HomeMy WebLinkAboutC04-199 Holy Cross d 01- -/9 9 -t.f-1 (,\('OS5 ~ ... '\I~ " ,,- l' 0' (;l .t: ..I.. ::t o "- ~'\I '\- ~ 5S0'4') 3799 HIGHWAY 82 . P.o. DRAWER 2150 GLENWOOD SPRINGS, COLORADO 81602 (970) 945-5491 . FAX (970) 945-4081 May 6, 2004 Mr. Steve Russell Recreation Director Western Eagle County Metropolitan Recreation District PO Box 246 Eagle, CO 81631 Re: Eagle County Sports Complex Lighting Dear Mr. Russell: Holy Cross Energy has completed a design and cost estimate for providing electric service to the above referenced project, hereinafter the "Project". Our facilities will be installed as shown on the attached sketch. The owner or developer of the subject Project is hereinafter referred to as the "OWner". The estimated cost of construction is as follows: Total estimated cost of underground construction $14.600.00 Construction ,deposit consisting of equivalent" overhead credits (refundable) $11,000.00 Contribution in aid of construction (nonrecoverable) 3.600.00 Total payment required before starting work on the project $14,600.00 Our power facilities must be installed on an easement. Please execute and return the enclosed,document. The following conditions are hereby noted: 1. The enclosed "Application For Electric Service" form must be completed, signed, and returned. 2. Holy Cross Energy has implemented a policy which requires that the Owner provide all excavation, backfill. compaction and cleanup needed for installation of the underground power system extension to serve the Project. The Owner must also set all vaults and Install all conduits as specified by Holy Cross Energy's design for the Project and the enclosed construction specifications. Holy Cross Energy will supply all material which can be picked up by the Owner at the appropriate storage yard. The cost of this material Is included in the job cost estimate. ~ It shall be the Owner's responsibility to ensure that splice vaults, switchgear vaults and transformer vaults Installed hereunder for the Project are accessible by Holy Cross boom trucks and other necessary equipment and personnel at all times. The use of such access by Holy Cross shall not require removal or alteration of any improvements, landscaping, or other obstructions. The ground surface grade shall not be altered within ten (10) feet of said splice, SWitchgear and transformer- vaults, nor along the power line route between the vaults. The ground surface grade at said transformer and switchgear vaults shall be six (6) inches below the top of the pad. The ground surface grade at said splice vaults shall be even with the top of the pad. The manhole opening of said splice vaults shall be uncovered (excluding snow) and accessible at all times. Improvements, landscaping or any other objects placed in the vicinity of said transformers and SWitchgear shall be located so as not to hinder complete opening of the equipment doors. The ground surface within ten (10) feet of said transformer and switchgear doors shall be flat, level and free of improvements, landscaping, and other obstructions. Improvements, landscaping and other objects will be kept a minimum of four (4) feet from non-opening sides and backs of said transformers and switchgear. OWner hereby agrees to maintain the requirements of this paragraph. and further agrees to correct any violations which may occur as soon as notified by Holy Cross Energy. Said corrections will be made at the sole cost and expense of o-V'lIner. 4. There.is no provision in our estimate for revegetation. Revegetation, if required, must be provided by parties other than Holy Cross Energy. 3. S. Secondary voltage available will be 240/480, single-phase. 6. Secondary facilities shall be installed in accordance with National Electrical Code and Holy Cross Energy speCifications. All meter locations must be approved. Any service over 200 amps or 240 volts must have prior written approval from Holy Cross Energy. 7. It will be the Owner's responsibility to extend underground secondary entrance conductors from the pad-mounted transformer to points of power usage. Steve Russell May 6,2004 Page Two 8. All underground services shall be installed in conduit ahead of the meter. All underground services must be in conduit beneath roads, driveways, and other areas of difficult excavation. 9. T~e meter housing must be positioned so the meter faces a driveway or road. 10. It s.hall be the Owner's responsibility to protect their electric equipment from temporary over voltage or under voltage situations resulting from causes beyond the control of Holy Cross Energy. 11 . The above mentioned cost estimate does not include connect fees or meter deposits, If required. Arrangements for payment of these items and for scheduling the actual meter Installation should be made through the local Holy Cross Energy office. 12. We attempt to complete all projects in a timely manner. However, highest priority is given to maintaining service to our existing consumers. This fact, along with inevitable construction delays, will not allow us to guarantee a project completion date. 13. All Holy Cross Energy rules and regulations will be followed. When Holy Cross Energy Is in receipt of the OWner's check in the amount of $14,600.00, all necessary executed easements, other permits, if required, a completed "Application For Electric Service" form and the signed original of this letter agreement (below), the job can be scheduled for construction. Sincerely, HOLY CROSS ENERGY Rex O. Berens, Engineering Technician RB:vw Enclosure The above terms and conditions are hereby agreed to and accepted By: cQp~.. Title: e \..o::Lt'_...~ Date: st ''1 \ 1..~"-\ W/0#04-18663:43-06:Eagle County Sports Complex berens\Russell HOLY CROSS ENERGY UNDERGROUND RIGHT-OF-WAY EASEMENT KNOW ALL MEN BY THESE PRESENTS, that the undersigned, THE COUNTY OF EAGLE, STATE OF COLORADO (hereinafter called "Grantor"), for a good and valuable consideration, the receipt whereof Is hereby acknowledged, does hereby grant unto Holy Cross Energy, a Colorado corporation whose post office address is P. O. Drawer 21 SO, Glenwood Springs, Colorado (hereinafter called "Grantee") and to its successors and assigns, the right of ingress and egress across lands of Grantor, situate In the County of Eagle, State of Colorado, described as follows: A parcel of land situate in Section 6, Township 5 South, Range 84 West of the 6th P.M., as more fully described In Book 570 at Page 593 in the records of the Eagle County Clerk and Recorder's Office, Eagle, Colorado. And, to construct, reconstruct, repair, change, enlarge, re-phase, operate, and maintain an underground electric transmission or distribution line, or both, with the underground vaults, conduit, fixtures and equipment used or useable In connection therewith, together with associated equipment required above ground, within the above mentioned lands, upon an easement described as follows: That portion of land defined by and contained within the existing Holy Cross Electric Association, Inc. Right-of-Way Easement as more particularly described by Reception No. 517556 in Book 621 at Page 488; in the records of the Eagle County Clerk and Recorder's Office, Eagle, Colorado. It shall be the Grantor's responsibility to ensure that splice vaults, SWitchgear vaults and transformer vaults Installed hereunder on said real property are accessible by Grantee's boom trucks and other necessary equipment and personnel at all times. The use of such access by Grantee shall not require removal or alteration of any Improvements, landscaping, or other obstructions. The ground surface grade shall not be altered within ten (10) feet of said splice, switchgear and transformer vaults, nor along the power line route between the vaults. The ground surface grade at said transformer and SWitchgear vaults shall be six (6) Inches below the top of the pad. The ground surface grade at said splice vaults shall be even with the top of the pad. The manhole opening of said splice vaults shall be uncovered (excluding snow) and accessible at all times. Improvements, landscaping or any other objects placed in the vicinity of said transformers and SWitchgear shall be located so as not to hinder complete opening of the equipment doors. The ground surface within ten (10) feet of said transformer and SWitchgear doors shall be flat, level and free of Improvements, landscaping, and other obstructions. Improvements, landscaping and other objects will be kept a minimum of four (4) feet from non-opening sides and backs of said transformers and switchgear. Grantor hereby agrees to maintain the requirements of this paragraph and further agrees to correct any violations which may occur as soon as notified by Grantee. Said corrections will be made at the sole cost and expense of Grantor. Together with the right to remove any and all trees, brush, vegetation and obstructions within said easement and the right to pile spoils outside said easement during construction and maintenance, when such Is reasonably necessary for the implementation and use of the rights hereinabove granted. In areas where vegetation is disturbed by the above described use of the easement, the ground surface shall be seeded using a standard native mix by Grantee. Grantor agrees that landscaping or other surface improvements added on said easement after the date of execution hereof will be minimized and that Grantee will not be responsible for damage to said additional landscaping or surface improvements caused by exercise of its rights granted by this easement. Grantor agrees that all facilities installed by Grantee on the above described lands, shall remain the property of Grantee, and shall be removable at the option of Grantee. Grantor covenants that It is the owner of the above described lands and that the said lands are free and clear of encumbrances and liens of whatsoever character, except those held by the following: TO HAVE AND TO HOLD, said right-of-way and easement, together with all and singular, the rights and privileges appertaining thereto, unto Grantee, its successors and assigns, forever. IN WITNESS WHERE~O ,Grantor has caused these.J~~sents to be duly executed on this ~ay of _~ .20 .2.. h THE COUNTY OF EAGLE, STATE OF COLORADO By: By: ~ STATE OF ) ~ )ss. COUNTY OF e-;.) . The foregoing instrument was acknowledged before me this .;r"r'.Idav of ~u.F . 20 "y , by TOM STONE as Chairman of the BOARD OF COUNTY COMMISSIONERS OF THE NTY OF EAGLE, STATE OF COLORADO. ~ ~/JS'8 W/O#04-18663:43-06:Eagle County Sports Complex:6-30-04 Veda\Berens\Russell Revised 4-1 6-01 .. ~ HOLY CROSS ENERGY UNDERGROUND RIGHT-Or.-WAV WEMENT KNOW ALL MEN BY THESE PRESENTS, that the undersigned, THE COUNTY OF EAGLE, STATE OF COLORADO (hereinafter called "GrantorU), for a good and valuable consideration, the receipt whereof Is hereby acknowledged, does hereby grant unto Holy Cross Energy, a Colorado corporation whose post office address is P. O. Drawer 21 SO, Glenwood Springs, Colorado (hereinafter called "Grantee") and to its successors and assigns, the right of ingress and egress across lands of Grantor, situate in the County of Eagle, State of Colorado, described as follows: A parcel of land situate In Section 6, Township 5 South, Range 84 West of the 611l P.M., as more fully described in Book 570 at Page 593 in the records ofthe Eagle County Clerk and Recorder's Office, Eagle, Colorado. And, to construct, reconstruct, repair, change, enlarge, re-phase, operate, and maintain an underground electric transmission or distribution line, or both, with the underground vaults, conduit, fixtures and equipment used or useable In connection therewith, together with associated equipment required above ground, within the above mentioned lands, upon an easement described as follows: That portion of land defined by and contained within the existing Holy Cross Electric Association, Inc. Right-of-Way Easement as more particularly described by Reception No. 517556 in Book 621 at Page 488, in the records ofthe Eagle County Clerk and Recorder's Office, Eagle, Colorado. It shall be the Grantor's responsibility to ensure that splice vaults, sWitchgear vaults and transformer vaults Installed hereunder on said real property are accessible by Grantee's boom trucks and other necessary equipment and personnel at all times. The use of such access by Grantee shall not require removal or alteration of any Improvements, landscaping, or other obstructions. The ground surface grade shall not be altered within ten (10) feet of said splice, switchgear and transformer vaults, nor along the power line route between the vaults. The ground surface grade at said transformer and 'tchgear vaults shall be six (6) inches below the top of the pad. The ground surface grade at said splice vaults shall be .n with the top of the pad. The manhole opening of said splice vaults shall be uncovered (excluding snow) and accessible at all times. Improvements, landscaping or any other objects placed In the vicinity of said transformers and switchgear shall be located so as not to hinder complete opening of the equipment doors. The ground surface within ten (10) feet of said transformer and switchgear doors shall be flat, level and free of Improvements, landscaping, and other obstructions. Improvements, landscaping and other objects will be kept a minimum of four (4) feet from non-opening sides and backs of said transformers and switchgear. Grantor hereby agrees to maintain the requirements of this paragraph and further agrees to correct any violations which may occur as soon as notified by Grantee. Said corrections will be made at the sole cost and expense of Grantor. Together with the right to remove any and all trees, brush, vegetation and obstructions within said easement and the right to pile spoils outside said easement during construction and maintenance, when such is reasonably necessary for the Implementation and use of the rights hereinabove granted. In areas where vegetation Is disturbed by the above described use of the easement, the ground surface shall be seeded using a standard native mix by Grantee. Grantor agrees that landscaping or other surface Improvements added on said easement after the date of execution hereof will be minimized and that Grantee will not be responSible for damage to said additional landscaping or surface improvements caused by exercise of its rights granted by this easement. STATEO~Lo~ COUNTY OF t;; ~ \.x7 .~ The foregoing instrument was acknowledged before me this IS -Cav by MICHAEL L. GALLAGHER as Chairman, Board of County Commission rs, WITNESS my hand and offjcial seal My commission expires: lo \ \'Z--\2-DC:>~ : Bo~ommlssioners . . 1I~....,.,an ) ) ss. ) . 20 0 L{-.. of Colorado. Address: W/0#04-18663:43-06:Eagle County Sports Complex:5-6-04 Veda\Berens\Russell Revised 4-16-01 Appendix l HOLY CROSS ENERGY RESIDENTIAL - LOAD INFORMATION AND METER LOCATION FORM CONDITIONS OF RESIDENTIAL SERVICE As the power supplier for this area, Holy Cross Energy has an obligation to provide electric service promptly and economically, consistent with good engineering and construction practices. Good planning and follow-through are necessary to minimize delays arid wasted efforts, particularly during the busy construction season and periods of rapid growth. Holy Cross Energy will provide appropriate information on rates, rules, regulations and conditions for receiving electric service. The Applicant requesting electric service shall apply for membership in and agrees to purchase electric energy from Holy Cross Energy under the terms and conditions detailed in the "Share Subscription and Application for Membership". Billing for electric service rendered will be as prescribed under the appropriate rate tariff as filed with the Public Utilities Commission of the State of Colorado. The Applicant will pay any required connect fees and meter deposits prior to meter installation being scheduled. The Applicant shall comply with all requirements of the appropriate electrical inspection authority and obtain its approval of all service work performed. In addition, the Applicant shall comply with all Holy Cr:oss Energy rules and specifications, whith include, but are not limited to the "Consumer Service Facilities Metering and Use Guidebook" and the "Equipment Screening" specifications. Compliance with the "Guidebook" (or any Holy Cross Energy specifications) and/or approval by Holy Cross Energy is not an endorsement or warranty of the consumers facilities. Compliance with the "Guidebook" and/or approval by Holy Cross Energy is an assurance that the electric service will be connected to its distribution system after approval by the appropriate electrical inspector. The consumer is solely responsible for determining the adequacy, safety and legality of all plans, specifications, facilities, equipment, sites, easements, installation and other characteristics of the electric service. All meter locations must be approved by Holy Cross Energy p'rior to the start of service construction. Any requested variance to the "Guidebook" must be referenced to the specific Guidebook Section per Appendix D. Metering work undertaken prior to such approval in a location that cannot be approved will require relocation of the metering equipment to an approved location at the expense of the project owner. Applications requiring only the installation of a meter for a new or revamped service can be scheduled after the Residential - Load Information and Meter Location Form is approved, the appropriate electrical inspection authority has approved the service work and all applicable membership and connect fees, and meter deposits have been received. The owner of the residential service to be connected must call and request meter installation. Applications requiring a new transformer, increasing the capacity of an existing transformer, or extension of additional distribution facilities must comply with Holy Cross Energy's "Extension Policy" on file with the Public Utilities Commission of the State of Colorado, which may require payment of part or all of the estimated cost of construction. Upon approval of a complete Residential - Load Information and Meter Location Form, Holy Cross Energy will field check and design the necessary work. The Applicant must provide final ground surface grade information 2/18/04 1 along the entire route of all facility extensions. Cost estimates, agreements, easements, contracts and special permits will be prepared and submitted to the proper parties. Once all necessary properly executed paperwork and payments have been received, the work will be scheduled for construction. After construction has been completed, installation of a meter can be scheduled after the appropriate electrical inspection authority has approved the service work and all applicable membership and connect fees, and meter deposits have been received. The owner of the residential service to be connected must call and request meter installation. The Applicant shall inform Holy Cross Energy of any and all revisions which may be made to the project after the original information is submitted. These revisions shall specifically include any changes in ground surface grade from that previously provided. Revisions may necessitate a change in the plan prepared to provide electric service and may cause preparation of revised paperwork and/or rescheduling work to be performed by Holy Cross Energy. If inaccurate ground surface grade information provided prior to construction or changes in ground surface grade made after construction is completed create a National Electrical Safety Code violation, Holy Cross Energy will correct the violation at the expense of the Applicant. Processing the application will not be possible until the required information is complete. Allow five (5) working days to process the application after receipt of all necessary information. HOLY CROSS ENERGY R I ~~ OI-ulDB'> ~ k~ \ ~'= L Iv I \.. . Richard D. Brinkley, General Manager - Regulated Services 2/18/04 2 . . HOLY CROSS ENERGY RESIDENTIAL - LOAD INFORMATION AND METER LOCATION FORM NAME (Applicant): NAME (Billing): ADDRESS (Billing): Bldg. Permit: No / Yes HCE Member: No / Yes Phone (Home) Phone (Business) LOCATION: Within City Limits? SECTION , TWP, SUBDIVISION STREET ADDRESS NAME OF HOLY CROSS ENERGY ENGINEER CONTACTED No / Yes City of S, RANGE ,LOT FILING, SERVICE REQUESTED: Number of Dwellings New Remodeled Full Time Seasonal Anticipated Electric Service Dates: Temp. Con st. Permanent Secondary Voltage: / volts Phase Secondary Wire Size Meter Location: Pole House Pedestal Distance (Transformer to meter) (ft) Existing Transformer No. (black on yellow numbers on face of transformer) Meter location must be approved by Holy Cross Energy. Any metering work undertaken prior to such approval may require relocation to an approved location at the expense of the project owner. House (sq. ft) Trailer (size) Other ELECTRICIAN: Phone ELECTRIC LOAD INFORMATION: Lighting kW Range: Electric Clothes Dryer: Electric Heat: Electric kWeach (Number ) or Gas kW each (Number ) or Gas ), Natural Gas _ or Propane Gas ) kW (Type No / Yes (Number of Zones kWeach (Number @ Electric Heat Zone Control: Water Heater: Electric Other Major Loads (kW), @ @ Estimated Maximum Demand (NEe) kW 3 . . REMARKS and/or Request for "Guidebook" exception per Appendix D for Section: This form may be faxed to the appropriate Holy Cross Energy office: Avon - 949-4566 Glenwood Springs - 945-4081 After this form is accepted as complete and the new service has been inspected by the electrical inspector. the appropriate Holy Cross Energy office must be contacted by the owner to request a connect: Aspen - 925-7311 Avon - 949-5892 Eagle - 328-6360 Glenwood Springs - 945-5491 I certify that the above information is correct and that I have read the attached "Conditions of Residential Service" and understand them. (Date of Application) (Customer Signature) 2/18/04 4 HOLY CROSS ENERGY RESIDENTIAL - LOAD INFORMATION AND METER LOCATION FORM (continued) SITE SKETCH On the space provided above please sketch the structure site including North Arrow. roads, driveways, sidewalks and proposed meter location(s). Physical address of project: . 2/1 8/04 5 . . ( WORK ORDER NUMBER: DESCRIPTION: 1) New Const. OHD UG 1) Distribution Work Plan # ENGINEER: 2) System Imprv. SS 3) Ord. Repl. 4) Ret. 2) Transmission Major (year) Work Plan Category LOCATION# N/R Minor Line Extension: Transformer: Secondary: Contract: Existing Const. Advance $ Existing Transformer: Co. No. Month/year / (Demand Accounts Included Above: KWH KW Estimated KVA OHD OHD OHD UG UG UG Existing Existing C/O C/O /mo., Trans. Min: Contr. in Aid of Const. $ Revenue: Canst. Deposit $ KVA KWH No. of Accounts ( Number of Accounts By: Comments: Approval for "Guidebook" exception per Appendix 0 for Section: Holy Cross Energy Date 2/18/04 6 19075 . WESTERN EAGLE COUNT TRO RECREATION DISTRICT PO BOX 246 970-328-6909 EAGLE, CO 81631 ALPINE u~K EAGLE, CO 81631 82-340/1021 303 6/212004 ~ .) THE ORDER OF Holy C-rollll Rlectric $.1.4 linn no Fourteen Thousand Six Hundred and 00/1 00......................................"''''...'''''''''''''''.'''.'''"''''.''''''.''''''.'''''''''''''''''''''..''''''''''''''''''''''''''' DOlLARS 3 Holy Cross Energy PO Drawer 2150 Glenwood Springs, CO 4--: 2---- ~ ~~: ...-" . .' . v....~-c. !'fiHORIZED SIGNATURE _ :I 0 :I 0 0 ~ q :I a 0 II-\.-X.... :\,J JJ.!../ . Ill' MEMO Install Electric transformer at Fairgrounds II-a ~ qo ? 511- .: ~O 2 ~o :1..0 ?: WESTERN EAGLE COUNTY METRO RECREATION DISTRICT 19075 Holy Cross Electric 204 - Fairgrounds 6/2/2004 Install Electric transformer at Fairgrounds 14,600.00 Alpine Checking Install Electric transformer at Fairgrounds 14,600.00 WESTERN EAGLE COUNTY METRO RECREATION DISTRICT 19075 Holy Cross Electric 204 - Fairgrounds 6/2/2004 Install Electric transformer at Fairgrounds 14,600.00 Alpine Checking Install Electric transformer at Fairgrounds 14,600.00 LMP12 ....