HomeMy WebLinkAboutC01-317 contract change order with B&B - Airportr } �A CONTRACT CHANGE ORDER NO. or SUPPLEMENTAL AGREEMENT NO. One (1) AIRPORT Eagle County Regional Airport :. ''' DATE 12/04/01 LOCATION Eagle, Colorado AIP PROJECT NO. CONTRACTOR B & B Excavating, Inc. C- 01— a.51'/ IF/ Page 1 of 2 pages 3 -08- 0020 -29 You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the engineer: Item No. Description Unit Unit Price Quanti ty Amount 1 Drivelane Widening L.S. $27,500.00 1 + $27,500.00 This Supplemental Agreement Total +) $27,500.00 Previous Change Order (s) Total ( -) $327,097.54 Original Contract Cost $1, 815, 286.19 Revised Contract Total (Federal) $1,515,688.65 Revised Contract Total (Non- Federal) $97,771.00 The time provided for completion in the contract is (unchanged) by 0 calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply. Changes are shown on issued for construction drawings. Recommended by: W Approved by: _ Fa Accepted by: Approved by: B &B Excavating, Inc. Federal Aviation Administration ���.. / Z 104YI01 K4A�,� Date ":moo D to ate Date NOTE: Change Orders and Supplemental Agreements require FAA approval prior to construction. Otherwise, no Federal participation can be granted. State Aeronautics concurrence is required when state participation is anticipated. : w Page 2 of 2 pages a AIP PROJECT NO. 3 -08- 0020 -29 SUPP. AGREE. NO. One (1) AIRPORT Eagle County Regional Airport LOCATION Eagle, CO JUSTIFICATION FOR CHANGE 1. Brief description of the proposed contract change(s) and location(s). Supplemental Agreement No. 1 includes the widening of a uni- directional drivelane on the south edge of the terminal parlang lots to a bi- directional lane (24 feet wide), including the removal of exi9ting curb and gutter, landscape, and asphalt, and the reconstruction with PCC curb and gutter, aggregate base, and PCC drivelanes. The use of PCC was necessitated by the closing of B & B's asphalt operations due to time -of- year weather restrictions. 2. Reasons for the changes This construction was necessitated by new security measures adopted by the FAA which limit parlang within prescribed distances to the terminal. 3. Justifications for unit prices or total cost. The total cost was presented in a lump sum bid due to B & B's substantial completion of the project and demobilization, and the necessity to remobilize to complete this construction. 4. The sponsor's share of this cost is available from: Local Funds 5. If this is a supplemental agreement involving more than $2,000, is the cost estimate based on the latest wage rate decision? Yes ® No ❑ Not Applicable ❑. 6. Has consent of surety been obtained? Yes ® Not Necessary ❑. 7. Will this change affect the insurance coverage? Yes ® No ❑. 8. If yes, will the policies be extended? Yes ® No ❑. 9. Has this ( ) (Supplemental Agreement) been discussed with FAA officials? Yes ® No ❑ When December 3, 2001 between Eddie F. Storer (EGE), and the FAA Comment Submit 4 copies to the FAA