HomeMy WebLinkAboutC04-289 American Civil Constructors~v,-- .-~
SECTION 00680
CHANGE ORDER
PROJECT: Multi-Purpose Pond Change Order No.
Tract C, Berry Creek/Miller Ranch PUD
G rT~v Ct ~?~f,~ I~-~6'~c~'L
~~
Proposal # 13
Contract No.: C03-311-47
Initiation Date: August 5th, 2004
TO: Michael Cirkovic Contract Date: October 28th, 2003
Eagle County Facilities Management
You are directed to make the following changes in this Contract.
Please add the following:
Tasks
Irrigation Installation
add 30 calendar days to contract
TOTAL
Cost
$ 185,295.00
Not valid until signed by both the Owner and Engineer.
Signature of the Engineer indicates his agreement herewith, including any adjustments in the Contract
Sum or Contract Time.
The Original Contract Sum was $ 675,375.00
Net Change by previously authorized Change Orders (1,2,3,4,5,6,7,8,9,10) $ 423,331.20
The Contract Sum prior to this Change Order was $ 1,098,706.20
The Contract Sum will be increased by this change order $ 185,295.00
The new Contract Sum including this Change Order will be $ 1,284,001.20
Current Substantial Completion Date September 7th, 2004
The new Substantial Completion Date is October 7th, 2004
AMERICAN CIVIL CONSTRUCTORS
(See attached for pricing breakdown)
(CONTRACTOR)
By: ~
Name: Mike ens
Title: Project Engineer
Date: 6/25/2004
EAGLE COUNTY
By:
Name: ~ ~a w- G~D yl ~~
Title: ~~~~,.~,~,t
Date: _ ~'aopt, ~-~ b ~
END SECTION 00680
mericaA
~v~l
onstru ors
~~ky n~,u<ta~ x~~y cl~
4901 South Windermere -Littleton, Colorado. 80120
Phone (303) 745 2582 Fax (303)347.1844
Submitted To: Eagle County Bid Title: Proposal 013 -Irrigation Lines
Address: Eagle, CO Bid Number: BERRY CREEK
Project Location: Berry Creek Pond
Contact: Michael Cirkovic Project City, State: Edwards, CO
Phone: Fax: EngineerlArchitect: PLC
American Civil Constructors is pleased to quote the following items on the above referenced project.
Line No. Item No. Item Description Estimated Quantity Unit Unit Price Total Price
00 Mobilization 1.00 LS $5,000.00 $5,000.00
01 3" Irrigation Sleeving (Complete) 150.00 LF $8.00 $1,200.00
02 6" Irrigation Sleeving (Complete) 150.00 LF $12.00 $1,800.00
03 8" Sleeving (Complete) 40.00 LF $13.50 $540.00
04 3" CL200 PVC 650.00 LF $10.00 $6,500.00
05 6" CL200 PVC 1,680.00 LF $14.00 $23,520.00
06 8" CL200 PVC 600.00 LF $20.00 $12,000.00
07 3" Valves 2.00 EACH $700.00 $1,400.00
08 6" Valves 2.00 EACH $875.00 $1,750.00
09 8" Valves 2.00 EACH $1,225.00 $2,450.00
10 Core and Seal to Existing Manhole 1.00 EACH $1,300.00 $1,300.00
11 Survey 1.00 LS $5,000.00 $5,000.00
12 Irrigation Laterals, Heads, Controllers 426.00 EACH $195.00 $83,070.00
13 New 4" Sleeving Under Path 80.00 LF $20.00 $1,600.00
14 New 6" Sleeving Under Path 80.00 LF $22.00 $1,760.00
15 New 10" Sleeving Under Path 20.00 LF $35.00 $700.00
16 Fine Grading 1.00 LS $12,000.00 $12,000.00
17 Sod 38,290.00 SF $0.50 $19,145.00
18 Bluegrass Seed 135,000.00 SF $0.06 $8,100.00
19 Credit For Original Irrigation Piping 1.00 LS ($3,540.00} ($3,540.00)
Total Bid Price: $185,295.00
Notes: * *All Pipe is Class 2006E Gasketed
*If additional quanties are required this sheet will serve as pricing for those quantites.
*Path will need to be sawcut, removed and replaced to allow for lateral installation. Costs are included.
*ACC will require 30 calendar days be added to the contract to compete this work.
Payment Terms: Net 30
Page 1 of 2
r
mericaA
~Ivil
onstru ors
Rocky Mountain Heavy Ciuil
4901 South Windermere -Littleton, Colorado. 80120
Phone (303) 795.2582 Fax (303)347.1844
Submitted To: Eagle County Bid Title: Proposa1013 -Irrigation Lines
Address: Eagle, CO Bid Number: BERRY CREEK
Project Location: Berry Creek Pond
Contact: Michaei Cirkovic Project City, State: Edwards, CO
Phone: Fax: EngineerlArchitect: PLC
American Civil Constructors is pleased to quote the following items on the above referenced project.
Line No. Item No. Item Description Estimated Quantity Unit Unit Price Total Price
ACCEPTED: CONFIRMED:
The above prices, specifications and conditions Rocky Mountain Civil
are satisfactory are hereby accepted.
i3uyer ~~ ~yti~.-, i
Authorized
Signature Signature:
Date of Acceptance . ~ t- ~ Estimator: Mike ph s
?age 2 of 2
~~~
~i
~.
~~
~~~
~~
~~~
3
g
~~~
~~
~ ~ x
a
N
3
d
•
~` o ~ ~
8 ~~~`~99 ; gel
~~~ ~~ ~ ~~
~~~ ~~~ ~ ~
~~~~~ ~ ~
~ ~ ~a ~
at1
Q~Q~A~~ '4q°t:~ ~~
~ ~ v ~~
~ ~~°-~~ ~
~~~~~ ~~~
~~
i~0
t
!I~~~
`_ {
n
Z
Z
m
n
Z
•" / I I
~ ~ ~ ~ ~ ~~ ~ Ililll llf l~~
.~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ I ~ ~ ~ ~ ~' ~~ TRACT C RECREATION PARCEL
$ ~ I ~ I I ~ ` ` ~ ` ~ ~ BERRY CREEKiMILLER RANCH PUD, EDWARDS, CO.