Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC03-114 Envirotech Services
AGREEMENT FOR CONSTRUCTION
CGp~~ll ~~t~`?
The Construction And Installation Of A Prefabricated Dome Structure
At The Eagle County Maintenance Service Center
THIS AGREEMENT is dated as of the day of n the year 2003 by and between
Board of County Commissioners
Eagle County, Colorado
(hereinafter called OWNER)
and
ENVIROTECH Services, Inc.
,(hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants set forth, agree as
follows:
ARTICLE 1 -WORK
CONTRACTOR shall provide all labor and materials to construct a 72 foot wide by 126 feet
long prefabricated arched truss structure by "COVER-ALL Building Systems" Model # 420
IAS and complete all work as set forth in article 8 and which are incorporated herein by
reference. The Work is generally described as providing all labor, material and services
to (1) deliver and install the new dome-like structure as shown and presented in the
COVER-ALL owner manuals provided (2) Contractor shall review the foundation plans
prepared by "KRM Consultants, Inc." for compliance, proper dimensions and anchor
locations prior to fabrication of the dome structure.
ARTICLE 2 -OWNER'S REPRESENTATIVE
The Project is underthe authority of the Eagle County Facilities Management Department,
the Director of which, or his designee, shall be Owner's liaison with Contractorwith respect
to the performance of the Work.
Agreement Page 1
F:\R&B maintain center\DomeContr.wpd
ARTICLE 3 -CONTRACT TIME
3.1 The work will be substantially completed on or before May / 20 / 2003, and
completed and ready for final payment in accordance with paragraph 14.13 of the
General Conditions on or before June / 03 /2003.
ARTICLE 4 -CONTRACT PRICE
4.1 The funds appropriated for this project are equal to or in excess of the contract
amount. Owner shall pay Contractor for performance of the Work in accordance
with the Contract Documents in current funds as follows:
Eagle County shall pay a total not to exceed: Eighty Nine Thousand Ninety four
($ 89,094.00) Dollars.
4.2 Pursuant to the provisions §24-91-103.6, C.R.S., and notwithstanding anything to
the contrary contained elsewhere in the Contract Documents, no change order or
other form of order or directive by Owner, and no amendment to this Agreement,
requiring additional compensable work to be performed which work causes the
aggregate amount payable under the Agreement to exceed the amount
appropriated for the original Agreement, shall be of any force or effect unless
accompanied by a written assurance by Owner that lawful appropriations to cover
the costs of the additional work have been made or unless such work is covered
under aremedy-granting provision in the Agreement.
Notwithstanding anything to the contrary contained in this Agreement, no charges
shall be made to Owner nor shall any payment be made to Contractor for any
Work done after December 31, 3003 without the written approval of the Owner in
accordance with a budget adopted by the Board of County Commissioners in
accordance with the provisions of Article 25 of Title 30 of the Colorado Revised
Statues and the Local Government Budget Law (C.R.S. 29-1-101 et seq.).
ARTICLE 5 -LIQUIDATED DAMAGES
5.1 LIQUIDATED DAMAGES: Owner and Contractor recognize that time is of the
essence of this Agreement and that Owner will suffer financial loss if the Work is
not substantially complete within the time specified in paragraph 3.1 above, plus
any extensions thereof allowed in accordance with the General Conditions. They
also recognize the delays, expense, and difficulties involved in proving a legal or
arbitration proceeding the actual loss suffered by Owner if the Work is not
Agreement Page 2
F:~R&B maintain centerlDomeContr.wpd
substantially complete on time. Accordingly, instead of requiring such proof,
Owner and Contractor agree that as liquidated damages for delay (but not as a
penalty)ContractorshallpayOwnerThreeHundreddollars( 300.00)foreachday
that expires afterthe time specified in paragraph 3.1 for completion until the Work
is complete.
5.2 The completion dates as set forth in paragraph 3.1 above include a reasonable
time for the reviews and approvals required by this agreement. Should the
Contractor be unreasonably delayed by the failure of any person or entity to
provide review or approval within such reasonable time, Contractor shall be
entitled to an appropriate extension of time after a written request for such
extension has been submitted to and approved by. county's designated
representative in writing. No time extension will be granted unless a determination
is made by the Owner, in its sole discretion, that good cause exists for such
extension.
ARTICLE 6 -PAYMENT PROCEDURE
Contractor shall submit applications for payment in accordance with the general
Conditions. Applications for Payment will be processed as provided in the General
Conditions.
6.1 PROGRESS PAYMENTS: Owner shall make monthly progress payments on
account of the Contract Price on the basis of Contractor's Applications for
Payments, as provided below. All progress payments will be on the basis of the
progress of the Work.
6.1.1 Prior to Completion, progress payments will be in an amount equal to:
90% of the Work completed until fifty percent (50%) of the Work is
performed, after which no additional retainage shall be withheld, and
90% of materials and equipment not incorporated in the Work but delivered
and suitably stored,
less in each case the aggregate of payments previously made.
6.2 FINAL PAYMENT: Upon final completion and acceptance in accordance with the
General Conditions, Owner shall pay the remainder of the Contract Price. The
final payment shall not be made until after final settlement of this contract has
been duly advertised at least ten days prior to such final payment by publication
Agreement Page 3
F:\RB~B maintain center\DomeContr.wpd
• •
of notice thereof at least twice in a public newspaper of general circulation
published in Eagle County, and the Board of County Commissioners has held a
public hearing, thereupon and complied with the C.R.S. §38-26-107. Final
payment shall be made in accordance with the requirements of the aforesaid
statute.
ARTICLE 7 -CONTRACTOR'S REPRESENTATIONS
In order to induce Owner to enter into this Agreement, Contractor makes the
following representations:
7.1 Contractor has familiarized himself with the nature and extent of the Contract
Documents, Work, locality, and with all local conditions, and federal, state, and
local laws, ordinances, rules and regulations that in any manner may affect cost,
progress, or performance of the Work.
7.2 Contractor has made, or caused to be made, examinations, investigations, and
tests and studies of such reports and related data as he deems necessary for the
performance of the Work at the Contract Price, within the Contract Time, and in
accordance with other terms and conditions of the Contract Documents; and no
additional examinations, investigations, tests, reports, or similar data are, or will
be required by Contractor for such purposes.
7.3 Contractor has correlated the results of all such observations, examinations,
investigations, tests, reports, and data with the terms and conditions of the
Contract Documents.
7.4 Contractor has given Owner written notice of all conflicts, errors, or discrepancies
that he has discovered in the Contract Documents and the written resolution
thereof by Owner is acceptable to Contractor.
ARTICLE 8 -CONTRACT DOCUMENTS
The Contract Documents which comprise the entire Agreement are made a part
hereof, and consist of the following:
8.1 This Agreement.
8.2 The Working Drawings & Specifications (The foundation plan and foundation
details prepared by KRM Consultants, Inc. )
Agreement Page 4
F:~R&B maintain center~DomeContr.wpd
~ 1
8.3 Notice of Award, Notice to Proceed.
8.4 General Conditions.
8.5 Contractors bid proposal, dated: 03 / 20 / 2003 and Product Description, dated
04/11 /2003
8.6 Any modification, including Change Orders, duly delivered after execution of
Agreement.
There are no Contract Documents other than those listed above in this Article 7.
The Contract Documents may only be altered, amended, or repealed by an
executed, written amendment to this Agreement.
ARTICLE 9 -SCHEDULE & SECURITY
Contractor shall submit its proposed Work schedule(s) to Ownerfor prior approval.
All Workwill be scheduled and performed in a mannerwhich will produce minimum
interference with the daily business activities of the Eagle County Old Courthouse
Building and the departments affected. Unless otherwise agreed, Contractor shall
be allowed on site for performance of Work only during the agreed upon time.
Working hours for Eagle County Buildings begin at 8:00 a.m. through 5:00 p.m.
Monday through Friday.
Contractor is required to maintain building security. In the event Contractor is
given access to the building outside normal building working hours, Contractor
shall be responsible for securing the building from entrance by persons without
authority to enter including locking all doors and closing all windows when
Contractor leaves the site.
ARTICLE 10-INDEPENDENT CONTRACTOR
10.1 It is expressly acknowledged and understood by the parties hereto that nothing
contained in this Agreement shall result in, or be construed as establishing, and
employment relationship. Contractor shall be, and shall preform as, an
independent contractor. No agent, subcontractor, employee, or servant of
Contractor shall be, or shall be deemed to be, the employee, agent or servant of
Owner. The Contractor shall be solely and entirely responsible for its act and for
the acts of Contractor's agents, employees, servants and subcontractors during
the performance of this Agreement.
Agreement Page 5
F:~R&B maintain center~Domecontr.wpd
! 1
ARTICLE 11-CONTRACTOR'S LEVEL OF CARE
11.1 The Contractor shall be responsible for completeness and accuracy of the Work,
including all supporting data and other documents prepared or compiled in
performance of the Work, and shall correct, at its sole expense, all errors and
omissions therein. The fact that the Owner has accepted or approved the
Contractor's Work shall not relieve the contractor of any of its responsibilities. The
Contractor and its professional consultants shall perform the Work in a skillful,
professional and competent manner and in accordance with the standards of care,
skill and diligence applicable to other contractors performing this type of work.
ARTICLE 12 -MISCELLANEOUS
12.1 No assignment by a party hereto of any rights under, or interests in the Contract
Documents will be binding on another party hereto without the written consent of
the party sought to be bound; and specifically, but without limitation, moneys that
may become due and moneys that are due may not be assigned without such
consent (except to the extent that the effect of this restriction may be limited by
law), and unless specifically stated to the contrary in any written consent to an
assignment, no assignment will release or discharge the assignor from any duty
or responsibility under the Contract Documents.
12.2 Owner and Contractor each binds himself, his partners, successors, assigns and
legal representatives to the other party hereto, in respect to all covenants,
agreements, and obligations contained in the Contract Documents.
12.3 ATTORNEY'S FEES: In the event of litigation between the parties hereto
regarding the interpretation of this Agreement, or the obligations, duties or rights
of the parties hereunder, or if suit otherwise is brought to recover damages for
breach of this Agreement, or an action be brought for- injunction or specific
performance, then and in such events, the prevailing party shall recover all
reasonable costs incurred with regard to such litigation, including reasonable
attorney's fees.
12.4 APPLICABLE LAW: This Agreement shall be governed by the laws of the State
of Colorado. Jurisdiction and venue of any suit, right, or cause of action arising
under, or in connection with this Agreement shall be exclusive in Eagle County,
Colorado.
Agreement Page 6
F:~R&B maintain center~DomeContr.wpd
12.5 INTEGRATION: This Agreement, including those documents set forth in article
8, supersedes all previous communications, negotiations and/or contracts between
the respective parties hereto, either verbal or written, and the same not expressly
contained herein are hereby withdrawn and annulled. This is an integrated
agreement and there are no representations about any of the subject matter
hereof except as expressly set forth in the Contract Documents.
12.6 NOTICE: Notice shall be provided to the respective parties by being given to the
persons at the addresses as follows, until changed by notice:
12.7 The Contractor shall not discriminate against any employee or applicant for
employment to be employed in the performance of the Work on the basis of race,
color, religion, national origin, sex, ancestry, physical handicap, or age. The
contractor shall require all consultants to agree to the provisions of this paragraph.
To CONTRACTOR:
ENVIROTECH Services, Inc.
379 Cascade Drrive
Grand Junction, Colorado 81503
Phone: 970-243-2697
Fax: 970-257-0236
Cell: 970-260-7420
To OWNER:
Director Facilities Management
Dept. Eagle County
P.O. Box 850, 590 Broadway
Eagle, CO 81631
Phone: 970-328-8880;
Fax: 970-328-8899
Written notices shall be delivered personally, by commercial messenger service or
by prepaid U.S. mail. Notices also may be given by facsimile transmission provided
an original is also promptly delivered.
////////
[next page is signature page]
\\\\\\\\
Agreement Page 7
F:~RS~B maintain center~Domecontr.wpd
~ •
IN WITNESS WHEREOF, the parties hereto have executed this Agreement effective
on the date first above written.
ATTEST
By: 1 .
Clerk of the B rd of
County Commissioners
STATE OF COLORADO
"Owner":
COUNTY OF EAGLE, STATE OF
COLORADO, By and Through Its
~;OARD OF COrdlNTY COMMISSIONERS
"Contractor":
ENVIROTECH Services, Inc.
Pat Hendricksen
1
By:
~ ss:
County of s v )
On this ~ ay f 2003, came before me, a notary public,
nown to me to be the ~~~ ~ ~ ~ ~ ~ of
ENVI OTECH Services, Inc. who acknowledged to me that he executed the foregoing
document, that he executed it in that capacity, and that the same was the act of that
corporation.
Notary Public
Agreement
F:~R&B maintain centerlDomeContr.wpd
My commission expires: ~ ~~~ Expires 11/08/2005
GENERAL CONDITIONS
1. Contractor shall provide and pay for labor, materials, equipment, tools,
utilities, permits, licenses, transportation, and other facilities and services necessary for
proper execution and completion of the Work.
2. If Contractor fails to obtain the tax exemption(s) applicable to public works
projects from sales, consumer, use and similar taxes, Contractor shall pay the same.
Owner will cooperate with Contractor to obtain tax exemption for this project.
3. Contractor shall be responsible for having taken steps reasonably necessary
to ascertain the nature and location of the Work, and the general and local conditions
which can affect the Work or the cost thereof. Any failure by Contractor to do so will not
relieve him from responsibility for successfully performing the Work without additional
expense to the Owner. Owner assumes no responsibility for any understanding or
representations concerning conditions made by any of its officers, employees or agents
priorto the execution of this Agreement, unless such understanding or representations are
expressly stated in the Agreement.
4. Before commencing activities, Contractor shall: (1) take field measurements
and verify field conditions; (2) carefully compare this and other information known to
Contractorwith theAgreement; and (3) promptly reporterrors,inconsistenciesoromissions
discovered to Owner.
5. Contractor shall supervise and direct the Work, using Contractor's best skill
and attention. Contractor shall be solely responsible for and have control over construction
means, methods, techniques, sequences and procedures, and for coordinating all portions
of the Work.
6. Contractor, as soon as practicable, shall furnish in writing to the Owner the
names of subcontractors and suppliers for each portion of the Work.
7. No charge shall be made by Contractor for hindrances or delays from any
cause whatever during the progress of any portion of the Work, unless such hindrance or
delay is caused in whole or in part by acts or omissions within the control of Owner. In any
event, Owner may grant an extension of time for the completion of the Work, provided it
General Conditions Page 9
F:~RB~B maintain center~DomeContr.wpd
is satisfied that delays or hindrances were due to causes outside Contractor's control, e.g.,
weather, orto acts of omission or commission by the Owner, provided that such extensions
of time shall in no instance exceed the time actually lost to Contractor by reason of such
causes, and provided further that Contractor shall have given Owner immediate (as
determined by the circumstances, but not exceeding 48 hours) notice in writing of the
cause of the detention or delay.
8. Contractorshalldetiver, handle, store and install materials in accordance with
manufacturers' instructions.
9. Contractor warrants to Owner that: (1) materials and equipment furnished
under the Agreement will be new and of good quality; (2) the Work will be free from defects
not inherent in the quality required or permitted; and (3) the Work will conform to the
requirements of the Agreement.
10. Contractor shall comply with and give notices required by all federal, state
and local laws, statutes, ordinances, building codes, rules and regulations applicable to the
Work. If the Contractor performs Work knowing it to be contrary to laws, statutes,
ordinances, building codes, rules or regulations without notice to Owner, Contractor shall
assume full responsibility for such Work and shall bear the attributable costs. Contractor
shall promptly notify Owner in writing of any conflicts between the specifications for the
Work and such governmental laws, rules and regulations.
11. Contractor shall keep the premises and surrounding area free from
accumulation of debris and trash related to the Work.
12. Contractorshallfnrnish performance and payment bonds, each in an amount
at least equal to the contract price as security for the faithful performance and payment of
all Contractor's obligations under the contract documents. These bonds shall remain in
effect at least until two years after the date of final payment, except as otherwise provided
by law. Contractor shall also furnish other bonds as are required by the supplementary
conditions. All bonds shall be in forms satisfactory to Owner, and be executed by such
sureties as (a) are licensed to conduct business in the state where the project is located,
and (b) are named in the current list of "Companies Holding Certificates of Authority as
Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as
published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury
General Conditions Page 10
F:~R&B maintain center~DomeContr.wpd
Department. All bonds signed by an agent must be accompanied by a certified copy of the
authority to act.
If the surety on any bond furnished by Contractor is declared bankrupt, or becomes
insolvent, or its right to do business is terminated in any state where any part of the project
is located, or it ceases to meet the requirements of clauses (a) and (b) of the preceding
paragraph, Contractor shall within five days thereafter substitute another bond and surety,
both of which shall be acceptable to Owner.
13. Contractor shall be solely responsible for the protection of the Work until its
final. acceptance by Owner. Contractor shall have no claim against Owner because of any
damage or loss to the Work, and shall be responsible for the complete restoration of
damaged Work to its original condition. In the event Contractor's Work is damaged by
another party, not under his supervision or control, Contractor shall make his claim directly
with the party involved. If a conflict or disagreement develops between Contractor and
another party concerning the responsibility for damage or loss to Contractor's Work, such
conflict shall not be cause for delay in Contractor's restoration of the damaged Work.
14. Contractor's Insurance:
The Contractor shall purchase and maintain such insurance as will protect him from
claims set forth below which may arise out of or result from the Contractor's operations
under the contract, whether such operations be by himself, or by any subcontractor, or by
anyone directly or indirectly employed by any of them, or by anyone for whose acts any of
them may be liable. All such insurance shall remain in effect until final payment, and at all
times thereafter when Contractor may be correcting, removing, or replacing defective
Work. In addition, Contractor shall maintain such completed operations insurance for at
least two years after final payment, and furnish Owner with evidence of continuation of
such insurance at final payment and one year thereafter.
Insurance coverages shall be as follows:
Claims under Workmen's Compensation, disability benefits, and other similar
employee benefit acts, with coverage and in amounts as required by the laws of
the State of Colorado;
Claims for damage because of bodily injury, occupational sickness or disease, or
death of his employees, and claims insured by usual personal injury liability
coverage;
General Conditions Page 11
F:\R&B maintain center~Domecontr.wpd
~ ~
Claims for damage because of bodily injury, sickness or disease, or death of any
person other than his employees, and claims insured by usual personal injury
liability coverage; and
Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom.
Contractor's Liability Insurance issued to and covering the liability for damage
imposed by law upon the Contractor and each subcontractor with respect to all
Work performed by them under the agreement (construction contract).
Contractor's Protective Liability Insurance issued to and covering the liability for
damages imposed bylaw upon the Contractor and each subcontractorwith respect
to all Work under the agreement (construction contract) performed for the
Contractor by subcontractors.
Completed Operations Liability Insurance issued to and covering the liability for
damage imposed by law upon the Contractor and each subcontractor arising
between the date of final cessation of the Work, and the date of final acceptance
thereof out of that part of the Work performed by each.
Comprehensive Automobile Insurance shall be carried in the amount of
$500,000/$1,000,000 for bodily injury and $500,000 for property damage, each
occurrence. All liability and properly damage insurance required hereunder shall
be Comprehensive General and Automobile Bodily Injury and Property Damage
form of policy.
The Contractor shall in addition, and in the amounts required under the above,
obtain protective Liability Insurance issued to and covering the liabilityfordamages
imposed by law upon the Owner with respect to all operations under the
construction contract by the Contractor or his subcontractors, including omissions
and supervisory acts by the Owner.
Builder's Risk Insurance: Insofar as the Work to be performed underthis contract
consists entirely of new construction removed and separated from any existing
facility used by Owner, Contractor shall procure and maintain, for the duration of
the Work of this project, Builder's Risk Insurance, including the perils of fire,
extended coverage (loss due to vehicles, explosion, wind, flood, riot, etc.),
vandalism and malicious mischief, and special extended coverage (loss due to
falling objects, collapse, water damage from faulty or leaking systems, etc.) in the
full amount of the contract price plus the cost of authorized extras. Said amount
of insurance coverage shall be considered to coverthe insurable value of the Work
General Conditions ~ Page 12
F:~R&B maintain center\DomeContr.wpd
underthis contract which is considered not to exceed one hundred percent (100%)
of the amount of this contract and authorized extras. Such policy shall not insure
any tools or equipment, or temporary structures erected at the site and belonging
to any person or persons, or their subcontractors who are obliged by contract with
the Owner to do Work on the projects.
Comprehensive Risk Policy Option: In lieu of the several policies specified for Contractor's
Liability Insurance, a comprehensive liability and property damage insurance policy
inclusive of all the insurance and requirements herein set forth, subject to the approval of
the Owner, will be permissible.
Insurance covering claims for damages to persons or property required by the preceding
paragraph shall be in the following minimum amounts:
Bodily Injury Liability:
Each Person: $ 1,000,000
Each Accident or Occurrence: $ 2,000,000
Property Damage Liability:
Each Accident or Occurrence: $ 1,000,000
Aggregate: $ 2,000,000
Insurance shall be placed jointly in the names of the Owner, Contractor, and any and all
subcontractors, and any and all others obliged by contract with the Owner to do Work on
this project, and, at the Owner's option, any other person or persons whom the Owner
deems to have an insurable interest in said property, or any part thereof, payable as their
several interests may appear. Any proceeds obtained from insurance provided for by this
paragraph shall be paid to and held by the Owner as trustee. The Owner shall have the
right to withhold payment of such proceeds until such time as the Work destroyed or
damaged and covered by. such insurance shall be reconstructed and shall pay such
proceeds on an installment basis similar to that provided for by progress payments
covering the original Work.
Certificates of Insurance: Certificates of Insurance acceptable to the Owner shall be filed
with the Owner prior to commencement of the Work. These Certificates shall contain
provisions naming the Owner as an additional insured under Contractor's insurance, as
more fully required bythe General Conditions herein, and that coverage afforded underthe
policies will not be cancelled until at least thirty days priorwritten notice has been given the
Owner. Contractor and his subcontractors shall not permit any of his subcontractors to
start Work until all required insurance have been obtained and certificates with the proper
endorsements have been filed with the Owner. Failure of the Contractorto complywith the
foregoing insurance requirements shall in noway waive the Owner'S rights hereunder.
General Conditions gage ~~
F:U2&B maintain center~DomeContr.wpd
15. The Owner, at his option, may purchase and maintain such liability insurance
as will protect him against claims which may arise from operations under this contract.
Purchasing and maintaining such insurance, however, will not relieve the Contractor from
purchasing and maintaining the insurance hereinbefore specified.
16. Before permitting any of his subcontractors to perform any Work under this
contract, Contractor shall either (a) require each of his subcontractors to procure and
maintain during the life of his subcontracts, Subcontractor's Public Liability and Property
Damage Insurance of the types and in the amounts as may be applicable to his Work,
which type and amounts shall be subject to the approval of the Owner, or (b) insure the
activities of his subcontractors in his own policy.
17. To the fullest extent permitted by law, Contractor shall indemnify and hold
harmless Owner, its board, commissioners, employees and the agents of any of them, from
and against claims, damages, losses and expenses, including but not limited to attorneys'
fees, arising out of or resulting from performance or nonperformance of the Work, provided,
that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease
or death, or to injury to or destruction of tangible property (other than the Work itself)
including loss of use resulting therefrom, but only to the extent caused in whole or in part
by negligent acts or omissions of the Contractor, a subcontractor, anyone directly or
indirectly employed by them or anyone for whose acts they may be liable, regardless of
whether or not such claim, damage, loss or expense is caused in part by a party
indemnified hereunder.
18. After execution of the Agreement, changes in the Work may be accomplished
by Change Order or by order for a minor change in the Work. Owner, without invalidating
the Agreement, may order changes in the Work within the general scope of the Agreement
consisting of additions, deletions or other revisions.
a. No Change Orders or other form of order or directive which requires
additional compensable work to be performed may be issued or be effective unless
accompanied by a written assurance to the Contractor that lawful appropriations
to cover the costs of the additional work have been made.
b. A Change Order shall be a written order to the Contractor signed by Owner
to change the Work.
General Conditions Page 14
F:~R&B maintain cente~Domecontr.wpd
•
c. Owner will have authority to order minor changes in the Work not involving
changes in the Contract Price or the Contract Time. Such changes shall be written
orders and shall be binding on the Contractor and Owner. Contractor shall carry
out such written orders promptly.
19. Progress Payments:
Not more often than once a month, or upon completion if the Work is performed
in under a month, Contractor shall submit to Owner an application for payment filled out
and signed by Contractor covering the work completed as of the date of the application,
and accompanied by such supporting documentation as Owner may reasonably require.
If payment is requested on the basis of materials and equipment not incorporated in the
work, but delivered and suitably stored at the site or at another location agreed to in
writing, the application for payment shall also be accompanied by such data, satisfactory
to Owner, as will establish Owner's title to the material and equipment, and protect Owner's
interest therein, including applicable insurance. Each subsequent application for payment
shall include an affidavit of Contractor stating that all previous progress payments received
on account of the work have been applied to discharge in full all of Contractor's obligations
reflected in prior applications for payment. The amount of retainage with respect to
progress payments will be as stipulated in the Agreement.
Owner will, within ten days after receipt of each application for payment, either
indicate in writing a recommendation of payment, or return the application to Contractor
indicating in writing its reasons for refusing to recommend payment. In the latter case,
Contractor may make the necessary corrections and resubmit the application. Owner
shall, within twenty days of recommendation of payment, pay Contractor the amount
recommended, except that final payment will be made pursuant to sections 20 and 22
hereunder.
The Contractorshall maintain comprehensive, complete and accurate records and
accounts of its performance relating to this Agreement for a period of three (3) years
following final payment hereunder, which period shall be extended at Owner's reasonable
requests. Owner shall have the right within such period to inspect such books, records and
documents upon demand, with reasonable notice and at a reasonable time.
20. Final Payment:
Upon written notice from Contractor that the work is complete, Owner will make a
final inspection with Contractor, and will notify Contractor in writing of all particulars in
General Conditions Page 15
F:~R&B maintain center~Domecontr.wpd
•
which this inspection reveals that the work is incomplete or defective. Contractor shall
immediately take such measures as are necessary to remedy such deficiencies.
After Contractor has completed all such corrections to the satisfaction of Owner,
and delivered all maintenance and operating instructions, schedules, guarantees, bonds,
certificates of inspection, marked-up record documents or as-built drawings covering all of
the Work, Contractor may make application for final payment following the procedure for
progress payments. The final application for payment shall be accompanied by all
documentation called for in the contract documents, and such other data and schedules
as Owner may reasonably require, together with complete and legally effective releases
or waivers (satisfactory to Owner) of all liens arising out of, or filed in connection with the
work. In lieu thereof, and as approved by Owner, Contractor may furnish receipts or
releases in full; an affidavit of Contractor that the releases and receipts include all labor,
services, material, and equipment for which lien could be filed, and that all payrolls,
material, and equipment bills, and other indebtedness connected with the work, for which
Owner or his property might in any way be responsible, have been paid or otherwise
satisfied; and consent of the surety, if any, to final payment. If any subcontractor,
manufacturer, fabricator, supplier, or distributor fails to furnish a release or receipt in full,
Contractor may furnish a bond or other collateral satisfactory to Owner to indemnify Owner
against any lien.
21. Contractor warrants and guarantees that title to all work, materials, and
equipment covered by any application for payment, whether incorporated in the projector
not, will pass to Owner at the time of payment free and clear of all liens, claims, security
interests, and encumbrances (in these General Conditions referred to as "Liens").
22. Final payment shall not become due until Contractor submits to Owner
releases and waivers of liens, and data establishing payment or satisfaction of obligations,
such as receipts, claims, security interests or encumbrances arising out of the Work. Final
payment is subject to the Final Settlement requirements and time periods set forth in
C.R.S. §38-26-107.
23. Contractor's obligation to perform and complete the Work in accordance with
the contract documents shall be absolute. Neither the recommendation of any progress
or final payment nor the payment by Owner to Contractor under the contract documents,
nor any use or occupancy of the Work or any part thereof by Owner, nor any act of
acceptance by Owner, nor any failure to do so, nor any correction of defective Work by
Owner shall constitute an acceptance of Work not in accordance with the contract
documents or a release of Contractor's obligation to perform the Work in accordance with
the contract documents.
General Conditions Page 16
F:~R86 maintain center~Domecontr.wpd
• i
24. If Contractor fails to correct Work which is not in accordance with the
Agreement, the Owner may direct the Contractor to stop the Work until the correction is
made.
25. If Contractor defaults or neglects to cant' out the Work in accordance with the
Agreement and fails within a seven day period after receipt of written notice from the
Owner to correct such default or neglect with diligence and promptness, the Owner may,
without prejudice to other remedies, correct such deficiencies. In such case, the
Agreement may be terminated by Owner or a Change Order shall be issued deducting the
cost of correction from payments due the Contractor.
26. The Contractorshall be responsibleforinitiating,maintaining and supervising
all safety precautions and programs, including all those required by law in connection with
performance of the Agreement. The Contractor shall promptly remedy damage and loss
to property caused in whole or in part by the Contractor, or by anyone for whose acts the
Contractor may be liable.
27. Contractor shall promptly correct Work rejected by Owner as failing to
conform to the requirements of the Agreement and Contractor shall bear the cost of
correcting such rejected Work.
28. Contractor warrants and guarantees to Owner that all Work will be in
accordance with the Contract Documents and will not be defective. Prompt notice of all
defects shall be given to Contractor. If, within one year after the date of completion, or
such longer period of time as may be set forth in the Agreement (including the. Bid),
prescribed bylaw, prescribed by the terms of any applicable warranty given by a materials
supplier or required by or a part of the Agreement, any Work is found to be defective,
Contractor shall promptly, without cost to Owner, and in accordance with Owner's written
instructions, either correct such defective Work, or, if it has been rejected by Owner,
remove it from the site, and replace it with non-defective work. If Contractor does not
promptly comply with the terms of such instructions, or in an emergencywhere delaywould
cause serious risk of loss or damage, Owner may have the defective Work corrected orthe
rejected Work removed and replaced, and all direct and indirect costs of such removal and
replacement, including compensation for additional professional services, shall be paid by
Contractor.
29. CONTRACTOR shall promptly notify OWNER in writing of any latent physical
conditions at the site or in an existing structure differing materially from those indicated or
referred to in the contract documents.
30. The performance of the Work may be terminated at any time in whole, orfrom
time to time in part, by Owner for its convenience. Any such termination shall be effected
General Conditions Page 17
F:~R&B maintain center~DomeContr.wpd
~ ~
by delivery to Contractor of a written notice ("Notice of Termination")specifying the extent
to which performance of the Work is terminated and the date upon which termination
becomes effective. After receipt of a Notice of Termination, and except as otherwise
directed by Owner, Contractor shall, in good faith, and to the best of its ability, do all things
necessary, in the light of such notice and of such requests in implementation thereof as
Owner may make, to assure the efficient, proper closeout ofthe terminated Work (including
the protection of Owner's property). Among other things, Contractor shall, except as
otherwise directed or approved by Owner:
a. stop the Work on the date and to the extent specified in the Notice of
Termination;
b. place no further orders or subcontracts for services, equipment or materials
except as may be necessary for completion of such portion of the Work as is not
terminated;
c. terminate all orders and subcontracts to the extent that they relate to the
performance of Work terminated by the Notice of Termination;
d. assign to Owner, in the manner and to the extent directed by it, all of the
right, title and interest of Contractor under the orders or subcontracts so
terminated, in which case Owner shall have the right to settle or pay any or all
claims arising out of the termination of such orders and subcontracts;
e. with the approval of Owner, settle all outstanding liabilities and all claims
arising out of such termination or orders and subcontracts; and
f. deliver to Owner, when and as directed by Owner, all documents and all
property which, if the Work had been completed, Contractor would be required to
account for or deliver to Owner, and transfer title to such property to Owner to the
extent not already transferred.
In the event of such termination, there shall be an equitable reduction of the Contract Price
to reflect the reduction in the Work and no cost.
General Conditions Page 18
F:~R~B maintain center~Domecontr.wpd
SPECIFICATIONS
DRAWINGS
General Conditions Page 19
F:~Ft&B maintain centerlDomeContrwpd
•
q ENU/HOTECH
March 20, 2003
Michael Cirkovic
Eagle Cauaty Facilities Managemmu
PO l;ox 850
Eagle Co. 81631
1)e~r Michael:
Sabj+act: ~elpt and Aacep~aace of Cover A8 Butlding Peking for Eagle County Fsellltles.
Price far 72' wide x lZ6' long Made14Z0 IA,S Asch buiWDag is S 89,094.00
This pricy inohules:
• The building and ail caaoa~a+aats.
• One ead ofnclosod.
• Freight, Labaa~ amd Ecluippaeoot to erect an yca~ supplied stem wall
• Your choice of color: Whig Sandstone or Gran. With enough il~brle to extend one fbot dawn
outside of stem wail.
if permit officials require Sre retardant isbric the prise would be S A1,9~M.~
Thank you for choosing Cover-All Building Systeaos. Please call me with questions and or cane~rns.
~CE11'T APTD ACCEPTANCE
The above offea is hereby aarepted and the undersagned her+~y agrees to the abovo-meationed twins and
t~uditione.
_ ~ ~~03
Poi Hemrielcsea ante
We~ern Colorado Sales
Er-vimTech Sarvioaa
tx: Ron Reea
Michael Cirkovic ante
Facffities Maaagenaant Deparaoo~ent
Eagle Counry
1
~i ,
G
~~
Grand Junction, C4 81503
{97Q} 243-21s97
Michael Cirkovic
Eagle Camry lecilitiea Management
Pd t3ox 850
Eagle Co. 81631
Alrn'1 t 1,2003
pfio~ve.°I. Ofm9G(~.tt3T'tdl,1
Sub~act: Camposeat®af TAS 72' CvverAD B~dtdisg for Eagle Couiatq d d~ iBridgR
Steel
Cower=Al1 bwlldinga are ooaed using olu d[c111~va ~pel'Steel, which is 1Q'/o sROn$er rhea,
competitive steel tubing of equal gauges CLrd wish triple osatad G~orshteld cearasion barrier, V~perSteel
has a service Life [bran times longer rhea oamventiatal galvanized steel tubing
The TAS 72 foot building is lirbricssted of welded truss arches with parallel 2.873 diameter tubes spaced
24" apart end strengthed by e~tinuous 1" strucan~al webbing. Main struc~usl support beams are
continuous from the groamd seal to the peak and t-aa~ta~twced so that ;ao atve exists. Tdare rate ao antterior
purlins spnd the strut~ure is eorlttpletsty class span with no intarim~ supports.
Dover
Covers are Eabr~icated of DwrriYeave 11 and tnsYalledwith aOtte-piece ~ manner and tensioned
both vertiealiy and horizontally to prevent wear and abrasion. Horizamtal stretch- warp directiaat-
(~~~,~ p~strdgs of 40 prnmds per linear i6oi) is maintained machmtie~lly with horizontal purlins and
ambling titer requires minimal ongoing maintenance. Vertical stretch dtl directim- (minimum pre-stress of
40 pounds per linear foot) is maintained mechanically with the iii rrchlae wing system that roquir~
minimal ongoing maimenaace. pymfYeave » onvera are assembled and tensioned in a uaana-er rbat
eliminates wrinkles in hot and cold tempeaatures. Cover seams are welded, maintainfng a minimum of 178
pounds per linear inch. Covey paneLt are ootttiuuous ftrodn the ground seal or wall connexion to the peak
end manufecxtved so that no save exists.
'llte ,~pWP.~+e lI 1e,4 are Consa'u~ed of two parts the SCrt~ and the voatUQg, DuraWeave bias
tremeandQUS rip, tear and punchue stresagth, wLu~e remaining pliable and resistant tv ultraviolet damage.
The weave tx-rlsi8ts of a 16 x 16 woven scrim using 16W denier tapes. Tatai thiclmeffi of cover is 23 mils.
The specialized exterior coating provides supeiwr ultraviolet prvtedion, wate~roo0ng and is scuff
resistant it is 4.0 mils thick on each side.
The lhrra~eave 11 tahric is a polyethylene falgic, no tmoic di~ic~ls care used im dxe pr+aducti~ and the
material is 100 % recyclable. DtonWeave ! 1 covers ere backed by a 15 year pro rata warranty.
%z
~ •
s ar
~~ ~~.
379 Cascades Drive
Grand .lunctlan, CO 81 X03
(470} 243-2b97
WincleLoe Fastanlsg Sy~e~w
wincb~I.oc fining System !~ designed to provide e~-mss ~Sm dY ~Pl~'s a
series of 10,000 lb. lashing winches and ~ro-strdr,6 belting, oKar novels smy tight and se+ctue, Eor a lon,0or
life and a cleanea look. You will have aQe winch a< dte base of each trues (trusses tape eveary 7'}, which will
be attachedlwinched to s pocket pipe rucnsing die length of the bu{ldhlg.
Iaapllst~
Your Cover-All building will'he d~ivered In a e~amplete ready-to-in~all padcsge and can ba 5il(Y
oaa~ucted in two weeks once die fo~mdatian u ready EnviroTecb's wcperienaed local instsllation crew
will install your Cover All banding ~o y~'A ~r d~aat Camty's complete sadisfacdion will bs Dear
cyst concern.
Plea9e dxl fray to cs11 me at any time with you gnestia~ ar uaaeerna
~~
S2aI'v4
Pat HmricksesR
w~ Colotad~ Sales
lnvi~dTech Senriees
cc: li~c pees
2~Z
(S~"