HomeMy WebLinkAboutC04-283 Old Castle SW Group dba B&B ExcavatingGDS- 2S~-.so CHANGE ORDER NUMBER 1 CONTRACTOR Old Castle SW Group, Inc., d.b.a. B & B Excavating, Inc. Contract for Lake Creek Pedestrian Path Contract Date July 6, 2004 TO: Old Castle SW Group, Inc., d.b.a. B & B Excavating, Inc. You are directed to make the changes noted below in the Subject Contract. Appropriations to cover the costs of additional work have been made. EAGLE COUNTY BOARD OF COUNTY COMMISSIONERS By: - Tom C. Stone, Chairman DATE: S 3~ ~ D Nature of Changes: Changes in the contract were made in an attempt to decrease the total cost of the project. These changes included having County staff perform some prep work for the contractor, and a modification to the design of the project. An itemization of the changes is attached as Exhibit "A". These changes result in the following adjustment of Contract Price and Contract Time: Contract Price Prior to this Change Order $190,965.00 Net Decrease Resulting from this Change Order -$26,806.00 Current Contract Price Including this Change Order $164,159.00 Change Order No. 1 Page 2 Contract Time Prior to this Change Order August 15, 2004 Net Resulting from this Change Order No Change Current Contract Time Including this Change Order August 15, 2004 The above changes are recommended: ~ r~--, Helen Migchelbrink County Engineer Date: U ~ U The above changes are accepted: Old Castle SW Group, Inc., d.b.a. B & B Excavating, Inc. ~ , By: Tit e: ~j Date: ~7~Z:~~~/ Change Order #1 Contract dated July 6, 2004 Lake Creek Pedestrian Path `~ ~'~~ ~• Phillip M. B wman, P.E. Date fA6Lf COUNTY Project Engineer Item Description Qt Unit Unit Price Original Contract Amount Change Order Quantity Change Unit Price Change Net Change Adjusted Contract Price 1 Mobilization 1 LS $10,000.00 $10,000.00 $10,000.00 2 6' Concrete Sidewalk 610 SY $39.50 $24,095.00 $24,095.00 3 4' Concrete Sidewalk 130 SY $56.50 $7,345.00 $7,345.00 4 Type IIB Curb and Gutter 930 LF $20.00 $18,600.00 $18, 600.00 5 4" Asphalt (HBP) 492 SY $28.50 $14,022.00 1 -110 -$3,135.00 $10,887.00 6 Existing Sign Removal 11 EA $150.00 $1,650.00 1 -11 -$1,650.00 $0.00 7 Retaining Wall (Lake Creek) 270 FSF $26.00 $7,020.00 $7,020.00 8 Sawcut & Remove Asphalt 575 SY $15.00 $8,625.00 1 -110 -$1,650.00 $6,975.00 9 Hand Rail along Lake Creek 310 LF $89.60 $27,776.00 1 -310 -$27,776.00 $0.00 10 Relocate Irrigation & Sprinkler Heads 1 LS $5,000.00 $5,000.00 $5,000.00 11 Reconstruct Site Entrance (Miele Lane 1 LS $7,930.00 $7,930.00 $7,930.00 12 Driveway Curb Cut and Ramp Lake Creek 1 LS $4,500.00 $4,500.00 $4,500.00 13 West Handicap Ramp (Lake Creek 1 LS $2,500.00 $2,500.00 $2,500.00 14 East Handicap Ramp and Curb Return Lake Creek 1 LS $4,415.00 $4,415.00 $4,415.00 15 Lake Creek and Highway 6 Sidewalk Connection 1 LS $1,567.00 $1,567.00 $1,567.00 16 Clearing and Grubbing 1 LS $23,235.00 $23,235.00 $23,235.00 17 Erosion Control 1 LS $3,500.00 $3,500.00 $3,500.00 18 Reseeding and Revegetation 1 LS $3,825.00 $3,825.00 $3,825.00 Lake Creek Pedestrian Path Change Order #1 Page 1 of 2