $408,791. 02
Bends, DIP 8" - 45 deg 30.00 EACH $180.37 $5,411.10 , · jJ';J ,
e l!l''''
Bends, DIP 8" - 22-1/2 deg 27.00 EACH $155.82 $4,207.14 t., .'411. . .. ~ .........
Bend~,D1P 8" - 11-1/4 dt:g - EACH $0.00 $0.00 ... .... "........ .~.~~ ". ,,-'
''!"~,, A f '{ ,-",
FROST CREEK P.U.D. J -<("_' ' .. _ \ \ \ "
, /1'll'" tt...'.1 \
F~st.CreekWater'~ I
-, .,'"<'
ITEM NO. DESCRIPTION EST Q1Y UNIT UNIT PRICE AMOUNT REMARKS
Gate Valve, DIP . 8" (with barrel and lid) 62.00 EACH 5622.56 538,598.72
TEE, DIP 8" x 8" x 10" 5.00 EACH 5303.82 51,519.10
TEE, DIP 8" x 8" x 8" 7.00 EACH 5284.98 5 I ,994.86
Reducer, DIP 8"x 6" 6.00 EACH $77.16 5462.96
Insulate water Main (4" rilrid for 20 LF.) 8.00 EACH 5224.1 I 51,792.88
Water Main Plug, DIP . 6" 1.00 EACH 591.19 591.19
BACKLOT 8"
Clear and Grub 10' swath 0.63 A CRES 51,500.00 5945.00
Topsoil Removal & Stockpile I' depth 1,018.00 C Y. 53.50 $3,563.00
Backlot Water Trench - Main 8" (6' - 10' depth) (Excavate,
Beddinl(. Backfill, Compact) 2,749.00 LF. 514.10 538,760.90
Bacldot Water Main, DIP. 8"
(poly wrapped) 2,749.00 LF. 515.62 542,939.38
Topsoil Placement 1,018.00 CY. 55.00 55,090.00
Revegetation 0.63 ACRES 52,000.00 51,260.00
Cut New Tee 14" 1.00 EACH 52,000.00 52,000.00
r----- Fire HYdrant Assembly 82.00 EACH 51,665.78 $136,593. 96
Fire Hydrant Guard Valve, DIP. 6" 82.00 EACH $743.52 $60,968.64
Tee. DIP 10" x 6" 15.00 EACH 5306.54 54,598.10
Tee, DIP 8" x 6" 67.00 EACH 5278.22 518,640.74
Fire Hydrant Lateral, DIP . 6" TrenchlPipe I d) 1,832.00 LF. 528.48 552,175.36
Air Release / Vacuum (ARV) Vault, Precast Concrete _ 48"
diameter 16.00 EACH 51,360.00 521,760.00
Air Release / Vacuum (ARV) Valve Assembly 16.00 EACH $436.04 56,976.64
PR V Vault, Precast Concrete 4.00 EACH 519,478.00 577,912.00
PRV Reliefvalve Assembly 4.00 EACH $1,860.00 $7,440.00
Water Service Trench (6' - 10' depth)
(Excavate, Bedding, Backfill, Compact) 96.00 EACH 5915.00 587,840.00
Water Service Line -2" CQJlJJer (< 60LF.) 96.00 EACH 5354.74 534,055.04
Water Service Curb Stop Valve
(with barrel and marker) 96.00 EACH 5249.75 523,976.00
Pump Station Install Only 1.00 LS. 525,000.00 525,000.00
Water Main, Pressure Testing 1.00 LS. 57,500.00 57,500.00
TOTAL. TREATED WATER CONSTRUCTION
FROST CREEK 51,857,284.85
TOTAL GENERAL & WATER CONSTRUCTION 51,970,284.85
INDIRECT COSTS
Surveying-Engineering_ T estlng-As-builts 5236,434.18
TOTAL INDIRECT COSTS 5236,434.18
TOTAL CONSTRUCTION & INDIRECT COSTS 52,206,719.03
-. 10% CONTINGENCY 5220,671.90
GRAND TOTAL 52,427,390.94
FROST CREEK P.U.D.
Frost Creek Water Line 2
PRELIMINARY ENGINEER'S ESTIMATE m' "'" ~
PROJECT NAME: Adams Rib Frost Creek P.U.D. 01) &il J ~ I;:J;: I ~\V/ J'!!J
Bike Path ~r JUN 3 0 2005 _
JK Job# EA05009
DATE :6-17-2005
Revised:6-29-2005
ENGINEERING
ITEM NO. DESCRIPTION EST QTY UNIT UNIT PRICE AMOUNT REMARKS
GENERAL
Bonds and Insurance 1.00 LS. $10,000.00 $10,000.00
Mobilization 1.00 LS. $20,000.00 $20;000.00
Site Cleanup 1.00 LS. $2,500.00 $2,500.00 "--
Demobilization 1.00 LS. $2,500.00 $2,500.00
Traffic Control 1.00 LS. $2,500.00 $2,500.00
TOTAL - GENERAL 537,500.00 ._--
BIKE PATH CONSTRUCTION .
Unclassified Excavation 14,800.00 CY. $2.50 $37,000.00
Embankment in Place Compacted 14,800.00 CY. $2.00 $29,600.00
Finish Bike Path Platfonn Subgrade 8,888.00 SY. $1.00 $8,888.00
Class 6 Base Cousre 13,333.00 SY. $8.50 $113,330.50
Asphalt 3" 8,888.00 SY. $10.25 $91,102.00
Fencing 400.00 LF. $15.00 $6,000.00
Drainage Crossings 12.00 EA. $350.00 $4,200.00
TOTAL - BIKE PATH CONSTRUCTION 5290,120.50 --
TOTAL CONSTRUCTION COSTS 5327,620.50
INDIRECT COSTS
Surveying-Engineering_ Testing-As-builts 538,090.46
TOTAL INDIRECT COSTS 538,090.46
TOTAL CONSTRUCTION & INDIRECT COSTS 5365,710.96
"t.t III111
25% CONTINGENCY 591,427.74 " HE .,"
,,~''.~\\ {JJC'/:'....,
I' ... ...V....q,,~ )~w
GRAND TOTAL $457,138.70 J I!~~' .... '!l =>./ f' l ~ '