SECTION 00680
CHANGE ORDER
PROJECT: Multi-Purpose Pond
Tract C, Berry Creek/Miller Ranch PUD
Change Order No. -:3
Contract No.: C03-311-47
Initiation Date: August 5th, 2004
TO:
Michael Cirkovic
Eagle County Facilities Management
Contract Date: October 28th, 2003
You are directed to make the following changes in this Contract.
Please add the following:
(See attached for pricing breakdown)
Tasks
Add 36" HDPE to existing run, including manholes
12 and 18" HDPE and erosion control- 5 days to contract
TOTAL
Cost
$ 130,455.00
Not valid until signed by both the Owner and Engineer.
Signature of the Engineer indicates his agreement herewith, including any adjustments in the Contract
Sum or Contract Time.
The Original Contract Sum was
Net Change by previously authorized Change Orders (1,2,3,4,5,6,7,8,9,10,11,12)
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this change order
The new Contract Sum including this Change Order will be
Current Substantial Completion Date
The new Substantial Completion Date is
$ 675,375.00
$ 611,626.20
$ 1,287,001.20
$ 130,455.00
$ 1,417,456.20
October 8th, 2004
October 15th, 2004
AMERICAN CIVIL CONSTRUCTORS
(CONTRACTOR)
By:
Name:
Title:
Date:
M~
Proj ect Engineer
8/5/2004
By:
Name:
Title:
Date:
EAGLE COUNTY
~~
mVlll 5/t; n-e-
(7 JIlA 1YM4417
q 1:;11J I ~4-
,
END SECTION 00680
A
C
C
meric6
ivil
onstructors
3925 CaIbon Road - InizIg, Texas. 75038
PholUl: (912) 827.0150 Fax: (912) 827.01.51
Date: 9/212004
Submitted To: Eagle County
Address: Eagle, CO
Bid ntle:
Berry Creek Proposal 015 - 36"
Extension
Bid Number:
Phone:
Fax:
Project Location:
Project City, State:
Engineer/Architect:
Edwards, CO
Contact:
Michael Cirkovic
PLC
American Civil Constructors Is pleased to quote the following Items on the above referenced project.
Line No. Item No. Item Description Estimated Quantity Unit Unit Price Total Price
1 Straw Wattles 560.00 LF $5.00 $2,800.00
2 Straw Bale Protection 5.00 EACH $75.00 $375.00
3 Inlet Protection 6.00 EACH $75.00 $450.00
4 18" HOPE 390.00 LF $44.00 $17,160.00
5 36" HOPE 1,250.00 LF $60.00 $75,000.00
6 Boot and Seal through Pond Liner 1.00 LS $2,500.00 $2,500.00
(Incl. Riprap reset)
7 4' Oia Manhole 4.00 EACH $1,650.00 $6,600.00
8 6' Oia Manhole 6.00 EACH $2,700.00 $16,200.00
9 12" PVC (SOR 35) 210.00 LF $27.00 $5,670.00
10 12" CPP 50.00 LF $24.00 $1,200.00
11 Surveyrr estlng 1.00 LS $2,500.00 $2,500.00
Total Price for the above Items: $130,455.00
Total Bid Price: $130,455.00
Notes: * PVC Pipe is to be SOR 35.
Payment Terms: Net 30
ACCEPTED:
The above prices, specifications and conditions
are satisfactory and are hereby accepted.
Buyer
Signature
Date of Acceptance
CONFIRMED:
American Civil Constructors
Amho~ed A~
Signature: fvr
Estimator: Mike e ns
Page 1 of 1