HomeMy WebLinkAboutC03-350 NexGen Constructors C!.03 ,--3. 5' 0 -0.3 CBANGEORDERNUMBER~ CONTRACTOR: NexGen Constructors, Inc Contract for: Avon to Dowd Junction Trail Phase I Contract Date: August 26th, 2003 TO: You are directed to make the changes noted below in the Subject Contract. County represents that lawful appropriations to cover the costs of the additional work described in this change order have been made. By: Date: OARD OF COUNTY COMMISSIONERS Nature of Changes: DESCRlPTION Quantity Add Culvert P2A 1 Deduct Type 13 Inlets 2 Add Type C Inlets 2 Add 30" RCP Irrigation Pipe 55 lineal feet Revise Wall Concrete Mix 180 cubic yards Add Concrete at Wall IR 1 lump sum Delete Culvert P5 1 Reduce Culvert P4 to 18" 1 Fill 30" CMP with Flyash 1 lump sum Totals . INCREASE DECREASE $4,529.00 $10,400.00 $5,400.00 $4,565.00 $1,800.00 $488.00 $7,702.00 $448.00 $8,292.00 $25,074.00 $18,550.00 , Change Order No. 1 Page 2 These changes result in the following adjustment of Contract Price and Contract Time: Contract Price Prior to this Change Order Net Increase Resulting from this Change Order Current Contract Price Including this Change Order Contract Time Prior to this Change Order Net Resulting from this Change Order Current Contract Time Including this Change Order $1,749,989.50 $6,524.00 $1,756,513.50 May 28, 2004 none May 28, 2004 The above changes are recommended: Owner's Representative Project Engineer The above changes are accepted: ./l/ ~:"..y ~J.,:- A/ e (J /liST A w v'TOtIf'S .I N C- Contractor By: Title: Date: 1iI,a ~ /~ - l - ().3