HomeMy WebLinkAboutC03-224 Colorado Aeronautical Boardv
C ~3 - ~Z ~ - ~~~Z
COLORADIJ DEPARTMENT OF TRANSPORTATION
COLO,RADp AERONAUTICi4L BOARD
2004
COLORADO DISCRETIONARY AVIATION GRANT
PROGRAM APPLICATION
Applicant Agency
Ci , Coun , Authori ,Other County of Eagle, State of Colorado
Pro act Location Eagle County Airport
Melling Address P.O. Box 850, Eagle, CO 81631
Telephone
Email eca
970.524.
ounty.com
Fax Number 970.524.8247
to: November 2004 ~.ctF
Facilities Director
Title
n _ ~ ~
Return Original Application ~°
COLORADO DEPART ENT OF TRANSPORTATION
Aeronautics Division
5126 Front Range Parkway Telephone:
Watkins, CO 80137 Fax:
Project Summary:
See attached
~i~~9"-~
Date
303-261-4418
303-261-9608
°~` c°~c
~ ~ ~
* ~
~ot~oo
,~ ~ ~~
Project Funding Summary:
CDAG $
Total >
Local $
Other 19 ,
Page 1 of 4
•
~ ,
f~
Project Summary and Grant Rrc~posai
Pr%ct Costs by Activity:
Lcl Match Maint. Infrastructure Equi ment Safety
Nav Aids Planning Econ. Devel. Land acquis. Fuel
Identify the existing problem:
See attached
How is the problem to be addressed:
See attached
Define the proposed project in detail:
Define work parameters by including a detailed map of the proposed project site.
See attached
If state grant funds are not available, how will the project be financed:
See attached
Attach additional pages if necessary
Page 2 of 4
f . • • •
PART A
2. Local In-kind $
3. Local Cash $
4. Federal Funds $ s29,6o0
5. Other Funds
(identi source $ 1,190 000
6. Total Other Funds Items 2,3,4,5 $2,019,600
7. Project Fundin Summa (items 1+6 $ 2,229,600
PART B
Budget Summary Define individual elements of each budget item.
TOTAL $ Grant
Share % $Other
Sources
Ca ital E ui ment 190,000 190,000 9.5
Maintenance Services
Facilities Im rovements 2,039,600 210,000 100 1,829,600 90.5
Project Grand Total 2 , 229 , 600 210 , 000 9.4 2 , 019 , 600 90.6
Page 3 of 4
•
Fin~ncia~ Infolrrn~ation #or ,~pplican# ~~enGy
Assessed Valuation
s onsorin a enc $1,968,609,490
Ai ort Lon Term Debt $ None
Annual Bud et for S onsorin A enc $72,017,47s
Annual Budget for Applicant
Ai ort if a licable $10 ; 794 , 935
Location of project #iscal records
Name Rich Cunningham Phone970.328.8881
Address P•0. Box 850 Fax 970.328.8899
City Eagle St CO Zlp 81631
On-site protect director
Name Rich Cunningham Phone 970.328.8881
Address P•0. Box 850 Fax 970.328.8899
City Eagle gt CO Zlp 81631
email rich. cunningham@eaglecounty.us
Page 4 of 4
.~
Page 1 of 4
Project Summary:
Eagle County proposed to construct a permanent air traffic control tower which meets or
exceeds FAA criteria. This tower will replace the Airport's temporary tower. This
temporary tower has been in use since 1993 and is no longer functional as its small size
and lack of facilities now compromises the effectiveness and efficiency of airport
operations.
Page 2 of 4
Identify the existing problem:
In 1993, increases in commercial and general aviation aircraft compelled the FAA and
Eagle County to control air traffic through the implementation of air traffic control
services. In 1995, continued growth necessitated expansion of air traffic services into a
twelve month seven day per week program. In 1996, Eagle County was awarded a
CDOT Discretionary Grant of $95,000 to raise and relocate the temporary facility. Since
1996, air traffic has increased by 199.1% and the temporary facility is no longer
functional. Its small size and lack of facilities now compromises the effectiveness and
efficiency of airport operations.
How is the problem to be addressed:
A permanent facility that meets or exceeds the criteria for control towers set forth by the
FAA is the solution to air traffic control. Eagle County is committed to the construction
of a permanent air traffic control facility. Eagle County will construct this tower through
funding from CO SIB, AIR Cost Sharing Program, FAA A1P, and local funding. The
tower will meet the requirements of FAA Order 6480.7c, OSHA standards, and be
designed for future installation of radar. The Tower will be required to have a life
expectancy of no less than twenty years.
Define the proposed project in detail:
Define work parameters by including a detailed map of the proposed project site.
See Attachment A for detailed schedule of estimated costs.
If state grant funds are not available, how will the project be financed:
If state grant funds are not available, this project will not proceed. Grant funding is a key
component in funding this project.
EXHIBIT A
- Eagle County Airport
` ~ Colorado Discretionary Aviation Grant Program
Constructlon of an Air Traffic Control Tower
Site 3
7 Floors (596sn, Cab (958 s~ + CtTtwallc f60S sfl 5.735 S F.
Deacdpdon mt o
a Qry to F.at®ato Cost
Sam omata6ao 17s CY 5985.m 567 Tsm
4om Pasaat a~-s 0019 SF 5117s 561,697.23
4om emmn m9a5 x,760 sF 51273 53s,t9aoo
40m &tmimFivfah 4,899 SF SS.m bR4,187.00
3000 L7nttFlomSlSb 11 CY $304m 53,420.m
90m MOOrDat68:T 3,172 SF 53.13 817367.80
900D mbACa0m~0oma 40 CY 5955.m S383mm
30m 9mE8 6 PLR SB,230.m 549$04m
300D 1TmdReaa ,relwoan, 0,640 LP 57.7s 520,06000
5000 CabF~faB&Ba9m)mFWa1m 835 8P 511400 5103,38000
7000 Ftaol'(ImWetTmyMO~h, 407M &Omffip) 1 19 848,750.m 548,754m
70m Z,T6D SF 57.13 820,010.00
80m Dome, HOdwme, VVindnwe, C9b 6:Fmmo S,OW 8P SZ9.m fI17,497.00
90m SOa1F FRP &; AI:T 3019 SF 36.50 532,623,70
Hm0 S:Hme(2vd Cah 362 9Y 830.OU SIae60.m
gam 700&Bam 480 SR 527.73 899,920.00
8000 a00m,mBQ8, 60m6.n~& 3,019 9F S3A0 S1JA97.00
14000 PJavamf 6• Hyd®Ik 1 T9 SBS,600.m SasA0a00
t8 f4m
L9 Sam
L9 Sam
IS Sam
LS 50.m
13000 FtrOB CIa551 3019 SF 59.23 821,930.75
13000 SAI9 SF 912.!3 561 08275
ISOm l1VAC 9,018 9P SI830 892,65130
160m ~~ 3A19 8P 523,30 5117,84630
Add0i~10amlCma01atlm6aal mmmdldn 1 SIOOA00.m 910D,OOa00
mLOwmk iOeeb 1 535,000.m SSSA00.00
a /810mni~h 8791® 1 SISA00.m 913amm
~alO~Bm® 1 SIOA04m SIOA00.m
~900rIa605 1 SE,Omm 8200Q00
56iaa0aoemo 10°A) 1 SA 8106,809.0! 5!06,809.01
Deseriptlon o
~ F.stimatc
Iim1l Vlmt
Q~mmCl9ub IAm CY 811.m 811,OO0.m
t L9 52.SOD.00 52300.00
Fradm CwOW 750 LF SI30 52624.m
Flatrlml3avhn
B°G900W9ta57at0 1
Im l3A
I.P S/S,OOam
S4S.m 577,004m
5430400
FireH
8'SCamrMeb 1
100 PA
U+ ~,730.m
SSim 7 m
S530Q00
COCmmdaa0s4-4°CmduO&FUS Bm
Cmen4n 250
640 LF
SF E2aoD
S12m 59,00000
57,66400
Si6aava0a
t1a50Coar9a-10'(Oaa9 1,2~
tai SF
CY 84.75
815.m S5,9SS.m
59975.00
Paolvgta• -t90754~1
A9L I.tm9Bam7ta0aeat-6• uo
0 rmn
8Y S19.m 84,29gm
3am
5
a5 to
1 ~
is a9om
SIAOO.m s9m.m
sLmam
& oa
Fmee Qret0 L10k) a
3m sF
IF s6.ls
S19.m am
E11,70am
liamt24' Clam&Aem9tm 1 L9 526,000OQ S26,Omm
0020 1 SS,OQ0.m 55,0m.m
et atlud9ec0 t semom umam
~ 9m® ~.m 5am
Sam Eam
etal9tal ,dm / 6ev. esmeea 1 s39,aooaa 2vaooo.m
ga49motce ae
Mircall®mm IGYO)
-.. 1
1
L9 u,00D.00
814,093.30 59,amm
$!0,09550
.. ,..
t 0
Des tloD U Cost
(koi~l 1 EA 87300.m 54304m
Did gad Eogme99iag (WSP6tA 1 FA 5!50611.18 5130311.18
SoviemDUring COnaoue6ml(WEP6ut 1 EA 849,377.83 549,377.83
SWEv9laadm md5pa60w5 ~ (W 1 EA E10,OO0.m 810,OOam
CroLLDmIDI&50%P9ofeAS 9advad,to 3aday9 1 BA 5180,80am StB0,8mm
e0aweoee fmrdm6®him 1 80.00 54m
1041 lamdng Oe 1 520,Oaam S20,OO0.m
6006108 1 855333.m 557375.m
0910 e0dsama dcadopmmt Cab 1 360,OO0.m 360,000.m
B~6ROmaWan ~ 1 SS,004m SSAm,m
B 1 51,000.m 81,000.m
e~'eY905 1 52,a00.m 82,OOam
eh9dow9m6981mvi911&F+allml^~Y 6a1P
__,... 1 s171A1a4a s171 oza44
,
... x~ ~
~_
?,T~ ~•vn' ~nYO RtiC _ €ati€3k Y~ ..i1. T1V ~ r ~"+..Y-_'4.fi/ ai~`5"b~IL t1.". ~ -, ~`iY r. ...
NOTE: Cost estimate infoTmaHOn presented in this exhibit is for comparison ody and is subject to change after the Design
Note: Anticipated cost now
below original estimate.