HomeMy WebLinkAboutC04-346 Vail/Arrowhead, Inc.`~ ~a ~,~.
'r
SUBDIVISION IMPROVEMENTS
AGREEMENT
Bachelor Gulch Village, Filing No. 4,
A Reconfiguration and Combination of Lots 107 and 108
File No. AFP-00193
THIS SUBDTVTSTON nVEMENTS AGREEMENT ("Agreement") made and
entered into this ~'~day of ~t , 2004, by and between the County of Eagle,
State of Colorado, a body corpc~~te politic, by and through its Board of County
Commissioners (hereinafter "County') and VaiUArrowhead, Inc., a Colorado Corporation,
whose address is P.O. Box 7, Vail, Colorado 81658 (hereinafter "Subdivider").
WITNESSETH
WHEREAS, the Subdivider, as a condition of approval of the Amended Final Plat of the
Bachelor Gulch Village Subdivision, Filing No. 4 (hereinafter referred to as "Subdivision"),
desires an Agreement as provided for by the Land Use Regulations of Eagle County, Colorado,
1999, as amended (hereinafter referred to as "Land Use Regulations") Chapter II, Section 5-
280.B.S.e. and C.R.S. §30-28-137; and
WHEREAS, pursuant to the same authority, the Subdivider is obligated to provide
security or collateral sufficient in the judgment of the County to make reasonable provisions for
completion of certain public improvements hereinafter described ("Subdivision Improvements");
and
WHEREAS, pursuant to Chapter II, Section 4-620 of the Land Use Regulations, when a
proposed subdivision is located in an area serviced by an existing County road and the County
determines that the traffic generated by such development will result in safety hazards for vehicle
drivers, pedestrians and/or adjacent residents, or will result in substantially increased
maintenance costs to the County, the County is empowered to determine the amount of work
necessary to bring the affected County road to acceptable standards to provide adequate safe
service to present owners, to the proposed subdivision and to other probable subdivisions, and to
require the Subdivider to improve its equitable portion of such road to an acceptably safe
condition; and
WHEREAS, the County has determined that the traffic which will be generated by the
Subdivision, along with other potential subdivisions in the area, will result in safety hazards and
substantially increased maintenance costs relative to the off-site roads; and
WHEREAS, the Subdivider has previously improved the roads to an acceptably safe
condition and has accommodated the incremental increase in traffic burden to the said roads
resulting from the development of this Subdivision, by the engineering, construction and
completion of physical improvements to the said road; and
WHEREAS, as a further condition of approval of the amended final plat of this
Subdivision, the Subdivider is obligated to provide security and collateral sufficient in the
~~~~$~
~ ~ ~ 03810/2004 04:218
Teak J Simonton Eagle, CO 89 R 0.00 D 0.00
judgment of the County to make reasonable provision for completion of the Subdivision
Improvements, including but not limited to off-site road improvements, referred to herein; and
WHEREAS, pursuant to Chapter II, Section 4-620.9 of the Land Use Regulations and
C.R.S. 43-2-147, the Subdivider shall provide access for all lots and parcels it creates to the state
highway system in conformance with the State Highway Access Code.
NOW, THEREFORE, in consideration of the premises and the covenants and agreements
herein contained to be kept and performed by the parties hereto, it is hereby understood and
agreed as follows:
1. SUBDIVISION IMPROVEMENTS.
1.1 Subdivision Improvements. Subdivision Improvements are deemed to include all
public improvements, including but not limited to off-site improvements as set forth in all
documents, construction drawings, designs, maps, specifications, sketches, cost estimates, and
other materials submitted by the Subdivider prior to or at final plat approval and acceptance by
the County. Such Subdivision Improvements shall include roads, utilities and other similar
public improvements as specified by the County Engineer.
1.2 Scope of Work. The Subdivider hereby agrees, at its sole cost and expense, to
furnish all necessary equipment and material, and to complete all Subdivision Improvements as
referenced in the attached Exhibit "A", and as set forth in all documents, construction drawings,
designs, maps, specifications, sketches, and other materials submitted by the Subdivider prior to
or at final plat approval and accepted by the County, and in accordance with all laws of the
United States of America, State of Colorado, County of Eagle, and their respective agencies and
affected governmental entities. Such performance shall include acquisition of all necessary
rights-of--way.
1.3 Duties of Subdivider. For those Subdivision Improvements required herein,
including but not limited to the reconstruction and physical improvement of that portion of any
road subject to this Agreement, the Subdivider shall retain an engineer whose duties shall include
construction staking, observation of construction for conformance to the approved plans and
specifications, and materials sampling, testing and inspection using the Colorado Department of
Highways 2001 Field Materials Manual as a guide for frequency of sampling and testing.
1.3.1 Construction Staking. Where applicable and by way of example only, the
following is a highlighting of the construction staking that will be required of the Subdivider:
a. Roadway -horizontal and vertical control every 50 feet or every 25 feet
in critical areas, specifically including:
-slope staking
-points of curvature ~ ~~~~~$
-points oftangency Page: z or iz
-fillet radius points ®a~i0iz00a 04.21P
-culverts Teak J Simonton Eagle, CO 89 R 0.00 D 0.00
-transition points for super-elevation
-finished sub-grade
-finished gravel
b. Water, Sewer, and Other Utilities -horizontal and vertical control
every 100 feet, or every 50 feet in critical areas.
1.3.2 Testing. Where applicable and by way of example only, the following is a
highlighting of the acceptance testing that will be required of the Subdivider:
a. Utility and drainage culvert trench backfill under roadwayprisms -one
density test per 200 C.Y. of backfill or a minimum of one test per roadway
crossing. This will require daily visits to the site by a testing laboratory
when utilities or drainage culverts are being backfilled within the roadway
prism.
b. Embankments for roadways -one density test per 2,000 C.Y. of any
additional embankment(s); and one density test per 500 C.Y. when within
100 feet of bridge approaches."
c. Finished sub-grade -one density test per 2501ineal feet of roadway.
d. A~g_egate base course -one in-place density per 2501ineal feet of
roadway, and gradation and Atterberg Limits test per 2000 tons of
aggregate base course.
e. Hot Bituminous Pavement -two asphalt content, gradation and in-place
density tests per day's production.
f. Concrete -Curb and Gutter, Sidewalks and Bikepaths -tests for air
content, slump and compressive strength per 50 C.Y. of concrete placed or
minimum of one set of tests per day.
1.3.3 Notification/Road Construction. Subdivider or his Engineer shall notify the
Eagle County Engineer for the purpose of arranging an on-site inspection no less than forty-eight
(48) hours in advance of the following stages of road construction:
1) Finished subgrade
2) Finished Aggregate Base Course
3) Asphalt Placement.
4) Concrete -Curb and Gutter, Sidewalks and Bikepaths
The County Engineer shall make an on-site visit within the forty-eight (48) hours notification
period or as shortly thereafter as reasonably possible for the purpose of observing proof rolls on
items 1) and 2) above and for general observation of construction methods being employed at
these stages. Said on-site inspection by the Eagle County Engineer shall in no way abrogate the
duties of the Subdivider outlined elsewhere in this Agreement. The Subdivider shall provide the
proof rolling by arranging for a loaded single unit truck carrying 18,000 pounds per rear axle.
Iq~III~~I~INIII~IIIIII~If~INNItlIRlllll g90688;,.
INIII IIIII IINI~ IV IIIIIh III ~N!
~~~~$~
Page: 4 of 12
09/10/2004 04:21P
R 0.00 D 0.00
1.3.4 Witnessing of Water and Sewer Laterals. It is essential that the ends of
these laterals be witnessed by the Subdivider's engineer to a minimum of three divergent points
and a permanent record made of the same. Copies of these records are required to be furnished
to the Eagle County Engineer prior to commencement of the two year warranty period. In
addition to witnessing of the horizontal location of these laterals, a vertical witness shall be
required. Horizontal witnessing shall be to property corners, fire hydrants, manholes, and other
"permanent" features. Vertical witnessing shall be based on depth below ground and elevation
based on a datum used for the subdivision. Bench marks shall be shown on witness records.
1.3.5 Test Reports. All test reports shall be consecutively numbered, with copies
furnished directly to the Eagle County Engineer from the laboratory as they are reported to the
Subdivider or its engineer.
1.3.6 As-Built Drawings of Subdivision Improvements. As-Built drawings,
sealed, signed and dated by a Registered Professional Engineer showing the as-constructed
horizontal and vertical locations of Subdivision Improvements shall be submitted to the Eagle
County Engineer prior to commencement of the two year warranty period. This shall include as-
built drawings in an electronic format acceptable to the County Engineer.
1.3.7 Affidavit of Monumentation. An Affidavit of Monumentation sealed,
signed and dated by a Registered Professional Land Surveyor stating that the subdivision has
been monumented in accordance with §38-51-105, C.R.S., and Chapter II, Section 5-280.S.a
(1)(a) of the Eagle County Land Use Regulations shall be provided to the Eagle County Engineer
prior to the acceptance of the Subdivision Improvements by the County.
1.4 Compliance with Colorado Department of Hi ways Access Code. Subdivider shall
provide the County with designs in compliance with the Colorado Department of Highways
Access Code for all road improvements.
1.5 Date of Completion. All Subdivision Improvements shall be completed prior to
December 31, 2005.
1.6 Approval and Acceptance of Work.
1.6.1 Copies of all test results corresponding to work which is being inspected
and any other information which maybe necessary to establish the satisfactory completion of the
work for which inspection is requested must be submitted prior to said inspection. All such
information shall be accompanied by a letter from the Subdivider's engineer verifying the
satisfactory completion of the work performed to date.
1.6.2 Notwithstanding Section 1.3.3 above, promptly after receiving a request for
inspection and the required documentation, the County Engineer shall review the information
presented and, if necessary, make an on-site inspection of the work completed.
1.6.3 All said work shall be done to the reasonable satisfaction of the County
Engineer and/or the County Department of Community Development, and shall not be deemed
complete until approved and accepted as complete by the County.
4
~4
~3906~8
Page: 5 of 12
09/10/2004 04:21P
Teak J Simonton Eagle, CO 89 R 0.00 D 0.00
1.7 Estimated Costs of Subdivision Improvements. The estimated cost of the
Subdivision Improvements is the sum of $ 749,282.60, as summarized in Exhibit "A". To secure
and guarantee performance of its obligations as set forth in this Section 1, including the
completion of the required Off-site Improvements, the Subdivider hereby agrees to provide
security and collateral in the form and as set forth in Section 2, below.
1.8 Common Park and Recreation Areas. If applicable, Subdivider agrees to submit a
Common Open Space, Park and Recreation Area Plan to be approved by the County Department
of Community Development prior to approval of final plat.
1.9 Landscape Guarantee. Subdivider agrees to submit a landscaping plan, prior to
approval of final plat, for the subdivision which will comply with Section 4-240, Installation and
Maintenance Reckuirements. The Subdivider agrees to abide by the Landscape Plan approved by
the County Department of Community Development.
2. SECURITY and COLLATERAL.
2.1 Collateral. Security and Collateral required in Section 1.7 herein, as security for the
performance by Subdivider of its obligations under this Agreement, shall be in the total amount
of $ 749,282.60. The Subdivider shall obtain collateral in the form of a LETTER OF CREDIT
prior to signing of the amended final plat, and attached hereto as Exhibit "B".
2.2 Partial Release of Collateral. Subdivider may apply to the County for the release of
portions of the Collateral based upon work completed in accordance with this Agreement. To
make such releases, Subdivider shall request the County Engineer to inspect the work in order to
verify satisfactory completion in accordance with plans and specifications in accordance with
Section 1.6.
2.3 Final Release of CollateraUWarranty. Within thirty (30) days after Subdivider has
completed all of the work required by this Agreement and the work has been approved and
accepted by the County, the entire remaining amount of the Collateral, less an amount equal to
ten percent (10%) of the original Collateral, shall be released. Subdivider shall be responsible
for the condition of the Subdivision Improvements for a period of two years after completion;
this shall be guaranteed either through the retention of Collateral, as set forth above, or
Subdivider may provide a substitute form of Collateral as set forth in Section 2.4 hereunder.
2.4 Substitution of Collateral. The Subdivider may at any time substitute the Collateral
originally deposited with the County herein, for another form of collateral acceptable to the
County, to guarantee the faithful completion of the Subdivision Improvements referred to herein
and the performance of the terms of this Agreement. At the time of substitution of collateral, an
inflationary andlor deflationary factor based upon the Denver-Boulder, Colorado Consumer
Price Index for All Urban Consumers, All Items (1967=100) published by the U.S. Bureau of
Labor Statistics, 303-837-2467, or, alternatively, an approved construction cost index, shall be
used to determine an adjusted estimated cost for all Subdivision Improvements as described
herein, and collateral shall be submitted by the Subdivider in accordance therewith.
~;
IRIV IRII IIVIII In INIIII VI M~„~
89@688
Page: 6 of 12
09/1@/20@4 04:21P
R 0.00 D 0.00
2.5 Draws. Draws against the Collateral shall only be made as directed by written
Resolution of the County, stating that there has been an event of default under this Agreement
and that a sum certain is required to remedy the default. Any amount drawn on the Collateral
must be applied for the purpose of completing the work required by this Agreement and related
expenses and costs.
2.6 Events of Default. The following events shall be deemed "Events of Default,"
entitling the County to draw on the Collateral:
2.6.1 If Subdivider has not completed the work required by this Agreement
within thirty (30) days prior to the Date of Completion set forth herein, the County may, after ten
(10) working days written Notice to Subdivider, draw upon the Collateral an amount sufficient to
complete said work and compensate the County for its reasonable costs and expenses related to
said draw.
2.6.2 If the original collateral presented to the County (or any extension thereof)
is due to expire and the work is not yet completed, and Subdivider has not provided substitute
collateral or the bank's written extension to the original collateral (as it may have been previously
extended), the County shall draw on the Collateral according to the provisions set forth in this
Section 2. It is Subdivider's responsibility, with or without notice, to ensure that the
Collateral is extended, or that substitute collateral is provided in a form acceptable to the
County, at least ten days prior to its expiration. If Collateral is neither extended nor
substitute collateral provided, in a form acceptable to the County, at least ten days prior to
its expiration, the developer shall pay the County an additional $500 (Five hundred dollars)
for the additional administrative work required because of the failure to extend or
substitute collateral in a timely manner as required by this agreement.
2.6.3 If the Collateral is substituted, as otherwise provided herein, this Agreement
maybe amended or modified in order to set forth specific Events of Default deemed necessary,
in the County's sole discretion, commensurate with the type of collateral substituted.
2.7 Costs and Expenses. Subdivider agrees to pay any costs and expenses, including but
not limited to legal fees, which the County may incur in determining to accept collateral, in
drawing upon the Collateral, or in accomplishing an extension of its expiration.
2.8 Landscape Plan Collateral.
2.8.1 Subdivider agrees to provide collateral in a form acceptable to the County
Attorney to ensure landscaping will be installed. Subdivider agrees to provide collateral for no
less than one hundred and twenty-five (125) percent of the estimated cost of the landscaping
improvements listed in the Landscape Plan.
2.8.2 As portions of the landscape improvements are completed, the Community
Development Director shall inspect them, and upon approval and acceptance, shall authorize the
release of the agreed estimated cost for that portion of the improvements, except that the (10)
percent shall be withheld until all proposed improvements are completed and approved, and an
additional twenty-five (25) percent shall be retained until the improvements have been
maintained in a satisfactory condition for two (2) years.
3. INSURANCE and INDEMNIFICATION.
3.1 Indemnification. Subdivider shall indemnify and hold the County harmless from any
and all claims made against the County by any contractor, subcontractor, materialmen,
employee, independent contractor, agent or representative involved in the work necessary to
comply with this Agreement, or on account of any other claims against the County because of
the activities conducted in furtherance of the terms of this Agreement. This indemnification and
hold harmless provision shall include any legal expenses or costs incurred by the County.
3.2 Certificates of Insurance. The Subdivider shall secure from any contractor or
subcontractor engaged in the work necessary to comply with this Agreement a Certificate of
Insurance providing for liability protection in the minimum amount of $150,000 per individual
and $600,000 per occurrence, naming the County as an additionally named insured. The
Subdivider, if it serves as the contractor for the Subdivision Improvements, shall provide
insurance in the same form and amounts as required of the general contractor. Said limits shall
be adjusted to comply with any changed limits in the Colorado Governmental Immunity Act,
Title 24, Article 10, Colorado Revised Statutes.
3.3 Coun y Incurs No Liability. The County shall not, nor shall any officer or employee
thereof, be liable or responsible for any accident, loss or damage happening or occurring to the
Subdivision and/or Subdivision Improvements specified in this Agreement prior to the
completion and acceptance of the same; nor shall the County, nor any officer or employee
thereof, be liable for any persons or property injured or damaged by reasons of the nature of said
work on the Subdivision Improvements, but all of said liabilities shall be and are hereby assumed
by the Subdivider. The Subdivider hereby agrees to indemnify and hold harmless the County
and any of its officers, agents and employees against any losses, claims, damages or liabilities for
which the County or any of its officers, agents, or employees may become subject to, insofar as
any such losses, claims, damages or liabilities (or actions in respect thereof) arise out of or are
based upon any performance by the Subdivider hereunder; and the Subdivider shall reimburse
the County for any and all legal and other expenses incurred by the County in connection with
investigating or defending any such loss, claim, damage, liability or action. This indemnity
provision shall be in addition to any other liability which the Subdivider may have.
4. GENERAL PROVISIONS.
The following shall apply to all Subdivision Improvements, including off-site improvements, set
forth in this Agreement:
4.1 Compliance with Land Use Regulations. The Subdivider shall be required to obtain
all necessary permits and comply with the provisions of the Land Use Regulations, including but
not limited to the Regulations for Construction within the Public Ways of Eagle County (Chapter
V), as the same are in effect at the time of commencement of construction of the Subdivision
Improvements referred to herein.
~ s~~s~~
I i 09910!2004 04:21P ~
Teak J Simonton Eagle, CO 99 R 0.00 D 0.00
4.2 Subdivision Improvement Agreement Controls. In the event of any inconsistency or
incongruity between the provisions of this Agreement and the Land Use Regulations, the
provisions of this Agreement shall in all respects govern and control.
4.3 Warranties and Guarantees. There shall be a two-year correction period, or such
longer period as may be prescribed by law, from the time of completion of the Subdivision
Improvements during which time the Subdivider shall promptly correct or remove and replace, in
accordance with the County's written instructions, defective work or materials and consequences
thereof. Repair or replacement made under the two-year correction period shall bear an
additional one-year correction period from the acceptance of the repair or the replacement by the
Eagle County Engineer. The work shall be collateralized during the correction period in an
amount and type of collateral as shall be reasonably determined by the County. The work shall
be inspected, at the request of the Subdivider, no less than sixty (60) days prior to expiration of
the one-year additional correction period, and any deficiencies shall be noted to the Subdivider.
4.4 Approval of Amended Final Plat. The County agrees to the approval of the amended
final plat of this Subdivision, subject to the terms and conditions of this Agreement.
4.5 Amended Final Plat Amendments. Where field changes or other circumstances have
caused the road, utilities, or other subdivision improvements to be constructed in locations
different from those shown on the approved plans, the locations ofrights-of--way, easements, lot
lines, building envelopes, setback lines, or other attributes shown on the Amended Final Plat
shall be amended as necessary to comply with Amended Final Plat requirements of the Eagle
County Land Use Regulations.
4.6 Amendment and Modification. The parties hereto mutually agree that this
Agreement maybe amended or modified from time to time, provided that such amendment or
modification be in writing and signed by all parties hereto.
4.7 Assi ability. This Agreement shall be enforceable against the Subdivider,
provided, however, that in the event the Subdivider sells, transfers or assigns all or part of the
subject Subdivision, the obligations of the Subdivider under this Agreement as to that portion of
the subject Subdivision maybe assumed in writing by the purchaser of the parcel, and the
Subdivider shall have no further obligations hereunder. It is agreed, however, that no such
assumption of these obligations shall be effective unless the County gives its prior written
approval to such assumption following an investigation of the financial condition of the
purchaser. The Subdivider shall not otherwise assign, transfer, convey, pledge or otherwise
dispose of this Agreement without prior written consent of the County, which consent shall not
be unreasonably withheld.
4.8 Binding upon Successors. This Agreement shall inure to the benefit of and be
binding upon the parties hereto, their respective successors, and assigns.
4.9 Sole Responsibility of Subdivider Prior to County Acceptance. It is further agreed
and understood that at all times prior to the completion and acceptance of the off-site
Subdivision Improvements set forth herein by the County, each of said improvements not
accepted as complete shall be under the sole responsibility and charge of the Subdivider. When
it is necessary to allow the general public to utilize the roadways under construction by the
` 1 $906$8 8
Page: 8 of 12
~ 09!10/2004 04:21P
Teak J Simonton~Eagle, CO 89 R 0.00 D 0.00
Subdivider, traffic control and warning devices shall be placed upon such roadways by the
Subdivider in accordance with the Manual on Uniform Traffic Control Devices for Streets and
Highways as prepared by the U.S. Department of Transportation, Federal Highway
Administration.
4.10 No Rights to Third Parties. This Agreement does not and shall not be deemed to
confer upon or grant to any third party any right to claim damages or to bring any lawsuit, action
or other proceedings against either the County or its officers, employees or agents because of any
breach hereof or because of any terms, covenants, agreements or conditions contained herein.
4.11 Notice. Notice required pursuant to the terms of this Agreement shall be deemed
given on the day that the same is placed in the United States Mails, postage prepaid, certified or
registered mail, return receipt requested.
4.12 Enforcement and Attorne~Fees. The County may enforce the provisions of this
Agreement in the same manner and with the same remedies applicable to the enforcement of
land use regulations pursuant to the Eagle County Land Use Regulations, as they maybe
amended from time to time, or as otherwise provided by law. Alternatively, the terms of this
Agreement maybe enforceable by the Board or its designee by any appropriate equitable or legal
action, including but not limited to specific performance, mandamus, abatement, or injunction.
The remedies explicitly provided herein are cumulative, and not exclusive, of all other remedies
provided by law. The prevailing party in any action brought pertaining to this Agreement shall
be entitled to an award of costs and reasonable attorney's fees.
III~IY%IMININI~I~IIIIIIININp ry~~~~~ry~q 890688
INIhINllimi~in~ro~mplpllAlll p%INIINI ';
9
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the
day and year first above written.
ATTEST: ,~~~~
~ ~`
~;
s, .~.
~~.
Teak J. Simonton, lerc to the Board oI~` ~°'~~
County Commissioners
COUNTY OF EAGLE, STATE OF COLORADO,
~By a.nTd TThrough Its
~d~Cl-J OF COUNTY COMMISSIONERS
~•
Tom C. S one
Chairman
Address for giving notice:
P.O. BOX 8S0
Eagle, CO 81631
Phone: (970) 328-8685
VAIL/ARROWHEAD,
~rfldress for giving
VaiUArrowhead, ~
P.O. Box 7
Vail, CO 8165
and
Gerry Arnold (Agent for Subdivider)
P.O. Box 9S9
Avon, CO 81620
Phone: (970) 845-2658
Fax: (970) 84S-2SSS
STATE OF COLORADO )
SS
County of ~.aq ~ ~ )
The foregoing was cknowledged before melt i ~~'~` da of u...~ 2004,
b ®~ Son as ~r~5 ~ n~ of v(k.~ ~'fD W h
WITNESS my hand and official seal.
My commission expires
. H F~
P,........ C
~'~TAq}.
''TOtary
$~06$$
09g10l2004f04?21R 10
Teak J Simonton Eagle; GO 89 R 0.0@ D 0.00
,AVB`~G
~ ••.....••Q
~OF CO~~
we
t
I"
.i~ . ,
tG ~l 1~",~~',,.q
Bachelor Gulch -Filing No. 4 ~~ t 1 ~ , L ~ '~~ ~ b
OPINION OF PROBABLE COSTS - JU ~ 7, 2010 ~ ~ LLU~
~ ~. u~. ,.. ,,. _.
EXTENSION AND IMPROVEMENTS OF HORIZ~i~f~~4.~,:;;;~;~ E
1
Mobilization 7%)
LS
1
$ 44,562.00 _ ~.,
$ 44,562.00
2 Cleazin LS 1 $ 10,000.00 $ (0,000.00
SUBTOTAL '"
Extension of Horizon Trail
1 To soil Removal 1' and Stock ile CY 598 $ 4.00 $ 2,392.00
2 To soil Re [ace on Roadway Slo es (4") CY 364 $ 4.00 $ 1,456.00
3 Place To soil on Skiwa CY 234 $ 4.00 $ 936.00
4 Excavation Placed as Embankment CY 3949 $ 6.00 $ 23,694.00
5 Sub rade Pre aration LS 1 $ 10,000.00 $ 10,000.00
6 Class 6 ABC 8") TON 450 $ 25.00 $ 11,250.00
7 Class 6 ABC (6") Mountain Access Rd. TON 75 $ 25.00 $ 1,875.00
8 As halt (4") TON 175 $ 55 00 $ 9,625.00
9 Sidewalk (5' Wide) LF 80 $ 25.00 $ 2,000.00
0 Curb and Gutter (2.5') LF b20 $ 23.00 $ 14,260.00
1 ] 2' Concrete Pan LF 42 $ 23.00 $ 966.00
12 MSE Retainin Wall SF 1901 $ 55.00 $ 104,555.00
SUBTOTAL ~ ; ~"" "
Skier Brid e
1 Bride LS 1 $ 300,000.00 $ 300,000.00
SUBTOTAL ~-~,~" '
Erosion Control
1 Silt Fence LF 498 $ 4.00 $ ~ 1,992.00
2 Stabilized Construction Entrance EA ( $ 1,500.00 $ 1,500.00
3 Ha Check Dam EA 2 $ 200.00 $ 400.00
4 Beaver Dam EA 1 $ 200.00 $ 200.00
5 Silt Sack EA 1 $ 250.00 $ 250.00
6 Erosion Control Mattin (TRM 450) LF 505 $ 9.00 $ 4,545.00
7 Reve elation LS 1 $ 2,200.00 $ 2,200.00
SUBTOTAL {
Water S stem
1 Fire H Brant Assembly EA 1 $ 3,800.00 $ 3,800.00
2 2" T K Co er Water service LF 35 $ 50.00 $ 1,750.00
3 8" DIP and Fittin LF 408 $ 70.00 $ 28,560,00
4 12" DIP and Fittin s LF 156 $ 80.00 $ 12,480.00
5 12" Gate Valve EA 1 $ 1,100.00 $ 1,100.00
6 8" Gate Valve EA 6 $ 950.00 $ 5,700.00
SUBTOTAL `'~"~ ~
Sewer S stem
1 6" PVC Sewer Service LF 125 $ 40.00 $ 5,000.00
2 4" PVC Sewer Service LF 31 $ 40,00 $ 1,240.00
3 4" and 6" PVC Sewer Service (Joint Trench) LF 292 $ 45.00 $ 13,140.00
4 4" Cleanout EA 3 $ 500.00 $ 1,500.00
5 6" Cleanout EA 3 $ 500.00 $ (,500.00
6 Sewer Encasement EA 1 $ 480,00 $ 480.00
SUBTOTAL °>;g
Draina e
1 2x3 Curb Inlet EA 1 $ 3,400.00 $ 3,000.00
2 3x3 Area Inlet EA 1 $ 3,000.00 $ 3,000.00
3 18" CMP LF 92 $ 40.00 $ 3,680.00
4 I8" Stone Outlet End Section EA 1 $ 320.00 $ 320.00
5 Ri Ra Culvert Outlet Protection LS 1 $ 1,500.00 $ 1,500.00
SUBTOTAL 3
Shallow Utilities
I Joint Trench LF 355 $ 20.00 $ 7,100.00
2 Handhole EA 1 $ 300.00 $ 300.00
3 Three Phase Transformer EA 1 $ 15,000.00 $ 15,000.00
4 Gas Line Trenchin Lr s97 $ 20.00 $ 7,940.00
5 4" Electric Conduit & Wire 2) LF 824 $ 9.00 $ 7,416.00
6 4" Phone Conduit & Wire LF 389 $ 6.00 $ 2,334.00
7 4" TV Conduit & Wire LF 389 $ 6.00 $ 2,334.00
8 4" Conduit S are) LF 389 $ 6.00 $ 2,334.00
SUBTOTAL
TOTAL
'~R~~ S3 Y ,~ 10% Conlin enc
~ ~
:Z ..iV'.:\;, ;fir
~..yt'F•,~, gw. $ 68,116.60
~~~~~I~ lp ll~I~~ ~~ %N a ~I 0890688
EXHIBIT
\~ • r*
DATE: JULY 22, 2004
IRREVOCABLE STANDBY LETTER OF CREDIT NUMBER: 3064294
BENEFICIARY
BOARD OF COUNTY COMMISSIONERS APPLICANT
COUNTY OF EAGLE, STATE OF COLORADO 137 BENCHMARK RDTION
500 BROADWAY AVON, CO '81620
EAGLE, CO 81631
PAGE: 1
AMOUNT
USD 749,282.60
SEVEN HUNDRED FORTY NINE THOUSAND
TWO HUNDRED EIGHTY TWO AND 60/100'S
US DOLLARS
EXPIRATION
JULY 22, 2005 AT OUR COUNTERS
WE HEREBY ESTABLISH IN YOUR FAVOR OUR IRREVOCABLE STANDBY LETTER OF
CREDIT WHICH IS AVAILABLE WITH BANK OF AMERICA, N.A. BY PAYMENT
AGAINST PRESENTATION OF THE ORIGINAL OF THIS LETTER OF CREDIT AND
YOUR DRAFTS AT SIGHT DRAWN ON BANK OF AMERICA, N.A., ACCOMPANIED BY
THE DOCUMENT DETAILED BELOW:
BENEFICIARY'S STATEMENT SIGNED BY AN AUTHORIZED OFFICER OF THE
BENEFICIARY STATING THE FOLLOWING:
"THERE HAS BEEN A DEFAULT IN THE CONSTRUCTION OF PUBLIC IMPROVEMENTS
REQUIRED BY EAGLE COUNTY (AND THE SUBDIVISION IMPROVEMENTS
AGREEMENT), STATE OF COLORADO, PURSUANT TO THE AGREEMENT BETWEEN VAIL
RESORTS DEVELOPMENT COMPANY AND EAGLE COUNTY TO PROCESS A PLAT
THROUGH EAGLE COUNTY, THE AMOUNT DRAWN IS REASONABLY REQUIRED TO
REMEDY THE DEFAULT."
WE HEREBY ENGAGE WITH YOU THAT DRAFT(S) DRAWN UNDER AND IN COMPLIANCE
WITH THE TERMS OF THIS LETTER OF CREDIT WILL BE DULY HONORED UPON
PRESENTATION TO US AT 333 SOUTH BEAUDRY AVENUE, 19TH FLOOR, MAIL CODE
CA9-703-19-23, LOS ANGELES, CA 90017 ATTN: STANDBY LETTER OF CREDIT
DEPARTMENT ON OR BEFORE THE EXPIRATION DATE AS SPECIFIED HEREIN.
THIS LETTER OF CREDIT IS SUBJECT TO THE INTERNATIONAL STANDBY
PRACTICES 1998, ICC PUBLICATION N0. 590.
IF YOU REQUIRE ANY ASSISTANCE OR HAVE
TRANSACTION, PLEASE CALL 213-345-0128.
--- --------------
AUTHORIZED SIGNATURE
ANY QUESTIONS REGARDING THIS
HERM11hN ~CHUTTERLE
u pII III I~aXIIX III II I~~IIIII4„~I' 890688,:
do of America, N.A. Trade Opemtiona
it Code: CA9-703-19-09
S. Besudry Avenue, 19th Floor, Los Angeles, CA 90017
35.0202NS8 9-1999_CA9 19
+/ ~t d
OFFICE OFTHE
COUNTY ATTORNEY
(970)328-8685
FAX: (970) 325-8699
www.eaglecounty.us
f~GL~ COUNTY
October 28, 2004
VaiVArrowhead, Inc.
P.O. Box 7
Vail, CO 81658
To Whom It May Concern:
Enclosed for your records is a copy of the recorded subdivision improvements agreement
between Eagle County and VaillArrowhead, Inc. regarding Bachelor Gulch Village, Filing No. 4,
a reconfiguration and combination of lots 107and 108.
Please do not hesitate to contact me if you have any questions.
Very truly yours,
aTfe~`- atthews ~/ ~`~~
Deputy County Attorney
WM:pn
xc:
Enclosures