HomeMy WebLinkAboutC04-244 Elam ConstructionLb4 7'N So CHANGE ORDER NUMBER _ 5 CONTRACTOR Elam Construction, Inc. Contract for Eagle-Vail Pedestrian Trail Improvements Contract Date August 5, 2003 TO: Elam Construction, Inc. You are directed to make the changes noted below in the Subject Contract. Appropriations to cover the costs of additional work have been made. EAGLE COUNTY BOARD OF COUNTY COMMISSIONERS By: Tom C. one, Chairman DATE: ~ ~ -5 " ` `~ Nature of Changes: Due to right-of--way width and the construction of the roundabout at Post Blvd. and Highway 6, a portion of the trail was removed from the project eliminating the need for removing a portion of stone wall. In addition, there were some final adjustments made to reflect as-built conditions. An itemization of the changes for this change order is attached as Exhibit "A". Due to winter weather conditions certain final portions of the work were not completed prior to the previous ending date of December 31, 2003, and were completed this spring. An increase in contract time is warranted. These changes result in the following adjustment of Contract Price and Contract Time: Contract Price Prior to this Change Order $477,754.07 Net Decrease Resulting from this Change Order -$ 9,518.00 Current Contract Price Including this Change Order $468,236.07 Change Order #5 Page 1 of 2 Contract Time Prior to this Change Order December 31, 2003 Net Increase Resulting from this Change Order 150 Days Cur; ent Contract Time Including this Change Order May 30, 2004 The above changes are recommended: .~ 1 ~ r 1 r, l ~~ G Helen Migchelbrink County Engineer Date: L ~` The above changes are accepted: Elam Construction, Inc. By: Title: Date: Change Order #5 Page 2 of 2 Change Order #5 Contract dated August 5, 2003 Eagle-Vail Pedestrian Trail Improvements ~ ~. Peter T. ulmeisters Date EAGLE COUNTY Project Manager Original Adjusted Contract Change Quantity Unit Price Contract Item Descri tion Qt Unit Unit Price Amount Order Chan a Chan a Net Chan a Price 1 Clearin & Grubbin 1 LS $20,000.00 $20,000.00 $0.00 $20,000.00 2 Excavation and Embankment 1 LS $53,790.00 $53,790.00 1 -0.4796% -$258.00 $57,184.00 2 6.7894% $3,652.00 3 Aggregate Base Course (Class 6) 2283 Tons $28.00 $63,924.00 1 -81.2600 -$2,275.28 $61,704.72 $28.00 2 2.0000 $56.00 4 Asphalt (HBP) 773 Tons $55.00 $42,515.00 1 -43.5300 -$2,394.15 $40,120.85 $55.00 2 0.0000 $0.00 5 Top Soil: Remove/Replace/Dispose 1 LS $15,000.00 $15,000.00 $0.00 $15,000.00 6 Reve etation & Seedin 1 LS $4,500.00 $4,500.00 $0.00 $4,500.00 7 Install Storm Manhole 1 EA $4,500.00 $4,500.00 4 -1.0000 -$4,500.00 $0.00 8 Ad'ust Manholes 8 EA $275.00 $2,200.00 $0.00 $2,200.00 9 Relocate Ped Heads 2 EA $1,350.00 $2,700.00 $0.00 $2,700.00 10 Relocate Electric Meter 1 EA $2,000.00 $2,000.00 $0.00 $2,000.00 11 Relocate Si nal Control Box 1 EA $2,800.00 $2,800.00 $0.00 $2,800.00 12 Install 18" CMP Culvert 90 LF $92.00 $8,280.00 2 -60.0000 -$5,520.00 $0.00 4 -30.0000 -$2,760.00 13 F.E.S. 4 EA $450.00 $1,800.00 2 -1.0000 -$450.00 $450.00 4 -2.0000 -$900.00 14 Ri ra 1.5 CY $1,000.00 $1,500.00 4 -1.5000 -$1,500.00 $0.00 15 T e C Inlet 1 EA $4,500.00 $4,500.00 2 -1.0000 -$4,500.00 $0.00 16 Extend 24" HDPE Pie 10 LF $200.00 $2,000.00 $0.00 $2,000.00 17 Connectin Band 1 EA $250.00 $250.00 $0.00 $250.00 18 Stona Wall Removal 1 LS $3,000.00 $3,000.00 5 -1.0000 -$3,000.00 $0.00 19 Remove Trees 15 EA $300.00 $4,500.00 4 -4.0000 -$1,200.00 $3,300.00 20 Hand Rail Over Tunnel 65 LF $115.00 $7,475.00 $0.00 $7,475.00 21 Si n Relocation 8 EA $65.00 $520.00 $0.00 $520.00 22 New Signs 52 EA $100.00 $5,200.00 4 -8.0000 -$800.00 $2,900.00 5 -15.0000 -$1,500.00 Eagle-Vail Pedestrian Trail Improvements Change Order #5 F- W .saIQ9e1 Page 1 of 3 Original Adjusted Contract Change Quantity Unit Price Contract Item Descri tion Qt Unit Unit Price Amount Order Chan a Chan a Net Chan a Price 23 Si n Posts 43 EA $50.00 $2,150.00 4 -31.0000 -$1,550.00 $600.00 Retaining Wall, Concrete Walk, Railin 24 Structure Excavation 30 CY $150.00 $4,500.00 $0.00 $4,500.00 25 Structure Backfill Class 1 30 CY $200.00 $6,000.00 $0.00 $6,000.00 26 A re ate Base Course Class 6 21 CY $125.00 $2,625.00 $0.00 $2,625.00 27 Concrete Block Facin MSE Walls 1645 SF $32.00 $52,640.00 $0.00 $52,640.00 28 Bikewa Railin Steel 595 LF $90.00 $53,550.00 1 -$8.61 -$5,123.00 $48,427.00 29 Concrete Class D 136 CY $275.00 $37,400.00 $0.00 $37,400.00 30 Reinforcin Steel E ox Coated 9750 LBS $1.00 $9,750.00 $0.00 $9,750.00 31 Guardrail, Type 3 290 LF $32.00 $9,280.00 2 185.0000 $5,920.00 $12,416.00 4 -87.0000 -$2,784.00 32 End Section 1 EA $2,200.00 $2,200.00 4 -$1,200.00 -$1,200.00 $1,000.00 33 Pedestrian Rub Rail 50 LF $14.00 $700.00 4 231.0000 $3,234.00 $3,934.00 34 Sanita Facilit 1 EA $400.00 $400.00 $0.00 $400.00 35 Erosion Control 1 LS $7,500.00 $7,500.00 $0.00 $7,500.00 36 Traffic Control 1 LS $20,000.00 $20,000.00 $0.00 $20,000.00 37 Surve in .1 LS $12,000.00 $12,000.00 $0.00 $12,000.00 38 New Item: Remove Existin HBP SF 2 1330.0000 $0.50 $665.00 $665.00 39 New Item: Sawcut LF 2 75.0000 $1.50 $112.50 $112.50 40 New Item: Struxture Excavation LS 2 1.0000 $1,000.00 $1,000.00 $1,000.00 41 New Item: Structure Backfill LS 2 1.0000 $1,500.00 $1,500.00 $1,500.00 42 New Item: Riprap section at 84" pipe for stabilizaion of slope. Time LS 3 1.0000 $20,000.00 $20,000.00 $14,982.00 and materials not to exceed rice 5 -25.09% -$5,018.00 43 New Item: Rase Existing Manhole ' LS a proximate 1 4 1.0000 $700.00 $700.00 $700.00 44 New Item: Increase cost to excavate LS ier holes due to rock soil 4 1.0000 $440.00 $440.00 $440.00 45 New Item: Remove and Replace 6 LF of 2' curb and utter LS 4 1.0000 $500.00 $500.00 $500.00 46 New Item: Plug Culvert at Eagle Rd with concrete LS 4 1.0000 $250.00 $250.00 $250 00 47 New Item: Wedge Patching E. of . Stone Creek intersection LS 4 1.0000 $2,150.00 $2,150.00 $2,150.00 Eagle-Vail Pedestrian Trail Improvements Change Order #5 Page 2 of 3 Original Adjusted Contract Change Quantity Unit Price Contract Item Descri tion Qt Unit Unit Price Amount Order Chan a Chan a Net Chan a Price New Item: Winter Protection for 48 LS Concrete Walk 4 1.0000 $1,640.00 $1,640.00 $1,640.00 TOTAL $473,649.00 -$9,518.00 $468,236.07 Change Order #4 Summary Original Contract Amount $473,649.00 Change Order #1 DECREASE -$10,050.43 'Change Order #2 INCREASE 2,435.50 ,Change Order#31NCREASE $20,000.00 Change Order #4 DECREASE ( -$8,280.00 Change Order #5 DECREASE -$9,518.00 New Contract Amount $468,236.07 Eagle-Vail Pedestrian Trail Improvements Change Order #5 Page 3 of 3