HomeMy WebLinkAboutC01-260 supplememental agreement with B&B - AirportGut -ZC� Page 1 of 2 pages d CONTRACT CHANGE ORDER NO. Three (3) Non - Federal or SUPPLEMENTAL AGREEMENT NO. AIRPORT Eagle County Regional Airport DATE 9/25101 LOCATION Eagle, Colorado AIP PROJECT NO. 3 -08- 0020 -29 CONTRACTOR B & B Excavating, Inc. You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the engineer: Item No. Description Unit Unit Price Quantity Amount 1 Additional Parking Lot Lighting L.S. $97,771.00 1 + $97,771.00 This Change Order Total on- Federal + $97,771.00 Previous Change Order(s) Total - $633,859.09 Original Contract Total $1,815,286.19 Revised Contract Total (Federal) $1,181,427.10 Revised Contract Total on- Federal $97,771.00 The time provided for completion in the contract is (unehanged) (decreased) (increased) by working days. This document shall become an amendment to the contract and all provisions of the contract will apply. Recommended by: Wa astWirtnre Services, Inc. Dat Accepted by: 7,10 B & cav nc. a� °Gy Lo > D to Approved by: / S �O ) Eagle dounty Date The table on page 3 is included as back-up justification for the lump sum unit price. AIP PROJECT NO. 3 -08- 0020 -29 0 Page 2 of 2 pages CHANGE ORDER NO. Three (3) (Supplemental Agreement) AIRPORT Eagle County Regional Airport LOCATION Eagle, Colorado 1. Brief description of the proposed contract change(s) and location(s). Additional parking lot lighting will be added for the four gravel parking lots identified on the attached drawing. 2. Reason(s) for the change(s) (Continue on reverse if necessary) This work was requested by Eagle County Regional Airport as part of an expanded parking system associated with the terminal and access expansion projects. 3. Justifications for unit prices or total cost. Unit prices were derived from existing contract prices and negotiated unit prices that are deemed fair and equitable. The unit cost for the installation of the 1 -2" PVC DEB duct assumes the shared cost with the AVI contract. If AVI does not share the 1 -2" PVC DEB duct, than additional payment will be due B & B Excavating, Inc. 4. The sponsor's share of this cost is available from: Local Funds S. If this is a supplemental agreement involving more than $2,000, is the cost estimate based on the latest wage rate decision? Yes ® No ❑ Not Applicable ❑. 6. Has consent of surety been obtained? Yes ® Not Necessary Fl. 7. Will this change affect the insurance coverage? Yes ® No ❑. 8. If yes, will the policies be extended? Yes ® No F]. 9. Has this (Change Order) ( ) been discussed with FAA officials? Yes ❑ No ® When With Whom Comment Non - Federal Funds Submit 1 copy to the FAA for information only Iierallo., 'ti4a MOWN [n s 2sCCat 1 Mobilization 1 L.S. $1,056.17 $1,056.1 2 Bonding, Surveying, and Additional Costs (8 1/o) 1 L.S. $7,242.30 $7,242.30 3 Install 1/c #4 600V XHHHW 1,256 L.F. $1.58 $1,984.48 4 Install 1/c #6 600V 7ff3HW 1,161 L.F. $1.47 $1,706.6 5 Install 1 -2" PVC Duct (DEB) 2,600 L.F. $8.44 $21,944.00 6 Install Type D Junction Box 3 Ea. $1,335.61 $4,006.83 7 Install 1 -2" Bore 120 L.F. $17.90 $2,148.00 8 Install Junction Box (2'x 2') 3 Ea. $621.11 $1,863.33 9 Install Power Equipment Panel 2 Ea. $2,481.97 $4,963.9 10 Install 30' Pole with 1 Fixture, 400W, Type III 14 Ea. $3,632.52 $50,855.28 Total Change Order No. 3 (Non- Federal) $97,771.00