Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC03-267 FAAe-o3 -~~ "7- I a
r
,`I .
`~ Department of Transportation
Federal Aviation Administration
CONTRACT AIltPORT TRAFFIC CONTROL
TOWER OPERATING AGREEMENT
THIS AGR~NT xs entered into this ~`~y of Septe~rober, X003 by the
Fed~~l Aviation Administration (hereinafter "Government'$) and Eag{e County,
Goloi~ado, a body corporate and politic, acting by and through its Do~rd of County
Commissioners (hereinafter "Airport Sponsor').
In consideration of the air traffic control (ATC) service being provided to the
Airport Sponsor by the Government at the Eagle County Regional Airport, Eagle County,
Colorado, the Airport Sponsor agrees to the following terms and conditions at no cost to
the Government:
1. Government has agreed to provide air traffic control service to the Airport
Sponsor under the terms of this Agreement. Airport Sponsor shall be responsible for
separately contracting for such additional hours as may be required by it.
2. The Airport Sponsor shall provide an airport traffic control tower (ATCT)
structure meeting all applicable state and local standards including, but not limited to,
applicable building, fire, safety, environmental, and security, codes and regulations. The
Airport Sponsor further agrees to maintain the ATCT structure in good and tenantable
condition throughout the term of the agreement.
3. The Airport Sponsor shall also provide and maintain on a continuing basis, all
utilities and services including heating, air conditioning, electrical, water, gas, sewer,
janitorial (to include washing tower cab windows and shades, interior and exterior, when
necessary), and security services necessary for the ongoing operation of ATC service.
4. The Airport Sponsor shall provide and maintain all ATC operational
equipment located or presently installed in the ATCT to include, ATC and safety
equipment, communications equipment, runway lighting equipment, weather reporting
equipment, navigational equipment and all wiring and control related to the equipment.
The equipment will be maintained in accordance with applicable FAA standards and
regulations.
5. The Airport Sponsor shall be responsible for the proper and continued
functioning of all equipment that the Government determines is necessary for ATC
operations, but that cannot be placed in operation or otherwise controlled from the ATCT
building. Examples include airport lighting, windsock, obstruction lights, rotating beacon,
VASI, etc.
• •
~~'~ 6. The Airport Sponsor agrees to enter into a Letter of Agreement (LOA) with
the contractor's local representative specifically for the purpose of providing an airport
point of contact and procedures to follow to ensure a timely response to requests
concerning equipment or building problems. In accordance with FAA Order 7210.3,
Section 3, other Letters of Agreement will be necessary for topics such as airport
emergency service, control of vehicular traffic on airport movement areas, operation of
airport lighting, and reporting airport conditions. The Airport Sponsor and the contractors
local representative assigned to the ATCT are encouraged to enter into letters of local
procedures, agreements or understandings. However the terms and conditions set forth.in
this agreement or the FCT contract cannot be waived or superseded by such local
agreements.
7. The Airport Sponsor agrees to hold the Government harmless and indemnify
the Government for damages the contractor inflicts. FAA will not be financially liable
for the actions of the contractor regardless of the dollar amount.
8. The Airport Sponsor agrees that notwithstanding any other provisions of this
operating agreement, the Government's ability to provide contract ATC service is
contingent upon the appropriation of adequate funds from year to year that enable the
Government to provide contract ATC services to the public. If adequate annual
appropriations are not provided, this operating agreement maybe terminated without
penalty to the Government.
9. The Airport Sponsor is aware of current FAA procedure to recalculate
benefit/cost ratios annually to determine the percentage of funds for which the FAA and
the airport are responsible. FAA provides full funding for sites with abenefit/cost ratio
of 1.0, or greater.
10. The sponsor is aware that funding from the FAA Contract Tower Program is
provided for contract ATC services only.
11. The services under this agreement shall commence on October 1, 2003 and
shall continue until such time as this Agreement is terminated. This agreement maybe
terminated by either party upon ninety (90) days notice to the other party.
'r
The undersigned agree to the terms and conditions of this agreement
AIRPORT SPONSOR FEDERAL AVIATION ADMINISTRATION
COUNTY OF EAGLE, STATE OF COLORADO
By and Through its Board of County Commissioners
y~~~ ~ ~/lL4S ss9~K+/rt~ ~.~/7A~f° ef°~a~ ~iPl/r~s~
(Type Name & Title)
(Signature)
~~ o~
(Date)
N:WT0140\TOWER\CANDIDA'1~OPAGREE2.DOC