HomeMy WebLinkAboutC04-225 American Civil ConstructorsGv~~-~~-~-~7
~~CTA~I~ oo~so
PROJECT: iVlulti-Purpose Portd Change Qrder loo. Proposal OU7
Trztct C, L erry Creek/Miller 12anch PTJD
Contract 1`10.: C03-311-47
Initiation Date: June TS, 20Q3
'l`d: ivlaokzael Cirkovic Contract Date: October 2$th, 2Q03
Eagle County Facilities 1Ylanagement
~'ou a.re directed to i~~ake the following changes in this Contract.
Phase add the fallowing:
Taslws Cost
See attached list far breakdown Uf costs $375,OOQ.00
Paz:king lot Cozaslractiorz (l*lct tQ Exceed Value)
't'O'I'~,L ~37~,040.l1U
Not vulici ~ztatil vigned by both the Owz2er aszd Engineer.
Silnaturt; o.f'the Engineec indicates his agreement herewith, including any adjustments in the Contract
Kunz or Coz~tract'Time.
Thr. Original Contract Sum was
Net Change by previously authorized Cha,ng~ Orders (1,2,3,4,5,6)
The Contract Sttan prior to this Change Order was
The Contract Sam will be increased by this change order
The new Contract Stun inclu~tinl; this Change Order will be
Currcn# Substnntiai GQmplction Date
The new Substantial Cpmpl~tion Date is
AMERICAN CIVfL COKSTRUCTORS (CQI~ITRACTQI~)
Nazue~ AMltl{4a ~ _ L'nS
Title: Project`E gineer
$ 675,375.00
$ 3,301.00
$ 683,676.00
$ 375,000.00
$ 1,058,676.00
July 7th, 2004
August 31,2004
EY: CJ! V`^
Name: Tom C. Stone
Title: Chairman
Late: July 6 , 2 0 ~ _ n !
ENI~ ~LCTIQN oo~so
G© ~Jtld 1SN00 ~I11I0 Nb0I2l~Wt7
J
Attest: ti ~ ` ~~`~` « s,'
Teak _3',,:', ~rt~G`o~t, Cr rk to t~
Boar. o;f Couri~ty, ;Commissioners
..
/' '
5
~;, r•
L8SILbEEflB 5E~£Z b~BZ/8ti/90
J UI•i-1J GUNJ~-F 1>' J7 I"ILU V•111'111GfE.1 ILfSG
~~
~~
~_ ~~~
AMEf:tCAN CIVEL CDNSTRUCTOf2s
4901 S. Windermere 5t., I.ittfeton, Ct7 80120
Phone 303.738.5103 Pax 303-347-1587
Owner Basle Count
590 Broadway-_ __
Basle, CtS, 81631 ----
Project: Berry Creek Pond
Location: 0450 Miller Ranch Road, Edwards, CO
Summary ~y: Mike Stephens
Date: 6l15/2004
item ff Bld ttQm Quantit Unit Prise 7atal
1 Structural Fill 5315 CY 6.00 $31,880.00
2 To sail Stri /Stock ilelRe lace 16215 CY 4.50 $72,967.50
3 Gradin 12275 CY 6.00 $73,650.00
4 Place Excess Materials in Stock files 9100 CY 4.00 $36,400.00
5 18" MDPE 60 LF 45.00 $2,700.00
6 18" FES 2 F_A 150.00 $300.00
7 24" HDPE 14p LF 49.00 $6,860.00
$ 24" FEg 2 EA 210,00 $420.00
9 As halt drive Area 145 SY 30.00 $4 350.00
10 Gravel Parkin Area 16225 SY 5A0 $$1,125.00
11 Erasion Control 1 LS $ 2,000.00 $2,000.00
12 Scarif and Recom act Parking Area 16225 SY $ 2.00 $32,450.00
$0.00
$0.00
707AL $345,112.50
* Parking area is to be 4" deep 1 1/2" screened materials trom onsi~e stocrcpues
* Permits are not included
* No Subexcavation or replacement included for parking areas
* Parking area to be scarified to depth of 1 ft and recompacted in areas where clay is presant
" Payment will be for actual quantities installed, all quantities will be measured
Surveying is not Included 4 {C MAX , fat, , ~' M ~ .
* Testing is included
* Contract completion date will need to be extended to August 31, 2004.
* This work can be completed by August 31,2004 if the weather is cooperative and there are no
unfarseen site conditions.
ACCEPTED 13Y:
Attest:
SUBMIT-fEU BY: r~ l ~ U
c?. ~..
American Civil Constructors
7-6-04
~~_(~ Date __.
eLBoa` Co my Commissioner;
Date
TUTHL P. D3