SECTION 00680
CHANGE ORDER
PROJECT: Berry Creek Skate Park Change Order No. 2
-
Tract C, Berry Creek/Miller Ranch PUD
Contract No.: Skate Park
Initiation Date: February 17,2005
l~' //
TO: He~ibrink Contract Date: October 12th, 2004
E~.~County Facilities Management
You are directed to make the following changes in this Contract.
Please add the following:
Tasks Cost
Additions and deletions per Architerrll (Item numbers are per Architerra revised Bid Form)
due to original contract signed 10/12104 with 95% drawings
A7 Additional Soil Prep (400 SF) $ 100.00
A9 Additional /0" PVC Pipc (21.1-') $ 60.00
AIO Delete /2" PYC Pipe (2LF) $ (70.00)
AI2 /S" ADS Catch Basins (NEW) (I EA) $ 1,200,00
Al4 Delete 8" Aluminum Drain Grates (I EA) $ (370.00)
AI5 Additional 12" Pedestrian Grates (3EA) $ 1,500.00
Delete /8" ell' Basin $ (1,500.00)
A/S Additional Concrete Sidewalk (50 SF) $ 300,00
A/9 Delete Skatepark Concrete Flatwork (87SF) $ (739.50)
A21 Additional CY to Curved Ramps (24CY) $ 20,400,00
A23 Delete CY from Ramps and Steps (ICY) $ (950,00)
A24 Delete CY from Concrete Walls (2CY) $ (1,750,00)
A25 Delete Concrete Curb (34 LF) $ (1,530,00)
/\26 Delete Concrete Cap (52 LF) $ (520.00)
;\27 Additional Stone Fa<;ade (174 SFF) $ 3.828,00
1\28 Additional Grind Rails (7 1,F) S 595,00
/\29 Pool Coping (NEW) (108 LF) $ 3,672,00
A31 Delete Copmg (S,t LF) $ (336000)
:\32 Dekte Ilandr<lll i.20 LI') $ (2,\ HOOO)
B3 Increase Bluegrass Sod (400 SF) $ 200,00
BIO Add Shibori Spirea (I J; EA) $ 2,300,00
HIM Delete Bluebird Columbine (6; EM $ (455,00)
BIIA Delete Monch Aster (65 EA) $ (552.50)
BI2A Delete Sunburst Coreopsis (65 EA) $ (455.00)
BI3A Delete Aristata Blanket Flower (65 EA) $ (45;,00)
BI4A Delete Scarlet Bulger Penstemoll (65EA) $ ( 455.00)
BI5A Delete Showy Tansey (65 EA) $ (520,00)
TOTAL S 18,373.00
Not valid until signed by both the Owner and Engineer.
Signature of the Engineer indicates his agreement herewith, including any adjustments in the Contract
Sum or Contract Time.
The Original Contract Sum was $ 943,552,50
Net Change by previously authorized Change Orders (0) $ 126,845,00
The Contract Sum prior to this Change Order was $ 1,070,397.50
The Contract Sum will be increased by this change order $ 18,373.00
The new Contract Sum including this Change Order will be $ 1,088,770.50
Current Substantial Completion Date August 12th, 2005
The new Substantial Completion Date is August 12th, 2005
AMERICAN CIVIL CONSTRUCTORS (CONTRACTOR) EAGL~{?:
By: ~ ,
By:
Name: GraH! Jg}:ms '. 1:./<.. ft"U."-E Name:
Title: Project S~erint0RQ~nt bV~I/"'.I-~ Title:
Date: 2/17/20905 6 /6 S- Date:
END SECTION 00680