HomeMy WebLinkAboutC04-007 Elam Construction .. .. ... c- c-04--o7- .sO ... CHANGE ORDER NUMBER ~ CONTRACTOR Elam Construction, Inc. Contract for Eagle-Vail Pedestrian Trail Improvements Contract Date August 5, 2003 TO: Elam Construction, Inc. You are directed to make the changes noted below in the Subject Contract. Appropriations to cover the costs of additional work have been made. By: COMMISSIONERS DATE: /-6-c{)M1/ Nature of Changes: Conditions encountered during construction resulted in modification of the method of excavation for the pier holes for the railing along the rail, raising of a manhole to the new grade necessary due to utility conflicts, winter protection for the concrete, additional asphalt patching for drainage, removal and replacement of 6' of curb and gutter, additional rub rail along the trail and revised quantities for tree removal, signs, guardrail and drainage structures. An itemization of the changes is attached as Exhibit "A". These changes result in the following adjustment of Contract Price and Contract Time: Contract Price Prior to this Change Order Net Decrease Resulting from this Change Order Current Contract Price Including this Change Order $486,034.07 -$ 8.280.00 $477,754.07 Contract Time Prior to this Change Order Net Increase Resulting from this Change Order Current Contract Time Including this Change Order November 15, 2003 45 Days December 31, 2003 Change Order #4 Page 1 of2 .. .... \ .. The above changes are recommended: ~ ~\~~ Helen Migchelbrink County Engineer Date: The above changes are accepted: Elam Construction, Inc. Change Order #4 Date: Page 2 of2