AGREEMENT FOR CENTERLINE MARKING PROJECT
THIS AGREEMENT is dated as of the 08 day of March , 2005,by and
between Eagle County, Colorado, a body corporate and politic, acting by and through its
Board of County Commissioners (hereinafter called "Owner"), and KOLBE
STRIPING, INC. (hereinafter called "Contractor").
Owner and Contractor, in consideration of the mutual covenants set forth, agree as
follows:
ARTICLE 1 - WORK
Contractor shall complete all work as specified or indicated in the Contract Documents
("Work"). The Work is generally described as: 2005 CENTERLINE MARKING
PROJECT AS SPECIFIED IN EXHIBIT "A" which is attached hereto and incorporated
by this reference.
ARTICLE 2 - OWNER'S REPRESENTATIVE
The Project is under the authority of the Eagle County Road & Bridge Department, the
Director of which, or his designee, shall be Owner's liaison with Cdn:tractor with respect
to the performance of the Work.
ARTICLE 3 - CONTRACT TIME
3.1 The Work will be completed and ready for final payment in accordance with the
Contract Documents on or before JUNE 1 , 2005.
3.2 LlQUIDA TED DAMAGES: Owner and Contractor recognize that time is of the
essence of this Agreement and that Owner will suffer financial loss if the Work
is not substantially complete within the time specified in paragraph 3.1 above,
plus any extensions thereof allowed in accordance with the General Conditions.
They also recognize the delays, expense, and difficulties involved in proving a
legal or arbitration proceeding the actual loss suffered by Owner if the Work is
not substantially complete on time. Accordingly, instead of requiring such proof,
Owner and Contractor agree that as liquidated damages for delay (but not as a
penalty) Contractor shall pay Owner Three Hundred dollars ($300.00) for each
day that expires after the time specified in paragraph 3.1 for completion until the
Work is complete.
Agreement Page 1
ARTICLE 4 - CONTRACT PRICE
4.1 The funds appropriated for this project are equal to or in excess of the contract
amount.
4.2 Owner shall pay Contractor for performance of the Work in accordance with the
Contract Documents in current funds as follows: PROGRESSIVE PAYMENTS
UPON COMPLETION OF EACH AREA AS SPECIFIED IN EXHIBIT "A".
4.3 Pursuant to the provisions ~24-91-1 03.6, C.R.S., and notwithstanding anything
to the contrary contained elsewhere in the Contract Documents, no change
order or other form of order or directive by Owner, and no amendment to this
Agreement, requiring additional compensable work to be performed which work
causes the aggregate amount payable under the Agreement to exceed the
amount appropriated for the original Agreement, shall be of any force or effect
unless accompanied by a written assurance by Owner that lawful appropriations
to cover the costs of the additional work have been made or unless such work
is covered under a remedy-granting provision in the Agreement.
4.4 The Board of County Commissioners for Eagle County is a governmental entity.
All obligations beyond the current fiscal year are subject to funds being
budgeted and appropriated.
ARTICLE 5 - PAYMENT PROCEDURES
Contractor shall submit Applications for Payment in accordance with the General
Conditions. Applications for Payment will be processed as provided in the General
Conditions.
5.1 PROGRESS PAYMENTS: Owner shall make monthly progress payments on
account of the Contract Price on the basis of Contractor's Applications for
Payments, as provided below. All progress payments will be on the basis of the
progress of the Work.
5.1.1 Prior to Completion, progress payments will be in an amount equal to:
0 90% of the Work completed until fifty percent (50%) of the Work is
performed, after which no additional retaining shall be withheld, and
0 90% of materials and equipment not incorporated in the Work but
delivered and suitably stored,
less in each case the aggregate of payments previously made.
Agreement Page 2
5.1.2 Progress payments and retained funds shall occur in compliance with
Paragraph 19 of the General Conditions attached hereto and C.R.S. S24-91-
103. The Owner shall authorize partial payments of properly requested
amounts of at least ninety percent of the calculated value of the work completed
until fifty percent of the work required under the Agreement has been
performed. Thereafter, the Owner shall authorize partial payments of any other
properly requested amounts without retaining additional funds if, in the opinion
of the Owner, satisfactory progress is being made in the work. The withheld
amounts of the contract price will be retained by the Owner until the contract is
completed satisfactorily and accepted by the Owner.
5.2 FINAL PAYMENT: Upon final completion and acceptance in accordance with
the General Conditions, Owner shall pay the remainder of the Contract Price.
The final payment shall not be made until after final settlement of this contract
has been duly advertised at least ten days prior to such final payment by
publication of notice thereof at least twice in a public newspaper of general
circulation published in Eagle County, and the Board of County Commissioners
has held a public hearing, thereupon and complied with the C.R.S. S38-26-107.
Final payment shall be made in accordance with the requirements of the
aforesaid statute.
ARTICLE 6 - Contractor's REPRESENTATIONS
In order to induce Owner to enter into this Agreement Contractor makes the following
representations:
6.1 Contractor has familiarized himself with the nature and extent of the Contract
Documents, Work, locality, and with all local conditions, and federal, state, and
local laws, ordinances, rules and regulations that in any manner may affect
cost, progress, or performance of the Work.
6.2 Contractor has made, or caused to be made, examinations, investigations, and
tests and studies of such reports and related data as he deems necessary for
the performance of the Work at the Contract Price, within the Contract Time,
and in accordance with other terms and conditions of the Contract Documents;
and no additional examinations, investigations, tests, reports, or similar data
are, or will be required by Contractor for such purposes.
6.3 Contractor has correlated the results of all such observations, examinations,
investigations, tests, reports, and data with the terms and conditions of the
Contract Documents.
6.4 Contractor has given Owner written notice of all conflicts, errors, or
discrepancies that he has discovered in the Contract Documents and the
written resolution thereof by Owner is acceptable to Contractor.
Agreement Page 3
6.5 In performing the work under this Agreement, the Contractor acts as an
independent contractor and is solely responsible for necessary and adequate
worker's compensation insurance, personal injury and property damage
insurance, as well as errors and omissions insurance. The Contractor, as an
independent contractor, is obligated to pay federal and state income tax on
moneys earned. The personnel employed by the Contractor are not and shall
not become employees, agents or servants of the Owner because of the
performance of any work by this Agreement.
ARTICLE 7 - CONTRACT DOCUMENTS
The Contract Documents which comprise the entire Agreement are made a part hereof,
and consist of the following:
7.1 This Agreement.
7.2 Contractor's Bid.
7.3 Performance and other Bonds.
7.4 Notice of Award and, if any, Notice to Proceed.
7.5 General Conditions (Pages 1 to 10, inclusive).
7.6 Specifications and Drawings.
7.7 Any modification, including Change Orders, duly delivered after execution of
Agreement.
7.8 The parties acknowledge and agree that the terms and conditions of this
Agreement (7.1) and the General Conditions (7.5) attached hereto, shall
supersede and control over any inconsistent or contrary provision in any other
attachment or agreement.
There are no Contract Documents other than those listed above in this Article 7. The
Contract Documents may only be altered, amended, or repealed by an executed,
written amendment to this Agreement.
ARTICLE 8 - BONDS
Not later than five business days following the execution of this Agreement, Contractor
shall deliver to the Owner the bonds required by the Contract Documents, and,
notwithstanding anything to the contrary contained in the Contract Documents, Owner
shall have no liability or obligation hereunder unless and until the bonds have been so
delivered.
Agreement Page 4
ARTICLE 9 - MISCELLANEOUS
9.1 No assignment by a party hereto of any rights under, or interests in the Contract
Documents will be binding on another party hereto without the written consent
of the party sought to be bound; and specifically, but without limitation, moneys
that may become due and moneys that are due may not be assigned without
such consent (except to the extent that the effect of this restriction may be
limited by law), and unless specifically stated to the contrary in any written
consent to an assignment, no assignment will release or discharge the assignor
from any duty or responsibility under the Contract Documents.
9.2 Owner and Contractor each binds himself, his partners, successors, assigns
and legal representatives to the other party hereto, in respect to all covenants,
agreements, and obligations contained in the Contract Documents.
9.3 ATTORNEY'S FEES: In the event of litigation between the parties hereto
regarding the interpretation of this Agreement, or the obligations, duties or
rights of the parties hereunder, or if suit otherwise is brought to recover
damages for breach of this Agreement, or an action be brought for injunction or
specific performance, then and in such events, the prevailing party shall recover
all reasonable costs incurred with regard to such litigation, including reasonable
attorney's fees.
9.4 APPLICABLE LAW: This Agreement shall be governed by the laws of the State
of Colorado. Jurisdiction and venue of any suit, right, or cause of action arising
under, or in connection with this Agreement shall be exclusive in Eagle County,
Colorado.
9.5 INTEGRATION: This Agreement supersedes all previous communications,
negotiations and/or contracts between the respective parties hereto, either
verbal or written, and the same not expressly contained herein are hereby
withdrawn and annulled. This is an integrated agreement and there are no
representations about any of the subject matter hereof except as expressly set
forth in the Contract Documents.
9.6 NOTICE: Any notice and all written communications required under this
Agreement shall be (i) personally delivered, (ii) mailed in the United States
mails, first class postage prepaid, or (iii) transmitted by facsimile machine
together with a hard copy conveyed by delivery or mail, to the appropriate party
at the following addresses:
To Contractor:
Kolbe Striping, Inc.
550 Topeka Way
Castle Rock, CO 80109
Agreement Page 5
To Owner:
Brad Higgins - Director
Road & Bridge Department
Eagle County
P.O. Box 250
Eagle, CO 81631
telephone: 970-328-3540
telefax: 970-328-3546
Mailed notices will be deemed given three business days after the date of
deposit in a regular depository of the United States Postal Service, and FAX
notices will be deemed given upon transmission, if during business hours, or
the next business day. Either party can change its address for notice by notice
to the other in accordance with this paragraph.
...
...
[signature page next page]
...
.. .
Agreement Page 6
IN WITNESS WHEREOF, the parties hereto have executed this Agreement effective on
the date first above written.
"Owner":
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
~ST . BO OF COUNTY
'" ~~IONE
....
By:
Clerk of the Board of
County Commissioners
"Contractor":
~v51n//;?~t-
STATE OF COLORADO
ss:
County of Eagle
On this tJ dayof ~J- ' 2005, came before me, a notary
public, :W known to me to be the
of T~ .:s ; c , who acknowledged to me
that he executed the foregoing document, that he executed it in that capacity,
and that the same was the act of the entity identified in the me as
"Contractor" .
My commission expires:
Agreement Page 7
FEB-10-2005 09:43 FROM:EAGLE CO RD&BR 19703283546 913036885478 P:3/3
Eagle County 2005 Ce:l1te:di11e Marking Project
EXHIBIT <<A" (Addendum)
~ Description Qh: Unit Unit Price Amount
1. Pavement Marking Paint 2,705 :l: Gal e>?5.96 ']e, \~~ .'75
with Beads (Yellow)
2. Pavement Marking Paint 125:b Gal ~5..~5 3,;?~3.'75
with Beads (White, edge
lines and turn lanes)
3. Thennoplastic Bum-On
Directional arrows, school markings/crosswalks,
golf cart crossings, stop bars, and speed hump ;(0/ 33&. OD
markings.
Total Cl3) '1'73.50
ROAD & BRIDGE DEPARTMENT
GENERAL CONDITIONS
1. Contractor shall provide and pay for labor, materials, equipment, tools, utilities,
permits, licenses, transportation, and other facilities and services necessary for
proper execution and completion of the Work.
2. If Contractor fails to obtain the tax exemption(s) applicable to public works
projects from sales, consumer, use and similar taxes, Contractor shall pay the
same. Owner will cooperate with Contractor to obtain tax exemption for this
project.
3. Contractor shall be responsible for having taken steps reasonably necessary to
ascertain the nature and location of the Work, and the general and local
conditions which can affect the Work or the cost thereof. Any failure by
Contractor to do so will not relieve him from responsibility for successfully
performing the Work without additional expense to the Owner. Owner assumes
no responsibility for any understanding or representations concerning conditions
made by any of its officers, employees or agents prior to the execution of this
Agreement, unless such understanding or representations are expressly stated
in the Agreement.
4. Before commencing activities, Contractor shall: (1) take field measurements and
verify field conditions; (2) carefully compare this and other information known to
Contractor with the Agreement; and (3) promptly report errors, inconsistencies or
omissions discovered to Owner.
5. Contractor shall supervise and direct the Work, using Contractor's best skill and
attention. Contractor shall be solely responsible for and have control over
construction means, methods, techniques, sequences and procedures, and for
coordinating all portions of the Work.
6. Contractor, as soon as practicable, shall furnish in writing to the Owner the
names of subcontractors and suppliers for each portion of the Work.
7. No charge shall be made by Contractor for hindrances or delays from any cause
whatever during the progress of any portion of the Work, unless such hindrance
or delay is caused in whole or in part by acts or omissions within the control of
Owner. In any event, Owner may grant an extension of time for the completion
of the Work, provided it is satisfied that delays or hindrances were due to causes
outside Contractor's control, e.g., weather, or to acts of omission or commission
by the Owner, provided that such extensions of time shall in no instance exceed
the time actually lost to Contractor by reason of such causes, and provided
further that Contractor shall have given Owner immediate (as determined by the
circumstances, but not exceeding 48 hours) notice in writing of the cause of the
detention or delay.
--.---, ..,.-.-- ---
8. Contractor shall deliver, handle, store and install materials in accordance with
manufacturers' instructions.
9. Contractor shall comply with and give notices required by all federal, state and
local laws, statutes, ordinances, building codes, rules and regulations applicable
to the Work. If the Contractor performs Work knowing it to be contrary to laws,
statutes, ordinances, building codes, rules or regulations without notice to
Owner, Contractor shall assume full responsibility for such Work and shall bear
the attributable costs. Contractor shall promptly notify Owner in writing of any
conflicts between the specifications for the Work and such governmental laws,
rules and regulations.
10. The Contractor shall be responsible for initiating, maintaining and supervising all
safety precautions and programs, including all those required by law in
connection with performance of the Agreement. The Contractor shall promptly
remedy damage and loss to property caused in whole or in part by the
Contractor, or by anyone for whose acts the Contractor may be liable.
11. Contractor shall keep the premises/work site and surrounding area free from
accumulation of debris and trash related to the Work.
12. Contractor shall furnish performance and payment bonds, each in an amount at
least equal to the contract price as security for the faithful performance and
payment of all Contractor's obligations under the contract documents. These
bonds shall remain in effect at least until two years after the date of final
payment, except as otherwise provided by law. Contractor shall also furnish
other bonds as are required by the supplementary conditions. All bonds shall be
in forms satisfactory to Owner, and be executed by such sureties as (a) are
licensed to conduct business in the state where the project is located, and (b) are
named in the current list of "Companies Holding Certificates of Authority as
Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring
Companies" as published in Circular 570 (amended) by the Audit Staff Bureau of
Accounts, U.S. Treasury Department. All bonds signed by an agent must be
accompanied by a certified copy of the authority to act.
If the surety on any bond furnished by Contractor is declared bankrupt, or
becomes insolvent, or its right to do business is terminated in any state where
any part of the project is located, or it ceases to meet the requirements of
clauses (a) and (b) of the preceding paragraph, Contractor shall within five days
thereafter substitute another bond and surety, both of which shall be acceptable
to Owner.
13. Contractor shall be solely responsible for the protection of the Work until its final
acceptance by Owner. Contractor shall have no claim against Owner because of
any damage or loss to the Work, and shall be responsible for the complete
restoration of damaged Work to its original condition. In the event Contractor's
- -'-<"--- --- ._~._._--_...-.-
Work is damaged by another party, not under his supervision or control,
Contractor shall make his claim directly with the party involved. If a conflict or
disagreement develops between Contractor and another party concerning the
responsibility for damage or loss to Contractor's Work, such conflict shall not be
cause for delay in Contractor's restoration of the damaged Work.
14. Contractor's Insurance:
The Contractor shall purchase and maintain such insurance as will protect him
from claims set forth below which may arise out of or result from the Contractor's
operations under the contract, whether such operations be by himself, or by any
subcontractor, or by anyone directly or indirectly employed by any of them, or by
anyone for whose acts any of them may be liable. All such insurance shall
remain in effect until final payment, and at all times thereafter when Contractor
may be correcting, removing, or replacing defective Work. In addition,
Contractor shall maintain such completed operations insurance for at least two
years after final payment, and furnish Owner with evidence of continuation of
such insurance at final payment and one year thereafter.
Insurance coverage shall be as follows:
Claims under Workmen's Compensation, disability benefits, and other similar
employee benefit acts, with coverage and in amounts as required by the laws of
the State of Colorado;
Claims for damage because of bodily injury, occupational sickness or disease, or
death of his employees, and claims insured by usual personal injury liability
coverage;
Claims for damage because of bodily injury, sickness, disease, or death of any
person other than his employees; and
Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom;
Contractor's Liability Insurance issued to and covering the liability for damage
imposed by law upon the Contractor and each subcontractor with respect to all
Work performed by them under the Agreement;
Contractor's Protective Liability Insurance issued to and covering the liability for
damages imposed by law upon the Contractor and each subcontractor with
respect to all Work under the Agreement performed for the Contractor by
subcontractors.
Completed Operations Liability Insurance issued to and covering the liability for
damage imposed by law upon the Contractor and each subcontractor arising
-_.-,--_.-._---" ----------"-.
between the date of final cessation of the Work, and the date of final acceptance
thereof out of that part of the Work performed by each.
Comprehensive Automobile Insurance:
AI/liability and property damage insurance required hereunder shall be
Comprehensive General and Automobile Bodily Injury and Property Damage
forms of policies, as the case may be.
The Contractor shall in addition, and in the amounts required under the above,
obtain protective Liability Insurance issued to and covering the liability for
damages imposed by law upon the Owner with respect to all operations under
the construction contract by the Contractor or his subcontractors, including
omissions and supervisory acts by the Owner.
Builder's Risk Insurance: Insofar as the Work to be performed under this contract
consists entirely of new construction removed and separated from any existing
facility used by Owner, Contractor shall procure and maintain, for the duration of
the Work of this project, Builder's Risk Insurance, including the perils of fire,
extended coverage (loss due to vehicles, explosion, wind, flood, riot, etc.),
vandalism and malicious mischief, and special extended coverage (loss due to
falling objects, collapse, water damage from faulty or leaking systems, etc.) in
the full amount of the contract price plus the cost of authorized extras. Said
amount of insurance coverage shall be considered to cover the- insurable value
of the Work under this contract which is considered not to exceed one hundred
percent (100%) of the amount of this contract and authorized extras. Such
policy shall not insure any tools or equipment, or temporary structures erected at
the site and belonging to any person or persons, or their subcontractors who are
obliged by contract with the Owner to do Work on the projects.
Comprehensive Risk Policy Option: In lieu of the several policies specified for
Contractor's Liability Insurance, a comprehensive liability and property damage
insurance policy inclusive of all the insurance and requirements herein set forth,
subject to the approval of the Owner, will be permissible.
Insurance covering claims for damages to persons or property shall at a
minimum provide coverage of the larger of (i) $500,000 each person/$1 ,000,000
each occurrence, for bodily injury and $600,000 each occurrence for property
damage, (ii) the maximum liability of a local government provided in the Colorado
Governmental Immunity Act, 24-10-101, et seq., CRS (1973) as that may be
amended from time-to-time, or (iii) such greater amount(s) as may be required by
law.
Insurance shall be placed jointly in the names of the Owner, Contractor, and any
and all subcontractors, and any and all others obliged by contract with the Owner
to do Work on this project, and, at the Owner's option, any other person or
_._~.._-~
persons whom the Owner deems to have an insurable interest in said property,
or any part thereof, payable as their several interests may appear. Any proceeds
obtained from insurance provided for by this paragraph shall be paid to and held
by the Owner as trustee. The Owner shall have the right to withhold payment of
such proceeds until such time as the Work destroyed or damaged and covered
by such insurance shall be reconstructed and shall pay such proceeds on an
installment basis similar to that provided for by progress payments covering the
original Work.
Certificates of Insurance: Certificates of Insurance acceptable to the Owner shall
be filed with the Owner prior to commencement of the Work. These Certificates
shall contain provisions naming the Owner as an additional insured under
Contractor's insurance, as more fully required by the General Conditions herein,
and that coverage afforded under the policies will not be canceled until at least
thirty days prior written notice has been given the Owner. Contractor and his
subcontractors shall not permit any of his subcontractors to start Work until all
required insurance have been obtained and certificates with the proper
endorsements have been filed with the Owner. Failure of the Contractor to
comply with the foregoing insurance requirements shall in no way waive the
Owner's rights hereunder.
15. Owner, at its option, may purchase and maintain such liability insurance as will
protect him against claims which may arise from operations under this contract.
Purchasing and maintaining such insurance, however, will not relieve the
Contractor from purchasing and maintaining the insurance hereinbefore
specified.
16. Before permitting any of his subcontractors to perform any Work under this
contract, Contractor shall either (a) require each of his subcontractors to procure
and maintain during the life of his subcontracts, Subcontractor's Public Liability
and Property Damage Insurance of the types and in the amounts as may be
applicable to his Work, which type and amounts shall be subject to the approval
of the Owner, or (b) insure the activities of his subcontractors in his own policy.
17. To the fullest extent permitted by law, Contractor shall indemnify and hold
harmless Owner, its board, commissioners, employees and the agents of any of
them, from and against claims, damages, losses and expenses, including but not
limited to attorneys' fees, arising out of or resulting from performance of the
Work, provided that such claim, damage, loss or expense is attributable to bodily
injury, sickness, disease or death, or to injury to or destruction of tangible
property (other than the Work itself) including loss of use resulting therefrom, but
only to the extent caused in whole or in part by negligent acts or omissions of the
Contractor, a subcontractor, anyone directly or indirectly employed by them or
anyone for whose acts they may be liable, regardless of whether or not such
claim, damage, loss or expense is caused in part by a party indemnified
hereunder.
.-._-- -..-.-.-..----......---.
'---- -.----
18. After execution of the Agreement, changes in the Work may be accomplished by
Change Order of by order for a minor change in the Work. Owner, without
invalidating the Agreement, may order changes in the Work within the general
scope of the Agreement consisting of additions, deletions or other revisions.
a. No Change Orders or other form of order or directive which requires
additional compensable work to be performed may be issued or be
effective unless accompanied by a written assurance to the Contractor
that lawful appropriations to cover the costs of the additional work have
been made.
b. A Change Order shall be a written order to the Contractor signed by
Owner to change the Work.
c. Owner will have authority to order minor changes in the Work not involving
changes in the Contract Price or the Contract Time. Such changes shall
be written orders and shall be binding on the Contractor and Owner.
Contractor shall carry out such written orders promptly.
19. Progress Payments:
If the project is subject to progress payments, not more often than once a month,
Contractor shall submit to Owner an application for payment filled out and signed
by Contractor covering the work completed as of the date of the application, and
accompanied by such supporting documentation as Owner may reasonably
require. If payment is requested on the basis of materials and equipment not
incorporated in the work, but delivered and suitably stored at the site or at
another location agreed to in writing, the application for payment shall also be
accompanied by such data, satisfactory to Owner, as will establish Owner's title
to the material and equipment, and protect Owner's interest therein, including
applicable insurance. Each subsequent application for payment shall include an
affidavit of Contractor stating that all previous progress payments received on
account of the work have been applied to discharge in full all of Contractor's
obligations reflected in prior applications for payment. The amount of retainage
with respect to progress payments will be as stipulated in the Agreement.
Owner will, with ten days after receipt of each application for payment, either
indicate in writing a recommendation of payment, or return the application to
Contractor indicating in writing its reasons for refusing to recommend payment.
In the latter case, Contractor may make the necessary corrections and resubmit
the application. Owner shall, within twenty days of recommendation of payment,
pay Contractor the amount recommended.
-.--..-.--...-...---.
20. Final Payment:
Upon written notice from Contractor that the work is complete, Owner will make a
final inspection with Contractor, and will notify Contractor in writing of all
particulars in which this inspection reveals that the work is incomplete or
defective. Contractor shall immediately take such measures as are necessary to
remedy such deficiencies.
After Contractor has completed all such corrections to the satisfaction of Owner,
and delivered all maintenance and operating instructions, schedules,
guarantees, bonds, certificates of inspection, marked-up record documents or
as-built drawings covering all of the Work, Contractor may make application for
final payment following the procedure for progress payments. The final
application for payment shall be accompanied by all documentation called for in
the contract documents, and such other data and schedules as Owner may
reasonably require, together with complete and legally effective releases or
waivers (satisfactory to Owner) of all liens arising out of, or filed in connection
with the work. In lieu thereof, and as approved by Owner, Contractor may
furnish receipts or releases in full; an affidavit of Contractor that the releases and
receipts include all labor, services, material, and equipment for which lien could
be filed, and that all payrolls, material, and equipment bills, and other
indebtedness connected with the work, for which Owner or his property might in
any way be responsible, have been paid or otherwise satisfied; and consent of
the surety, if any, to final payment. If any subcontractor, manufacturer,
fabricator, supplier, or distributor fails to furnish a release or receipt in full,
Contractor may furnish a bond or other collateral satisfactory to Owner to
indemnify against any lien.
21. Final payment shall not become due until Contractor submits to Owner releases
and waivers of liens, and data establishing payment or satisfaction of obligations,
such as receipts, claims, security interests or encumbrances arising out of the
Work. Final payment is subject to the Final Settlement requirements and time
periods set forth in C.RS. S38-26-107.
22. Contractor warrants and guarantees that title to all work, materials, and
equipment covered by any application for payment, whether incorporated in the
project or not, will pass to Owner at the time of payment free and clear of all
liens, claims, security interests, and encumbrances (in these General Conditions
referred to as "Liens").
23. Contractor's obligations to perform and complete the Work in accordance with
the contract documents shall be absolute. Neither the recommendation of any
progress or final payment nor the payment by Owner to Contractor under the
contract documents, nor any use or occupancy of the Work or any part thereof
by Owner, nor any act of acceptance by Owner, nor any failure to do so, nor any
correction of defective Work by Owner shall constitute an acceptance of Work
.._......._---.--- ,-,.-".----.-..----
not in accordance with the contract documents or a release of Contractor's
obligation to perform the Work in accordance with the contract documents.
24. If Contractor fails to correct Work which is not in accordance with the Agreement,
the Owner may direct the Contractor to stop the Work until the correction is
made.
25. Contractor shall promptly correct Work rejected by Owner as failing to conform to
the requirements of the Agreement and Contractor shall bear the cost of
correcting such rejected Work.
26. Contractor warrants to Owner that: (1) materials and equipment furnished under
the Agreement will be new and of good quality; (2) the Work will be free from
defects not inherent in the quality required or permitted; and (3) the Work will
conform to the requirements of the Agreement.
27. Contractor warrants and guarantees to Owner that all Work will be in accordance
with the Contract Documents and will not be defective. Prompt notice of all
defects shall be given to Contractor. If, within one year after the date of
completion, or such longer period of time as may be set forth in the Agreement
(including the Bid), prescribed by law, prescribed by the terms of any applicable
warranty given by a materials supplier or required by or a part of the Agreement,
any Work is found to be defective, Contractor shall promptly, without cost to .
Owner, and in accordance with Owner's written instructions, either correct such
defective Work, or, if it has been rejected by Owner, remove it from the site, and
replace it with nondefective work. If Contractor does not promptly comply with
the terms of such instructions, or in an emergency where delay would cause
serious risk of loss or damage, Owner may have the defective Work corrected or
the rejected Work removed and replaced, and all direct and indirect costs of
such removal and replacement, including compensation for additional
professional services, shall be paid by Contractor.
28. If Contractor defaults or neglects to carry out the Work in accordance with the
Agreement and fails within a seven day period after receipt of written notice from
the Owner to correct such default or neglect with diligence and promptness, the
Owner may, without prejudice to other remedies, correct such deficiencies. In
such case, the Agreement may be terminated by Owner or a Change Order shall
be issued deducting the cost of correction from payments due the Contractor.
29. The performance of the Work may be terminated at any time in whole, or from
time-to-time in part, by Owner for its convenience. Any such termination shall be
effected by delivery to Contractor of a written notice ("Notice of Termination")
specifying the extent to which performance of the Work is terminated and the
date upon which termination becomes effective. After receipt of a Notice of
Termination, and except as otherwise directed by Owner, Contractor shall, in
good faith, and to the best of its ability, do all things necessary, in the light of
._-~----_..__. .~- ..,--~--,_.__.-._---- ,~._-_._-_.
such notice and of such requests in implementation thereof as Owner may
make, to assure the efficient, proper closeout of the terminated Work (including
the protection of Owner's property). Among other things, Contractor shall,
except as otherwise directed or approved by Owner:
a. stop the Work on the date and to the extent specified in the Notice of
Termination;
b. place no further order or subcontracts for services, equipment or materials
except as may be necessary for completion of such portion of the Work as
is not terminated;
c. terminate all orders and subcontracts to the extent that they relate to the
performance of Work terminated by the Notice of Termination;
d. assign to Owner, in the manner and to the extent directed by it, all of the
right, title and interest of Contractor under the orders or subcontracts so
terminated, in which case Owner shall have the right to settle or pay any
or all claims arising out of the termination of such orders and
subcontracts;
e. with the approval of Owner, settle all outstanding liabilities and all claims
arising out of such termination or orders and subcontracts; and
f. deliver to Owner, when and as directed by Owner, all documents and all
property which, if the Work had been completed, Contractor would be
required to account for or deliver to Owner, and transfer title to such
property to Owner to the extent not already transferred.
In the event of such termination, there shaH be an equitable reduction of the Contract
Price to reflect the reduction in the Work and no cost incurred after the effective date of
the Notice of Termination shall be treated as a reimbursable cost unless it relates to.
carrying out the unterminated portion of the Work or taking closeout measures.
-"--...,,--. '.--...----..--..--.---
THE Al\f~RlCAN INSTITUTE OF 1c~CHITECTS
( <"
AlA Document A3l 0
Bid Bond
BOND # 05CLMPEC216
KNOW ALL MEN BY THESE PRESENTS, that we KOLBE STRIPING, INC.
550 TOPEKA WAY CASTLE ROCK, CO 80109
(Here insert full name ,and address or legal title of Contractor)
as Principal, hereinafter called the Principal, and HARTFORD FIRE INSURANCE COMPANY
7670 S. CHESTER ST. 3RD FLOOR ENGLEWOOD, CO 80112
a corporation duly organized under the laws of the State of CT
as Surety, hereinafter called the Surety, are held and ftrmly bound unto
EAGLE COUNTY ROAD AND BRIDGE
PO BOX 250 EAGLE, CO 81631
(Here insert full name ,and address or legal title of Owner)
as Obligee, hereinafter called the Obligee, in the sum of
Five Percent of Amount Bid----------------Dollars ($5% ),
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our
heirs, executors, administrators, successors and assigns, jointly and severally, fmnly by these presents.
WHEREAS, the Principal has submitted a bid for 2005 Centerline Marking Project
(Here insert full name, address and description of project)
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract
with the Obligee in accordance with the terms of such bid and give such bond or bonds as may be specifted in the
bidding or Contract Documents with good and sufftcient surety for the faithful performance of such Contract and
for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of
the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the
difference not to exceed the penalty hereof between the amount specifted in said bid and such larger amount for
which the Obligee may in good faith contract with another party to perform the Work covered by said bid then this
obligation shall be null and void, otheIWise to remain in full force and effect. .
Signed and sealed this 16th day 0 ruary,2005
Ko~pmG',u
By: By: ~
Witness
HARTFORD FIRE INSU CECO~
- ~ ~._M): .-0___. ~1 ~
By: c By:L .. 1h
Witness Jod
AlA DOCUMENT A310 BID BOND AlA @ FEBRUARY 1970 ED THE AMERICAN
INSTITUTE OF ARCHITECTS, ]735 N.Y. AVE, N.W. WASHINGTON, D.C. 20006
WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.
MEMBER -- MOODY INSURANCE AGENCY, INC.
lID 3773 CHERRY CREEK NORTH DRIVE, SUITE 800
DENVER, COLORADO 80209-3804
NATlONAl ASSOCIATION OF PHONE: (303) 824-6600
SURETY BONO PROOUCERS
POWER ("'"F ATTORNEY THE HARTFORD
HARTFORD PLAZA
HARTFORD, CONNECTICUT 06115
[E] Hartford Fire Insurance Company Twin City Fire Insurance Company C
[E] Hartford Casualty Insurance Company Hartford Insurance Company of Illinois C
[E] Hartford Accident and Indemnity Company Hartford Insurance Company of the Midwest C
CJ Hartford Underwriters Insurance Company Hartford Insurance Company of the Southeast C
KNOW ALL PERSONS BY THESE PRESENTS THAT the Hartford Fire Insurance Company, Hartford Accident and Indemni
Company and Hartford Underwriters Insurance Company, corporations duly organized under the laws of the State of Connecticut; HartfOl
Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois; Hartford Casualty Insurance Compan]
Twin City Fire Insurance Company and Hartford Insurance Company of the Midwest. corporations duly organized under the laws of th
State of Indiana; and Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Floride
having their home office in Hartford, Connecticut, {hereinafter collectively referred to as the "Companies"} do hereby make, constitute an.
appoint, up to the amount of unlimited:
Evan E. Moody, Jody Anderson, Brad Moody, Vera T. Kalba, Kimberly D. Johnson
of
Denver, CO
their true and lawful Attorney(s}-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies)
only as delineated above by ~, and to execute. seal and acknowledge any and all bonds, undertakings, contracts and other written
instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons. guaranteeing the
performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings
allowed by law.
In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on September 12th, 2000,
the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly
attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby
unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney.
Dc
Paul A. Bergenholtz. Assistant Secretary John P. Hyland. Assistant Vice President
STATE OF CONNECTICUT}
55. Hartford
COUNlY OF HARTFORD
On this 19th day of September. 2000, before me personally came John P. Hyland, to me known. who being by me duly sworn, did
depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Assistant Vice President of the Companies,
the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals
affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations
and that he signed his name thereto by like authority.
p~~::~
Notary Public
My Commission Expires June 30, 2004
I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the abov~ and foregoing is a true and
correct copy of the Power of Attorney executed by said Companies. which is still in full force effective as of r:e{yu..Of'1 } (p J a:JJ,5'
Signed and sealed at the City of Hartford.
~..""."'..
~'(({I......~
~~
1: ~ ~i
,,:1>. ยท I,d
\~~...t 9 7 ~ i...~~f
'\:~""~.._.~.,,,
~r;~~~\>i<'~
~~
Colleen Mastroianni, Assistant Vice President
~
Insured's Name
Kolbe Striping, Inc.
Insured's Mailing Address
550 Topeka Way
Castle Rock, CO 80104
Policy Number
BID BOND
IMPORT ANT t~OTICE TO OBLIGEES/POLICYHOLDERS -
TERRORISM RISK INSURANCE ACT OF 2002
You are hereby notified that, under the Terrorism Risk Insurance Act of 2002, effective
November 26, 2002, we must make terrorism coverage available in your bond/policy.
However, the actual coverage provided by your bond/policy for acts of terrorism, as is true for
all coverages, is limited by the terms, conditions, exclusions, limits, other provisions of your
bond/policy, any endorsements to the bond/policy and generally applicable rules of law.
Any terrorism coverage provided by this bond/policy is partially reinsured by the United States
of America under a formula established by Federal Law. Under this formula, the United States
will pay 90% of covered terrorism losses exceeding a statutorily-established deductible paid by
sureties/insurers until such time as insured losses under the program reach $100 billion. If that
occurs, Congress will determine the procedures for, and the source of, any payments for
losses in excess of $100 billion.
The premium charge that has been established for terrorism coverage under this bond/policy is
either shown on this form or elsewhere in the bond/policy. If there is no premium shown for
terrorism on this form or elsewhere in the bond/policy, there is no premium for the coverage.
, Terrorism premium: 1$0 I
Form 8-3333-0 Page 1 of 1
@ 2002, The Hartford
.
THE AMERICAN INSTITUTE OF ARCHITECTS
.
Premium Amount Based
on Final Contract Amount
Bond No. 34BCSDC1216
AlA Document A312
Performance Bond
Any singular reference to Contractor. Surety. Owner or other party shall be considered plural where applicable.
CONTRACTOR (Name and Address): SURETY (Name and Principal Place of Business):
KOLBE STRIPING, INC. HARTFORD FIRE INSURANCE COMPANY
550 TOPEKA WAY 7670 S. CHESTER ST.
CASTLE ROCK, CO 80109 ENGLEWOOD, CO 80112
OWNER (Name and Address):
EAGLE COUNTY
PO BOX 250
EAGLE, CO 81631
CONSTRUCTION CONTRACT
Date: 3/08/2005
Amount: NINETY THREE THOUSAND SEVEN HUNDRED SEVENTY THREE AND 50/100 ($ 93,773.50)
Description (Name and Location):
2005 Centerline Marking Project - Exhibit A
BOND
Date (Not earlier than Construction Contract Date): 3/14/2005
Amount: NINETY THREE THOUSAND SEVEN HUNDRED SEVENTY THREE AND 50/100 ($ 93,773.50)
Modifications to this Bond: [X] None U See Page 3
CONTRACTOR AS PRINCIPA
COMPANY: (C~rate Seal)
KOLB R C.
Signature:
6cl~ ~/~ Name and Ti
Jody Anderson, Attorney-in-Fact
itional signatures appear on page 3)
FOR INFORMATION ONLY-Name, Address and Telephone OWNER'S REPRESENTATIVE (Architect,
AGENT OR BROKER: or Engineer or other party):
MOODY INSURANCE AGENCY, INC.
3773 CHERRY CREEK N. DR., #800 ,
DENVER, CO 80209.3804
AlA DOCUMENT A312 PERFORMANCE BOND AND PAYMENT BOND DECEMBER 1984 ED., AlA 0 A 312-1984 1
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON D.C. 20006
THIRD PRINTING - MARCH 1987
reasonable promptness under the circumstances:
1. The Contractor and the Surety, jointly and severally, .1 After investigation, determine the amount for which it may be
bind themselves, their heirs, executors, administrators, liable to the Owner and, as soon as practicable after the amount is
successors, and assigns to the Owner for the performance determined, tender payment therefor to the
of the Construction Contract, which is incorporated herein Owner; or
by reference. .2 Deny liability in whole or in part and notify the Owner
citing reasons therefor.
2. If the Contractor performs the Construction Contract,
the Surety and the Contractor shall have no obligation 5. If the Surety does not proceed as provided in Paragraph
under this Bond, except to participate in conferences as 4 with reasonable promptness, the Surety shall be deemed
provided in Subparagraph 3.1. to be in default on this Bond fifteen days after receipt of an
additional written notice from the Owner to the Surety
3. If there is no Owner Default, the Surety's obligation demanding that the Surety perform its obligations under
under this Bond shall arise after: this Bond, and the Owner shall be entitled to enforce any
remedy available to the Owner. If the Surety proceeds as
3.1 The Owner has notified the Contractor and the provided in Subparagraph 4.4, and the Owner refuses the
Surety at its address described in Paragraph 10 below payment tendered or the Surety has denied liability, in
that the Owner is considering declaring a Contractor whole or in part, without further notice the Owner shall be
Default and has requested and attempted to arrange a entitled to enforce any remedy available to the Owner.
conference with the Contractor and the Surety to be
held not later than fifteen days after receipt of such 6. After the Owner has terminated the Contractor's right
notice to discuss methods of performing the Construc- to complete the Construction Contract, and if the Surety
tion Contract. If the Owner, the Contractor and the elects to act under Subparagraph 4.1, 4.2, or 4.3 above,
Surety agree, the Contractor shall be allowed a reason- then the responsibilities of the Surety to the Owner shall
able time to perform the Construction Contract, but not be greater than those of the Contractor under the
such an agreement shall not waive the Owner's right, if Construction Contract, and the responSibilities of the
any, subsequently to declare a Contractor Default; and Owner to the Surety shall not be greater than those of the
Owner under the Construction Contract. To the limit of the
3.2 The Owner has declared a Contractor Default and amount of this Bond, but subject to commitment by the
formally terminated the Contractor's right to complete Owner of the Balance of the Contract Price to mitigation of
the contract. Such Contractor Default shall not be de- costs and damages on the Construction Contract, the Sure-
cia red earlier than twenty days after the Contractor and ty is obligated without duplication for:
the Surety have received notice as provided in Sub-
paragraph 3.1; and 6.1 The responsibilities of the Contractor for correc-
tion of defective work and completion of the Construc-
3.3 The Owner has agreed to pay the Balance of the tion Contract;
Contract Price to the Surety in accordance with the
terms of the Construction Contract or to a contractor 6.2 Additional legal, design professional and delay
selected to perform the Construction Contract in accor- costs resulting from the Contractor's Default, and re-
dance with the terms of the contract with the Owner. suiting from the actions or failure to act of the Surety
under Paragraph 4; and
4. When the Owner has satisfied the conditions of Para- 6.3 Liquidated damages, or if no liquidated damages
graph 3, the Surety shall promptly and at the Surety's ex- are specified in the Construction Contract, actual dam-
pense take one of the following actions: ages caused by delayed performance or non-perfor-
mance of the Contractor.
4.1 Arrange for the Contractor, with consent of the
Owner, to perform and complete the Construction 7. The Surety shall not be liable to the Owner or others for
Contract; or obligations of the Contractor that are unrelated to the Con-
struction Contract, and the Balance of the Contract Price
4.2 Undertake to perform and complete the Construc- shall not be reduced or set off on account of any such
tion Contract itself, through its agents or through inde- unrelated obligations. No right of action shall accrue on
pendent contractors; or this Bond to any person or entity other than the Owner or
its heirs, executors, administrators, or successors.
4.3 Obtain bids or negotiated proposals from
qualified contractors acceptable to the Owner for a 8. The Surety hereby waives notice of any change, includ-
contract for performance and completion of the Con- ing changes of time, to the Construction Contract or to
struction Contract, arrange for a contract to be pre- related subcontracts, purchase orders and other obliga-
pared for execution by the Owner and the contractor tions.
selected with the Owner's concurrence, to be secured
with performance and payment bonds executed by a 9. Any proceeding, legal or equitable, under this Bond
qualified surety equivalent to the bonds issued on the may be instituted in any court of competent jurisdiction in
Construction Contract, and pay to the Owner the the location in which the work or part of the work is located
amount of damages as described in Paragraph 6 in ex- and shall be instituted within two years after Contractor
cess of the Balance of the Contract Price incurred by the Default or within two years after the Contractor ceased
Owner resulting from the Contractor's default; or working or within two years aftter the Surety refuses or fails
to perform its obligations under this Bond, whichever oc-
4.4 Waive its rights to perform and complete, arrange curs first. If the provisions of this Paragraph are void or
for completion, or obtain a new contractor and with prohibited by law, the minimum period of limitation avail-
AlA DOCUMENT A312 PERFORMANCE BOND AND PAYMENT BOND DECEMBER 1984 ED., AlA 0 A 312-1984 2
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE.. NW.. WASHINGTON. D.C.20006
THIRD PRINTING. MARCH 1987
able to sureties as a defense in the jurisdiction of the suit tractor of any amounts received or to be received by
shall be applicable. the Owner in settlement of insurance or other claims
for damages to which the Contractor is entitled, re-
10. Notice to the Surety, the Owner or the Contractor shall duced by all valid and proper payments made to or on
be mailed or delivered to the address shown on the sig- behalf of the Contractor under the Construction Con-
nature page. tract.
11. When this Bond has been furnished to com ply with a 12.2 Construction Contract: The agreement between
statutory or other legal requirement in the location where the Owner and the Contractor identified on the sig-
the construction was to be performed, any provision in this nature page, including all Contract Documents and
Bond conflicting with said statutory or legal requirement changes thereto.
shall be deemed deleted herefrom and provisions con-
forming to such statutory or other legal requirement shall 12.3 Contractor Default: Failure of the Contractor,
be deemed incorporated herein. The intent is that this which has neither been remedied nor waived, to per-
Bond shall be construed as a statutory bond and not as a form or otherwise to comply with the terms of the
common law bond. Construction Contract.
12 DEFINITIONS 12.4 Owner Default: Failure of the Owner, which has
neither been remedied nor waived, to pay the Con-
12.1 Balance of the Contract Price: The total amount tractor as required by the Construction Contract or to
payable by the Owner to the Contractor under the perform and complete or comply with the other terms
Construction Contract after all proper adjustments thereof.
have been made, including allowance to the Con-
MODIFICATIONS TO THIS BOND ARE AS FOLLOWS:
(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.)
CONTRACTOR AS PRINCIPAL SURETY
Company: (Corporate Seal) Company: (Corporate Seal)
Signature: Signature:
Name and Title: Name and Title:
Address: Address:
AlA DOCUMENT A312 PERFORMANE BOND AND PAYMENT BOND DECEMBER 198430.. AlA 0 A312-1984 3
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006
THIRD PRINTING - MARCH 1987
THE AMERICAN INSTITUTE OF ARCHITECTS
.
Bond No. 34BCSDC1216
AlA Document A312
Payment Bond
Any singular reference to Contractor. Surety, Owner or other party shall be conskfered plural where applicable.
CONTRACTOR (Name and Address): SURETY (Name and Principal Place of Business):
KOLBE STRIPING, INC. HARTFORD FIRE INSURANCE COMPANY
550 TOPEKA WAY 7670 S. CHESTER ST.
CASTLE ROCK, CO 80109 ENGLEWOOD, CO 80112
OWNER (Name and Address):
EAGLE COUNTY
PO BOX 250
EAGLE, CO 81631
CONSTRUCTION CONTRACT
Date: 3/08/2005
Amount: NINETY THREE THOUSAND SEVEN HUNDRED SEVENTY THREE AND 50/100 ($ 93,773.50)
Description (Name and Location):
2005 Centerline Marking Project - Exhibit A
BOND
Date (Not earlier than Construction Contract Date): 3/14/2005
Amount: NINETY THREE THOUSAND SEVEN HUNDRED SEVENTY THREE AND 50/100 ($ 93,773.50)
Modifications to this Bond: {x} None { } See Page 6
CONTRACTOR AS PRINCIPAL SURETY
COMPANY:
KOLBE STRIPIN
L-' Signature:
Signature: i {//l
Name and Ti Name and Tit j
Jody Anderson, Atto
(Any additional signatures appear on page 6)
FOR INFORMATION ONLY-Name, Address and Telephone OWNER'S REPRESENTATIVE (Architect,
AGENT OR BROKER: Engineer or other party):
MOODY INSURANCE AGENCY, INC.
3773 CHERRY CREEK N. DR., #800 ,
DENVER, CO 80209-3804
AlA DOCUMENT A312 PERFORMANCE BOND AND PAYMENT BOND DECEMBER 1984 ED., AIAO
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A312-1984 4
THIRD PRINTING. MARCH 1987
1. The Contractor and the Surety, jointly and severally, 6. When the Claimant has satisfied the conditions of
bind themselves, their heirs, executors, administrators, Paragraph 4, the Surety shall promptly and at the
successors, and assigns to the Owner to pay for labor, Surety's expense take the following actions:
materials and equipment furnished for use in the perfor- 6.1 Send an answer to the Claimant, with a copy to
mance of the Construction Contract, which is incorpo- the Owner, within 45 days after receipt of the claim,
rated herein by reference.
2. With respect to the Owner, this obligation shall be stating the amounts that are undisputed and the basis
null and void if the Contractor: for challenging any amounts that are disputed.
2.1 Promptly makes payment, directly, or indirectly, 6.2 Payor arrange for payment of any undisputed
for all sums due Claimants, and amounts.
7. The Surety's total obligation shall not exceed the
2.2 Defends, indemnifies and holds harmless the amount of this Bond, and the amount of this Bond shall be
Owner from claims, demands, liens or suits by any credited for any payments made in good faith by the Surety.
person or entity whose claim, demand, lien or suit is 8. Amounts owed by the Owner to the Contractor under
for the payment for labor, materials, or equipment fur- the Construction Contract shall be used for the perfor-
nished for use in the performance of the Construction mance of the Construction Contract and to satisfy claims,
Contract, provided the Owner has promptly notified if any, under any Construction Performance Bond. By
the Contractor and the Surety (at the address the Contractor furnishing and the Owner accepting this
described in Paragraph 12) of any claims, demands, Bond, they agree that all funds earned by the Contractor
liens, or suits and tendered defense of such claims, in the performance of the Construction Contract are
demands, liens or suits to the Contractor and the dedicated to satisfy obligations of the Contractor and
Surety, and provided there is no Owner Default. the Surety under this Bond, subject to the Owner's prior-
3. With respect to Claimants, this obligation shall be ity to use the funds for the completion of the wone
null and void if the Contractor promptly makes pay- 9. The Surety shall not be liable to the Owner, Claimants
ment, directly or indirectly, for all sums due. or others for obligations of the Contractor that are unrelat-
ed to the Construction Contract. The Owner shall not be
4. The Surety shall have no obligation to Claimants liable for payment of any costs or expenses of any Claim-
under this Bond until: ant under this Bond, and shall have under this Bond no obli-
4.1 Claimants who are employed by or have a direct gations to make payments to, give notices on behalf of, or
contract with the Contractor have given notice to the otherwise have obligations to Claimants under this Bond.
Surety (at the add res described in Paragraph 12) and 10. The Surety hereby waives notice of any change,
sent a copy, or notice thereof, to the Owner, stating including changes of time, to the Construction Contract
that a claim is being made under this Bond and, with or to related subcontracts, purchase orders and other obligations.
substantial accuracy, the amount of the claim. 11. No suit or action shall be commenced by a Claimant
4.2 Claimants who do not have a direct contract under this Bond other than in a court of competent juris-
with the Contractor: diction in the location in which the work or part of the
.1 Have furnished written notice to the Con- work is located or after the expiration of one year from the
tractor and sent a copy, or notice thereof, to date (1) on which the Claimant gave the notice required by
the Owner, within 90 days after having last
performed labor or last furnished materials or Subparagraph 4.1 or Clause 4.2.3, or (2) on which the last
equipment included in the claim stating, with labor or service was performed by anyone or the last mate-
substantial accuracy, the amount of the claim rials or equipment were furnished by anyone under the Con-
and the name of the party to whom the struction Contract, whichever of (1) or (2) first occurs. If the
materials were furnished or supplied or for provisions of this Paragraph are void or prohibited by law,
whom the labor was done or performed; and the minimum period of limitation available to sureties as a
.2 Have either received a rejection in whole or defense in the jurisdiction of the suit shall be applicable.
in part from the Contractor, or not received 12. Notice to the Surety, the Owner or the Contractor
within 30 days offurnishing the above no- shall be mailed or delivered to the address shown on the
tice any communication from the Contractor signature page. Actual receipt of notice by Surety, the
by which the Contractor has indicated the Owner or the Contractor, however accomplished, shall
claim will be paid directly or indirectly; and be sufficient compliance as of the date received at the
.3 Not having been paid within the above 30 address shown on the signature page.
days, have sent a written notice to the Surety 13. When this Bond has been furnished to comply with a
(at the address described in Paragraph 12) and statutory or other legal requirement in the location where
sent a copy, or notice thereof, to the Owner, the construction was to be performed, any provision in this
stating that a claim is being made under this Bond conflicting with said statutory or legal requirement
Bond and enclosing a copy of the previous shall be deemed deleted herefrom and provisions con-
written notice furnished to the Contractor. forming to such statutory or other legal requirement shall
be deemed incorporated herein. The intent is that this
5. If a notice required by Paragraph 4 is gven by the Owner to the
Contractor or to the Surety, that is sufficient compliance.
AlA DOCUMENT A312 PERFORMANCE BOND AND PAYMENT BOND DECEMBER 1984 ED., AIAO A312-1984 5
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006
THIRD PRINTING. MARCH 1987
Bond shall be construed as a statutory bond and not as a Construction Contract, architectural and engineering
common law bond. services required for performance of the work of the
Contractor and the Contractor's subcontractors, and
14. Upon request by any person or entity appearing to be a all other items for which a mechanic's lien may be
potential beneficiary of this Bond, the Contractor shall asserted in the jurisdiction where the labor, materials
promptly furnish a copy of this Bond or shall permit a copy or equipment were furnished.
to be made.
15.2 Construction Contract: The agreement between
15. DEFINITIONS the Owner and the Contractor identified on the sig-
nature page, including all Contract Documents and
15.1 Claimant: An individual or entity having a direct changes thereto.
contract with the Contractor or with a subcontractor of
the Contractor to furnish labor, materials or equip- 15.3 Owner Default: Failure of the Owner, which has
ment for use in the performance of the Contract. The neither been remedied nor waived, to pay the Con-
intent of this Bond shall be to include without Iimita- tractor as required by the Construction Contract or to
tion in the terms "labor, materials or equipment" that perform and complete or comply with the other terms
part of water, gas, power, light, heat. oil, gasoline, thereof.
telephone service or rental equipment used in the
MODIFICATIONS TO THIS BOND ARE AS FOLLOWS:
(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.)
CONTRACTOR AS PRINCIPAL SURETY
Company: (Corporate Seal) Company: (Corporate Seal)
Signature: Signature:
Name and Title: Name and
Address: Address:
AlA DOCUMENT A312 PERFORMANCE BOND AND PAYMENT BOND DECEMBER 1984 ED. AIAO A312-1984 6
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006
THIRD PRINTING - MARCH 1987
( x.......- Direct Inquiries/Claims to:
POWER OF ATTORNEY THE HARTFORD
BOND, T-4
690 ASYLUM AVENUE
HARTFORD, CONNECTICUT 00115
call: 888-266-3488 or fax: 860-757-5835
KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 34-341006
[!=:J Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut
[!=:J Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana
[!=:J Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut
CJ Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State ofCOIlllecticut
CJ Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana
CJ Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois
CJ Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana
CJ Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida
having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint,
up to. the amount of unlimited:
Evan E. Moody, Jody Anderson, Brad Moody, Vera T. Kalba
of
Denver, CO
their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as
delineated above by [8], and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the
nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and
executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on July 21, 2003 the Companies
have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant
Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are
and will be bound by any mechanically applied signatures applied to this Power of Attorney.
Ct. ~ "~'l'-,\ ~~
Paul A. Bergenholtz, Assistant Secretary David T. Akers, Assistant Vice President
STATE OFCONNECTlaJT}
ss. Hartford
COUNTY OF HARTFORD
On this 4th day of August, 2004, before me personally came David T. Akers, to me known, who being by me duly sworn, did depose and
say: that he resides in the County of Hampden, Commonwealth of Massachusetts; that he is the Assistant Vice President of the Companies, the
corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the
said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed
his name thereto by like authority.
. ~
-<!)~I/JZ/ ~
Scott E. Paseka
Notary Public
CERTlFICA TE My Commission Expires October 31, 2007
I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct
copy of the Power of Attorney executed by said Companies, which is still in full force effective as of (.~" \ '-\ J...'.::kJ 5
Signed and sealed at the City of Hartford. J
~~~
<6~\
:;~: .. j::
\;-,\ t97~ ;!
~,~,:;..~--<~e.,~~
~ft:=9
Gary W. Stumper, Assistant Vice President
POA 2004
dj
>. -.- i
Insured's Name
Kolbe Striping. Inc.
Insured's Mailing Address
550 Topeka Way
Castle Rock, CO 80109
Policy Number
34BCSDC1216
IMPORT ANT NOTICE TO OBLIGEES/POLICYHOLDERS -
TERRORISM RISK INSURANCE ACT OF 2002
You are hereby notified that, under the Terrorism Risk Insurance Act of 2002, effective
November 26, 2002, we must make terrorism coverage available in your bond/policy.
However, the actual coverage provided by your bond/policy for acts of terrorism, as is true for
all coverages, is limited by the terms, conditions, exclusions, limits, other provisions of your
bond/policy, any endorsements to the bond/policy and generally applicable rules of law.
Any terrorism coverage provided by this bond/policy is partially reinsured by the United States
of America under a formula established by Federal Law. Under this formula, the United States
will pay 90% of covered terrorism losses exceeding a statutorily-established deductible paid by
sureties/insurers until such time as insured losses under the program reach $100 billion. If that
occurs, Congress will determine the procedures for, and the source of, any payments for
losses in excess of $100 billion.
The premium charge that has been established for terrorism coverage under this bond/policy is
either shown on this form or elsewhere in the bond/policy. If there is no premium shown for
terrorism on this form or elsewhere in the bond/policy, there is no premium for the coverage.
I Terrorism premium: 1$0 I
Form B-3333-0 Page 1 of 1
@ 200? ThA I...brtfrw~
BID COMPARJSON
DESCRIPTION:
2005 Centerline Markinq
QTY I I MAKE! ICOST 10 MAKE!
VENDOR VENDOR MODEL COST
MODEL
Warning Lites $84,815.00 Construction New Serv.
no bid
Total $84,815.00
IVENDOR I MAKE! ICOST 10 MAKE!
QTY VENDOR MODEL COST
MODEL
Patriot Highway Markings Sealeo Corp.
no bid no bid
RECOMMENDATION:
ljlLJ L;UMPAKI~UN
DESCRIPTION:
2005 Centerline Marking
QTY I I MAKE! ICOST 10 MAKE!
VENDOR VENDOR MODEL COST
MODEL
United Rentals $112,100.00 Kolbe Striping $93,773.50
Total $112,100.00 Total $93,773.50
***Preferred Vendor
IVENDOR I MAKE/ ICOST 10 MAKE/
QTY VENDOR MODEL COST
MODEL
RECOMMENDATION: